CN204715350U CN201520421634.4U CN201520421634U CN204715350U CN 204715350 U CN204715350 U CN 204715350U CN 201520421634 U CN201520421634 U CN 201520421634U CN 204715350 U CN204715350 U CN 204715350U
Authority
CN
China
Prior art keywords
flitch
bellows
design elevation
stake top
mark height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520421634.4U
Other languages
Chinese (zh)
Inventor
罗文�
郑晓峰
宁俊荣
汪迎
吴锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 6 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 6 Engineering Co Ltd filed Critical China Gezhouba Group No 6 Engineering Co Ltd
Priority to CN201520421634.4U priority Critical patent/CN204715350U/en
Application granted granted Critical
Publication of CN204715350U publication Critical patent/CN204715350U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

For stake top mark height in a pile extension device for design elevation, bellows outer wall is vertically arranged multiple first flitch, the first flitch is fixed on bellows by many fastening iron wires.Be provided with the second flitch between bellows and surrounding soil, the second flitch bottom contacts with soil, and top contacts with the first flitch, and the second flitch is obliquely installed.By adopting the mode of bellows pile extension, stake top mark height being dealt with in the situation of design elevation, utilizes bellows as formwork for placing, ensureing pouring quality; Utilize the first flitch to be vertically fixed on bellows outer wall, ensure that the vertical of the bellows in casting process; And the second flitch arranged, further ensure the stable of bellows, improve construction quality.By adopting said structure, be compared to existing stake top mark height in the settling mode of design elevation, this novel provided structure and mode operate more simple, and not by space constraint, formwork assembling and disassembling is convenient, and can ensure construction quality.

Description

A kind of for stake top mark height in the pile extension device of design elevation
Technical field
The utility model relates to pile foundation construction field, particularly a kind of for stake top mark height in the pile extension device of design elevation.
Background technology
The engineerings such as existing apartment is built, bridge adopt pile foundation in a large number, especially in the majority with pile for prestressed pipe, precast square pile, castinplace pile.And unavoidable appearance occurs super situation about sending and mechanical clashing and breaking pile body in digging process needing to cut off bad segments because of Geological Reasons in pile for prestressed pipe and construction of prefabricated piles process, cause a top mark height in design elevation.Another castinplace pile also easily occurs that in work progress aperture casing is extracted too early, and soil body extruding causes quality problems such as stake top concrete folder mud, leakiness etc., and to cut after this defective part that stake top mark is high will lower than design elevation.Need at stake jacking row pile extension for this kind of situation.General pile extension scheme all needs to increase additional bar cage, and shuttering adopts concreting to design elevation, or adopts hand excavated pile to carry out pile extension.But because pile extension position is at below ground, limit by operating space, column-form makes and peace tears equal inconvenience open, and adopts hand excavated pile time-consuming, and safety not easily ensures.
Summary of the invention
Technical problem to be solved in the utility model be to provide a kind of for stake top mark height in the pile extension device of design elevation, the safe, efficient of construction can be ensured, guarantee pile extension concrete pouring quality, and this apparatus structure is simple, easy accessibility, can reuse.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of for stake top mark height in the pile extension device of design elevation, bellows outer wall is vertically arranged multiple first flitch, the first flitch is fixed on bellows by many fastening iron wires.
In preferred scheme, be provided with the second flitch between described bellows and surrounding soil, the second flitch bottom contacts with soil, and top contacts with the first flitch, and the second flitch is obliquely installed.
In preferred scheme, described bellows is made up of two semicolumns.
In preferred scheme, described bellows is the two ancient piece of jade, round, flat and with a hole in its centre bellows of HDPE, and its minimum lamination wall thickness is 4.5mm, ring stiffness SN >=4.
In preferred scheme, the first flitch length should be identical with pile extension length, avoids occurring joint, if single flitch length is less than pile extension length, the mode of overlap joint can be adopted to regulate.
The utility model provide a kind of for stake top mark height in the pile extension device of design elevation, by adopting the mode of bellows pile extension, stake top mark height is dealt with in the situation of design elevation, utilize bellows as formwork for placing, rely on the owned rigidity of bellows, on-deformable feature, ensures pouring quality; Utilize the first flitch to be vertically fixed on bellows outer wall, ensure that the vertical of the bellows in casting process; And the second flitch arranged, further ensure the stable of bellows, improve construction quality.By adopting said structure, be compared to existing stake top mark height in the settling mode of design elevation, this novel provided structure and mode operate more simple, and not by space constraint, formwork assembling and disassembling is convenient, and can ensure construction quality.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is positive facade structural representation of the present utility model.
In figure: bellows 1, the first flitch 2, fastening iron wire 3, second flitch 4.
Detailed description of the invention
As in figure, a kind of for stake top mark height in the pile extension device of design elevation, bellows 1 outer wall is vertically arranged multiple first flitch 2, first flitch 2 and is fixed on bellows 1 by many fastening iron wires 3.
In preferred scheme, be provided with the second flitch 4, second flitch 4 bottom between described bellows 1 and surrounding soil and contact with soil, top contacts with the first flitch 2, and the second flitch 4 is obliquely installed.Utilize the second flitch to be fixed whole bellows, ensure the stability of bellows in casting process.
In preferred scheme, described bellows 1 is made up of two semicolumns.Bellows is cut into two parts, facilitate the dismounting of bellows.
In preferred scheme, described bellows 1 is the two ancient piece of jade, round, flat and with a hole in its centre bellows of HDPE, and its minimum lamination wall thickness is 4.5mm, and ring stiffness is SN >=4.
By adopting said structure, realize the pile extension of stake top mark height in design elevation situation, and ensure that the process of pile extension process is simply efficient, ensure that the construction quality in later stage.
Embodiment 1:
Choose the bellows of corresponding internal diameter according to designing requirement, adopt cutting machine longitudinally to cut open bellows into two halves, be convenient to detaching device.The good semicircle bellows of split, formation class is cylindrical, first flitch 2 of 50 × 100mm is laid outside pipe, along all long spacing≤250mm as vertical reinforcing, adopt fastening iron wire 3 first to fix bellows two ends flitch, top, bottom from bellows top, end distance is 200mm, interlude fastening iron wire 3 spacing controls within 750mm, flitch can be adopted to overlap when flitch is shorter than bellows height, lap length is 1.0m, and has at least the fastening iron wire 3 of twice to reinforce within the scope of this overlap joint.Reinforce good rear lower additional bar cage, the more lower plate device reinforced, adopt short steel pipes to prize, slight adjusting device is to design plane position.Utilize on-the-spot discarded flitch, be cut into the second suitable flitch 4, flitch one end withstands on the first flitch 2, and one end withstands on foundation ditch surrounding soil.Concreting, until after strength of mould stripping, removes the second flitch 4, then cuts off fastening iron wire 3 with bolt clipper, can light detaching device.

Claims (4)

1. for stake top mark height in a pile extension device for design elevation, it is characterized in that: bellows (1) outer wall is vertically arranged multiple first flitch (2), the first flitch (2) is fixed on bellows (1) by many fastening iron wires (3).
2. according to claim 1 a kind of for stake top mark height in the pile extension device of design elevation, it is characterized in that: between described bellows (1) and surrounding soil, be provided with the second flitch (4), second flitch (4) bottom contacts with soil, top contacts with the first flitch (2), and the second flitch (4) is obliquely installed.
3. according to claim 1 a kind of for stake top mark height in the pile extension device of design elevation, it is characterized in that: described bellows (1) is made up of two semicolumns.
4. according to claim 1 a kind of for stake top mark height in the pile extension device of design elevation, it is characterized in that: described bellows (1) is the two ancient piece of jade, round, flat and with a hole in its centre bellows of HDPE, and its minimum lamination wall thickness is 4.5mm, ring stiffness SN >=4.
CN201520421634.4U 2015-06-18 2015-06-18 A kind of for stake top mark height in the pile extension device of design elevation Expired - Fee Related CN204715350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520421634.4U CN204715350U (en) 2015-06-18 2015-06-18 A kind of for stake top mark height in the pile extension device of design elevation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520421634.4U CN204715350U (en) 2015-06-18 2015-06-18 A kind of for stake top mark height in the pile extension device of design elevation

Publications (1)

Publication Number Publication Date
CN204715350U true CN204715350U (en) 2015-10-21

Family

ID=54314354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520421634.4U Expired - Fee Related CN204715350U (en) 2015-06-18 2015-06-18 A kind of for stake top mark height in the pile extension device of design elevation

Country Status (1)

Country Link
CN (1) CN204715350U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836195A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 Pile extension device and pile extension method that a kind of use waste and scrap makes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836195A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 Pile extension device and pile extension method that a kind of use waste and scrap makes

Similar Documents

Publication Publication Date Title
CN102203361B (en) A lifting device and method for concrete elements
CN103510640B (en) A kind of fabricated shear wall and assembly method thereof
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN103352471B (en) Container prefabricated house assembling type steel reinforced concrete single-double-column foundation and construction method thereof
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
KR100924701B1 (en) Construction method for Utility-pipe conduit
CN102493446B (en) Steel tube column capable of preventing concrete spillover and method for mounting steel tube column
KR100926173B1 (en) Piping structure and method for constructing the same
CN103343547B (en) Container type prefabricated house assembling steel reinforced concrete four patten and construction method
CN112112056A (en) Assembled steel-concrete combined bridge pier and capping beam connecting system and construction method thereof
KR101566528B1 (en) Basement extension construction method using underground structure
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN102041806A (en) Construction method for inserting steel column in bored pile
KR20140017381A (en) A reinforcement method of a foundation structure used a micro pile
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN204715350U (en) A kind of for stake top mark height in the pile extension device of design elevation
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
JP2011017188A (en) Demolition method of existing building
JP2016205051A (en) Construction method for structure
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN204226126U (en) The improved-type blower foundation ring of a kind of variation rigidity anchoring
CN108755739B (en) Wind generating set foundation ring
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
JP5905802B2 (en) Construction method of breakwater using multi-purpose post
CN204098224U (en) Detachable concrete prefabricated wall plate structure house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021