CN204728361U - The architectural construction of a kind of underground radiation proof rigid self-waterproof - Google Patents

The architectural construction of a kind of underground radiation proof rigid self-waterproof Download PDF

Info

Publication number
CN204728361U
CN204728361U CN201520351075.4U CN201520351075U CN204728361U CN 204728361 U CN204728361 U CN 204728361U CN 201520351075 U CN201520351075 U CN 201520351075U CN 204728361 U CN204728361 U CN 204728361U
Authority
CN
China
Prior art keywords
tunnel
cover
waterproof
profiled sheet
heavy wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520351075.4U
Other languages
Chinese (zh)
Inventor
孙礼军
陈星�
曾纯亮
李欣
廖雄
欧旻韬
谢雪珍
林启明
李伟红
刘艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Guangdong Province
Original Assignee
Architectural Design and Research Institute of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Guangdong Province filed Critical Architectural Design and Research Institute of Guangdong Province
Priority to CN201520351075.4U priority Critical patent/CN204728361U/en
Application granted granted Critical
Publication of CN204728361U publication Critical patent/CN204728361U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the architectural construction of a kind of underground radiation proof rigid self-waterproof, this self waterproofing architectural construction comprises heavy wall concrete tunnel, heavy wall concrete tunnel comprises top board, tunnel-side and substrate, heavy wall concrete tunnel periphery has additional bucker, bucker comprises top cover, side cover and the cover end, top cover is constructed by the profiled sheet of warpage and steel concrete and is formed, profiled sheet is laid on top board, profiled sheet has guiding gutter, between side cover and tunnel-side, there is spacing, between the cover end and substrate, be also provided with U-shaped steel plate.This self waterproofing architectural construction can carry out effective pressure release, collection and discharge to underground water, make heavy wall concrete tunnel can completely cut off underground water completely, to prevent the ground water seepage of radiation kernel equipment and the underground water nuclear pollution to the periphery soil body, safety and environmental protection, cheap, and the waterproof life-span of architectural construction is consistent with structural life-time.

Description

The architectural construction of a kind of underground radiation proof rigid self-waterproof
Technical field
The utility model relates to a kind of underground building structure, specifically refers to the architectural construction of a kind of underground radiation proof rigid self-waterproof.
Background technology
The immediate cause producing subterranean tunnel infiltration has three: 1. tunnel space enclosing structure exists penetrating passage; 2. the infiltration water source that hydraulic pressure is enough large is had; 3. infiltration water source communicates with penetrating passage.These three factors just produce infiltration when jointly existing, and therefore can think that there is direct relation in the infiltration of underground structure and crack.And the generation in crack is except the load stress of probability that accounts for 30% and differential settlement, mainly because concrete shrinkage, shrinkage and creeping causes, this with concrete physics, chemical property is relevant.
Existing waterproof technique mainly contains rigid waterproofing and flexible water two type.Rigid waterproofing mainly refers to the waterproofing course using rigidity water-proofing material, and this kind of rigid material mainly contains fibrous concrete waterproofing materials, prestressed concrete waterproofing materials, pea gravel concreten waterproofing materials etc.Flexible water is then the main body waterproofing materials using the material such as malthoid and pitch to manufacture.The advantage flexible of flexible waterproof layer, can adapt to certain distortion and breathing, not easy to crack.Shortcoming is that service life is short, and existing flexible water technology is only 10 ~ 20 years the longest service life.And relatively stricter to the requirement of basal plane, must construct on completely smooth, bright and clean, that water content is below 9% basal plane, otherwise just there will be the situation of layering, a drum, channeling water.
Traditional rigid waterproofing technology refers to cement, sand, stone as raw material, mix a small amount of Admixture or high molecular polymer, by adjustment match ratio, improve pore structure, increase the density at a raw material interface, or pass through compensate for shrinkage, improve the methods such as concrete impervious leakage prevention, make concrete structures reach the technology of waterproof.The feature of rigid waterproofing technology takes diverse ways according to different engineering structuress, and construction is simple, convenient, and cost is lower, for ease of maintenaince, and waterproof good endurance.So in conventional civil construction, rigid waterproofing accounts for sizable ratio.But the shortcoming of conventional rigid waterproof is also comparatively obvious, is in self highdensity reason and causes rigid waterproofing deadweight larger.And rigid waterproof layer is once occur dry green deformation, crack phenomenon, so waterproofing course also will be impaired.
Conventional rigid waterproof type has the following two kinds:
(1) rigidity water-proofing material is utilized to carry out waterproof
The main base material of rigid waterproofing is cement, as portland cement, Portland cement, slag cements, trass cement.The impermeability of these hydraulic cementing materials and waterproof durability are all good, so domestic and international many waterproofings all adopt cement as cementitious materials.But, because the tensile strength of cement is low, be out of shape little, be easy to shrinkage cracking, often destroy the integral waterproofing of structure.And after cement becomes concrete, the many pore seams of inner formation, become the passage of infiltration.
In order to improve concrete impermeability, domestic and international scientific and technical personnel work out many inorganic water-proof agents, as ferric trichloride, inorganic aluminate, triethanolamine etc.By adding these waterproof agents, improving the density of cement mortar or improving the crack resistance of mortar, thus reaching the object of water proof anti-seepage.But these measures cannot stop seepage completely.
(2) impermeable structure
Impervious prerequisite is cracking resistance, and common waterproof concrete and Admixture waterproof concrete do not have expansion character, and they do not have anti-cracking function, even if their impermeability is very high, Shrinkage Cracking of Concrete also just loses integral waterproofing function.
Impermeable structure technology is by expansive cement and cement and expanded or Shi Hanzhang, the whole or most of tensile stresss making compressive pre-stress can offset structure to produce in contraction process.But the more difficult corner of expansive concrete, the irregular occasion in cross section; Although Shi Hanzhang better can solve waterproof problem, construction is complicated, and cost is very high.
Intense radiation nuclear equipment comprises atomic energy industry and the isotopic device of application of radiation, as reactor, accelerator, radiochemistry device, customs, hospital etc., there is intense radiation core in these radiation kernel equipment, severe contamination can be caused to underground water, therefore the safeguard structure of carrying equipment is needed to shield ray, and there is extremely strong water resistance, require that outside underground water must not infiltrate equipment scope peripheral extent.
α, χ can be covered, gamma-rays and neutron current etc. have the concrete of harm to be called radiation shield concrete to human body, the tunnel of the isolated radiation constructed thus is referred to as radiation shield concrete tunnel, radiation shield concrete tunnel generally adopts the high density concrete that density ratio ordinary concrete is large, its apparent density≤2800kg/m 3.High density concrete is formulated by cement, water and heavyweight aggregate, and concrete is heavier, and wall is thicker, and its protection X, gamma-ray performance are better.
In reality, because high density concrete is expensive and not easily purchase, and thicker ordinary concrete wall also possesses the function of isolated radiation the same as high density concrete, therefore often adopts ordinary concrete to replace high density concrete.But the isolation effect of ordinary concrete is poor more than high density concrete, reach desirable isolation effect, safeguard structure thickness at least needs 1m.And atomic power device required precision is high, require that space enclosing structure must grow distance sequential production.Under the requirement that this is harsh, need sequential production and thick and heavy ordinary concrete component drying shrinkage is obvious, the heat of hydration is large, is difficult to generation and the crack progressing of control critical eigenvalue.Therefore there is a large amount of cracks in tunnel wall, depends sidewall alone and cannot realize rigid waterproofing.Although flexible water can be filled crack and reach good waterproof effect, but its life-span only has at most 20 years, the atomic energy industry device being embedded in underground can not excavate every 20 years and again do a waterproof construction, therefore need a kind of technology reach can radiation proof, again can absolute waterproof.
The existing rigid waterproofing scheme stopping concrete water-permeating mainly contains two kinds:
(1) inner embedding steel plate
Existing conventional concrete tunnel 100 as shown in Figure 1, is built formed by concrete and reinforcing bar 101, steel tie 102.In order to stop concrete water-permeating, the concrete tunnel 200 of built-in embedding steel plate as shown in Figure 2, embedding built-in steel plate 202 between reinforcing bar 201, and be welded into an overall after-pouring concrete, this is equivalent to make a steel box, utilizes the exhausted water-based of steel plate to carry out waterproof.This method makes safeguard structure have good waterproof, water isolating really, but there is obvious shortcoming: 1. steel need welding to cause the steel plate of taking can not be too thin, thickness is generally greater than 3 ~ 5mm, causes structural steel amount huge, and overall cost is 3 ~ 6 times of conventional concrete construction.2. the embedding steel plate of inside concrete causes the tension rib between the reinforcing bar of interior outside to arrange, very large to concrete side walls stressing influence.3. embedding steel plate is higher to concreting technological requirement, needs two-step pouring concrete and need ensure that the concrete of building for the first time is very smooth, intact to ensure steel plate laminating.
(2) Shi Hanzhang
By stretch-draw prestressing force steel bundle, apply precompression to concrete structure, effectively can prevent concrete cracking.But Shi Hanzhang requires higher to concrete intensity, Creep Characteristics, and a large amount of stretch-draw prestressing force steel Shu Zaocheng constructs, very difficulty and cost promote 2 ~ 3 times.
Utility model content
The purpose of this utility model is to provide the architectural construction of a kind of underground radiation proof rigid self-waterproof, this self waterproofing architectural construction is by arranging the jointly stressed bucker of participation, effective pressure release, collection and discharge can be carried out to underground water, the Structural strength calls of architectural construction can be ensured, make again heavy wall concrete tunnel can completely cut off underground water completely, to prevent the ground water seepage of radiation kernel equipment and the underground water nuclear pollution to the periphery soil body, safety and environmental protection, and the waterproof life-span of architectural construction is consistent with structural life-time, can reach more than 50 years.
This purpose of the present utility model realizes by following technical solution: the architectural construction of a kind of underground radiation proof rigid self-waterproof, comprise the heavy wall concrete tunnel of isolated radiation, heavy wall concrete tunnel is for placing radiation kernel equipment, described heavy wall concrete tunnel comprises top board, tunnel-side and substrate, it is characterized in that: described heavy wall concrete tunnel periphery has additional bucker, bucker integral coating heavy wall concrete tunnel, described bucker comprises top cover, side cover and the cover end, described top cover is constructed by the profiled sheet of warpage and steel concrete and is formed, described profiled sheet is laid on described top board, and cover top board completely, profiled sheet has guiding gutter, also connector is provided with between described side cover and tunnel-side, between described side cover and tunnel-side, there is spacing, described side cover, the space that tunnel-side is enclosed with cover end three forms catch basin, catch basin is also connected with underground water centralized detecting treating apparatus, the below of described substrate is positioned at the bottom of described cover, U-shaped steel plate is also provided with between the cover end and substrate, U-shaped steel plate is laid at the bottom of described cover, with the infiltration of isolated bottom underground water, described self waterproofing architectural construction can carry out effective pressure release to underground water, collect and discharge, make heavy wall concrete tunnel can completely cut off underground water completely, thus prevent the ground water seepage of radiation kernel equipment and the phenomenon of periphery soil body underground water nuclear pollution is occurred.
Self waterproofing architectural construction of the present utility model is by setting up bucker, profiled sheet, guiding gutter, catch basin and U-shaped steel plate, the underground water that centralized recovery outside is infiltrated is gone forward side by side row relax, the underground water infiltrating bucker is thoroughly carried out pressure release and effectively discharge, bucker is mainly used in pressure release draining.When the profiled sheet of tunnel top does not have corrosion saturating, profiled sheet plays exhausted water effect to outside underground water; Permanent when the time, profiled sheet, by after corrosion, utilizes the guiding gutter with cavity performance in the middle of profiled sheet that underground water infiltration is carried out to pressure release and discharged, thus makes heavy wall concrete tunnel can completely cut off underground water completely.This self waterproofing architectural construction solves needs the contraction of the heavy wall concrete tunnel of sequential production, cracking and leaking of causing and the problem to groundwater pollution, is that the waterproof life-span is consistent with structural life-time, can reaches more than 50 years, and cheap.
In the utility model, described profiled sheet is lap jointing type roofing profiled sheet, model is YW51-760, this profiled sheet slope height 51mm, every block cover width is 760mm, and steel plate thickness is 1mm, the cross section of guiding gutter is isosceles trapezoid, the upper base of this isosceles trapezoid is 65mm, goes to the bottom as 125mm, high 51mm.
In the utility model, the guiding gutter of profiled sheet is multiple straight-line groove, and multiple guiding gutter be arranged in parallel, and the two ends of guiding gutter extend to the end of top board respectively.
In the utility model, described side cover and the material at the cover end are waterproof concrete.
In the utility model, the connector arranged between described side cover and tunnel-side is many connecting rods, and by connecting rod support-side cover, described many connecting rods divide upper and lower multilayer to arrange, and the connecting rod of every one deck is many of horizontally set.
In the utility model, the spacing between described side cover and tunnel-side is 500 ~ 800mm.
In the utility model, the thickness of described U-shaped steel plate is 2 ~ 6mm, and material is Q235.
In the utility model, described heavy wall concrete tunnel is Rectangular Tunnel, and described bucker is also rectangular cover.
In the utility model, the two ends of described U-shaped steel plate extend in catch basin, and fit with the inwall that side is covered.
Compared with prior art, self waterproofing architectural construction of the present utility model thoroughly solves the ground water seepage of intense radiation nuclear facilities and the problem to the nuclear pollution of periphery soil body underground water, make the heavy wall concrete tunnel of built-in radiation kernel equipment can completely cut off underground water completely, safety and environmental protection.This self waterproofing architectural construction can be applicable to spallation neutron target experimental facilities, small cores experimental facilities, Medical Technology Building dept. of radiology comprise x ray room, CT, DSA, nuclear magnetic resonant (MRI) and the corresponding architectural space controlling the special protection of needs such as machine room, also after can be used for building function change, the improvement of waterproof of structure.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and instantiation, the utility model is described in further detail.
Fig. 1 is the structural representation in conventional concrete tunnel in prior art;
Fig. 2 is the structural representation of the concrete tunnel of built-in embedding steel plate in prior art;
Fig. 3 is the partial perspective view of the utility model underground radiation proof rigid self-waterproof architectural construction;
Fig. 4 is the sectional view of the utility model underground radiation proof rigid self-waterproof architectural construction, the annexation of display heavy wall concrete tunnel and bucker and position relationship;
Fig. 5 is the sectional view of heavy wall concrete tunnel in the architectural construction of the utility model underground radiation proof rigid self-waterproof;
Fig. 6 is the sectional view of bucker in the architectural construction of the utility model underground radiation proof rigid self-waterproof;
Fig. 7 is the utility model underground radiation proof rigid self-waterproof architectural construction partial structurtes schematic diagrames, the display composition of profiled sheet and the position relationship with heavy wall concrete tunnel top board;
Fig. 8 is the utility model underground radiation proof rigid self-waterproof architectural construction partial structurtes schematic diagrames, and when display profiled sheet does not corrode, profiled sheet guides the infiltration on profiled sheet into two ends discharge along the length direction of guiding gutter;
Fig. 9 is the utility model underground radiation proof rigid self-waterproof architectural construction partial structurtes sectional views, and after the corrosion of display profiled sheet, the pressure release principle of profiled sheet, profiled sheet guides the infiltration entered in profiled sheet guiding gutter into two ends discharge by guiding gutter.
Description of reference numerals
100, concrete tunnel; 101, reinforcing bar; 102, steel tie;
200, concrete tunnel; 201, reinforcing bar; 202, built-in steel plate;
1, heavy wall concrete tunnel; 11, top board; 12, tunnel-side; 13, substrate;
2, bucker; 21, top cover; 211, profiled sheet; 211a, guiding gutter;
212, steel concrete; 22, side cover; 23, the end is covered; 3, U-shaped steel plate; 4, catch basin;
5, connecting rod; 6, outside saturated clays; 7, radiation kernel equipment
Detailed description of the invention
A kind of underground radiation proof rigid self-waterproof architectural construction as shown in Fig. 3 to Fig. 9, comprise the heavy wall concrete tunnel 1 of isolated radiation, heavy wall concrete tunnel 1 is for placing radiation kernel equipment 7, heavy wall concrete tunnel 1 comprises top board 11, tunnel-side 12 and substrate 13, the upper surface of top board 11 is made has the domatic of certain angle of inclination, heavy wall concrete tunnel 1 periphery has additional the bucker 2 being mainly used in pressure release draining, bucker 2 integral coating heavy wall concrete tunnel 1, heavy wall concrete tunnel 1 is Rectangular Tunnel, bucker 2 is also rectangular cover, bucker 2 and heavy wall concrete tunnel 1 form overall structure.The thick 1000mm of top board 11 of heavy wall concrete tunnel 1, the thick 1000mm of tunnel-side 12, the thick 1000mm of substrate 13, wherein top board 11 thick also can within the scope of 800 ~ 1200mm value.
Bucker 2 comprises top cover 21, side cover 22 and the cover end 23, the material at side cover 22 and the cover end 23 is waterproof concrete, top cover 21 is constructed by the profiled sheet 211 of warpage and steel concrete 212 and is formed, steel concrete 212 is formed by the steel bar girder be laid on profiled sheet 211 and concreting, namely steel concrete 212 comprises steel bar girder and concrete, profiled sheet 211, the top cover 21 of whole bucker 2 is formed after steel bar girder and concreting, profiled sheet 211 is laid on top board 11, and cover top board 11 completely, profiled sheet 211 also has certain slope, suitable with the upper surface of top board 11, the upper surface of top cover 21 is also for having the domatic of certain angle of inclination, top cover 21 and top board 11 and profiled sheet 211 all adopt domatic, be convenient to infiltration flowing, profiled sheet 211 plays exhausted water effect to outside underground water, profiled sheet 211 has guiding gutter 211a, the guiding gutter 211a of profiled sheet 211 is the multiple straight-line grooves be on same slope, multiple guiding gutter 211a be arranged in parallel, between adjacent guiding gutter 211a, there is spacing, the two ends of guiding gutter extend to the end of top board 11 respectively, the setting direction of guiding gutter 211a is along the width of heavy wall concrete tunnel 1, as shown in Figure 3, heavy wall concrete tunnel 1 is in horizontal plane, the direction on longer limit is its length direction, the direction on shorter limit is its width, also connector is provided with between the side cover 22 of bucker 2 and the tunnel-side 12 of heavy wall concrete tunnel 1, wherein, the connector arranged between side cover 22 and tunnel-side 12 is many connecting rods 5, by connecting rod 5 support-side cover 22, many connecting rods about 5 points multilayers are arranged, the connecting rod 5 of every one deck is many of horizontally set, there is between side cover 22 and tunnel-side 12 spacing of 800mm, side cover 22, the space that tunnel-side 12 is enclosed with the cover end 23 three forms catch basin 4, catch basin 4 is also connected with underground water centralized detecting treating apparatus, underground water centralized detecting treating apparatus is used for detecting the water in catch basin 4 and processing.
Side cover 22 and tunnel-side 12 between spacing also can between 500 ~ 800mm value.
Cover the below that the end 23 is positioned at substrate 13, U-shaped steel plate 3 is also provided with between the cover end 23 and substrate 13, U-shaped steel plate 3 to be laid at the bottom of cover on 23, with the infiltration of isolated bottom underground water, the thickness of U-shaped steel plate 3 is 4mm, material is Q235, and the two ends of U-shaped steel plate 3 extend in catch basin 4, and fits with the inwall that side covers 22.The thickness of U-shaped steel plate 3 also can between 2 ~ 6mm value.
In the present embodiment, profiled sheet 211 is lap jointing type roofing profiled sheet, model is YW51-760, this profiled sheet slope height 51mm, every block cover width is 760mm, and steel plate thickness is 1.0mm, the cross section of guiding gutter is isosceles trapezoid, the upper base of this isosceles trapezoid is 65mm, goes to the bottom as 125mm, high 51mm.
The self waterproofing architectural construction of the present embodiment can carry out effective pressure release, collection and discharge to underground water, make heavy wall concrete tunnel 1 can completely cut off underground water completely, thus prevent the ground water seepage of radiation kernel equipment 7 and the phenomenon of periphery soil body underground water nuclear pollution is occurred.
The operating principle of each parts of the utility model self waterproofing architectural construction is as follows:
1. there is the bucker top cover 21 of guiding gutter
The top cover 21 of bucker is constructed by the profiled sheet 211 of warpage and steel concrete 212 and is formed, and profiled sheet 211 has the guiding gutter 211a that cross section is isosceles trapezoid.Top cover 21, when constructing, is first laid profiled sheet 211, then assembling reinforcement on profiled sheet 211, and is built the waterproof concrete on top on the top board 11 of heavy wall concrete tunnel, construction simple and fast, with low cost.
When profiled sheet 211 does not have corrosion saturating, profiled sheet 211 plays exhausted water effect to outside underground water, make heavy wall concrete tunnel can completely cut off underground water completely, as shown in Figure 8, outside underground water is when outside saturated clays 6 infiltrates profiled sheet 211 upper surface, profiled sheet 211 guides the infiltration of infiltrating profiled sheet upper surface into two ends along the length direction of guiding gutter, the infiltration of guiding two ends into carries out underground water collection in the internal face inflow catch basin 4 of the side cover 22 of bucker, then by underground water centralized detecting treating apparatus, the underground water collected in catch basin 4 is detected and processed.
Permanent when the time, profiled sheet 211 is by after corrosion, the guiding gutter 211a in the middle of profiled sheet 211 is utilized to carry out pressure release to the underground water infiltrating profiled sheet guiding gutter 211a, as shown in Figure 9, after profiled sheet 211 corrodes, profiled sheet 211 guides the infiltration entered in profiled sheet guiding gutter into two ends by guiding gutter 211a, the infiltration of guiding two ends into carries out underground water collection in the outside wall surface inflow catch basin 4 of the tunnel-side 12 of heavy wall concrete tunnel, then by underground water centralized detecting treating apparatus, the underground water collected in catch basin 4 is detected and processed, thus make heavy wall concrete tunnel can completely cut off underground water completely.
Therefore, arrange profiled sheet 211, no matter whether profiled sheet 211 is by corrosion, and can both ensure that heavy wall concrete tunnel can completely cut off underground water completely, prevent the ground water seepage of radiation kernel equipment 7, the waterproof life-span is consistent with structural life-time, can reach more than 50 years.
The setting of profiled sheet arranges stainless steel exhausted water plate or imbeds the cost of steel plate low by more than 70% frequently, and the ingenious guiding gutter that make use of the profiled sheet of the warpage of rigidity carries out water conservancy diversion, even and if after profiled sheet corrosion, the guiding gutter of profiled sheet also can play the effect guiding underground water discharge, removal underground water to infiltrate hydraulic pressure.
2. the side cover 22 of bucker
The concrete side cover 22 of bucker both sides is thinner, effectively can reduce the heat of hydration of tunnel-side and the impact of contraction, and side cover 22 uses conventional waterproof concrete, can reach good waterproof effect.But bucker can not completely cut off the infiltration of outside underground water completely, when profiled sheet 211 is not saturating by corrosion, infiltration is covered 22 inwalls along side and is flowed to catch basin 4, and the current direction underground water centralized detecting treating apparatus of catch basin 4, discharges without after nuclear pollution after testing again.
By bucker 2, outside underground water just cannot touch inner heavy wall concrete tunnel 1, and the accurate radiation kernel equipment 7 being positioned at heavy wall concrete tunnel 1 inside is also protected, and plays the effect of 100% completely isolated underground water.
3. heavy wall concrete tunnel and bucker acting in conjunction
The heavy wall concrete tunnel 1 of heavy wall concreting, maximum advantage to completely cut off radiation.When tunnel wall is thicker, can stop that Radiolucent sidewall that inner core equipment produces is toward external radiation, that is, has more thick and heavy concrete side walls completely, inner core radiation just cannot pollute the underground water beyond the underground water and bucker of outside infiltration, reaches the effect of stopping nuclear pollution.
But because radiation kernel equipment 7 pairs of tunnel rigidity requirements are high, tunnel needs continuously the large scale of construction to build, and can not establish many structural joints as common municipal tunnel and separately build, cause concrete shrinkage, hydration heat effect obvious especially.Experiment shows, when building with conventional concrete, tunnel-side and roof and floor, concrete cracking is more serious.If therefore do not make bucker, waterproof of singly taking measures on concrete, it is almost impossible for reaching absolute waterproof.
Bucker 2, in order to reduce shrinkage crack, reduce the heat of hydration and design thinner, keeps out the limited in one's ability of outside soil pressure.The sidewall of inner heavy wall concrete tunnel 1 designs thicker to isolate ray, and rigidity is better.Therefore carrying out support-side cover 22 by arranging many connecting rods 5 between side cover 22 and tunnel-side 21, bucker 2 and heavy wall concrete tunnel 1 being connected to form an overall structure, making it jointly stressed.Bucker 2 provides the effect of waterproof and opposing soil pressure, and heavy wall concrete tunnel 1 provides radiation proof and supports the stressed double action of bucker 2, and both common co-ordinations, realize the effect that 1+1 is greater than 2.
4. the U-shaped steel plate 3 set up
Traditional waterproof slab adopts flexible water or imbeds steel plate.Flexible water is effective, but the life-span only has 10 ~ 20 years, much smaller than structural life-time, again lays more difficult and effect is bad after damage.Imbedding steel plate then causes the tension rib in concrete slab between the reinforcing bar of outside to arrange, very large to concrete side walls stressing influence, and higher to concreting technological requirement.
The utility model at the bottom of cover 23 build after, directly lay thinner U-shaped steel plate 3 on top, then construct the substrate 13 of heavy wall concrete tunnel above.Set up the infiltration that U-shaped steel plate 3 effectively can completely cut off bottom underground water, to ensure again at the bottom of cover that the drawknot in 23 between reinforcing bar is not destroyed, and low to concreting technological requirement.U-shaped steel plate 3 only needs punching press just plastic, and only need weld between two blocks of U-shaped steel plates, welding capacity is few.
The construction method of above-mentioned underground radiation proof rigid self-waterproof architectural construction, this construction method comprises the steps:
(1), construction concrete cushion;
(2), after concrete cushion of having constructed, assembling reinforcement on bed course, erection template, then concreting, to form at the bottom of the cover of bucker 2 23;
(3), after the cover bottom application work of bucker, carry out that cover basal surface is smooth, after water spray, brush neat slurry, at the bottom of cover, lay U-shaped steel plate 3 on 23, and ensure that U-shaped steel plate 3 is fitted well with the cover end 23;
(4) after, laying U-shaped steel plate 3, construction radiation proof heavy wall concrete tunnel, the construction of heavy wall concrete tunnel comprises the construction to top board 11, tunnel-side 12 and substrate 13, and the side of synchronous construction bucker 2 cover 22 and contact rod member between bucker and heavy wall concrete tunnel;
(5), on the top board 11 of the heavy wall concrete tunnel of having constructed, direct laying profiled sheet 211, only needs between profiled sheet 211 and top board 11 to locate, does not need connector to connect, profiled sheet 211 places steel bar girder after laying above profiled sheet 211; In the construction of this process, do not need direct assembling reinforcement on profiled sheet 211, only need place steel bar girder above profiled sheet 211, avoid the damage to profiled sheet as far as possible;
(6), on profiled sheet 211 and steel bar girder concreting, form the top cover 21 of bucker 2, complete the construction of whole self waterproofing architectural construction.
Above-described embodiment of the present utility model is not the restriction to the utility model protection domain; embodiment of the present utility model is not limited thereto; all this kind is according to foregoing of the present utility model; according to ordinary technical knowledge and the customary means of this area; do not departing under the utility model above-mentioned fundamental technics thought prerequisite; to the amendment of other various ways that the utility model said structure is made, replacement or change, all should drop within protection domain of the present utility model.

Claims (8)

1. underground radiation proof rigid self-waterproof architectural construction, comprise the heavy wall concrete tunnel of isolated radiation, heavy wall concrete tunnel is for placing radiation kernel equipment, described heavy wall concrete tunnel comprises top board, tunnel-side and substrate, it is characterized in that: described heavy wall concrete tunnel periphery has additional bucker, bucker integral coating heavy wall concrete tunnel, described bucker comprises top cover, side cover and the cover end, described top cover is constructed by the profiled sheet of warpage and steel concrete and is formed, described profiled sheet is laid on described top board, and cover top board completely, profiled sheet has guiding gutter, also connector is provided with between described side cover and tunnel-side, between described side cover and tunnel-side, there is spacing, described side cover, the space that tunnel-side is enclosed with cover end three forms catch basin, catch basin is also connected with underground water centralized detecting treating apparatus, the below of described substrate is positioned at the bottom of described cover, U-shaped steel plate is also provided with between the cover end and substrate, U-shaped steel plate is laid at the bottom of described cover, with the infiltration of isolated bottom underground water, described self waterproofing architectural construction can carry out effective pressure release to underground water, collect and discharge, make heavy wall concrete tunnel can completely cut off underground water completely, thus prevent the ground water seepage of radiation kernel equipment and the phenomenon of periphery soil body underground water nuclear pollution is occurred.
2. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, it is characterized in that: described profiled sheet is lap jointing type roofing profiled sheet, model is YW51-760, this profiled sheet slope height 51mm, every block cover width is 760mm, and steel plate thickness is 1mm, the cross section of guiding gutter is isosceles trapezoid, the upper base of this isosceles trapezoid is 65mm, goes to the bottom as 125mm, high 51mm.
3. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, is characterized in that: the guiding gutter of profiled sheet is multiple straight-line groove, and multiple guiding gutter be arranged in parallel, and the two ends of guiding gutter extend to the end of top board respectively.
4. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, is characterized in that: described side cover and the material at the cover end are waterproof concrete.
5. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, it is characterized in that: the connector arranged between described side cover and tunnel-side is many connecting rods, by connecting rod support-side cover, described many connecting rods divide upper and lower multilayer to arrange, and the connecting rod of every one deck is many of horizontally set.
6. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, is characterized in that: the thickness of described U-shaped steel plate is 2 ~ 6mm, and material is Q235.
7. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, is characterized in that: described heavy wall concrete tunnel is Rectangular Tunnel, and described bucker is also rectangular cover.
8. radiation proof rigid self-waterproof in underground according to claim 1 architectural construction, is characterized in that: the two ends of described U-shaped steel plate extend in catch basin, and fits with the inwall that side is covered.
CN201520351075.4U 2015-05-27 2015-05-27 The architectural construction of a kind of underground radiation proof rigid self-waterproof Expired - Fee Related CN204728361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520351075.4U CN204728361U (en) 2015-05-27 2015-05-27 The architectural construction of a kind of underground radiation proof rigid self-waterproof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520351075.4U CN204728361U (en) 2015-05-27 2015-05-27 The architectural construction of a kind of underground radiation proof rigid self-waterproof

Publications (1)

Publication Number Publication Date
CN204728361U true CN204728361U (en) 2015-10-28

Family

ID=54386723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520351075.4U Expired - Fee Related CN204728361U (en) 2015-05-27 2015-05-27 The architectural construction of a kind of underground radiation proof rigid self-waterproof

Country Status (1)

Country Link
CN (1) CN204728361U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947710A (en) * 2015-05-27 2015-09-30 广东省建筑设计研究院 Underground anti-radiation rigid self-waterproofing building structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947710A (en) * 2015-05-27 2015-09-30 广东省建筑设计研究院 Underground anti-radiation rigid self-waterproofing building structure and construction method thereof
CN104947710B (en) * 2015-05-27 2016-08-24 广东省建筑设计研究院 A kind of underground radioprotective rigid self-waterproof Architectural Construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN201865127U (en) Reinforced waterproof late poured band of basement bottom plate
CN102383443B (en) Connection structures between foundation pit support piles and outer walls of basement and construction method
CN203531009U (en) Basement bottom plate rubble layer hydrophobic structure
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN104947710B (en) A kind of underground radioprotective rigid self-waterproof Architectural Construction and construction method thereof
CN112127356A (en) Assembled grid underground continuous wall of dry-type connection
Silva et al. Effectiveness of the repair of unstabilised rammed earth with injection of mud grouts
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN106545030B (en) Small-sized buried reservoir of one kind and preparation method thereof
CN104032771A (en) Anti-cracking construction method for additionally arranging induction joint on underground structure
CN109706952A (en) Large-scale well-sinking construction method
CN102146733A (en) Method for strengthening brick wall through fiber cloth
CN111042569A (en) Construction method for additionally building linear accelerator machine room in limited space of basement of hospital
CN204728361U (en) The architectural construction of a kind of underground radiation proof rigid self-waterproof
CN210766835U (en) Foundation beam side vertical face waterproof structure
CN117127642A (en) Fluidized solidified soil bearing platform structure and manufacturing method
CN106638544A (en) Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN108035453B (en) Sliding shock insulation device with ring beam masonry structure and construction method thereof
CN102535493B (en) Method for constructing inverted type foundation beam
CN206667263U (en) A kind of foundation pit supporting construction
CN202148539U (en) Composite waterproof structure using underground engineering waterproof leaking stoppage treatment and construction method
CN205712123U (en) A kind of foundation ditch permanent support structure based on double pile for prestressed pipe
CN108589758A (en) A kind of foundation structure and construction method of acid-resistance infiltration
CN208251134U (en) A kind of foundation structure of acid-resistance infiltration

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20180527