CN204645691U - Construction site regularization tool-type list vertical rod guard rail - Google Patents

Construction site regularization tool-type list vertical rod guard rail Download PDF

Info

Publication number
CN204645691U
CN204645691U CN201420821034.2U CN201420821034U CN204645691U CN 204645691 U CN204645691 U CN 204645691U CN 201420821034 U CN201420821034 U CN 201420821034U CN 204645691 U CN204645691 U CN 204645691U
Authority
CN
China
Prior art keywords
steel pipe
bolt
guard rail
coating
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420821034.2U
Other languages
Chinese (zh)
Inventor
马一方
路野
孙成帅
王旭
张昊
曾华生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201420821034.2U priority Critical patent/CN204645691U/en
Application granted granted Critical
Publication of CN204645691U publication Critical patent/CN204645691U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of regularization tool-type list vertical rod guard rail, comprise supported rod erecting, steel pipe welding fitting, coating steel pipe cross bar, multiple bolt, coating steel pipe, connector of steel tube and base steel plate, an entirety is connected into by welding and bolt, supported rod erecting bottom is together with base Plate Welding, base steel plate utilizes expansion bolt to be fixed on concrete staircase, supported rod erecting also welds two connector of steel tube, coating steel pipe to be inserted in connector of steel tube and to fix with bolt, one end of steel pipe welding fitting is enclosed within coating steel pipe, and fix with bolt, after coating steel pipe cross bar inserts the other end of steel pipe welding fitting, bolton is used by bolt hole reserved on steel pipe welding fitting, wherein the length of coating steel pipe cross bar can adjust according to the actual needs of engineering, so that guard rail can adjust according to the actual needs of engineering, material saved by this guard rail, dismounting is simple, be convenient to turnover, save manpower.

Description

Construction site regularization tool-type list vertical rod guard rail
Technical field
The utility model relates to construction site safety protection field, particularly relates to a kind of construction site regularization tool-type list vertical rod guard rail.
Background technology
Along with the improving constantly of current building operations managerial skills, the improving constantly of building construction technology, the job site duration becomes more and more tighter, within the duration of anxiety, how to improve the attention that job site safety protection facility has more and more caused people in time, therefore improve the safe of safety device, standardization, regularization, tool-type be the effective way ensureing builing industry safety in production.Job site temporary railing is gone along with sb. to guard him facility as indispensable safety in little high level, high level, construction of super highrise building process and is more and more taken seriously.How to select that safety is reliable, construction technology simply, many units in charge of construction of then always perplexing of safe protective railing fast.The temporary protection railing used in current building construction process is of a great variety, general is all the railing taken knot with common steel tube or be welded, material itself is comparatively heavy on the one hand for this railing, also need to do antirust treatment after peace tears trouble, installation open, take or waste lot of materials and artificial, use cannot be had enough to meet the need, another aspect steel pipe is set up, weld stair railing and structure is fixing very difficult, especially rotation angle position, safety construction requirement standard cannot be reached, there is severe compromise.
Utility model content
In order to solve, the material that existing temporary protection railing exists is heavy, dismounting trouble, waste material, use inconvenience, profile unsightly, the problems such as use cannot be had enough to meet the need, the utility model provides a kind of construction site regularization tool-type list vertical rod guard rail, its a kind of structure adopting single vertical rod support, coating steel pipe cross bar, connector and bolt etc. to assemble is simple, easy disassembly, cheap, use can be had enough to meet the need, safe and reliable, the temporary protection railing of economy, the utility model can be widely used in various construction site process.
Construction site regularization tool-type list vertical rod guard rail of the present utility model, comprise supported rod erecting, steel pipe welding fitting, coating steel pipe cross bar, multiple bolt, coating steel pipe, connector of steel tube and base steel plate, by welding or be inserted in and connecting into an entirety with bolt;
Wherein,, together with base Plate Welding, base steel plate there are four bolts hole described supported rod erecting bottom, utilizes expansion bolt to be fixed on concrete staircase, supported rod erecting has also welded two connector of steel tube, coating steel pipe to be inserted in connector of steel tube and to fix with bolt;
Preferably, one end of described steel pipe welding fitting is enclosed within coating steel pipe, and fixes with bolt, after coating steel pipe cross bar inserts the other end of steel pipe welding fitting, uses bolton by bolt hole reserved on steel pipe welding fitting.
Wherein the length of coating steel pipe cross bar can adjust according to the actual needs of engineering, so that guard rail can adjust according to the actual needs of engineering.
Construction site regularization tool-type list vertical rod guard rail of the present utility model, is suitable as various construction site and faces limit safety protection facility; Between this guard rail vertical rod support and structured base layer, connector, all with bolts between the component such as front rail, lock jail, bolt is unclamped during dismounting, vertical rod support is only had to need to weld with fraction components such as base steel plate, connector of steel tube, without the need to destroying bar material, save material, dismounting is simple, be convenient to turnover, save manpower; This guard rail supported rod erecting adopts and uses stone bolt and deck to fix after base Plate Welding, according to protection length needs, can arrange supported rod erecting quantity by constant spacing, the bolt unclamping supported rod erecting base is just removable, peace is torn open flexibly, reusable, is convenient to transport; This fender rod front rail adopts coating steel pipe, self has good rustless property, need not carry out antirust treatment after installation, and simultaneously guard rail securely, handsome in appearance, to be applicable to various building engineering construction on-the-spot.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of construction site regularization tool-type list vertical rod guard rail of the present utility model;
Accompanying drawing 2 is the base steel plate top view of construction site regularization tool-type list vertical rod guard rail of the present utility model;
Accompanying drawing 3 is the supported rod erecting schematic diagram of construction site regularization tool-type list vertical rod guard rail of the present utility model;
Accompanying drawing 4 is the supported rod erecting lateral view of construction site regularization tool-type list vertical rod guard rail of the present utility model.
Wherein Reference numeral is: 1. supported rod erecting, 2. steel pipe welding fitting, 3. coating steel pipe, 4. bolt, 5. coating steel pipe, 6. short steel pipes, 7. expansion bolt, 8. base steel plate, 9. concrete staircase, 10. bolt hole.
Detailed description of the invention
In order to make, those skilled in the art are clearer understands the technical solution of the utility model, describes its detailed description of the invention in detail below in conjunction with accompanying drawing.
As shown in Figure 1, construction site regularization tool-type list vertical rod guard rail of the present utility model, comprise supported rod erecting 1, steel pipe welding fitting 2, coating steel pipe cross bar 3, multiple bolt 4, coating steel pipe 5, connector of steel tube 6 and base steel plate 8, by welding or be inserted in and using bolt 4 to connect into an entirety.
As shown in Figure 2,4, described supported rod erecting 1 bottom and base steel plate 8 weld together, and base steel plate 8 have four bolts hole 10, utilize expansion bolt 7 to be fixed on concrete staircase 9.
As shown in Figure 1,3, supported rod erecting 1 has also welded two connector of steel tube 6, coating steel pipe 5 is inserted in connector of steel tube 6 also to be fixed with bolt 4.
One end of described steel pipe welding fitting 2 is enclosed within coating steel pipe 5, and fix with bolt 4, after coating steel pipe cross bar 3 inserts the other end of steel pipe welding fitting 2, use bolt 4 fastening by bolt hole reserved on steel pipe welding fitting 2, wherein the length of coating steel pipe cross bar 3 can adjust according to the actual needs of engineering, so that guard rail can adjust according to the actual needs of engineering.
The above; it is preferred embodiment of the present utility model; not other forms of restriction is done to the utility model; any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the Equivalent embodiments of equivalent variations; in every case be do not depart from technical solutions of the utility model content; according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations and remodeling, still belong to technical solutions of the utility model protection domain.

Claims (2)

1. a regularization tool-type list vertical rod guard rail, it is characterized in that: comprise supported rod erecting, steel pipe welding fitting, coating steel pipe cross bar, multiple bolt, coating steel pipe, connector of steel tube and base steel plate, by welding or be inserted in and connecting into an entirety with bolt;
Wherein,, together with base Plate Welding, base steel plate there are four bolts hole described supported rod erecting bottom, utilizes expansion bolt to be fixed on concrete staircase, supported rod erecting has also welded two connector of steel tube, coating steel pipe to be inserted in connector of steel tube and to fix with bolt.
2. regularization tool-type list vertical rod guard rail according to claim 1, it is characterized in that: one end of described steel pipe welding fitting is enclosed within coating steel pipe, and fix with bolt, after coating steel pipe cross bar inserts the other end of steel pipe welding fitting, use bolton by bolt hole reserved on steel pipe welding fitting.
CN201420821034.2U 2014-12-23 2014-12-23 Construction site regularization tool-type list vertical rod guard rail Expired - Fee Related CN204645691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420821034.2U CN204645691U (en) 2014-12-23 2014-12-23 Construction site regularization tool-type list vertical rod guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420821034.2U CN204645691U (en) 2014-12-23 2014-12-23 Construction site regularization tool-type list vertical rod guard rail

Publications (1)

Publication Number Publication Date
CN204645691U true CN204645691U (en) 2015-09-16

Family

ID=54098449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420821034.2U Expired - Fee Related CN204645691U (en) 2014-12-23 2014-12-23 Construction site regularization tool-type list vertical rod guard rail

Country Status (1)

Country Link
CN (1) CN204645691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259168A (en) * 2019-07-02 2019-09-20 中建四局第六建筑工程有限公司 A kind of temporary protection device of precast stair

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259168A (en) * 2019-07-02 2019-09-20 中建四局第六建筑工程有限公司 A kind of temporary protection device of precast stair

Similar Documents

Publication Publication Date Title
CN206859719U (en) A kind of efficient assembled safety barrier for edge protection
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN204645691U (en) Construction site regularization tool-type list vertical rod guard rail
CN203701565U (en) Detachable cantilever scaffold anchor ring
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN103225412A (en) Vertical connector for workside guard rails
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN110578405A (en) Protection method for standard floor outer wall edge opening
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN202882454U (en) Temporary safe protective barrier
CN203129621U (en) Connecting part for corners of edge-adjacent protection rails
CN202047581U (en) Wall connecting piece for scaffold
CN207073297U (en) A kind of portable structure exempts from the edge protection fixing device of damage
CN204850515U (en) Steel construction faces limit protector
CN209760855U (en) Safety belt fastening and hanging device for balcony part construction
CN203257079U (en) Scaffold steel tie fixing device
CN201635414U (en) Floor edge safety protection device
CN202672701U (en) Overhanging scaffold pre-buried ring capable of being repeatedly used
CN203583906U (en) Disassembling-free floor edge guardrail in decoration stage
CN202090618U (en) Protective device for limb opening
CN203361675U (en) Edge protection device for elevator shaft door on operation floor in construction project
CN206987415U (en) Folding is gone along with sb. to guard him temporarily
CN203547114U (en) Wall connecting assembly
CN203113821U (en) Corner connection part of stair adjacent edge protecting railing
CN202788018U (en) Storey near edge temporary guard rail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916