CN204728157U - A kind of three-dimensional traffic system solving urban road crossing traffic congestion - Google Patents
A kind of three-dimensional traffic system solving urban road crossing traffic congestion Download PDFInfo
- Publication number
- CN204728157U CN204728157U CN201520394441.4U CN201520394441U CN204728157U CN 204728157 U CN204728157 U CN 204728157U CN 201520394441 U CN201520394441 U CN 201520394441U CN 204728157 U CN204728157 U CN 204728157U
- Authority
- CN
- China
- Prior art keywords
- trunk roads
- major trunk
- underground passage
- urban road
- direct lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of three-dimensional traffic system solving urban road crossing traffic congestion, solve the technical problem of urban road crossing traffic congestion, a kind of three-dimensional traffic system solving urban road crossing traffic congestion of the utility model, comprise vertical first major trunk roads and the second major trunk roads mutually, described first major trunk roads comprise direct lane and turning roadway, described direct lane is established on the ground, the below of direct lane is provided with the underground passage be positioned at below ground, walkway is provided with between direct lane and underground passage, second major trunk roads and turning roadway are communicated with respectively and pass underground passage, traffic light signal system is provided with in described underground passage.
Description
Technical field
The utility model relates to a kind of three-dimensional traffic system solving urban road crossing traffic congestion.
Background technology
The usual traffic in urban road crossing is blocked up very much, especially in section in rush hour, automobile to wait several traffic lights just by, vehicle waits for more time-consuming and excessive fuel consumption at crossing, and causes exhaust emissions to increase, thus has increased the weight of air pollution; Pedestrian and vehicle carry out robbing row within several seconds times that green light of being everlasting terminates, and the occurrence frequency of traffic accident is also increased greatly, and once there is traffic accident, the congestion level at crossing will worsen further.
Utility model content
The utility model provides a kind of three-dimensional traffic system solving urban road crossing traffic congestion, solves the technical problem of urban road crossing traffic congestion.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of three-dimensional traffic system solving urban road crossing traffic congestion, comprise vertical first major trunk roads and the second major trunk roads mutually, described first major trunk roads comprise direct lane and turning roadway, described direct lane is established on the ground, the below of direct lane is provided with the underground passage be positioned at below ground, be provided with walkway between direct lane and underground passage, the second major trunk roads and turning roadway are communicated with respectively and pass underground passage, are provided with traffic light signal system in described underground passage.
As preferred scheme, described turning roadway penetrates and is connected with underground passage respectively by the first tunnel with the roadway segment passing underground passage, described second major trunk roads penetrate and are connected with underground passage respectively by the second tunnel with the road segment segment passing underground passage, the road surface in described first tunnel and the second tunnel has inclination alpha, 0 < α≤45 °.
Further preferred version, the road surface in two the first tunnels and two the second tunnels is respectively equipped with the catch basin reclaiming rainwater, and described catch basin communicated drainage pipe carries out concentrating discharge to rainwater.
As preferred scheme, described direct lane is provided with the arch track raised up, and described walkway is the bridge opening of the below being located at arch track.
As preferred scheme, the periphery of the roadway segment that described first major trunk roads and the second major trunk roads rest on the ground is respectively equipped with guardrail.
The beneficial effects of the utility model are:
By the direct lane of the first major trunk roads is established on the ground, the turning roadway of the first major trunk roads and the second major trunk roads are communicated with respectively and pass underground passage, through vehicles on direct lane can directly no longer need by crossing to wait for traffic lights, and the vehicle on the turning roadway of the first major trunk roads and the second major trunk roads carries out underground passage, passed through in order by traffic light signal system, because the vehicle of direct lane no longer counts traffic light signal system, therefore the stand-by period of traffic light signal system shortens greatly, optimize the current of the vehicle entering crossing, alleviate the degree that crossing traffic blocks up, simultaneously, the bicycle such as pedestrian and electric motor car can pass through crossing by walkway, current more smooth and safety.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described further:
Fig. 1 is stereogram of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 be in Fig. 2 A-A to sectional view;
Fig. 4 be in Fig. 2 B-B to sectional view.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
As shown in Figures 1 to 4, a kind of three-dimensional traffic system solving urban road crossing traffic congestion, comprise vertical first major trunk roads 1 and the second major trunk roads 2 mutually, first major trunk roads 1 comprise direct lane 101 and turning roadway 102, direct lane 101 is established on the ground, first major trunk roads 1 and the second major trunk roads 2 adopt two-way Four-Lane Road, the road surface of the first major trunk roads 1 and the second major trunk roads 2 is provided with the arrow 7 in the current direction of instruction, the track, outside two of the first major trunk roads 1 is turning roadway 102, two tracks be positioned in the middle of two turning roadwaies 102 are direct lane 101, through vehicles on direct lane 101 can directly no longer need by crossing to wait for traffic lights, therefore, road larger for straightgoing vehicle flow in urban road is set to the direct lane 101 of the first major trunk roads 1, effectively can alleviate the jam situation of through vehicles.
The below of direct lane 101 is provided with the underground passage 3 be positioned at below ground, second major trunk roads 2 are communicated with respectively with turning roadway 102 and pass underground passage 3, the track, outside two of the second major trunk roads 2 is for keeping straight on and general track of turning, two tracks in the middle of second major trunk roads 2 are direct lane, traffic light signal system 301 is provided with in underground passage 3, the vehicle be positioned on turning roadway 102 goes on the second major trunk roads 2 by underground passage 3, passed through in order by traffic light signal system 301, because traffic light signal system 301 no longer needs to count the through vehicles on direct lane 101, thus significantly shorten the time of the vehicle on the second major trunk roads 2 and turning roadway 102 by underground passage 3, alleviate crossing traffic jam situation.
Walkway 4 is provided with between direct lane 101 and underground passage 3, direct lane 101 is provided with the arch track 1011 raised up, walkway 4 is for being located at the bridge opening of the below in arch track 1011, the bicycle such as pedestrian and electric motor car can pass through crossing by walkway 4, decrease the bicycle such as pedestrian and electric motor car to make a dash across the red light the generation of phenomenon, make motor vehicle, bicycle and pedestrian be more smooth and safety by crossing, the periphery of the roadway segment that the first major trunk roads 1 and the second major trunk roads 2 rest on the ground is respectively equipped with guardrail 6, pedestrian and electric motor car are advanced outside guardrail, further increase current safety.
Turning roadway 102 penetrates and is connected with underground passage 3 respectively by the first tunnel 1021 with the roadway segment passing underground passage 3, second major trunk roads 2 penetrate and are connected with underground passage 3 respectively by the second tunnel 201 with the road segment segment passing underground passage 3, vehicle on turning roadway 102 enters underground passage 3 by the first tunnel 1021, the second tunnel 201 is proceeded to afterwards by traffic light signal system 301 instruction, then the road segment segment that the second major trunk roads 2 are positioned at ground is sailed into, vehicle on second major trunk roads 2 enters underground passage 3 by the second tunnel 201, through vehicles on second major trunk roads 2 indicates through underground passage 3 by traffic light signal system 301, then sail by the second tunnel 201 of opposite side the road segment segment that the second major trunk roads 2 are positioned at ground into, turning vehicle on second major trunk roads 2 proceeds to the first tunnel 1021 by traffic light signal system 301 instruction, then the road segment segment that the first major trunk roads 1 are positioned at ground is sailed into, vehicle is orderly by the control of traffic light signal system 301.
The road surface in the first tunnel 1021 and the second tunnel 201 has inclination alpha, 0 < α≤45 °, the inclination angle in the first tunnel 1021 and the second tunnel 201 is no more than 45 °, and vehicle enters underground passage 3 and declines and more relax, and can reduce the generation of traffic accidents such as knocking into the back.
The road surface in two the first tunnels 1021 and two the second tunnels 201 is respectively equipped with the catch basin 5 reclaiming rainwater, the notch of catch basin 5 is provided with castiron water drainage cover board, and catch basin 5 communicated drainage pipe carries out concentrating discharge to rainwater.
Be described with regard to the utility model preferred embodiment above, but can not be interpreted as it is restriction to claim.The utility model is not only confined to above embodiment, its concrete structure allows to change, those skilled in the art can make various change and distortion according to the utility model, only otherwise depart from spirit of the present utility model, all belong to the scope that the utility model claims define.
Claims (5)
1. one kind can solve the three-dimensional traffic system of urban road crossing traffic congestion, it is characterized in that: comprise vertical first major trunk roads and the second major trunk roads mutually, described first major trunk roads comprise direct lane and turning roadway, described direct lane is established on the ground, the below of direct lane is provided with the underground passage be positioned at below ground, walkway is provided with between direct lane and underground passage, second major trunk roads and turning roadway are communicated with respectively and pass underground passage, are provided with traffic light signal system in described underground passage.
2. a kind of three-dimensional traffic system solving urban road crossing traffic congestion according to claim 1, it is characterized in that: described turning roadway penetrates and is connected with underground passage respectively by the first tunnel with the roadway segment passing underground passage, described second major trunk roads penetrate and are connected with underground passage respectively by the second tunnel with the road segment segment passing underground passage, the road surface in described first tunnel and the second tunnel has inclination alpha, 0 < α≤45 °.
3. a kind of three-dimensional traffic system solving urban road crossing traffic congestion according to claim 2, it is characterized in that: the road surface in two the first tunnels and two the second tunnels is respectively equipped with the catch basin reclaiming rainwater, described catch basin communicated drainage pipe carries out concentrating discharge to rainwater.
4. a kind of three-dimensional traffic system solving urban road crossing traffic congestion according to claim 1, it is characterized in that: described direct lane is provided with the arch track raised up, described walkway is the bridge opening of the below being located at arch track.
5. a kind of three-dimensional traffic system solving urban road crossing traffic congestion according to claim 1, is characterized in that: the periphery of the roadway segment that described first major trunk roads and the second major trunk roads rest on the ground is respectively equipped with guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520394441.4U CN204728157U (en) | 2015-06-09 | 2015-06-09 | A kind of three-dimensional traffic system solving urban road crossing traffic congestion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520394441.4U CN204728157U (en) | 2015-06-09 | 2015-06-09 | A kind of three-dimensional traffic system solving urban road crossing traffic congestion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204728157U true CN204728157U (en) | 2015-10-28 |
Family
ID=54386519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520394441.4U Expired - Fee Related CN204728157U (en) | 2015-06-09 | 2015-06-09 | A kind of three-dimensional traffic system solving urban road crossing traffic congestion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204728157U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019325A (en) * | 2015-06-09 | 2015-11-04 | 高正强 | Three-dimensional traffic system capable of solving problem of traffic jams at city crossroads |
-
2015
- 2015-06-09 CN CN201520394441.4U patent/CN204728157U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019325A (en) * | 2015-06-09 | 2015-11-04 | 高正强 | Three-dimensional traffic system capable of solving problem of traffic jams at city crossroads |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204940026U (en) | Novel traffic road mouth structure | |
CN202247574U (en) | Three-dimensional crossroad of traffic road | |
CN102646331A (en) | Design method for cooperating street crossing of opposite-angle pedestrians and left turning of motor vehicles at intersection | |
CN102708675A (en) | Design method for improving traffic of T-shaped road intersection based on asymmetrical traffic requirements | |
CN103061223A (en) | Annular left type urban flyover | |
CN104195909A (en) | Non-elevated tiny urban cross overpass | |
CN204728157U (en) | A kind of three-dimensional traffic system solving urban road crossing traffic congestion | |
CN102787540A (en) | Unimpeded overpass | |
CN101492904A (en) | Traffic road junction roadway | |
CN203782508U (en) | Precast type road intersection structure system | |
CN204676382U (en) | People walks level land car and walks up and down only this bus and to give in each other intersection | |
CN105019325A (en) | Three-dimensional traffic system capable of solving problem of traffic jams at city crossroads | |
CN103898820B (en) | Quasi rail transit road system | |
CN204475091U (en) | A kind of cross directional barrier-free overpass | |
CN102337712A (en) | Crossed directional barrier-free overpass | |
CN205934626U (en) | Miniature tunnel | |
CN101906743A (en) | Road traffic system at urban intersections | |
CN204608620U (en) | A kind of city grade crossing isolated island | |
CN105178123A (en) | Cross overpass | |
CN202164518U (en) | Cross directional barrier-free overpass | |
CN205839642U (en) | A kind of non-absolute isolating device of Multifunctional City | |
CN203383113U (en) | Cross road and T road all-directional no-parking flyover | |
CN202925409U (en) | Half-storey-height flyover unit | |
CN105908658B (en) | A kind of non-absolute isolating device of Multifunctional City | |
CN205501746U (en) | Light automobile steel of highway T crossing constructs overpass structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 Termination date: 20190609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |