CN204626237U - Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device - Google Patents

Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device Download PDF

Info

Publication number
CN204626237U
CN204626237U CN201520264361.7U CN201520264361U CN204626237U CN 204626237 U CN204626237 U CN 204626237U CN 201520264361 U CN201520264361 U CN 201520264361U CN 204626237 U CN204626237 U CN 204626237U
Authority
CN
China
Prior art keywords
buoyant raft
shallow water
dismountable
attacks
pontoon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520264361.7U
Other languages
Chinese (zh)
Inventor
曹亮
罗熙
朱瑞
张亮
张北衡
方艳丽
尹志凯
张帅华
廉丰
葛明
都意
苏本超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Huanghe Road And Bridge Engineering Co Ltd
Original Assignee
Puyang Huanghe Road And Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Huanghe Road And Bridge Engineering Co Ltd filed Critical Puyang Huanghe Road And Bridge Engineering Co Ltd
Priority to CN201520264361.7U priority Critical patent/CN204626237U/en
Application granted granted Critical
Publication of CN204626237U publication Critical patent/CN204626237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of servicing unit for shallow water river channel soil excavation, specifically below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device, this device is arranged on shallow water river surface to be onstructed, comprise one or more buoyant raft be connected to each other, pontoon bridge, many pontoons and tractor tug, described pontoon bridge is across many described pontoon tops, and be connected with described pontoon is dismountable, one end of described pontoon bridge is dismountable is connected to riverbank, the other end and described buoyant raft is dismountable links together, described pontoon and buoyant raft are all anchored in river bed by ship anchor, described tractor tug is by connector and described buoyant raft is dismountable links together.Beneficial effect improves construction economy usefulness, reduces construction cost, reduces engineering resource consumption.

Description

Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device
Technical field
The utility model relates to a kind of servicing unit for shallow water river channel soil excavation, and specifically below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device.
Background technology
In area, the vast North China Plain, most river course belongs to riverbed, shallow water position.The whirling river etc. in the Xiong Erhe in such as Zhengzhou, the Jin Di river of Puyang and Kaifeng.The bosom depth of water in its riverbed is also essentially between 2 ~ 5m, and the gradient in riverbed is lower substantially also between 0.01 ~ 0.1 ‰ than also.So the runoff feature in riverbed, this kind of shallow water position is that the horizontal section width in riverbed is comparatively large, and river flow velocity is more slow, and channel sediment deposition is serious, and river potential barrier is to uncertain, and the collection rain face area of river is comparatively large, and during flood water, flood peak flow velocity is slow.
In order to solve Sediment Siltation problem and the river course tendency problem in this type of river course, the excavation work of the large volume soil body below urban river water bit line certainly will to be carried out.Due to plant equipment height restriction, making general excavation equipment only can enter the depth of water is the excavation work that the soil body is under water carried out in the phytal zone of below 0.5m.In more than depth of water 0.5m, profundal zone carries out under water when soil excavation, substantially with cofferdam drainage construction for main construction method.But when the construction of the middle water level region of 0.5 ~ 5m, if use cofferdam construction method economic efficacy lower, construction cost is higher, and engineering resource consumption is large.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of raising construction economy usefulness, reduces construction cost, and below the shallow water river channel waterline of minimizing engineering resource consumption, large volume soil excavation attacks and occupies device.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device, this device is arranged on shallow water river surface to be onstructed, comprise one or more buoyant raft be connected to each other, pontoon bridge, many pontoons and tractor tug, described pontoon bridge is across many described pontoon tops, and be connected with described pontoon is dismountable, one end of described pontoon bridge is dismountable is connected to riverbank, the other end and described buoyant raft is dismountable links together, described pontoon and buoyant raft are all anchored in river bed by ship anchor, described tractor tug is by connector and described buoyant raft is dismountable links together.
The beneficial effects of the utility model are: described buoyant raft is drawn to job location by described tractor tug, under described buoyant raft, good ship anchoring is fixed, install described pontoon bridge, excavation equipment is reached on buoyant raft can be carried out excavation operation by the described pontoon bridge connecting riverbank, because described pontoon bridge is connected with described pontoon is dismountable, one end of described pontoon bridge is dismountable is connected to riverbank, the other end is connected described buoyant raft with dismountable, the i.e. all recyclable recycling of described pontoon bridge and buoyant raft, transport it into job location when needing to be in place and can to construct, improve construction economy usefulness, reduce construction cost, reduce engineering resource consumption.
On the basis of technique scheme, the utility model can also do following improvement.
Further, described connector is cable, and described cable two ends are all fixedly connected with hook, and the two ends of described cable are connected with described tractor tug and buoyant raft hook respectively by described hook, and realize described tractor tug and be connected with described buoyant raft is dismountable, structure is reliable.
Further, described buoyant raft is cuboid box like, bottom it, corner is all fixedly connected with the first connecting hole, the ship anchor be connected with described buoyant raft is fixedly connected with described first connecting hole by iron chains, while ensureing the reliability of described buoyant raft carrying excavation equipment, guarantee the reliability that described buoyant raft is fixing in job location.
Further, described buoyant raft is provided with multiple, the corner, top of described buoyant raft is all fixedly connected with the second connecting hole, adjacent described buoyant raft is connected to each other through described second connecting hole by iron chains, when needs use multiple described buoyant raft to carry excavation equipment, connect the connecting hole on adjacent buoyant raft by iron chains, adjacent buoyant raft is coupled together, guarantee that structure is reliable.
Further, described pontoon bridge is formed by connecting by plurality of steel plates successively level is dismountable, removes each block of described steel plate and recyclable described pontoon bridge, is convenient to the recovery of described pontoon bridge.
Further, junction plate is provided with between two blocks of adjacent described steel plates, the two ends of described junction plate respectively by bolt corresponding with its two ends described steel plate dismountablely to link together, realize two pieces of adjacent dismountable connections of described steel plate, and structure is reliable.
Further, described pontoon bridge and described pontoon link together by reinforcing bar is dismountable, guarantee the reliability that described pontoon bridge is connected with described pontoon.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
In accompanying drawing, the list of parts representated by each label is as follows:
1, junction plate, 2, pontoon bridge, 3, bolt, 4, steel plate, 5, buoyant raft, the 6, second connecting hole, 7, connector, 8, tractor tug, 9, pontoon.
Detailed description of the invention
Be described principle of the present utility model and feature below in conjunction with accompanying drawing, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figure 1, below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device, this device is arranged on shallow water river surface to be onstructed, comprise the one or more buoyant raft 5, pontoon bridge 2, many pontoons 9 and the tractor tug 8 that are connected to each other, pontoon bridge 2 is across many pontoons 9 top, and be connected with pontoon 9 is dismountable, one end of pontoon bridge 2 is dismountable is connected to riverbank, the other end and buoyant raft 5 is dismountable links together, pontoon 9 and buoyant raft 5 are all anchored in river bed by ship anchor, and tractor tug 8 is linked together with buoyant raft 5 is dismountable by connector 7.
In the present embodiment, connector 7 is cable, and cable two ends are all fixedly connected with hook, and the two ends of cable are connected with tractor tug 8 and buoyant raft 5 hook respectively by hook; Buoyant raft 5 is in cuboid box like, and bottom it, corner is all fixedly connected with the first connecting hole, and the ship anchor be connected with buoyant raft 5 is fixedly connected with the first connecting hole by iron chains; Buoyant raft 5 is provided with multiple, and the corner, top of buoyant raft 5 is all fixedly connected with the second connecting hole 6, and adjacent buoyant raft 5 is connected to each other through the second connecting hole 6 by iron chains; Pontoon bridge 2 is formed by connecting by plurality of steel plates 4 successively level is dismountable; Be provided with junction plate 1 between two adjacent block plates 4, the two ends of junction plate 1 respectively by bolt 3 corresponding with its two ends steel plate 4 dismountablely to link together; Pontoon bridge 2 and pontoon 9 link together by reinforcing bar is dismountable.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (7)

1. below a shallow water river channel waterline, large volume soil excavation attacks and occupies device, this device is arranged on shallow water river surface to be onstructed, it is characterized in that: comprise one or more buoyant raft (5) be connected to each other, pontoon bridge (2), many pontoons (9) and tractor tug (8), described pontoon bridge (2) is across many described pontoon (9) tops, and be connected with described pontoon (9) is dismountable, one end of described pontoon bridge (2) is dismountable is connected to riverbank, the other end and described buoyant raft (5) is dismountable links together, described pontoon (9) and buoyant raft (5) are all anchored in river bed by ship anchor, described tractor tug (8) is linked together with described buoyant raft (5) is dismountable by connector (7).
2. below a kind of shallow water river channel waterline according to claim 1, large volume soil excavation attacks and occupies device, it is characterized in that: described connector (7) is cable, described cable two ends are all fixedly connected with hook, and the two ends of described cable are connected with described tractor tug (8) and buoyant raft (5) hook respectively by described hook.
3. below a kind of shallow water river channel waterline according to claim 1, large volume soil excavation attacks and occupies device, it is characterized in that: described buoyant raft (5) is in cuboid box like, bottom it, corner is all fixedly connected with the first connecting hole, and the ship anchor be connected with described buoyant raft (5) is fixedly connected with described first connecting hole by iron chains.
4. below a kind of shallow water river channel waterline according to claim 3, large volume soil excavation attacks and occupies device, it is characterized in that: described buoyant raft (5) is provided with multiple, the corner, top of described buoyant raft (5) is all fixedly connected with the second connecting hole (6), and adjacent described buoyant raft (5) is connected to each other through described second connecting hole (6) by iron chains.
5. below a kind of shallow water river channel waterline according to claim 1, large volume soil excavation attacks and occupies device, it is characterized in that: level is dismountable is successively formed by connecting by plurality of steel plates (4) for described pontoon bridge (2).
6. below a kind of shallow water river channel waterline according to claim 5, large volume soil excavation attacks and occupies device, it is characterized in that: between two pieces of adjacent described steel plates (4), be provided with junction plate (1), the two ends of described junction plate (1) respectively by bolt (3) corresponding with its two ends described steel plate (4) dismountablely to link together.
7. below a kind of shallow water river channel waterline according to any one of claim 1 to 6, large volume soil excavation attacks and occupies device, it is characterized in that: described pontoon bridge (2) and described pontoon (9) link together by reinforcing bar is dismountable.
CN201520264361.7U 2015-04-28 2015-04-28 Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device Expired - Fee Related CN204626237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520264361.7U CN204626237U (en) 2015-04-28 2015-04-28 Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520264361.7U CN204626237U (en) 2015-04-28 2015-04-28 Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device

Publications (1)

Publication Number Publication Date
CN204626237U true CN204626237U (en) 2015-09-09

Family

ID=54045282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520264361.7U Expired - Fee Related CN204626237U (en) 2015-04-28 2015-04-28 Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device

Country Status (1)

Country Link
CN (1) CN204626237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522233A (en) * 2016-11-04 2017-03-22 四川共拓岩土科技股份有限公司 Water surface platform capable of floating up and down and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522233A (en) * 2016-11-04 2017-03-22 四川共拓岩土科技股份有限公司 Water surface platform capable of floating up and down and construction method thereof

Similar Documents

Publication Publication Date Title
CN101748705A (en) Method for reclaiming land around sea
CN103382713B (en) Foundation quay wall structure and construction method thereof
CN101565952A (en) Method and structure for preventing pit-type building foundation floating
CN204626237U (en) Below a kind of shallow water river channel waterline, large volume soil excavation attacks and occupies device
CN203034492U (en) Reinforced concrete pipe ditch deformation seam
CN101929149A (en) Shallow sea pile foundation concrete oil drilling and producing platform
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN202273215U (en) Safety environment-friendly trash floating barrier device
CN104120696B (en) Environment-friendly type slope sticking type trashrack structure and construction method thereof
CN204570637U (en) A kind of mud-dumping yard overflow system
CN101922148B (en) Bridge and culvert type sheet-pile structure
CN206538732U (en) A kind of long piled wharf
CN202047399U (en) Water storage tank type steel-structured dam
CN102080369A (en) Shallow sea novel floating type oil storage platform structure
CN2535443Y (en) Stee-frame cofferdam type artificial island
CN201386275Y (en) U-shaped steel sheet pile with vortex combination structure
CN210899012U (en) Be applied to photovoltaic power generation structure of breakwater
CN211523254U (en) Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation
CN113463606A (en) Reconstruction and extension navigable building arrangement structure and construction method thereof
CN204185819U (en) Honeycomb dykes and dams shore protection component
CN202451974U (en) Anti-floating structure of buried pipeline
CN202899150U (en) Draught fan base of offshore wind power station
KR101290920B1 (en) Turbine structure for tidal power plant
CN103382712B (en) Buttress type foundation quay wall structure and construction method thereof
CN201339196Y (en) Caisson for reclaiming fields from the shallow sea

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909