CN204637665U - Shaft bottom settler - Google Patents
Shaft bottom settler Download PDFInfo
- Publication number
- CN204637665U CN204637665U CN201520188826.5U CN201520188826U CN204637665U CN 204637665 U CN204637665 U CN 204637665U CN 201520188826 U CN201520188826 U CN 201520188826U CN 204637665 U CN204637665 U CN 204637665U
- Authority
- CN
- China
- Prior art keywords
- water
- working area
- separate tank
- sedimentation basin
- port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
Shaft bottom settler disclosed in the utility model, comprises sedimentation basin and underground water working area, and sedimentation basin is the rectangular pool that there is opening at the two ends formed by precipitation bay wall, water inlet, delivery port and mattess; Be provided with multiple separate tank in sedimentation basin, between each separate tank, all have separate tank partition wall; Water inlet is connected with inlet channel, and connectivity port is provided with baffle plate A, and delivery port is connected with outlet conduit, and connectivity port is provided with water fender B; Underground water working area is the U-shaped waters surrounded by twice working area wall and mattess; The one end in underground water working area is connected with inlet channel, and the port of connection is provided with water fender C, and the other end is connected with outlet conduit, and the port of connection is provided with water fender D; The utility model can solve large water gaging coal in prior art and cause that sump moisture storage capacity reduces, drainage equipment shortens and be unfavorable for the problem that water coal reclaims service life.
Description
Technical field
The utility model belongs to technical field of waste water processing, relates to a kind of shaft bottom settler of waste-water from coal mine process.
Background technology
A large amount of underground water is needed to drain when working face is mined at the bottom of coal mine, but also containing a large amount of coals in underground water, after these water coals enter drainage system, can cause in wellhole and enter a large amount of coals, thus cause moisture storage capacity to reduce the service life that simultaneously also can shorten drainage equipment.In order to ensure drainage system normal operation, at least must clear up a sump every two months, cleaning work difficulty is large, and a large amount of water coals can be entered ground again, is unfavorable for the recovery of water coal.
Utility model content
The purpose of this utility model is to provide a kind of shaft bottom settler, solves that the water storehouse moisture storage capacity that the large water gaging coal that exists in prior art causes reduces, drainage equipment shortens and is unfavorable for the problem that water coal reclaims service life.
The technical solution of the utility model is: shaft bottom settler, comprises sedimentation basin and underground water working area, and sedimentation basin is that the two ends that Ge You tetra-road precipitation bay wall, water inlet, delivery port and a mattess is formed have the rectangular pool of opening; The width of water inlet, delivery port is less than the width of place precipitation bay wall; Be provided with multiple separate tank in sedimentation basin, between each separate tank, all have separate tank partition wall; Be equipped with Qing Meitai in each separate tank, water inlet is connected with inlet channel, and connectivity port is provided with the baffle plate A of its width fits, and delivery port is connected with outlet conduit, and connectivity port is provided with the water fender B of its width fits; Sedimentation basin cover plate is provided with above sedimentation basin;
Underground water working area is the rectangular U-shaped waters surrounded by twice working area wall and mattess; The one end in underground water working area is connected with inlet channel, and the port of connection is provided with the water fender C of its width fits; The other end in underground water working area is connected with outlet conduit, and the port of connection is provided with the water fender D of its width fits; The upper surface in underground water working area is provided with working area cover plate.
Feature of the present utility model is also:
The quantity of separate tank is 6-10.
The structure of clear coal platform is: comprise many tracks parallel to each other, and the two ends of every root track are all horizontal to be inserted in the two sides adjacent with limit, water inlet place and to precipitate in bay wall wall, and the height of track is higher than the height of separate tank partition wall, and track is lower than the height of precipitation bay wall.
The quantity of track is 3-5 root.
The beneficial effects of the utility model are: the shaft bottom settler be formed by combining by precipitation bay wall, separate tank partition wall, underground water working area, track, water fender A, water fender B, water fender C, water fender D, solve the large water gaging coal existed in prior art and cause that water storehouse moisture storage capacity reduces, drainage equipment shortens and is unfavorable for the problem that water coal reclaims service life.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model shaft bottom settler;
Fig. 2 is the sedimentation basin profile of the utility model shaft bottom settler;
Fig. 3 is the underground water working area profile of the utility model shaft bottom settler.
In figure, 1. water fender A, 2. water fender B, 3. water fender C, 4. water fender D, 5. water inlet, 6. track, 7. separate tank partition wall, 8. precipitate bay wall, 9. delivery port, 10. underground water working area, 11. sedimentation basin cover plates, 12. working area cover plates, 13. working area walls.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.
The structure of the utility model shaft bottom settler as shown in Figure 1 and Figure 2, comprises sedimentation basin and underground water working area 10, and sedimentation basin is that the two ends that Ge You tetra-road precipitation bay wall 8, water inlet 5, delivery port 9 and a mattess is formed have the rectangular pool of opening; The width of water inlet 5, delivery port 9 is less than the width of place precipitation bay wall 8; Be provided with multiple separate tank in sedimentation basin, the quantity of separate tank is 6-10, all has separate tank partition wall 7 between each separate tank; Qing Meitai is equipped with in each separate tank, the structure of clear coal platform is: comprise many tracks 6 parallel to each other, the two ends of every root track 6 are all horizontal to be inserted in the two sides adjacent with limit, water inlet 5 place and to precipitate in bay wall 8 wall, the quantity of track 6 is 3-5 root, the height of track 6 is higher than the height of separate tank partition wall 7, and track 6 is lower than the height of precipitation bay wall 8; Water inlet 5 is connected with inlet channel, and connectivity port is provided with the baffle plate A1 with its width fits, and delivery port 9 is connected with outlet conduit, and connectivity port is provided with the water fender B2 with its width fits; Sedimentation basin cover plate 11 is provided with above sedimentation basin;
As shown in Figure 3, underground water working area 10 is the rectangular U-shaped waters surrounded by twice working area wall 13 and mattess; The one end in underground water working area 10 is connected with inlet channel, and the port of connection is provided with the water fender C3 with its width fits, and the other end in underground water working area 10 is connected with outlet conduit, and the port of connection is provided with the water fender D4 with its width fits; The upper surface in underground water working area 10 is provided with working area cover plate 12.
Sedimentation basin cover plate 11 and working area cover plate 12 are welded by screw-thread steel and angle steel.
During use, open water fender A1 and dash by plate B2, close water fender C3 and water fender D4, the coal mine underground water in inlet channel is made to flow to sedimentation basin from flowing to water inlet 5, when water in first separate tank covers separate tank partition wall 7, above separate tank partition wall 7, enter second separate tank, enter last separate tank by that analogy, finally flow out from delivery port 9, flow into water storehouse from outlet conduit.
When the water coal at the bottom of sedimentation basin needs cleaning, open water fender C3, close water fender A1, dash by plate B2 and water fender D4, make underground water flow to underground water working area 10; Opened by sedimentation basin cover plate 11, plank costed by the track 6 of Qing Meitai, people stands on plank and clears up the water coal at the bottom of sedimentation basin.
The utility model shaft bottom settler precipitates through the separating for several times of multiple separate tank by making shaft bottom underground water, can solve large water gaging coal in prior art and cause that sump moisture storage capacity reduces, drainage equipment shortens and be unfavorable for the problem that water coal reclaims service life.
Claims (4)
1. shaft bottom settler, it is characterized in that: comprise sedimentation basin and underground water working area (10), described sedimentation basin is Ge You tetra-road precipitation bay wall (8), there is the rectangular pool of opening at the two ends of water inlet (5), delivery port (9) and mattess formation; The width of water inlet (5), delivery port (9) is less than the width at place precipitation bay wall (8); Be provided with multiple separate tank in described sedimentation basin, between each separate tank, be provided with separate tank partition wall (7); Qing Meitai is equipped with in each separate tank, water inlet (5) is connected with inlet channel, connectivity port is provided with the baffle plate A (1) of its width fits, and delivery port (9) is connected with outlet conduit, and connectivity port is provided with the B (2) of its width fits of water fender; Sedimentation basin cover plate (11) is provided with above sedimentation basin;
Described underground water working area (10) is the rectangular U-shaped waters surrounded by twice working area wall (13) and mattess; The one end in underground water working area (10) is connected with inlet channel, the port connected is provided with the water fender C (3) of its width fits, the other end in underground water working area (10) is connected with outlet conduit, and the port of connection is provided with the water fender D (4) of its width fits; The upper surface in underground water working area (10) is provided with working area cover plate (12).
2. shaft bottom according to claim 1 settler, is characterized in that, the quantity of described separate tank is 6-10.
3. shaft bottom according to claim 1 settler, it is characterized in that, the structure of described clear coal platform is: comprise many tracks (6) parallel to each other, the two ends of every root track (6) are all horizontal to be inserted in the two sides adjacent with water inlet (5) limit, place and to precipitate in bay wall (8) wall, the height of track (6) is higher than the height of separate tank partition wall (7), and track (6) is lower than the height of precipitation bay wall (8).
4. shaft bottom according to claim 3 settler, is characterized in that, the quantity of described track (6) is 3-5 root.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520188826.5U CN204637665U (en) | 2015-03-31 | 2015-03-31 | Shaft bottom settler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520188826.5U CN204637665U (en) | 2015-03-31 | 2015-03-31 | Shaft bottom settler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204637665U true CN204637665U (en) | 2015-09-16 |
Family
ID=54090442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520188826.5U Expired - Fee Related CN204637665U (en) | 2015-03-31 | 2015-03-31 | Shaft bottom settler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204637665U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756705A (en) * | 2016-02-19 | 2016-07-13 | 中冶京诚(秦皇岛)工程技术有限公司 | Integrated constructing and cleaning method for setting pond and water sump of underground mine |
-
2015
- 2015-03-31 CN CN201520188826.5U patent/CN204637665U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756705A (en) * | 2016-02-19 | 2016-07-13 | 中冶京诚(秦皇岛)工程技术有限公司 | Integrated constructing and cleaning method for setting pond and water sump of underground mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110410143A (en) | A kind of reverse-slope tunnel construction drainage system | |
CN204689755U (en) | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system | |
CN204637665U (en) | Shaft bottom settler | |
CN206769017U (en) | A kind of hole pumping system with precipitation function | |
CN108374471B (en) | Drainage pump station | |
CN205999065U (en) | Oil water separator | |
CN206823249U (en) | A kind of rainwater circulating purifying device | |
CN206063873U (en) | A kind of settlement of sewage system in shield machine mining process | |
CN206138806U (en) | Waste water sedimentation pond's cleaning device | |
CN210131449U (en) | Drainage device with adjusting function for mine underground drainage | |
CN213477127U (en) | Rainwater regulation and storage system | |
CN208634046U (en) | A kind of river water extraction safety device | |
CN210422689U (en) | Drainage system that gold deposit stromatolite dead zone used | |
CN203961002U (en) | Locomotive inspection and repair trench drainage system | |
CN208244258U (en) | A kind of Multistage settling pond | |
CN103463836B (en) | Combined sediment collector for ash water of ash field and collection method thereof | |
CN203188945U (en) | Drilling fluid four-phase separator debris removal pipe anti-blocking structure | |
CN201588430U (en) | Large-capacity water storage bin disposed approaching shaft mouth | |
CN206722054U (en) | Rain water collecting system based on Liang Chang | |
CN108187372B (en) | A high-efficient water and sewage piece-rate system for underground mine | |
CN201620914U (en) | Imitated heart structure coal mine drainage system | |
CN206233331U (en) | A kind of pipe stores formula double water tank rainwater comprehensive utilization system | |
CN203362224U (en) | Main-auxiliary water tank for hanging scaffolds | |
CN210105917U (en) | Auxiliary drainage pipe fitting for preventing and treating water in coal mine construction | |
CN203559829U (en) | Liquid feeding mechanism of four-phase separator for drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150916 Termination date: 20160331 |
|
CF01 | Termination of patent right due to non-payment of annual fee |