CN204715730U CN201520233236.XU CN201520233236U CN204715730U CN 204715730 U CN204715730 U CN 204715730U CN 201520233236 U CN201520233236 U CN 201520233236U CN 204715730 U CN204715730 U CN 204715730U
Authority
CN
China
Prior art keywords
plug
unit
keeper
cross bar
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520233236.XU
Other languages
Chinese (zh)
Inventor
费地超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Shengjian Construction Equipment Leasing Co Ltd
Original Assignee
Chongqing Shengjian Construction Equipment Leasing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Shengjian Construction Equipment Leasing Co Ltd filed Critical Chongqing Shengjian Construction Equipment Leasing Co Ltd
Priority to CN201520233236.XU priority Critical patent/CN204715730U/en
Application granted granted Critical
Publication of CN204715730U publication Critical patent/CN204715730U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses the syndeton that a kind of peripheral scaffold is built, comprise plug-in unit and keeper, plug-in unit is positioned at the junction of cross bar and the vertical rod wherein body of rod, keeper is positioned at the junction of cross bar and vertical rod wherein another body of rod, the vacancy portion that keeper comprises stop part and passes for plug-in unit, plug-in unit is through vacancy portion, and the body of rod and the stop part at plug-in unit place offset.The utility model plug-in unit can realize the installation of cross bar and vertical rod through vacancy portion, such operation very simple and fast, and reduce the triviality of operation, efficiency is higher, makes setting up of scaffold very fast.Because plug-in unit and keeper can be arranged along the circumference of the body of rod, plug-in unit and keeper can overlap at the axial location of the body of rod, therefore leger and little cross bar can be positioned at same level, make scaffold seem neat appearance.When laying springboard, springboard can contact with little cross bar completely with leger, makes springboard uniform force.

Description

The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure
Technical field
The utility model belongs to the technical field of scaffold, is specifically related to the connection between scaffold member.
Background technology
Scaffold refers to that job site is the various supports that operative also solves vertically and horizontal transport is set up, and is used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height.Peripheral scaffold refers to a kind of scaffold that the outside (along building periphery) of building is set up, and carries out external wall construction or perimeter security net is gone along with sb. to guard him mainly for constructor.
Existing peripheral scaffold is primarily of vertical rod and cross bar composition, and vertical rod refers to the body of rod arranging in the vertical direction; Cross bar refers to the setting body of rod in the horizontal direction, and cross bar is divided into again leger and little cross bar, and leger refers to the cross bar along scaffold genesis analysis, and little cross bar refers to the cross bar along scaffold cross direction profiles.Leger and little cross bar are all connected in vertical rod by means of only fastener.
There are the following problems to adopt above-mentioned syndeton: 1, each junction of cross bar and vertical rod needs a fastener respectively, as a vertical rod needs to be connected with four cross bars, so just need to come fastening by four fasteners, and by the fastening usual needs of fastener repeatedly rotary buckle tighten up a screw and just can complete connection between scaffold with fixing, complex operation, cost of labor are higher and to set up speed slower.2, because each fastener vertically can occupy the space of vertical rod, therefore the cross bar be fixed in a vertical rod can not be positioned in same level, affect attractive in appearance, and, make the springboard be laid on scaffold can not contact completely with little cross bar with leger like this, cause springboard unbalance stress.
Utility model content
The syndeton that the utility model provides a kind of peripheral scaffold to build and scaffold, be all connected to by means of only fastener vertical rod cause the comparatively slow and cross bar of speed of setting up can not be positioned at problem in same level to solve leger and little cross bar.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme: the syndeton that a kind of peripheral scaffold is built, comprise plug-in unit and keeper, plug-in unit is positioned at the junction of cross bar and the vertical rod wherein body of rod, keeper is positioned at the junction of cross bar and vertical rod wherein another body of rod, the vacancy portion that keeper comprises stop part and passes for plug-in unit, plug-in unit is through vacancy portion, and the body of rod and the stop part at plug-in unit place offset.
Principle of the present utility model is: when connecting, and plug-in unit inserts the vacancy portion of keeper, can realize the connection of plug-in unit and keeper, be applicable to highly lower or easy scaffold and build.Certainly in order to increase the stability connected between plug-in unit and keeper, can will be designed to tight fit between plug-in unit and keeper or securing member is set on plug-in unit or keeper.
Compared with prior art, the utility model has the advantage of: 1, plug-in unit can realize the installation of cross bar and vertical rod, such operation very simple and fast through vacancy portion, and reduce the triviality of operation, efficiency is higher, make scaffold set up very fast.2, because plug-in unit and keeper can be arranged along the circumference of the body of rod, plug-in unit and keeper can overlap at the axial location of the body of rod, therefore leger and little cross bar can be positioned at same level, make scaffold seem neat appearance.When laying springboard, springboard can contact with little cross bar completely with leger, makes springboard uniform force.
Further, also comprise securing member, securing member is movably connected in cross bar or vertical rod to limit the motion of plug-in unit or location division.When there being multiple cross bar to be connected with vertical rod, after plug-in unit can being inserted the vacancy portion of keeper, then reinforced by multiple tie point by securing member, need fastener for installing respectively relative to each tie point, this kind of reinforcing mode is more quick.
Further, the linearly or L shape of described plug-in unit.When plug-in unit is positioned on cross bar, rectilinear plug-in unit; When plug-in unit is positioned in vertical rod, need the L-shaped vacancy portion that could insert keeper.
Further, the vacancy portion of described keeper is hole, groove or default space, when the vacancy portion of Design Orientation part, can at barrier plate perforate or groove, also can directly using default space as vacancy portion.
Further, described keeper is connecting ring, and connecting ring is provided with through hole for the formation of described vacancy portion, and connecting ring and the body of rod have more contact surface in the circumferential, makes connection more stable, and through hole facilitates plug-in unit to insert wherein.
Further, described securing member is fastener, because fastener is fastener conventional on scaffold, also can directly use fastener as securing member herein.
A kind of scaffold of the syndeton adopting the peripheral scaffold as said structure to build, comprise cross bar, vertical rod, plug-in unit, keeper and securing member, plug-in unit is arranged on cross bar, the quantity of plug-in unit is at least two, and plug-in unit is vertical with cross bar, and keeper and securing member are arranged in vertical rod, keeper protrudes from the circumference of vertical rod, keeper is provided with the installing hole passed for plug-in unit, and one end of plug-in unit is through installing hole, and the other end and the securing member of plug-in unit offset.This scaffold reduces the triviality of operation, and efficiency is higher, make scaffold set up very fast.Leger and little cross bar can be positioned at same level, make scaffold seem neat appearance.When laying springboard, springboard can contact with little cross bar completely with leger, makes springboard uniform force.
The scaffold of the another kind of syndeton adopting the peripheral scaffold as said structure to build, comprise cross bar, vertical rod, plug-in unit, keeper and securing member, keeper is arranged on cross bar, keeper is the connecting hole that radial direction is arranged on cross bar, the quantity of connecting hole is at least two, and plug-in unit and securing member are arranged in vertical rod, and plug-in unit is L-shaped, plug-in unit is through connecting hole, and securing member and cross bar offset.This scaffold reduces the triviality of operation, and efficiency is higher, make scaffold set up very fast.Leger and little cross bar can be positioned at same level, make scaffold seem neat appearance.When laying springboard, springboard can contact with little cross bar completely with leger, makes springboard uniform force.
The scaffold of the another kind of syndeton adopting the peripheral scaffold as said structure to build in addition, comprise cross bar, vertical rod, plug-in unit, keeper and securing member, plug-in unit is arranged on cross bar, plug-in unit is L-shaped, keeper and securing member are arranged in vertical rod, backstay is also L-shaped, and the interior recess of plug-in unit and the interior recess of keeper interlock, and securing member and plug-in unit offset.This scaffold reduces the triviality of operation, and efficiency is higher, make scaffold set up very fast.Leger and little cross bar can be positioned at same level, make scaffold seem neat appearance.When laying springboard, springboard can contact with little cross bar completely with leger, makes springboard uniform force.
Further, the quantity of described keeper or plug-in unit is two, and keeper or plug-in unit, near the two ends of cross bar, can effectively utilize the length of cross bar.
Further, described plug-in unit is arranged in the same way, if plug-in unit simultaneously towards upper or down simultaneously, can conveniently install cross bar like this.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
Fig. 1 is the structural representation of the syndeton embodiment 1 that the peripheral scaffold of the utility model is built.
Fig. 2 is the structural representation of the syndeton embodiment 3 that the peripheral scaffold of the utility model is built.
Fig. 3 is the structural representation of the syndeton embodiment 4 that the peripheral scaffold of the utility model is built.
Detailed description of the invention
Reference numeral in Figure of description comprises: cross bar 1, vertical rod 2, inserted block 3, keeper 4, fastener 5, through hole 6, connecting hole 7.
Embodiment 1
As shown in Figure 1, a kind of scaffold in the present embodiment, comprises cross bar 1, vertical rod 2, inserted block 3, keeper 4 and fastener 5.Inserted block 3 linearly shape, the quantity of inserted block 3 is two, and inserted block 3 is arranged on the two ends of cross bar 1, and vertical with the cross bar 1 respectively and homonymy of two inserted blocks 3 is arranged.Keeper 4 is arranged on the junction of vertical rod 2 and cross bar 1, and keeper 4 is connecting ring, and connecting ring is provided with through hole 6, and the lower end of inserted block 3 is through through hole 6.Fastener 5 is arranged in vertical rod 2, and fastener 5 is positioned at the top of inserted block 3 and is close to inserted block 3.
The concrete installation steps of the present embodiment are as follows: first vertical rod 2 installed, and connecting ring is equidistantly vertically welded in vertical rod 2, then two inserted blocks 3 on cross bar 1 are inserted in different through holes 6 respectively, after all cross bars 1 corresponding in a vertical rod 2 are all inserted into through hole 6 by inserted block 3, fastener 5 is arranged on the top of inserted block 3, inserted blocks 3 all in this vertical rod 2 all compresses by fastener 5.
Embodiment 2
The present embodiment is substantially identical with the structure of embodiment, and difference is: inserted block 3 is formed by carrying out cutting to cross bar 1, and the radial cut namely along cross bar 1 goes out bar hole, and namely the end of cross bar 1 forms inserted block 3.The benefit of such operation to weld the parts also not needing to increase other, but take full advantage of the material of cross bar 1 self.
Embodiment 3
As shown in Figure 2, a kind of scaffold in the present embodiment, comprises cross bar 1, vertical rod 2, inserted block 3, keeper 4 and fastener 5.Keeper 4 is arranged on cross bar 1, and keeper 4 is the radial connecting hole 7 being arranged on cross bar 1, and the quantity of connecting hole 7 is two, and connecting hole 7 is in one plane parallel.Inserted block 3 and fastener 5 are arranged in vertical rod 2, and inserted block 3 is L-shaped, and upward, inserted block 3 is through connecting hole 7, and fastener 5 is positioned at the top of cross bar 1 and is close to cross bar 1 for the free end of inserted block 3.
The concrete installation steps of the present embodiment are as follows: first vertical rod 2 installed, and the inserted block 3 of L shape is welded equidistantly vertically be welded in vertical rod 2, also the circumference along vertical rod 2 distributes, then two connecting holes 7 on cross bar 1 are inserted in the inserted block 3 of L shape respectively, when all cross bars 1 corresponding in a vertical rod 2 are all connected to after in vertical rod 2, fastener 5 is arranged on the top of cross bar 1, cross bars 1 all in this vertical rod 2 all compresses by fastener 5.
Embodiment 4
As shown in Figure 3, a kind of scaffold in the present embodiment, comprises cross bar 1, vertical rod 2, inserted block 3, keeper 4 and fastener 5.Wherein, inserted block 3 and keeper 4 all L-shaped, the quantity of inserted block 3 is two, is welded on respectively on the two ends of cross bar 1.Keeper 4 is welded in vertical rod 2, and inserted block 3 and the interior recess of keeper 4 interlock the connection both realizing.Fastener 5 is arranged in vertical rod 2, and is positioned at the top of inserted block 3, and is close to inserted block 3.
The concrete installation steps of the present embodiment are as follows: first vertical rod 2 installed, and the keeper 4 of L shape is welded equidistantly vertically be welded in vertical rod 2, also the circumference along vertical rod 2 distributes, then recess in cross bar 1 two ends inserted block 3 is placed on recess in keeper 4, when all cross bars 1 corresponding in a vertical rod 2 are all connected to after in vertical rod 2, fastener 5 is arranged on the top of inserted block 3, inserted blocks 3 all in this vertical rod 2 all compresses by fastener 5.
For a person skilled in the art; under the prerequisite not departing from the utility model structure; can also make some distortion and improvement, these also should be considered as protection domain of the present utility model, and these all can not affect effect and the practical applicability of the utility model enforcement.

Claims (10)

1. the peripheral scaffold syndeton of building, it is characterized in that: comprise plug-in unit and keeper, plug-in unit is positioned at the junction of cross bar and the vertical rod wherein body of rod, keeper is positioned at the junction of cross bar and vertical rod wherein another body of rod, the vacancy portion that keeper comprises stop part and passes for plug-in unit, plug-in unit is through vacancy portion, and the body of rod and the stop part at plug-in unit place offset.
2. the peripheral scaffold as claimed in claim 1 syndeton of building, it is characterized in that: also comprise securing member, securing member is movably connected in cross bar or vertical rod to limit the motion of plug-in unit or location division.
3. the peripheral scaffold as claimed in claim 1 syndeton of building, is characterized in that: the linearly or L shape of described plug-in unit.
4. the peripheral scaffold as claimed in claim 1 syndeton of building, is characterized in that: the vacancy portion of described keeper is hole, groove or default space.
5. the peripheral scaffold as claimed in claim 4 syndeton of building, it is characterized in that: described keeper is connecting ring, connecting ring is provided with through hole for the formation of described vacancy portion.
6. the peripheral scaffold as claimed in claim 2 syndeton of building, is characterized in that: described securing member is fastener.
7. the scaffold of the syndeton adopting peripheral scaffold as claimed in claim 2 to build, comprise cross bar and vertical rod, it is characterized in that: also comprise plug-in unit, keeper and securing member, plug-in unit is arranged on cross bar, and the quantity of plug-in unit is at least two, plug-in unit is vertical with cross bar, keeper and securing member are arranged in vertical rod, and keeper protrudes from the circumference of vertical rod, and keeper is provided with the installing hole passed for plug-in unit, one end of plug-in unit is through installing hole, and the other end and the securing member of plug-in unit offset.
8. the scaffold of the syndeton adopting peripheral scaffold as claimed in claim 2 to build, comprise cross bar and vertical rod, it is characterized in that: also comprise plug-in unit, keeper and securing member, keeper is arranged on cross bar, and keeper is the connecting hole that radial direction is arranged on cross bar, and the quantity of connecting hole is at least two, plug-in unit and securing member are arranged in vertical rod, plug-in unit is L-shaped, and plug-in unit is through connecting hole, and securing member and cross bar offset.
9. the scaffold of the syndeton adopting peripheral scaffold as claimed in claim 2 to build, comprise cross bar and vertical rod, it is characterized in that: also comprise plug-in unit, keeper and securing member, plug-in unit is arranged on cross bar, plug-in unit is L-shaped, and keeper and securing member are arranged in vertical rod, and backstay is also L-shaped, the interior recess of plug-in unit and the interior recess of keeper interlock, and securing member and plug-in unit offset.
10. the scaffold as described in claim 7,8 or 9, is characterized in that: the quantity of described keeper or plug-in unit is two, and keeper or plug-in unit are near the two ends of cross bar.
CN201520233236.XU 2015-04-17 2015-04-17 The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure Expired - Fee Related CN204715730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520233236.XU CN204715730U (en) 2015-04-17 2015-04-17 The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520233236.XU CN204715730U (en) 2015-04-17 2015-04-17 The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure

Publications (1)

Publication Number Publication Date
CN204715730U true CN204715730U (en) 2015-10-21

Family

ID=54314732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520233236.XU Expired - Fee Related CN204715730U (en) 2015-04-17 2015-04-17 The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure

Country Status (1)

Country Link
CN (1) CN204715730U (en)

Similar Documents

Publication Publication Date Title
CN103029204B (en) Modularized side form for prefabricating superimposed sheet
CN205653902U (en) Floor entrance to a cave block structure
CN204418662U (en) A kind of building vertical structure typified form negative and positive angle bracing means
CN205370110U (en) Constructon site fence
CN204152231U (en) Socket type safety guard rail
CN102720347B (en) Scaffold tool type wall connecting piece and construction method thereof
CN203947774U (en) A kind of building concrete outer wall template adds fixing bolt
CN204311723U (en) A kind of Cantilever Beams fastening devices for building
CN204715730U (en) The syndeton that a kind of peripheral scaffold is built and the scaffold adopting this structure
CN203867143U (en) Ground tile and connecting structure thereof
CN202117301U (en) Movable operating platform
CN205348693U (en) Horizontal big moulding of stone material curtain
CN205444560U (en) Heat preservation load bearing wall that improved generation 3D printed
CN103225395A (en) Floor post-cast strip template structure and use method
CN204457079U (en) Enclosure upright post
CN202209055U (en) Protection rail for construction site
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure
CN204023406U (en) The cradle vehicle that speedway cable is installed at bridge place
CN203160668U (en) Buckled type scaffold floor
CN202788018U (en) Storey near edge temporary guard rail
CN203320935U (en) Rear-embedded wall connecting device of scaffold
CN201991144U (en) Hanging stool for thickness-quality control of cast-in-place concrete floor upper-layer plate-rib protecting layer and concrete plate
CN204457074U (en) Combined enclosing wall component
CN204590796U (en) The detachable guardrail of a cluster cyclone
CN107060332B (en) Unilateral Screw arbor with nut at both-ends system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021