CN204648636U - The gas heater of built-in buffer tank - Google Patents

The gas heater of built-in buffer tank Download PDF

Info

Publication number
CN204648636U
CN204648636U CN201520306947.5U CN201520306947U CN204648636U CN 204648636 U CN204648636 U CN 204648636U CN 201520306947 U CN201520306947 U CN 201520306947U CN 204648636 U CN204648636 U CN 204648636U
Authority
CN
China
Prior art keywords
water
pipe
bypass
buffer tank
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520306947.5U
Other languages
Chinese (zh)
Inventor
叶远璋
唐元锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Vanward New Electric Co Ltd
Original Assignee
Guangdong Vanward New Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Vanward New Electric Co Ltd filed Critical Guangdong Vanward New Electric Co Ltd
Priority to CN201520306947.5U priority Critical patent/CN204648636U/en
Application granted granted Critical
Publication of CN204648636U publication Critical patent/CN204648636U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

A kind of gas heater of built-in buffer tank, comprise heat exchanger, water inlet pipe and outlet pipe, water inlet pipe, outlet pipe are connected to heat exchanger two ends, it is characterized in that: it also comprises bypass pipe, water circulating pump and buffer tank, bypass pipe is in parallel with heat exchanger, the two ends of bypass pipe connect water inlet pipe, outlet pipe respectively, water circulating pump is arranged on water inlet pipe, the input of water circulating pump is near bypass pipe side, recirculated water delivery side of pump is near heat exchanger side, and buffer tank is connected on the outlet pipe between heat exchanger and bypass pipe.Cold water in closed circulation pipeline is carried out circulating-heating by water circulating pump, bypass pipe by the utility model, reaches the effect of start without cold water; Meanwhile, by the buffer tank of stored hot water of connecting on outlet pipe, can the water larger with the design temperature temperature difference in start-up course, the course of work of heat of neutralization hydrophone, thus improve the temperature persistance of complete machine, improve the bath comfort degree of user.

Description

The gas heater of built-in buffer tank
Technical field
The utility model relates to a kind of gas heater of built-in buffer tank.
Background technology
In the prior art, gas heater is be contained in outdoor mostly, have certain distance with water spot to water outlet of water heater end from user, all there is certain cold water before each user uses in water pipe, the cold water that must rack up in water pipe could use water heater hot water out.Moreover, due to the impact of water pressure fluctuations in bathing process, inevitably cause in the fluctuation of leaving water temperature and bathing process and there will be the high phenomenon of water cut-off temperature-rising owing to again starting after the closedown of water heater short time, above series of problems has a strong impact on the bath comfort degree of user.For overcoming these defects, spy develops the gas heater of built-in buffer tank.
Summary of the invention
Technical problem to be solved in the utility model is the gas heater that will provide a kind of built-in buffer tank, and it can cold water in circulating-heating pipeline, also can the water larger with the design temperature temperature difference in start-up course, the course of work of heat of neutralization hydrophone.
The technical scheme that the utility model solves the employing of its technical problem is: it comprises heat exchanger, water inlet pipe and outlet pipe, water inlet pipe, outlet pipe are connected to heat exchanger two ends, in addition, it also comprises bypass pipe, water circulating pump and buffer tank, bypass pipe is in parallel with heat exchanger, the two ends of bypass pipe connect water inlet pipe, outlet pipe respectively, water circulating pump is arranged on water inlet pipe, the input of water circulating pump is near bypass pipe side, recirculated water delivery side of pump is near heat exchanger side, and buffer tank is connected on the outlet pipe between heat exchanger and bypass pipe.Water circulating pump works, and the water in outlet pipe, buffer tank flows to heat exchanger by bypass pipe and water circulating pump, after reheating, is stored in buffer tank, thus user is started shooting can use the hot water of suitable temperature.In addition, the hot water be stored in buffer tank contributes to the fluctuating temperature cushioning the problem initiation such as water pressure fluctuations and water cut-off temperature-rising height.
The technical program also comprises water pump check valve, and water pump check valve and water circulating pump are installed in parallel, and the input of water pump check valve is near bypass pipe side, and the output of water pump check valve is near heat exchanger side.The nozzle sizes of water circulating pump is generally less than normal, the structure that water pump check valve and water circulating pump are installed in parallel, both water circulating pump and water inlet pipe can have been avoided because of nozzle sizes difference to affect the discharge of gas heater, can ensure that again the water in outlet pipe, buffer tank can be delivered to heat exchanger by water circulating pump.
For preventing the cold water in water inlet pipe from directly entering outlet pipe by bypass pipe, described bypass pipe is provided with bypass check valve, and the input of bypass check valve is near outlet pipe side, and the output of bypass check valve is near water inlet pipe side; Or bypass pipe is provided with bypass cutoff valve.
When bypass pipe is provided with bypass cutoff valve, the technical program also comprises return pipe.Return pipe one end is reserved opening, and the other end is connected with bypass pipe or water inlet pipe, is provided with backwater check valve or backwater stop valve between the reserved opening of return pipe and water inlet pipe.Return pipe coordinates with water circulating pump and and can be transported to buffer tank heat exchanger with the water between water spot and gas heater outlet pipe and carry out circulating-heating, reach the effect of insulation hot water, and by hot water storage in the buffer tank that gas heater is built-in, to extend the temperature retention time of hot water, ensure the temperature persistance of gas heater.
Described return pipe is provided with return water temperature probe, and water inlet pipe is provided with inflow temperature probe and water flow sensor, and outlet pipe is provided with leaving water temperature probe.
Described inflow temperature probe and water flow sensor are located on the water inlet pipe between heat exchanger and bypass pipe.Inflow temperature probe and water flow sensor are arranged at this position, both can monitor temperature and the flow of the running water entering water inlet pipe, also can monitor when working from water circulating pump, flow to temperature and the flow of the cold water of water inlet pipe from bypass pipe.
The utility model compares produced beneficial effect with background technology:
Cold water in closed circulation pipeline is carried out circulating-heating by water circulating pump, bypass pipe by the utility model, reaches the effect of start without cold water; Meanwhile, by the buffer tank of stored hot water of connecting on outlet pipe, can the water larger with the design temperature temperature difference in start-up course, the course of work of heat of neutralization hydrophone, thus improve the temperature persistance of complete machine, improve the bath comfort degree of user.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is another structural representation of the present utility model;
Fig. 3 is the structural representation of the utility model using state.
Detailed description of the invention
As depicted in figs. 1 and 2, the present embodiment comprises heat exchanger 1, water inlet pipe 2, outlet pipe 3, bypass pipe 4, water pump check valve 5, water circulating pump 6 and buffer tank 7.Water inlet pipe 2, outlet pipe 3 are connected to heat exchanger 1 two ends, and bypass pipe 4 is provided with bypass cutoff valve 9.Bypass pipe 4 is in parallel with heat exchanger 1, and the two ends of bypass pipe 4 connect water inlet pipe 2, outlet pipe 3 respectively.Water circulating pump 6 is arranged on water inlet pipe 2, and the input of water circulating pump 6 is near bypass pipe 4 side, and the output of water circulating pump 6 is near heat exchanger 1 side.Water pump check valve 5 and water circulating pump 6 are installed in parallel, and the input of water pump check valve 5 is near bypass pipe 4 side, and the output of water pump check valve 5 is near heat exchanger 1 side.Buffer tank 7 is connected on the outlet pipe 3 between heat exchanger 1 and bypass pipe 4.
The present embodiment also comprises return pipe 10, and return pipe 10 one end is reserved opening, and the other end is connected with bypass pipe or water inlet pipe, is provided with backwater check valve 8 or backwater stop valve (not shown), as shown in Figure 1 or 2 between the reserved opening of return pipe 10 and water inlet pipe 2.Return pipe 10 is provided with return water temperature probe 11, and water inlet pipe 2 is provided with inflow temperature probe 21 and water flow sensor 22, and outlet pipe 3 is provided with leaving water temperature probe 31.Inflow temperature probe 21 and water flow sensor 22 are located on the water inlet pipe 2 between heat exchanger 1 and bypass pipe 4.
The utility model adds bypass pipe 4, return pipe 10, water circulating pump 6 and buffer tank 7 etc. on general gas water heater basis, outlet pipe 3, return pipe 10 form a closed-loop path with water inlet pipe 2 road, outlet pipe 3, bypass pipe 4 form another closed-loop path with water inlet pipe 2 road, the water flow in closed-loop path can be allowed to produce water-flow signal by water circulating pump 6, with gas water heater working, the water in closed-loop path is heated to the temperature of user's setting, when treating the first bathing of user, what flow out from outlet pipe 3 is the hot water heated.And be connected in outlet pipe 3 due to buffer tank 7, the water in buffer tank 7 can in and the hot and cold water that causes of cold water in gas heater start-up course, the water cut-off temperature-rising high-temperature water, the water pressure fluctuations that cause, thus reduce the fluctuation of the temperature difference in bathing process.
The utility model adopts four temp probes to combine with water flow sensor, according to the keying of the Numerical Control water circulating pump 6 of monitoring.As shown in Figure 3, in figure, dotted line represents that return pipe 10 alternative is disconnected or connects, and when water circulating pump 6 works, the utility model has two kinds of circulation patterns, and user can select circulation pattern by the keying controlling bypass cutoff valve 9.Wherein one is Inner eycle pattern, now return pipe 10 is disconnected and is needed to adopt plug to close, bypass cutoff valve 9 is opened, outlet pipe 3 flows to heat exchanger 1 with the water in buffer tank 7 by bypass pipe 4, water pump check valve 5, water circulating pump 6, return outlet pipe 3 and buffer tank 7, so circulate; Another kind is outer circulation pattern, now return pipe 10 needs to connect, and bypass cutoff valve 9 cuts out, and outlet pipe 3 flows to heat exchanger 1 with the water in buffer tank 7 by return pipe 10, water pump check valve 5, water circulating pump 6, return outlet pipe 3 and buffer tank 7, so circulate.
In the utility model, bypass cutoff valve 9 can adopt bypass check valve (not shown) to replace, and bypass check valve is located on bypass pipe 4, and the input of bypass check valve is near outlet pipe 3 side, and the output of bypass check valve is near water inlet pipe 2 side.Now, water heater, without the need to arranging return pipe 10, does not namely possess outer circulation function, and when working to prevent water circulating pump 6, bypass pipe 4 water route and return pipe 10 water route influence each other.

Claims (7)

1. the gas heater of a built-in buffer tank, comprise heat exchanger (1), water inlet pipe (2) and outlet pipe (3), water inlet pipe (2), outlet pipe (3) is connected to heat exchanger (1) two ends, it is characterized in that: it also comprises bypass pipe (4), water circulating pump (6) and buffer tank (7), bypass pipe (4) is in parallel with heat exchanger (1), the two ends of bypass pipe (4) connect water inlet pipe (2) respectively, outlet pipe (3), water circulating pump (6) is arranged on water inlet pipe (2), the input of water circulating pump (6) is near bypass pipe (4) side, the output of water circulating pump (6) is near heat exchanger (1) side, buffer tank (7) is connected on the outlet pipe (3) between heat exchanger (1) and bypass pipe (4).
2. the gas heater of built-in buffer tank according to claim 1, it is characterized in that: it also comprises water pump check valve (5), water pump check valve (5) and water circulating pump (6) are installed in parallel, the input of water pump check valve (5) is near bypass pipe (4) side, and the output of water pump check valve (5) is near heat exchanger (1) side.
3. the gas heater of built-in buffer tank according to claim 1 and 2, it is characterized in that: described bypass pipe (4) is provided with bypass check valve, the input of bypass check valve is near outlet pipe (3) side, and the output of bypass check valve is near water inlet pipe (2) side.
4. the gas heater of built-in buffer tank according to claim 1 and 2, is characterized in that: described bypass pipe (4) is provided with bypass cutoff valve (9).
5. the gas heater of built-in buffer tank according to claim 4, it is characterized in that: described it also comprise return pipe (10), return pipe (10) one end is reserved opening, the other end is connected with bypass pipe or water inlet pipe, is provided with backwater check valve (8) or backwater stop valve between the reserved opening of return pipe (10) and water inlet pipe (2).
6. the gas heater of built-in buffer tank according to claim 5, it is characterized in that: described return pipe (10) is provided with return water temperature probe (11), water inlet pipe (2) is provided with inflow temperature probe (21) and water flow sensor (22), and outlet pipe (3) is provided with leaving water temperature probe (31).
7. the gas heater of built-in buffer tank according to claim 6, is characterized in that: described inflow temperature probe (21) and water flow sensor (22) are located on the water inlet pipe (2) between heat exchanger (1) and bypass pipe (4).
CN201520306947.5U 2015-05-14 2015-05-14 The gas heater of built-in buffer tank Active CN204648636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520306947.5U CN204648636U (en) 2015-05-14 2015-05-14 The gas heater of built-in buffer tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520306947.5U CN204648636U (en) 2015-05-14 2015-05-14 The gas heater of built-in buffer tank

Publications (1)

Publication Number Publication Date
CN204648636U true CN204648636U (en) 2015-09-16

Family

ID=54101383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520306947.5U Active CN204648636U (en) 2015-05-14 2015-05-14 The gas heater of built-in buffer tank

Country Status (1)

Country Link
CN (1) CN204648636U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823203A (en) * 2015-11-25 2016-08-03 广州帝胜智能科技有限公司 Split type quick-heating multifunctional water heater
CN107490175A (en) * 2017-08-18 2017-12-19 郑州朗鑫智能电子科技有限公司 A kind of Intelligent heating gas heater
CN108444094A (en) * 2018-06-06 2018-08-24 广东万家乐燃气具有限公司 A kind of thermostatic type central heater and control method
CN109506418A (en) * 2018-12-24 2019-03-22 苏州奥德机械有限公司 A kind of water temperature machine with time pumping function
CN110701792A (en) * 2018-07-09 2020-01-17 罗卫华 Gas water heater 'mixed temperature water tank'
CN111664573A (en) * 2020-07-08 2020-09-15 珠海格力电器股份有限公司 Anti-freezing control method and device for gas water heater
CN111964267A (en) * 2020-07-09 2020-11-20 华帝股份有限公司 Water heater and control method thereof
CN113339994A (en) * 2021-06-15 2021-09-03 珠海格力电器股份有限公司 Gas water heater, control method and control device thereof
CN114111048A (en) * 2020-08-31 2022-03-01 芜湖美的厨卫电器制造有限公司 Heat exchanger and water heating apparatus

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823203A (en) * 2015-11-25 2016-08-03 广州帝胜智能科技有限公司 Split type quick-heating multifunctional water heater
CN107490175A (en) * 2017-08-18 2017-12-19 郑州朗鑫智能电子科技有限公司 A kind of Intelligent heating gas heater
CN108444094A (en) * 2018-06-06 2018-08-24 广东万家乐燃气具有限公司 A kind of thermostatic type central heater and control method
CN110701792A (en) * 2018-07-09 2020-01-17 罗卫华 Gas water heater 'mixed temperature water tank'
CN109506418A (en) * 2018-12-24 2019-03-22 苏州奥德机械有限公司 A kind of water temperature machine with time pumping function
CN109506418B (en) * 2018-12-24 2024-02-02 苏州奥德高端装备股份有限公司 Water temperature machine with water back pumping function
CN111664573A (en) * 2020-07-08 2020-09-15 珠海格力电器股份有限公司 Anti-freezing control method and device for gas water heater
CN111964267A (en) * 2020-07-09 2020-11-20 华帝股份有限公司 Water heater and control method thereof
CN111964267B (en) * 2020-07-09 2024-02-23 华帝股份有限公司 Water heater and control method thereof
CN114111048A (en) * 2020-08-31 2022-03-01 芜湖美的厨卫电器制造有限公司 Heat exchanger and water heating apparatus
CN113339994A (en) * 2021-06-15 2021-09-03 珠海格力电器股份有限公司 Gas water heater, control method and control device thereof

Similar Documents

Publication Publication Date Title
CN204648636U (en) The gas heater of built-in buffer tank
CN105387629A (en) Constant-temperature type gas water heater and control method
CN204478508U (en) Gas heater
KR102057367B1 (en) Heat pump heat supply system
CN207702743U (en) Automatic-boosting hot water circulating device and its application system
CN104930692A (en) Gas water heater, control method thereof and waterway pipe network
CN104913508B (en) A kind of gas heater thermostat and constant-temperature effluent control method
CN204648637U (en) The gas heater of built-in buffer tank
CN105258351A (en) Gas water heater capable of achieving automatic bathtub draining function
CN106871428A (en) A kind of antifreeze boosting type gas heater
CN204574515U (en) Domestic hot water system
CN104566929A (en) Gas water heater and control method
CN204513731U (en) A kind of gas heater
CN206771717U (en) Water heater with small fluctuation of outlet water temperature
CN204574198U (en) A kind of heat pump heating unit with hydraulic module
CN204718138U (en) The gas heater of built-in buffer tank and apply its water route pipe network
CN205939817U (en) Air can water temperature control unit and is used its water bath system
CN104633940A (en) Constant-temperature water heater with internal circulation water return pipe
CN204063518U (en) A kind of gas heater the heat source machine be unified into
CN204478486U (en) Teat pump boiler
CN106196730A (en) A kind of air energy Water temp controller group and use its water-bath system
CN106152521A (en) A kind of capable of self-circulating circulating device and there is the water heater of this circulating device
CN204853625U (en) Energy -conserving heating system
CN204718140U (en) For the external water EGR of water heater and the combination with water heater thereof
CN204511993U (en) A kind of boiler room feed water pump cooling water circulation utilization apparatus of energy-conserving and environment-protective

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant