CN204690698U - 一种泥石流拦砂坝 - Google Patents
一种泥石流拦砂坝 Download PDFInfo
- Publication number
- CN204690698U CN204690698U CN201520394800.6U CN201520394800U CN204690698U CN 204690698 U CN204690698 U CN 204690698U CN 201520394800 U CN201520394800 U CN 201520394800U CN 204690698 U CN204690698 U CN 204690698U
- Authority
- CN
- China
- Prior art keywords
- dam
- slope
- debris
- main body
- bed course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开了一种泥石流拦砂坝。所述拦砂坝包括坝体基础和设于坝体基础之上的坝身主体,坝身主体的迎水面侧设有塑性混凝土护面垫层,护面垫层与坝身主体之间呈阶梯状连接,护面垫层的面坡坡比1:m小于坝身主体的面坡坡比1:n。与现有技术相比,本实用新型能够缓冲泥石流和块石对坝体的冲击力,减小坝体损坏,提高拦砂坝使用年限和寿命。
Description
技术领域
本实用新型涉及一种泥石流防治技术,特别是涉及一种抗泥石流大石块冲击、带有塑性混凝土护面垫层的泥石流拦砂坝。
背景技术
泥石流是我国的主要地质灾害类型之一,广泛分布于我国的西部地区,尤其是西南山区。泥石流具有爆发突然、来势凶猛、破坏力强、覆盖范围广等特点,已成为严重制约西部山区、城镇经济发展的重要因素。目前,泥石流防灾减灾形势依然严峻,泥石流工程治理更加突显了它的重要性。
目前泥石流防治工程类型有:拦砂坝(谷坊)、桩林、排导槽、停淤场等,拦砂坝是诸多防治工程类型中应用范围最广的一种。受5.12汶川地震的影响,四川、甘南部分山区山坡土体松动、岩体破碎,加之极端天气(连续强降雨)的影响,极易形成大规模的泥石流,且常夹杂粒径大的巨石,例如:2010年8月13日文家沟泥石流冲出的巨石尺寸达3.0m×2.5m×1.6m,2010年8月8日舟曲三眼峪泥石流中的巨石尺寸达7.5m×7.0m×5.5m。巨石对拦砂坝的撞击容易使得拦砂坝坝体受到破坏,坝体破损后,抵抗泥石流的能力减弱,经维修后也很难达到原有期望值,且后期维修费用也很高;受巨石撞击后,拦砂坝坝体受损、使用年限减短,甚至可能被完全摧毁,丧失拦挡性能。可见,巨石对拦砂坝的冲击破坏危害非常大,研发一种抗泥石流冲击性能好的新型拦砂坝显得非常迫切。
实用新型内容
本实用新型的目的就是针对现有技术的不足,提供一种抗泥石流冲击、带塑性混凝土护面垫层的泥石流拦砂坝,能够缓冲泥石流和块石对坝体的冲击力,减小坝体损坏,提高拦砂坝使用年限和寿命。
为实现上述目的,本实用新型的技术方案是:
本实用新型提出的一种泥石流拦砂坝,包括坝体基础和设于坝体基础之上的坝身主体;坝身主体的迎水面侧设有塑性混凝土护面垫层,护面垫层与坝身主体之间呈阶梯状连接,护面垫层的面坡坡比1:m小于坝身主体的面坡坡比1:n。护面垫层的面坡坡比1:m取值为1:0.60-1:0.50。坝身主体的面坡坡比1:n取值为1:0.20-1:0.05。护面垫层厚度b为坝顶宽度B的1/10-1/8。
塑性混凝土的水泥含量较低,属于柔性材料,弹性模量低,应力变形大,充分利用其“以柔克刚”的特性,能够缓冲泥石流浆体和大块石对拦砂坝的冲击力,同时也减小了通过迎水面护面垫层缓冲后传递给背水面坝身主体的冲击力,能够减小泥石流和大块石对拦砂坝整体的破坏。为了便于护面垫层与坝身主体之间的结合,保持拦砂坝整体的完整性,护面垫层与坝身主体之间呈阶梯状连接。
与现有技术相比,本实用新型的有益效果是:充分利用塑性混凝土弹性模量低的性能,有效减小巨石对拦砂坝的冲击力,达到延长拦砂坝使用寿命的目的。
附图说明
图1是本实用新型的结构示意图。
图中标号如下:
1 坝体基础 2 坝身主体
3 护面垫层
b 护面垫层厚度 B 坝顶宽度
1:m 护面垫层的面坡坡比 1:n 坝身主体的面坡坡比
具体实施方式
下面结合附图,对本实用新型的优选实施例作进一步的描述。
实施例1
如图1所示。某泥石流沟流域面积为1.36km2,沟床纵比降412‰,沟口处设有乡村公路。泥石流暴发后,常淤埋沟口公路,堵塞道路,长达1月之久。为保障该公路的畅通,采用“拦挡+排导+停淤”的工程治理措施,即规划主沟道4座拦砂坝、跨越公路的明硐渡槽和沟口堆积扇的停淤场组成。由于该沟道纵比降大,泥石流运动速度大,对拦砂坝的冲击力也很大。为了减小巨石对拦砂坝的冲击力,采用本实用新型的泥石流拦砂坝。
所述拦砂坝包括坝体基础1和设于坝体基础1之上的坝身主体2;坝身主体2的迎水面侧设有塑性混凝土护面垫层3,护面垫层3与坝身主体2之间呈阶梯状连接。根据泥石流沟流域情况规划所述拦砂坝,总坝高20.5m,溢流口底部至坝体基础1顶面的有效坝高为12.5m,垂直于主流方向的坝轴线长38m,坝顶宽度B为2.5m,护面垫层3的面坡坡比1:m为1:0.50,坝身主体2的面坡坡比1:n为1:0.20,护面垫层3厚度b为坝顶宽度B的1/8,即b为0.31m。
实施例2
如图1所示。某泥石流沟流域面积7.19km2,主河从沟口堆积扇前缘穿过,并在堆积扇上建有省道公路干线。为防止泥石流堵塞河道和淤埋省道公路,采用“拦挡+停淤”的工程治理措施,即规划在沟道内修建2座拦砂坝和堆积扇上修建1个停淤场。为了减小巨石对拦砂坝的冲击力,采用本实用新型的泥石流拦砂坝。
所述拦砂坝包括坝体基础1和设于坝体基础1之上的坝身主体2;坝身主体2的迎水面侧设有塑性混凝土护面垫层3,护面垫层3与坝身主体2之间呈阶梯状连接。根据泥石流沟流域情况规划所述拦砂坝,总坝高14m,溢流口底部至坝体基础1顶面的有效坝高为10m,垂直于主流方向的坝轴线长110m,坝顶宽度B为3.0m,护面垫层3的面坡坡比1:m为1:0.60,坝身主体2的面坡坡比1:n为1:0.05,护面垫层3厚度b为0.3m。
由于该泥石流沟沟道内冲出大量的块石,冲出的巨石尺寸达3.0m×2.3m×2.0m,速度5m/s,按照该尺寸模拟计算得出泥石流对位于沟口泥石流拦砂坝的冲击力为4.95×104kN。采用本实用新型的泥石流拦砂坝,按照上述巨石尺寸,经模拟计算,泥石流对该拦砂坝的冲击力为1.92×104kN。与泥石流撞击传统拦砂坝的冲击力相比,减少了61.2%,极大地消减了巨石对拦砂坝的冲击能力。
Claims (4)
1.一种泥石流拦砂坝,所述拦砂坝包括坝体基础(1)和设于坝体基础(1)之上的坝身主体(2),其特征在于:坝身主体(2)的迎水面侧设有塑性混凝土护面垫层(3),护面垫层(3)与坝身主体(2)之间呈阶梯状连接,护面垫层(3)的面坡坡比1:m小于坝身主体(2)的面坡坡比1:n。
2.根据权利要求1所述的泥石流拦砂坝,其特征在于:护面垫层(3)的面坡坡比1:m取值为1:0.60-1:0.50。
3.根据权利要求1所述的泥石流拦砂坝,其特征在于:坝身主体(2)的面坡坡比1:n取值为1:0.20-1:0.05。
4.根据权利要求1-3任一所述的泥石流拦砂坝,其特征在于:护面垫层(3)厚度b为坝顶宽度B的1/10-1/8。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520394800.6U CN204690698U (zh) | 2015-06-09 | 2015-06-09 | 一种泥石流拦砂坝 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520394800.6U CN204690698U (zh) | 2015-06-09 | 2015-06-09 | 一种泥石流拦砂坝 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204690698U true CN204690698U (zh) | 2015-10-07 |
Family
ID=54231007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520394800.6U Expired - Fee Related CN204690698U (zh) | 2015-06-09 | 2015-06-09 | 一种泥石流拦砂坝 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204690698U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104067A (zh) * | 2017-12-25 | 2018-06-01 | 浙江大学 | 一种适用于山区的新型柔性泥石流拦挡装置及其施工方法 |
CN111663495A (zh) * | 2020-05-07 | 2020-09-15 | 中国电建集团华东勘测设计研究院有限公司 | 一种适用于沟口狭窄的填渣场防护和排导结构及施工方法 |
CN113282997A (zh) * | 2021-06-16 | 2021-08-20 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流拦砂坝库内回淤纵比降测算方法、应用 |
CN115387290A (zh) * | 2022-08-22 | 2022-11-25 | 黄河水利职业技术学院 | 一种水利水电工程溢流水坝结构 |
-
2015
- 2015-06-09 CN CN201520394800.6U patent/CN204690698U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104067A (zh) * | 2017-12-25 | 2018-06-01 | 浙江大学 | 一种适用于山区的新型柔性泥石流拦挡装置及其施工方法 |
CN111663495A (zh) * | 2020-05-07 | 2020-09-15 | 中国电建集团华东勘测设计研究院有限公司 | 一种适用于沟口狭窄的填渣场防护和排导结构及施工方法 |
CN113282997A (zh) * | 2021-06-16 | 2021-08-20 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流拦砂坝库内回淤纵比降测算方法、应用 |
CN113282997B (zh) * | 2021-06-16 | 2022-10-11 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流拦砂坝库内回淤纵比降测算方法、应用 |
CN115387290A (zh) * | 2022-08-22 | 2022-11-25 | 黄河水利职业技术学院 | 一种水利水电工程溢流水坝结构 |
CN115387290B (zh) * | 2022-08-22 | 2023-10-27 | 黄河水利职业技术学院 | 一种水利水电工程溢流水坝结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476305B (zh) | 一种基于梯级防冲刷齿槛群的泥石流排导槽及其应用 | |
CN204690698U (zh) | 一种泥石流拦砂坝 | |
CN205314071U (zh) | 一种多级扇形陡坡消能结构 | |
CN103088791B (zh) | 一种消能式排导拦挡结合的泥石流拦砂坝 | |
CN101270570B (zh) | 一种稀性泥石流和高含沙洪水的泥沙拦淤方法及其应用 | |
CN102162229A (zh) | 一种防御大规模低频率泥石流的拦砂坝 | |
CN205077452U (zh) | 一种泥石流沟治理的拦挡坝结构 | |
CN103195024B (zh) | 自动分配排导量和停淤量的泥石流分流坝及其设计方法 | |
CN201962615U (zh) | 一种能主动防护泥石流的加固网 | |
CN110344374A (zh) | 泥石流柔性拦挡网及泥石流柔性拦挡坝 | |
CN205954559U (zh) | 用于大型拦渣场的沟水处理结构 | |
CN210529629U (zh) | 一种泥石流排导槽 | |
CN103233440B (zh) | 一种基于矿渣型泥石流形成机理的防治方法 | |
CN208309527U (zh) | 一种曲线形泥石流拦挡的防护系统 | |
CN105926542A (zh) | 一种非对称式泥石流排导槽及其设计方法和应用 | |
CN215562326U (zh) | 一种用于泥石流拦挡、分流和水石分离的防治系统 | |
CN104727301A (zh) | 地质加固装置 | |
CN108560503A (zh) | 一种泥石流拦挡结构及拦挡方法 | |
CN213233325U (zh) | 应用于泥石流防治的截导结构 | |
CN104452789A (zh) | 一种均质粘土灰坝排渗系统 | |
CN208055980U (zh) | 一种水利工程用透水防冲墙结构 | |
CN112900369A (zh) | 一种尾矿库排渗加固结构 | |
KR20110083935A (ko) | 친환경 복합 사방댐 | |
CN211815973U (zh) | 无坝取水进水渠防淤结构 | |
CN205296359U (zh) | 一种环山公路截水沟 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151007 Termination date: 20170609 |