CN206637822U - A kind of antifreeze boosting type gas heater - Google Patents

A kind of antifreeze boosting type gas heater Download PDF

Info

Publication number
CN206637822U
CN206637822U CN201720196235.1U CN201720196235U CN206637822U CN 206637822 U CN206637822 U CN 206637822U CN 201720196235 U CN201720196235 U CN 201720196235U CN 206637822 U CN206637822 U CN 206637822U
Authority
CN
China
Prior art keywords
pipe
antifreeze
heater
water inlet
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720196235.1U
Other languages
Chinese (zh)
Inventor
余少言
何迪朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Macro Gas Appliance Co Ltd
Original Assignee
Guangdong Macro Gas Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Macro Gas Appliance Co Ltd filed Critical Guangdong Macro Gas Appliance Co Ltd
Priority to CN201720196235.1U priority Critical patent/CN206637822U/en
Application granted granted Critical
Publication of CN206637822U publication Critical patent/CN206637822U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses a kind of antifreeze boosting type gas heater, including:Gas water-heater housing, the heat exchanger in gas water-heater housing, coil pipe on heat exchangers is wound, water inlet pipe, the outlet pipe being connected with coil pipe, and the antifreeze heater being arranged on coil pipe;It is characterized in that, bypass pipe, electric T-shaped valve and booster pump are additionally provided with gas water-heater housing, the bypass pipe is connected water inlet pipe, outlet pipe by electric T-shaped valve, water inlet pipe, coil pipe, outlet pipe is formed circulation loop, the booster pump is arranged on circulation loop;Temp probe is additionally provided with heat exchanger or coil pipe, the antifreeze heater, electric T-shaped valve, booster pump, temp probe are all connected with gas heater master controller.Not only mounting structure is simple for the utility model, and current coordinate antifreeze heater to generate heat when closed-loop-pipeline circulates, and uniform fluid flow is heated, and plays dual antifreeze, effectively prevents water tank coil frost broken.

Description

A kind of antifreeze boosting type gas heater
Technical field
It the utility model is related to gas heater technical field, more particularly to a kind of antifreeze boosting type gas heater.
Background technology
The long-term temperature in the northern area of China is low, and Water tank for gas water heater coil frost broken problem happens occasionally, existing most of heat Hydrophone manufacturer is antifreeze using Electric heating using antifreeze heater winding water tank coil pipe.But when antifreeze heater fails When or strong cold wind when entering water tank by smoke pipe, cooling velocity is even faster than the rate of heat addition of antifreeze calandria, in water tank Residual water still can freeze and cause tank breaks.
In the prior art, also have using circulating pump to realize the gas heater of antifreeze function.Such as Publication No. CN203375718U Chinese utility model patent discloses a kind of warm-up cycle device, the water inlet end being located at outside water heater and water outlet In one point of loop between end, there is anti-frost protection effect.It is this anti-but the existing antifreeze form of circulating pump is that external is antifreeze It is more complicated to freeze preheating method pipeline, otherwise default water return pipeline is needed, otherwise need to allow user to purchase in addition when buying water heater This water heater box with loop control is bought, cost is high, and installation is also inconvenient.
Utility model content
For problems of the prior art, the purpose of this utility model is to provide a kind of simple in construction, installation side Just the gas heater of supercharging antifreeze function, is integrated.
To achieve the above objectives, the utility model adopts the following technical scheme that.
A kind of antifreeze boosting type gas heater, including:Gas water-heater housing, in gas water-heater housing Heat exchanger, coil pipe on heat exchangers is wound, water inlet pipe, the outlet pipe being connected with coil pipe, and be arranged on antifreeze on coil pipe Heater;Characterized in that, bypass pipe, electric T-shaped valve and booster pump are additionally provided with gas water-heater housing, the bypass Pipe is connected water inlet pipe, outlet pipe by electric T-shaped valve, water inlet pipe, coil pipe, outlet pipe is formed circulation loop, the supercharging Pump is arranged on circulation loop;Be additionally provided with temp probe on heat exchanger or coil pipe, the antifreeze heater, electric T-shaped valve, Booster pump, temp probe are all connected with gas heater master controller, and the gas heater master controller is according to temp probe Feedback signal controls antifreeze heater, electric T-shaped valve and supercharging pump work.
As with improvement, the electric T-shaped valve includes water inlet, the first delivery port and the second delivery port, and passes through water inlet Mouth, the first delivery port are serially connected on outlet pipe, and one end of the bypass pipe and the second delivery port of motor-driven valve connect, bypass pipe The other end is directly connected with water inlet pipe.
As with improvement, the booster pump, on water inlet pipe, outlet pipe or bypass pipe.
As check valve with improvement, is provided with water inlet pipe, the check valve is located at bypass pipe and water inlet pipe junction Upstream.
As with improvement, do not lighted a fire under heated condition in gas heater, when temp probe detects temperature≤setting temperature When spending T, main controller controls electric T-shaped valve is switched to circulation loop connected state, while controls antifreeze calandria to begin to warm up And control booster pump to be run with minimum power output, the water in circulation loop is carried out circulation anti-freezing.
As with improvement, when temp probe detects temperature > design temperature T1, the antifreeze heater of main controller controls Stop heating, only booster pump is run with minimum power output.
As with improvement, when temp probe detects temperature > design temperature T2, the antifreeze heater of main controller controls Stop heating and control booster pump to shut down.
As with improvement, when gas water heater ignition normal work, main controller controls electric T-shaped valve switches back into just Conventional water state, and control booster pump to be operated with peak power output.
As with improvement, the design temperature T, design temperature T1, design temperature T2 span are 2-5 DEG C.
The beneficial effects of the utility model are:
First, by built-in circulating pump, electric T-shaped valve, realized with shorter pipeline and faster time in gas heater The circulating-heating of portion's pipeline, not only mounting structure is simple, and current coordinate antifreeze heater when closed-loop-pipeline circulates Heating, uniform fluid flow is heated, dual antifreeze, effectively prevents water tank coil frost broken.
2nd, when carrying out antifreeze, booster pump is operated with minimum output power, saves, be Jing Yin;When carrying out bathing, supercharging Pump is run with peak power output, realizes function of increasing pressure, and comfortable experience of taking a shower is brought to user.
Brief description of the drawings
Fig. 1 show antifreeze boosting type gas heater structural representation provided by the utility model.
Description of reference numerals:
1:Gas water-heater housing, 2:Heat exchanger, 3:Coil pipe, 4:Water inlet pipe, 5:Outlet pipe, 6:Antifreeze heater, 7:It is other Siphunculus, 8:Electric T-shaped valve, 9:Booster pump, 10:Temp probe, 11:Check valve.
Embodiment
Essence of the present utility model is more fully understood for convenience of those skilled in the art, it is new to this practicality below in conjunction with the accompanying drawings The embodiment of type is described in detail.
As shown in figure 1, a kind of antifreeze boosting type gas heater, including:Gas water-heater housing 1, installed in combustion gas heat Heat exchanger 2 in water heater casing 1, the coil pipe 3 being wrapped on heat exchanger 2, the water inlet pipe 4 being connected with coil pipe 3, outlet pipe 5, and The antifreeze heater 6 being arranged on coil pipe 3;Characterized in that, bypass pipe 7, electronic three are additionally provided with gas water-heater housing 1 Port valve 8 and booster pump 9, the bypass pipe 7 are connected water inlet pipe 4, outlet pipe 5 by electric T-shaped valve 8, make water inlet pipe 4, coil pipe 3rd, outlet pipe 5 forms circulation loop, and the booster pump 9 is arranged on circulation loop;Temperature is additionally provided with heat exchanger 2 or coil pipe 3 Degree probe 10, the antifreeze heater 6, electric T-shaped valve 8, booster pump 9, temp probe 10 all with gas heater master controller Connection, the gas heater master controller control antifreeze heater 6, electric T-shaped valve 8 according to the feedback signal of temp probe 10 Worked with booster pump 9.
Wherein, the electric T-shaped valve 8 is serially connected on outlet pipe 5 by water inlet, the first delivery port, and the one of bypass pipe 7 End is connected with the second delivery port of motor-driven valve, and the other end of bypass pipe 7 is directly connected with water inlet pipe 4.The booster pump 9 is arranged on On water inlet pipe 4.
During real work, do not lighted a fire under heated condition in gas heater, when temp probe 10 detects temperature≤setting During temperature T, main controller controls electric T-shaped valve 8 is switched to circulation loop connected state, while controls antifreeze calandria 6 to start Heat and control booster pump 9 to be run with minimum power output, the water in circulation loop is carried out circulation anti-freezing.When temp probe 10 When detecting temperature > design temperature T1, the antifreeze heater 6 of main controller controls stops heating, and only booster pump 9 is with minimum output Power operation.When temp probe 10 detects temperature > design temperature T2, the antifreeze heater 6 of main controller controls stops heating And booster pump 9 is controlled to shut down.When gas water heater ignition normal work, main controller controls electric T-shaped valve 8 switches Just conventional water state is returned, and controls booster pump 9 to be operated with peak power output, reaches pressurized effect.
In the present embodiment, preferred settings temperature T is identical with design temperature T1, is all 2 DEG C;It is 5 DEG C to preferably set temperature T2. In other embodiments, according to the difference of actual conditions, design temperature T and design temperature T1 value can be different, setting Temperature T, T1, T2 value can arbitrarily adjust in 2-5 DEG C, be not limited to the present embodiment.
Further, to avoid the recirculated water during circulation anti-freezing from pouring in down a chimney into water inlet pipe 4, also set on water inlet pipe 4 There is check valve 11, and check valve 11 is located at the upstream of bypass pipe 7 and the junction of water inlet pipe 4.Here upstream passes through water (flow) direction To determine, i.e. the place that current firstly flow through is upstream.
Essence of the present utility model is described in detail above embodiment, but can not be come with this to this reality Limited with new protection domain.It should be evident that under the enlightenment of the utility model in essence, the common skill of the art Art personnel can also carry out many improvement and modification, for example electric T-shaped valve is changed to be arranged on water inlet pipe, and such as will supercharging Pump be changed to be arranged on outlet pipe on etc..Wanted it should be noted that these improve and modified all to fall in right of the present utility model Ask within protection domain.

Claims (4)

1. a kind of antifreeze boosting type gas heater, including:Gas water-heater housing, changing in gas water-heater housing Hot device, coil pipe on heat exchangers is wound, water inlet pipe, the outlet pipe being connected with coil pipe, and the antifreeze hair being arranged on coil pipe Hot body;Characterized in that, bypass pipe, electric T-shaped valve and booster pump are additionally provided with gas water-heater housing, the bypass pipe Water inlet pipe, outlet pipe are connected by electric T-shaped valve, water inlet pipe, coil pipe, outlet pipe is formed circulation loop, the booster pump It is arranged on circulation loop;Temp probe, the antifreeze heater, electric T-shaped valve, increasing are additionally provided with heat exchanger or coil pipe Press pump, temp probe are all connected with gas heater master controller.
A kind of 2. antifreeze boosting type gas heater according to claim 1, it is characterised in that the electric T-shaped valve bag Water inlet, the first delivery port and the second delivery port are included, and is serially connected in by water inlet, the first delivery port on outlet pipe, the side One end of siphunculus and the second delivery port of motor-driven valve are connected, and the other end of bypass pipe is directly connected with water inlet pipe.
3. a kind of antifreeze boosting type gas heater according to claim 1, it is characterised in that the booster pump, installation On water inlet pipe, outlet pipe or bypass pipe.
4. a kind of antifreeze boosting type gas heater according to claim 1, it is characterised in that be provided with water inlet pipe single To valve, the check valve is located at the upstream of bypass pipe and water inlet pipe junction.
CN201720196235.1U 2017-03-02 2017-03-02 A kind of antifreeze boosting type gas heater Expired - Fee Related CN206637822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720196235.1U CN206637822U (en) 2017-03-02 2017-03-02 A kind of antifreeze boosting type gas heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720196235.1U CN206637822U (en) 2017-03-02 2017-03-02 A kind of antifreeze boosting type gas heater

Publications (1)

Publication Number Publication Date
CN206637822U true CN206637822U (en) 2017-11-14

Family

ID=60252300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720196235.1U Expired - Fee Related CN206637822U (en) 2017-03-02 2017-03-02 A kind of antifreeze boosting type gas heater

Country Status (1)

Country Link
CN (1) CN206637822U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108931084A (en) * 2018-07-04 2018-12-04 珠海格力电器股份有限公司 Anti-freezing control device of heat pump unit, heat pump unit and anti-freezing control method of heat pump unit
CN110513860A (en) * 2019-08-02 2019-11-29 广东长虹日电科技有限公司 A kind of anti-freezing gas water heater and its control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108931084A (en) * 2018-07-04 2018-12-04 珠海格力电器股份有限公司 Anti-freezing control device of heat pump unit, heat pump unit and anti-freezing control method of heat pump unit
CN108931084B (en) * 2018-07-04 2019-10-18 珠海格力电器股份有限公司 Anti-freezing control device of heat pump unit, heat pump unit and anti-freezing control method of heat pump unit
CN110513860A (en) * 2019-08-02 2019-11-29 广东长虹日电科技有限公司 A kind of anti-freezing gas water heater and its control method

Similar Documents

Publication Publication Date Title
CN106871428A (en) A kind of antifreeze boosting type gas heater
CN202813788U (en) Gas water heater
CN207702743U (en) Automatic-boosting hot water circulating device and its application system
CN104344567B (en) Water heater pipeline anti-freezing control method and system and water heater
CN100467972C (en) Energy saving controlling method for electric water heater, and electrically heating system
CN200996689Y (en) Geothermal water-circulating temperature controller
CN103884105A (en) Constant-temperature bathing system
CN207230724U (en) Circulator, central hot water gas heater and its application system
CN110207389A (en) Control method for pressurization function of gas water heater
CN204786682U (en) Constant temperature constant current hot -water heating system
CN106969490A (en) A kind of gas heater heated with bathroom and its control method
CN106885372A (en) Hot water cyclesystem and its control method
CN110440443A (en) A kind of water-heater system
CN206637822U (en) A kind of antifreeze boosting type gas heater
CN109916076A (en) A kind of water heater increase-volume thermostat
CN205825411U (en) A kind of gas heater of band heating function
CN208751007U (en) Central hot water gas heater and its application system
CN207515028U (en) A kind of central water heating device integrated for warm domestic hot-water
CN108088070A (en) A kind of Intelligent preheating gas heater and its subsystem and implementation method
CN204478486U (en) Teat pump boiler
CN207230905U (en) A kind of gas heater
CN207729833U (en) A kind of circulating heat pump water heater
CN206609166U (en) A kind of energy-saving and water-saving servicing unit of storage-type electric water heater
CN205956444U (en) Automatic thermostatic water mixing valve
CN210532674U (en) Gas water heating equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20200302