CN211523254U - Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation - Google Patents

Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation Download PDF

Info

Publication number
CN211523254U
CN211523254U CN201922085428.1U CN201922085428U CN211523254U CN 211523254 U CN211523254 U CN 211523254U CN 201922085428 U CN201922085428 U CN 201922085428U CN 211523254 U CN211523254 U CN 211523254U
Authority
CN
China
Prior art keywords
square
foundation
side wall
chain
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922085428.1U
Other languages
Chinese (zh)
Inventor
练继建
钮新强
刘润
燕翔
赵昊
陶铁玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201922085428.1U priority Critical patent/CN211523254U/en
Application granted granted Critical
Publication of CN211523254U publication Critical patent/CN211523254U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a mechanical broken-soil discharging and sinking device of straight line subareas based on an offshore wind power square cylinder type foundation, wherein a group of sinking device monomers are arranged on four side walls of the square cylinder type foundation, each group of sinking device monomers comprises a straight line subarea soil breaking groove, a chain and a soil breaking plate, and the straight line subarea soil breaking groove is arranged at the bottom of the side wall of the square cylinder type foundation; the chain is arranged around the side wall of the square cylindrical foundation and can rotate around the side wall of the square cylindrical foundation under the driving of a motor; the chain positioned at the bottom of the side wall of the square barrel type foundation is arranged in the linear subarea soil breaking groove; the ground breaking plates are arranged on the chain and are arranged at intervals along the length direction of the chain. The utility model discloses imitate the disturbance soil body scope of having controlled that the broken earth leads to, partition control has guaranteed to sink the in-process to the control of levelness, takes away the broken soil body of disturbance through mechanical system to effectively guaranteed the quick effective safe operation of sinking of square basis.

Description

Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation
Technical Field
The utility model relates to an installation of marine wind power basis, wind energy engineering, new forms of energy, in particular to broken dumping of sharp subregion machinery sinks device based on marine wind power square tubular type basis realizes the installation of the compound cartridge type basis high efficiency of thick wall concrete.
Background
With the increasing prominence of global energy, climate, environment and other problems, renewable energy is generally concerned by various countries. Compared with the traditional fossil fuel, the wind energy is clean in use and low in cost, and has the advantages of wide development range, safety, inexhaustible energy and the like. Compared with onshore wind power, offshore wind power has the advantages of high wind speed, low turbulence, no land occupation and the like. At present, the offshore wind power foundation in China mostly adopts a pile foundation or a composite pile foundation, the design is simple, the installation process is mature, but the horizontal deformation caused by transverse loads (wind, wave and flow) is large. The appearance of wide shallow formula section of thick bamboo type basis provides new direction for the design of marine fan basis, and great transverse load that marine fan received can effectively be resisted to this basis, and its simple structure, cost are lower, the construction is convenient quick.
In recent years, with the successful application of the offshore composite cylindrical fan foundation and the one-step installation technology of the fan, the construction cost of the offshore wind power foundation is greatly reduced, and the method is suitable for the areas with proper water depth and geological conditions in part of China and has good engineering application prospect. At present, a designed and installed composite cylindrical foundation consists of a concrete transition section, a circular steel cylinder and a steel bin distribution plate. In order to further reduce the cost of the cylinder foundation, a concrete cylinder can be used for replacing a steel cylinder on the premise of ensuring the design strength requirement. Since concrete is less rigid than steel, thicker concrete walls (about 0.4m) are required to meet the corresponding design requirements, which also puts higher demands on the later submerged installation. The thickening of section of thick bamboo wall will certainly increase the end resistance of sinking in-process, can't guarantee quick effectual sinking operation, weakens the superiority of one-step mounting technique to a certain extent. The existing steel-concrete composite cylinder type foundation bottom soil breaking device combines slotting soil breaking and high-pressure injection soil breaking, and is combined with partition soil breaking, so that the problem of unbalanced levelness in settlement caused by the difference of geological structures of different parts of the seabed is effectively solved, but the mechanical soil breaking efficiency is restricted by an annular track by partitioning on a cylinder arc-shaped thick wall, and is not as high as the soil breaking efficiency of a side wall linear track of a square cylinder type foundation. Meanwhile, the seabed soil is mostly silt clay, and broken clay is difficult to take away by hydraulic flushing, so that the sinking efficiency is seriously influenced; and the excessive flushing pressure can enlarge the area range of the disturbed soil body, which is not beneficial to the stability of the cylinder type foundation operation period.
Therefore, the utility model provides a broken dumping of sharp subregion machinery sinks device based on marine wind power square tube type basis, the device utilize mechanical subregion to break ground, arrange soil, when having guaranteed the control of levelness, make the fan basis sink to target in place fast effectively safely.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the problem that above-mentioned exists, provide a broken dumping of sharp subregion machinery device of sinking based on installation of marine wind power square tube type basis, effectively controlled the disturbance soil body scope that leads to that breaks ground, subregion control has guaranteed the in-process of sinking to the control of levelness, takes away the broken soil body of disturbance through mechanical system to effectively guaranteed the quick effective safe operation of putting of sinking of square basis.
The utility model adopts the technical proposal that: the utility model provides a broken dumping of sharp subregion machinery sinks device based on offshore wind power square tube type basis, all is provided with a set of device monomer that sinks on four limit walls on square tube type basis, every group sink the device monomer and include:
the straight line partition soil breaking groove is arranged at the bottom of the side wall of the square barrel type foundation;
the chain is arranged around the side wall of the square cylindrical foundation and can rotate around the side wall of the square cylindrical foundation under the driving of a motor; the chain positioned at the bottom of the side wall of the square barrel type foundation is arranged in the linear subarea soil breaking groove; and the number of the first and second groups,
the ground breaking plates are arranged on the chain and are arranged at intervals along the length direction of the chain.
Further, the straight line subregion broken soil groove includes:
the pair of rectangular plates with rectangular sections are arranged along the length direction of the bottom of the side wall of the square-cylinder foundation; the pair of rectangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-tube-shaped foundation and are arranged at the edge of the bottom of the side wall of the square-tube-shaped foundation; and the number of the first and second groups,
the triangular plates are arranged along the length direction of the bottom of the side wall of the square-cylinder-shaped foundation; the pair of triangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-tube-shaped foundation and are arranged at the edge of the bottom of the side wall of the square-tube-shaped foundation; one of them right-angle side of triangle-shaped board is hugged closely the minor face of rectangle board is arranged, another right angle border the long side direction of rectangle board is arranged, just, and, it is a pair of triangle-shaped board hypotenuse is arranged relatively and is arranging form broken row of soil cabin between the triangle-shaped board, be located the side wall bottom on square cylinder type basis the chain with broken soil board sets up broken row of soil cabin is indoor.
Furthermore, the number of the chains is two, and each chain is fixed by guide wheels at two ends of the straight line partition soil breaking groove.
Further, the motor is installed on the surface of the square barrel type foundation.
The utility model has the advantages that: the utility model relates to a device sinks based on broken dumping of marine wind power square tubular type basis installation's straight line subregion machinery, compare in current machinery-water conservancy joint fluting device, more be fit for the broken soil of square tubular type basis and sink, the straight line subregion compares in the broken soil groove of ring partition, makes mechanical broken soil efficiency promote greatly, has simplified the design of mechanical device; the mechanical soil breaking device integrates the soil breaking and dumping functions, fully considers the occurrence of the phenomenon that the soil breaking efficiency is reduced in the later sinking period due to the fact that crushed seabed clay is difficult to be discharged from a soil breaking area in a hydraulic conveying mode caused by the physical properties of soil, and meanwhile, compared with the hydraulic conveying mode, the mechanical soil dumping can more accurately and effectively control the soil breaking amount and the sinking amount of a square-tube foundation, the foundation installation can achieve higher horizontal precision, and the problem that the horizontal precision is influenced by uneven sinking caused by the difference of the seabed soil quality in the sinking process of the square-tube foundation is effectively solved; mechanical ground breaking is compared with high-pressure hydraulic ground breaking, the range of a seabed disturbance area is reduced to a certain extent, and safety and stability of a later-stage square-cylinder foundation are facilitated.
Drawings
FIG. 1 is a schematic structural diagram of a longitudinal section of a linear partition mechanical soil breaking, discharging and sinking device based on an offshore wind power square-barrel-shaped foundation.
Fig. 2 is a schematic structural diagram of a longitudinal section of a square barrel type foundation structure provided with the linear partition mechanical soil breaking, discharging and sinking device.
Fig. 3 is a schematic cross-sectional structure view of a square-tube foundation structure provided with the linear partition mechanical soil breaking, discharging and sinking device.
The attached drawings are marked as follows: 1. a straight line partition soil breaking groove; 2. partitioning and separating; 3. a chain; 4. a guide wheel; 5. a motor; 6. a ground breaking plate; 7. a square tubular foundation; 8. a soil breaking and discharging cabin; 9. a transition section.
Detailed Description
For further understanding of the contents, features and functions of the present invention, the following embodiments will be exemplified in conjunction with the accompanying drawings as follows:
as shown in the accompanying drawings 1 to 3, the straight line partition mechanical soil breaking, discharging and sinking device based on the offshore wind power square cylinder type foundation is characterized in that the square cylinder type foundation 7 is divided into four mutually perpendicular side walls by partition walls 2, a group of sinking device monomers are arranged on the four side walls of the square cylinder type foundation 7, and each group of sinking device monomers comprises a straight line partition soil breaking groove 1, a chain 3, a guide wheel 4, a motor 5 and a soil breaking plate 6.
The straight line partition soil breaking groove 1 is arranged at the bottom of the side wall of the square-cylinder foundation 7. The straight line partition soil breaking groove 1 comprises a pair of rectangular plates with rectangular sections and a pair of triangular plates with right-angled triangle sections. The rectangular section of the rectangular plate is 3-6 cm thick and 12-18 cm high; the rectangular plates are arranged along the length direction of the bottom of the side wall of the square cylindrical foundation 7; the pair of rectangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-tube-shaped foundation 7, and are arranged at the edge of the bottom of the side wall of the square-tube-shaped foundation 7. The hypotenuse of the right-angled triangle section of the triangular plate is 15-20 cm long and 10-15 cm high; the triangular plates are arranged along the length direction of the bottom of the side wall of the square cylindrical foundation 7; the pair of triangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-cylinder-shaped foundation 7 and are arranged at the edge of the bottom of the side wall of the square-cylinder-shaped foundation 7; one of them right-angle side of triangle-shaped board is hugged closely the minor face of rectangle board is arranged, another right angle border the long edge direction of rectangle board is arranged, just, it is a pair of triangle-shaped board hypotenuse is arranged relatively and is being arranged relatively form between the triangle-shaped board and be the same as arranging chain 3 and the broken cabin 8 that arranges that earths breaks board 6.
The chain 3 is provided with two, every the chain 3 is around the limit wall of square tube type basis 7 arranges all around, just, every the chain 3 by the leading wheel 4 at straight line subregion broken soil groove 1 both ends is fixed. The chain 3 can rotate around the side wall of the square cylindrical foundation 7 under the driving of the motor 5, and the motor 5 is installed on the surface of the square cylindrical foundation 7.
The ground breaking plates 6 are arranged on the chains 3 and arranged at intervals along the length direction of the chains 3 at intervals of 8-15 cm. The ground breaking plate 6 is a steel plate with the length of 12-18 cm, the width of 4-6 cm and the thickness of 0.5-2 cm. The chain 3 and the soil breaking plate 6 which are positioned at the bottom of the side wall of the square barrel type foundation 7 are arranged in the soil breaking and discharging cabin 8 of the linear subarea soil breaking groove 1. The broken soil plate 6 is followed the sinking of square tube type basis 7 breaks ground, because the viscidity of clay, soil follows broken soil plate 6 promotes to the surface of square tube type basis 7, clay drops by oneself under the action of gravity, and the residual clay of adhesion washes by water and assists and drops.
In the embodiment, the outer side length of the square-tube-shaped foundation 7 is 35m, the thickness of the top cover is 1m, the wall thickness is 0.4m, and the wall height is 10 m; the transition section 9 has an outer diameter of 7m at the top, an outer diameter of 26m at the bottom, a height of 20m and a wall thickness of 0.6 m.
Although the preferred embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-mentioned embodiments, which are only illustrative and not restrictive, and those skilled in the art can make many forms without departing from the spirit and scope of the present invention, which is within the protection scope of the present invention.

Claims (4)

1. The utility model provides a broken dumping of sharp subregion machinery sinks device based on offshore wind power square tubular basis which characterized in that all is provided with a set of device monomer that sinks on four boundary walls of square tubular basis (7), every group sink the device monomer and include:
the straight line partition soil breaking groove (1), wherein the straight line partition soil breaking groove (1) is arranged at the bottom of the side wall of the square-cylinder foundation (7);
the chain (3) is arranged around the side wall of the square cylindrical foundation (7) and can rotate around the side wall of the square cylindrical foundation (7) under the driving of a motor (5); the chain (3) positioned at the bottom of the side wall of the square-cylinder foundation (7) is arranged in the straight line partition soil breaking groove (1); and the number of the first and second groups,
the ground breaking plate (6) is arranged on the chain (3) and is arranged at intervals along the length direction of the chain (3).
2. The mechanical soil breaking, discharging and sinking device for the straight line subarea based on the offshore wind power square barrel type foundation of claim 1, wherein the straight line subarea soil breaking groove (1) comprises:
the pair of rectangular plates with rectangular cross sections are arranged along the length direction of the bottom of the side wall of the square-cylinder foundation (7); the pair of rectangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-cylinder-shaped foundation (7) and are arranged at the edge of the bottom of the side wall of the square-cylinder-shaped foundation (7); and the number of the first and second groups,
the pair of triangular plates with right-angled triangle sections are arranged along the length direction of the bottom of the side wall of the square-cylinder-shaped foundation (7); the pair of triangular plates are symmetrically arranged in the thickness direction of the bottom of the side wall of the square-cylinder-shaped foundation (7) and are arranged at the edge of the bottom of the side wall of the square-cylinder-shaped foundation (7); one of them right-angle side of triangle-shaped board is hugged closely the minor face of rectangle board is arranged, another right angle border the long side direction of rectangle board is arranged, and, it is a pair of triangle-shaped board hypotenuse is arranged relatively and is arranging form broken soil discharging cabin (8) between the triangle-shaped board, is located the limit wall bottom of square tube type basis (7) chain (3) with broken soil discharging cabin (8) set up in the broken soil discharging cabin (8).
3. The mechanical soil breaking, discharging and sinking device for the straight line subarea based on the offshore wind power square cylinder type foundation as claimed in claim 1, wherein two chains (3) are provided, and each chain (3) is fixed by guide wheels (4) at two ends of the straight line subarea soil breaking groove (1).
4. The offshore wind power square tubular foundation-based linear zoning mechanical soil breaking, discharging and sinking device as claimed in claim 1, wherein the motor (5) is mounted on the surface of the square tubular foundation (7).
CN201922085428.1U 2019-11-28 2019-11-28 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation Active CN211523254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922085428.1U CN211523254U (en) 2019-11-28 2019-11-28 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922085428.1U CN211523254U (en) 2019-11-28 2019-11-28 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation

Publications (1)

Publication Number Publication Date
CN211523254U true CN211523254U (en) 2020-09-18

Family

ID=72444144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922085428.1U Active CN211523254U (en) 2019-11-28 2019-11-28 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation

Country Status (1)

Country Link
CN (1) CN211523254U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886310A (en) * 2019-11-28 2020-03-17 天津大学 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886310A (en) * 2019-11-28 2020-03-17 天津大学 Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation
CN110886310B (en) * 2019-11-28 2024-03-15 天津大学 Linear partition mechanical breaking and soil discharging sinking device based on offshore wind power square cylinder foundation

Similar Documents

Publication Publication Date Title
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN110984214A (en) Offshore wind power single pile-wing plate-rockfill composite foundation and construction method thereof
CN110439022A (en) Marine single-pile foundation with compacting grouting and reinforcing ground
CN211523254U (en) Linear partition mechanical soil breaking, discharging and sinking device based on offshore wind power square-barrel-shaped foundation
CN113653601A (en) Semi-submersible floating type fan device and system
CN210341970U (en) Installation foundation assembly for offshore wind turbine generator system
CN202969343U (en) Diffusion device in discharging thick seawater into sea
CN104313999A (en) Bridge pier structure
CN110439020A (en) Marine single-pile foundation with sand pile reinforcing ground
CN202265837U (en) Single-pile foundation for offshore wind generation set
CN110055994A (en) A kind of suction cylindrical structure
CN106080997A (en) Marine floating carrying platform and the method for construction of photovoltaic plant
CN202273215U (en) Safety environment-friendly trash floating barrier device
CN108149775A (en) A kind of prefabricated Boosting pumping station of PE and its mounting process
CN204849730U (en) Soft soil foundation pile extension structure
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN110886310B (en) Linear partition mechanical breaking and soil discharging sinking device based on offshore wind power square cylinder foundation
CN201582062U (en) Foundation structure of gravity type marine wind turbine group
CN110758662A (en) Movable free-rising and sinking storm platform
CN204000763U (en) Old tire and concrete block combined type wash away protector
CN205893897U (en) Be applied to flexible float tube bridge of floating pump station
CN211032946U (en) Movable free-rising and sinking storm platform
CN204570637U (en) A kind of mud-dumping yard overflow system
CN204626445U (en) A kind of barrel base with steel wing plate
CN210482350U (en) Auxiliary reinforced single pile foundation for circular truncated cone of offshore wind turbine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant