CN204609879U - A kind of pick anchor all-in-one - Google Patents
A kind of pick anchor all-in-one Download PDFInfo
- Publication number
- CN204609879U CN204609879U CN201520053096.8U CN201520053096U CN204609879U CN 204609879 U CN204609879 U CN 204609879U CN 201520053096 U CN201520053096 U CN 201520053096U CN 204609879 U CN204609879 U CN 204609879U
- Authority
- CN
- China
- Prior art keywords
- rod
- bolter
- integrated
- body platform
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Earth Drilling (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及煤矿巷道掘进支护技术领域,特别是涉及一种掘锚一体机。The utility model relates to the technical field of coal mine roadway excavation and support, in particular to an integrated machine for digging and bolting.
背景技术Background technique
中国的能源赋存属“缺油、少气、富煤”,因此煤炭在中国一次能源消耗中长期占有70%以上的比例。随着中国经济的高速增长,煤炭消耗量也持续增加,2013年煤炭产量达到了37亿吨,预计未来一个时期,煤炭消费增速将保持在3%左右,到2020年,全国煤炭需求总量将在48亿吨左右,届时,煤炭在我国一次性能源消费结构中的比重仍能占60%左右。到2020年,全国煤炭可利用产能40亿吨,产能缺口8亿吨左右。China's energy reserves are "lack of oil, less gas, and rich in coal", so coal has long accounted for more than 70% of China's primary energy consumption. With the rapid growth of China's economy, coal consumption has also continued to increase. In 2013, coal production reached 3.7 billion tons. It is expected that the growth rate of coal consumption will remain at about 3% in the coming period. By 2020, the total national coal demand It will be around 4.8 billion tons. By then, the proportion of coal in my country's primary energy consumption structure will still account for about 60%. By 2020, the country's available coal production capacity will be 4 billion tons, with a production capacity gap of about 800 million tons.
随着煤炭行业科技的发展和我国产业政策的要求,自上世纪八十年代开始,先进的机械化掘进设备和锚杆锚索支护技术在我国的煤矿巷道掘进中得到了广泛应用。目前,我国大中型煤矿综掘巷道的掘进设备多采用掘进机,锚杆锚索支护作业方式大多依靠人工使用手持式单体锚杆机和煤电钻进行施工,支护作业占用大量时间,掘进机开机率不足30%,支护时也存在空顶下作业安全系数低、劳动强度大、作业环境恶劣及生产效率低等问题,所以在煤矿综掘巷道存在“综掘不综”的境地。而且,单体式锚杆钻机结构比较简单,因此转矩特性较差,电机容易过载,加上锚杆孔钻机是立式作业,电机内易受淋水污染,电气部分故障率高;另外,单体式锚杆钻机机械化程度低,工人工作量大,并且需要工人成组作业,因此单体式锚杆钻机的效率也较低;又因为通常在裸露顶板下作业,存在比较严重的安全隐患,而且锚杆锁紧力需要二次紧固。With the development of science and technology in the coal industry and the requirements of my country's industrial policy, since the 1980s, advanced mechanized excavation equipment and bolt and cable support technology have been widely used in coal mine roadway excavation in my country. At present, the excavation equipment of large and medium-sized coal mine fully-mechanized roadways in my country mostly uses roadheaders, and most of the bolt and cable support operations rely on manual use of hand-held single-body bolters and coal electric drills for construction, and support operations take up a lot of time. The operating rate of the roadheader is less than 30%, and there are also problems such as low safety factor, high labor intensity, harsh working environment and low production efficiency under the roof during support. . Moreover, the structure of the single-body bolter is relatively simple, so the torque characteristics are poor, and the motor is easily overloaded. In addition, the bolt hole drill is a vertical operation, the motor is easily polluted by water, and the failure rate of the electrical part is high; in addition, The single-body bolter has a low degree of mechanization, a large workload, and requires workers to work in groups, so the efficiency of the single-body bolter is also low; and because it is usually operated under the exposed roof, there are serious safety hazards , and the locking force of the anchor rod requires secondary tightening.
综掘机的广泛使用使掘进工作面实现了机械化落煤和装煤,因而大大增加了掘进速度。但现有的支护设备的支护速度较慢,支护占用时间为掘进总时间的三分之二,大大影响了生产效率。现在市场上虽存在四臂钻车、八臂掘钻车,但普遍存在机体庞大,在煤矿井下巷道的移动和通过性都很差等问题。The extensive use of fully mechanized excavators has enabled mechanized coal dropping and coal loading in the tunneling face, thus greatly increasing the tunneling speed. However, the support speed of the existing support equipment is relatively slow, and the support takes up two-thirds of the total excavation time, which greatly affects the production efficiency. Although there are four-arm drilling trucks and eight-arm drilling trucks on the market now, there are generally problems such as huge bodies, poor movement and passability in coal mine underground roadways.
由此可见,根据产业行业的发展需要,割煤和支护的综合机械化作业问题在目前煤矿巷道掘进过程中显得非常突出。如何能创设一种可以进行高效割煤掘进与机械化锚杆锚索支护相结合的,工作效率高、安全可靠且能够在复杂地质条件下使用的新型掘锚一体机,成为当前业界的目标。It can be seen that according to the development needs of the industry, the comprehensive mechanized operation of coal cutting and support is very prominent in the current coal mine roadway excavation process. How to create a new type of all-in-one digging and bolting machine that can combine high-efficiency coal-cutting tunneling with mechanized bolt and cable support, has high work efficiency, is safe and reliable, and can be used under complex geological conditions has become the goal of the current industry.
实用新型内容Utility model content
本实用新型要解决的技术问题是提供一种掘锚一体机,使其同时满足在掘进过程中割煤、落煤、转载、运输、临时支护和永久支护作业,从而克服综掘巷道存在的“综掘不综”、掘锚支护效率低和劳动强度大的问题。The technical problem to be solved by the utility model is to provide an all-in-one machine for digging and bolting, so that it can simultaneously meet the operations of cutting coal, dropping coal, reloading, transporting, temporary support and permanent support during the excavation process, thereby overcoming the existence of a fully mechanized roadway. "Comprehensive excavation is not comprehensive", low efficiency of excavation and anchor support and high labor intensity.
为解决上述技术问题,本实用新型提供一种掘锚一体机,包括机体平台、行走机构、掘进机构、转运机构、支护机构、锚杆锚索钻孔机构、液压系统和电气系统;In order to solve the above technical problems, the utility model provides an all-in-one machine for digging and bolting, including a body platform, a traveling mechanism, a tunneling mechanism, a transfer mechanism, a supporting mechanism, a bolt and cable drilling mechanism, a hydraulic system and an electrical system;
所述锚杆锚索钻孔机构包括打钻机构、滑轨机构和连接打钻机构与滑轨机构的钻臂回转机构,所述滑轨机构设置于机体平台或转运机构上,所述打钻机构在滑轨机构和钻臂回转机构的带动下实现展开和收回。The bolt and cable drilling mechanism includes a drilling mechanism, a slide rail mechanism and a drill arm rotation mechanism connecting the drilling mechanism and the slide rail mechanism. The slide rail mechanism is arranged on the body platform or a transfer mechanism, and the drilling The mechanism is deployed and retracted under the drive of the slide rail mechanism and the drill arm rotary mechanism.
作为本实用新型的一种改进,所述滑轨机构包括固定部分和位于固定部分内部的可伸缩的移动部分,其固定部分固定于机体平台或转运机构上,所述钻臂回转机构包括钻臂和连杆机构,钻臂的一端连接打钻机构,另一端与所述移动部分的可伸出端可转动连接,所述连杆机构包括杆Ⅰ、杆Ⅱ和杆Ⅲ,所述杆Ⅰ、杆Ⅱ和杆Ⅲ的一端分别可转动的连接钻臂的中部、滑轨机构的移动部分和固定部分,所述杆Ⅰ、杆Ⅱ和杆Ⅲ的另一端可转动连接,且杆Ⅲ为伸缩油缸。As an improvement of the present utility model, the slide rail mechanism includes a fixed part and a telescopic moving part inside the fixed part, the fixed part is fixed on the body platform or the transfer mechanism, and the drill arm rotation mechanism includes a drill arm and a link mechanism, one end of the drill arm is connected to the drilling mechanism, and the other end is rotatably connected to the extendable end of the moving part. The link mechanism includes rod I, rod II and rod III, and the rod I, One end of rod II and rod III is rotatably connected to the middle part of the drill arm, the moving part and the fixed part of the slide rail mechanism, and the other end of rod I, rod II and rod III is rotatably connected, and rod III is a telescopic oil cylinder .
进一步改进,所述打钻机构通过旋转油缸与钻臂连接,且所述打钻机构上安装有伸缩油缸。As a further improvement, the drilling mechanism is connected to the drill arm through a rotary cylinder, and a telescopic cylinder is installed on the drilling mechanism.
进一步改进,所述掘进机构包括切割炮头、摇臂机构、切割电机和变位油缸,所述摇臂机构的一端连接切割炮头,另一端通过销轴连接在机体平台的前端上部,所述切割电机带动切割炮头旋转,所述变位油缸设置在摇臂机构和机体平台之间。As a further improvement, the tunneling mechanism includes a cutting nozzle, a rocker mechanism, a cutting motor and a displacement oil cylinder. One end of the rocker mechanism is connected to the cutting nozzle, and the other end is connected to the upper front end of the body platform through a pin shaft. The cutting motor drives the cutting nozzle to rotate, and the displacement oil cylinder is arranged between the rocker mechanism and the body platform.
进一步改进,所述切割炮头采用纵向切割炮头。As a further improvement, the cutting gun head adopts a longitudinal cutting gun head.
进一步改进,所述支护机构包括固定座、支护顶梁和连接固定座与支护顶梁的二连杆机构,所述固定座设置在掘进机构的摇臂机构上,所述二连杆机构包括杆a和杆b,杆a和杆b的一端分别连接在固定座的两端,杆a的另一端连接在杆b的中部,杆b的另一端连接支护顶梁,且杆a和杆b均为液压伸缩油缸。As a further improvement, the support mechanism includes a fixed seat, a supporting top beam and a two-link mechanism connecting the fixed seat and the supporting top beam, the fixed seat is arranged on the rocker mechanism of the tunneling mechanism, and the two connecting rods The mechanism includes rod a and rod b, one end of rod a and rod b are respectively connected to the two ends of the fixed seat, the other end of rod a is connected to the middle of rod b, the other end of rod b is connected to the support beam, and rod a and rod b are hydraulic telescopic oil cylinders.
进一步改进,所述掘锚一体机包括两个锚杆锚索钻孔机构,其两个滑道机构的伸缩方向与该掘锚一体机的行车方向一致,且分别设置在所述机体平台或转运机构的两侧。As a further improvement, the integrated bolter digging machine includes two bolt and anchor cable drilling mechanisms, the expansion and contraction directions of the two slideway mechanisms are consistent with the driving direction of the integrated bolter digging machine, and are respectively arranged on the body platform or transfer sides of the institution.
进一步改进,所述转运机构包括装载机构和刮板运输机构:As a further improvement, the transfer mechanism includes a loading mechanism and a scraper transport mechanism:
所述装载机构可转动的连接在机体平台的前端下部,包括铲板、耙爪机构、液压马达和液压油缸;The loading mechanism is rotatably connected to the lower front end of the body platform, including a shovel plate, a claw mechanism, a hydraulic motor and a hydraulic cylinder;
所述刮板运输机构包括刮板、链条和液压马达,所述刮板设置在机体平台中间且沿所述掘锚一体机的行车方向设置,且刮板前端与装载机构衔接。The scraper transportation mechanism includes a scraper, a chain and a hydraulic motor. The scraper is arranged in the middle of the body platform and along the driving direction of the integrated bolter digging machine, and the front end of the scraper is connected to the loading mechanism.
进一步改进,所述行走机构为履带式行走机构,位于所述掘锚一体机底部、机体平台下方。As a further improvement, the traveling mechanism is a crawler-type traveling mechanism, which is located at the bottom of the integrated bolter digging machine and below the body platform.
进一步改进,所述液压系统包括油箱、泵站部分、液压管路以及位于液压管路上的安全阀和操作阀;所述电气系统包括防爆电机、电磁启动器、防爆照明灯、瓦斯断电仪、灯光语音信号装置、急停按钮、防爆接线盒和防爆电缆;所述防爆电机连接并控制所述泵站部分。As a further improvement, the hydraulic system includes a fuel tank, pumping station parts, hydraulic pipelines, safety valves and operating valves located on the hydraulic pipelines; the electrical system includes explosion-proof motors, electromagnetic starters, explosion-proof lighting, gas breakers, Light and voice signal device, emergency stop button, explosion-proof junction box and explosion-proof cable; the explosion-proof motor is connected to and controls the pumping station part.
采用上述的设计后,本实用新型具有以下优点:After adopting the above-mentioned design, the utility model has the following advantages:
1、本实用新型掘锚一体机中的锚杆锚索钻孔机构通过可伸缩滑道和连杆机构,可实现钻臂大范围的、稳定的移动,扩大了打钻机构的作业范围,并通过支护机构的临时超前支护,可防止作业工人在迎头空顶下作业,保护了作业工人的安全。1. The anchor rod and anchor cable drilling mechanism in the integrated bolter digging machine of the utility model can realize a large-scale and stable movement of the drilling arm through the telescopic slideway and the connecting rod mechanism, which expands the working range of the drilling mechanism and Through the temporary advance support of the support mechanism, the workers can be prevented from working under the head-on roof, and the safety of the workers can be protected.
2、本实用新型采用全液压控制,通过防爆电机带动液压油泵向各执行机构供液,进而控制各执行机构完成相应的执行动作,操作简单、故障率低、维修方便。2. The utility model adopts full hydraulic control, and the explosion-proof motor drives the hydraulic oil pump to supply liquid to each actuator, and then controls each actuator to complete the corresponding execution action, with simple operation, low failure rate and convenient maintenance.
3、本实用新型的电气系统具有防爆功能,进一步保证了作业人员的人身安全。3. The electrical system of the utility model has an explosion-proof function, which further ensures the personal safety of the operators.
4、本实用新型掘锚一体机可实现掘进机工作面的割煤、落煤、转载、运输、临时支护和永久支护作业,并且在巷道中具有良好的协调与稳定性,提高了支护效率和作业安全系数,降低劳动强度。且整体机构结构紧凑合理、外型尺寸小、刚性好、行走自如可靠,适应在恶劣的环境下工作,可实现我国煤矿行业安全、高效、机械化作业的目标,丰富和完善了业内锚杆锚索车的功能,在煤矿巷道里具有非常好的适用性。4. The integrated machine for digging and bolting of the utility model can realize coal cutting, coal dropping, reloading, transportation, temporary support and permanent support on the working face of the roadheader, and has good coordination and stability in the roadway, which improves the support Improve maintenance efficiency and operation safety factor, reduce labor intensity. And the overall mechanism structure is compact and reasonable, small size, good rigidity, free and reliable to walk, adapt to work in harsh environments, can achieve the goal of safe, efficient and mechanized operation in my country's coal mine industry, enrich and improve the industry's bolt and anchor cable The function of the car has very good applicability in the coal mine roadway.
附图说明Description of drawings
上述仅是本实用新型技术方案的概述,为了能够更清楚了解本实用新型的技术手段,以下结合附图与具体实施方式对本实用新型作进一步的详细说明。The above is only an overview of the technical solution of the utility model. In order to better understand the technical means of the utility model, the utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
图1是本实用新型掘锚一体机展开状态的侧视示意图;Fig. 1 is a schematic side view of the expanded state of the utility model integrated bolter digging machine;
图2是本实用新型掘锚一体机展开状态的俯视示意图;Fig. 2 is a top view schematic diagram of the expanded state of the utility model integrated bolter digging machine;
图3是本实用新型掘锚一体机收回状态的侧视示意图。Fig. 3 is a schematic side view of the retracted state of the integrated bolter digging machine of the present invention.
具体实施方式Detailed ways
参照附图1至3所示,本实用新型一种掘锚一体机,包括机体平台2、行走机构5、掘进机构1、转运机构、支护机构7、锚杆锚索钻孔机构6、液压系统8和电气系统9。Referring to the accompanying drawings 1 to 3, the utility model is an all-in-one machine for digging and bolting, including a body platform 2, a traveling mechanism 5, a tunneling mechanism 1, a transfer mechanism, a supporting mechanism 7, an anchor rod and cable drilling mechanism 6, a hydraulic System 8 and Electrical System 9.
行走机构5位于该掘锚一体机的底部,机体平台2设于其上方,锚杆锚索钻孔机构6、液压系统8和电气系统9均设置在该机体平台2上。行走机构5优选为履带式行走机构,履带式行走机构包含有涨紧机构、减速机和行走马达。履带涨紧机构由涨紧轮组、涨紧油缸组成,涨紧轮组通过涨紧油缸的伸缩运动可调整履带的涨紧程度。行走马达提供行走机构5的行走动力,带动行走机构5向前移动,行走机构5上装有自锁阀,在掘锚一体机停车时按下自锁阀,掘锚一体机不能行走,然后可进行打钻支护等动作;当掘锚一体机需要移动时,打开行走机构5的自锁阀,行走马达带动减速机,通过链轮带动履带实现行走机构5的行走。The traveling mechanism 5 is located at the bottom of the integrated bolter digging machine, the body platform 2 is arranged above it, and the bolt and anchor cable drilling mechanism 6 , the hydraulic system 8 and the electrical system 9 are all arranged on the body platform 2 . The traveling mechanism 5 is preferably a crawler-type traveling mechanism, and the crawler-type traveling mechanism includes a tensioning mechanism, a speed reducer and a traveling motor. The track tensioning mechanism is composed of a tensioning wheel set and a tensioning oil cylinder, and the tensioning wheel set can adjust the tension of the track through the telescopic movement of the tensioning oil cylinder. The traveling motor provides the walking power of the traveling mechanism 5, and drives the traveling mechanism 5 to move forward. The self-locking valve is installed on the traveling mechanism 5. When the self-locking valve is pressed when the integrated anchor digging machine stops, the integrated anchor digging machine cannot walk, and then it can be carried out. Actions such as drilling and support; when the integrated machine needs to move, the self-locking valve of the traveling mechanism 5 is opened, the traveling motor drives the reducer, and the crawler belt is driven by the sprocket to realize the walking of the traveling mechanism 5.
掘进机构1主要用于割煤,包括切割炮头、摇臂机构、切割电机和变位油缸。切割炮头采用纵向切割炮头。摇臂机构的一端连接切割炮头,另一端可转动连接在机体平台2的前端上部,如通过销轴连接。切割电机带动切割炮头旋转,变位油缸连接在摇臂机构和机体平台2之间,用于调整切割炮头的位置。The tunneling mechanism 1 is mainly used for coal cutting, including a cutting nozzle, a rocker mechanism, a cutting motor and a displacement oil cylinder. The cutting gun head adopts the longitudinal cutting gun head. One end of the rocker mechanism is connected to the cutting gun head, and the other end is rotatably connected to the upper front end of the body platform 2, such as being connected by a pin shaft. The cutting motor drives the cutting gun head to rotate, and the displacement oil cylinder is connected between the rocker mechanism and the body platform 2 for adjusting the position of the cutting gun head.
转运机构包括装载机构3和刮板运输机构4。装载机构3包括铲板、耙爪机构、液压马达和油缸,主要用于割煤后的清煤。铲板可转动的连接在机体平台2的前端下部,如通过销轴连接。刮板运输机构4包括刮板、链条和液压马达,主要用于清煤过程的运输。刮板设置在机体平台2中间且沿该掘锚一体机的行车方向设置,刮板前端与装载机构3衔接。The transfer mechanism includes a loading mechanism 3 and a scraper transport mechanism 4 . The loading mechanism 3 includes a shovel plate, a claw mechanism, a hydraulic motor and an oil cylinder, and is mainly used for coal cleaning after coal cutting. The shovel plate is rotatably connected to the lower front end of the body platform 2, such as being connected by a pin shaft. The scraper transportation mechanism 4 includes scrapers, chains and hydraulic motors, and is mainly used for transportation in the coal cleaning process. The scraper is arranged in the middle of the body platform 2 and arranged along the driving direction of the integrated bolter digging machine, and the front end of the scraper is connected with the loading mechanism 3 .
支护机构7可折叠的设置于掘进机构1上,可进行巷道迎头空顶的临时支护,包括固定座、支护顶梁和连接固定座与支护顶梁的二连杆机构。固定座设置在掘进机构1的摇臂机构上。二连杆机构用于保证支护机构7的稳定运动,包括杆a和杆b,杆a和杆b的一端分别连接固定座的两端,杆a的另一端连接在杆b的中部,杆b的另一端连接支护顶梁,且杆a和杆b均为液压伸缩油缸,在杆a和杆b的伸缩带动下,支护机构7展开或收回。The support mechanism 7 is foldably arranged on the tunneling mechanism 1, and can perform temporary support for the head-on empty roof of the roadway, and includes a fixing seat, a supporting roof beam and a two-link mechanism connecting the fixing seat and the supporting roof beam. The fixing seat is arranged on the rocker mechanism of the tunneling mechanism 1 . The two-bar linkage mechanism is used to ensure the stable movement of the support mechanism 7, including rod a and rod b. One end of rod a and rod b is respectively connected to the two ends of the fixing seat, and the other end of rod a is connected to the middle part of rod b. The other end of b is connected to the supporting top beam, and rod a and rod b are both hydraulic telescopic oil cylinders, driven by the expansion and contraction of rod a and rod b, the support mechanism 7 is expanded or retracted.
锚杆锚索钻孔机构6可折叠的设置于机体平台2上或刮板运输机构4上,主要用于顶板和侧帮的锚杆锚索支护,包括滑轨机构6-1、钻臂回转机构和打钻机构6-2。优选滑轨机构6-1包括固定部分和位于固定部分内部的可伸缩的移动部分,固定部分可固定于机体平台2或刮板运输机构4上。钻臂回转机构包括钻臂和连杆机构,钻臂的一端通过旋转油缸连接打钻机构6-2,使打钻机构6-2实现多角度的旋转,以便完成顶板和侧帮的锚杆锚索支护,并且打钻机构6-2上安装有伸缩油缸可推动打钻机构的伸长,实现深孔钻孔作业;钻臂的另一端与滑轨机构6-1移动部分的可伸出端可转动连接;连杆机构包括杆Ⅰ、杆Ⅱ和杆Ⅲ,杆Ⅰ、杆Ⅱ和杆Ⅲ的一端分别可转动的连接在钻臂的中部、滑轨机构6-1的可移动部分和固定部分上,杆Ⅰ、杆Ⅱ和杆Ⅲ的另一端可转动连接在一起,且杆Ⅲ为伸缩油缸,上述可转动连接均可采用销轴连接方式。参照附图1和3所示,在杆Ⅲ的伸缩带动下,钻臂回转机构实现展开与收回,进而带动打钻机构展开和收回。The bolt and cable drilling mechanism 6 is foldably arranged on the body platform 2 or the scraper transportation mechanism 4, and is mainly used for the bolt and cable support of the roof and side walls, including the slide rail mechanism 6-1, the drilling arm Slewing mechanism and drilling mechanism 6-2. Preferably, the slide rail mechanism 6 - 1 includes a fixed part and a telescopic moving part inside the fixed part, and the fixed part can be fixed on the body platform 2 or the scraper transport mechanism 4 . The drilling arm slewing mechanism includes a drilling arm and a connecting rod mechanism. One end of the drilling arm is connected to the drilling mechanism 6-2 through a rotary cylinder, so that the drilling mechanism 6-2 can rotate at multiple angles, so as to complete the anchor rod and anchor of the roof and side panels. Cable support, and the drilling mechanism 6-2 is equipped with a telescopic oil cylinder that can promote the extension of the drilling mechanism to realize deep hole drilling operations; the other end of the drilling arm and the movable part of the slide rail mechanism 6-1 can extend The connecting rod mechanism includes rod I, rod II and rod III, and one end of rod I, rod II and rod III is respectively rotatably connected to the middle part of the drill arm, the movable part of the slide rail mechanism 6-1 and On the fixed part, the other ends of rod I, rod II and rod III are rotatably connected together, and rod III is a telescopic oil cylinder, and the above-mentioned rotatable connections can all be connected by pin shafts. Referring to Figures 1 and 3, driven by the expansion and contraction of the rod III, the drilling arm slewing mechanism realizes deployment and retraction, and then drives the drilling mechanism to expand and retract.
参照附图2所示,掘锚一体机包括两个锚杆锚索钻孔机构6,其两个滑轨机构6-1的伸缩方向与该掘锚一体机的行车方向一致,且分别固定在机体平台2或刮板运输机构4的两侧。其两个钻臂回转机构可以有不同程度的伸缩,且可独立操作,同时进行锚杆锚索的支护作业。Referring to Figure 2, the integrated bolter digging machine includes two anchor rod and anchor cable drilling mechanisms 6, the expansion and contraction directions of the two slide rail mechanisms 6-1 are consistent with the driving direction of the integrated bolter digging machine, and are respectively fixed on Both sides of the body platform 2 or the scraper transport mechanism 4. Its two drill arm slewing mechanisms can be expanded and retracted to different degrees, and can be operated independently, and the support operation of the anchor rod and anchor cable is carried out at the same time.
液压系统8包括油箱、泵站部分、连接油箱与泵站部分以及连接泵站部分与各执行机构的液压管路、液压油缸以及位于液压管路上的安全阀和操作阀。泵站部分包括液压油泵、压力表及护罩,压力表通过液压管路与液压油泵连接,液压油泵可选用齿轮泵或柱塞泵等。泵站部分通过液压系统的液压管路为整机提供动力,是掘锚一体机的动力中心。掘锚一体机通过液压管路从泵站部分获得动力,然后通过液压管路把动力传递到各执行机构,与各执行机构相对应的控制阀配合完成行走、打钻、支护等动作。The hydraulic system 8 includes a fuel tank, a pumping station part, a hydraulic pipeline connecting the fuel tank and the pumping station part and connecting the pumping station part and each actuator, a hydraulic cylinder, and a safety valve and an operating valve on the hydraulic pipeline. The pumping station includes a hydraulic oil pump, a pressure gauge and a shield. The pressure gauge is connected to the hydraulic oil pump through a hydraulic pipeline. The hydraulic oil pump can be a gear pump or a plunger pump. The pump station part provides power for the whole machine through the hydraulic pipeline of the hydraulic system, and is the power center of the bolter digging machine. The integrated bolter digging machine obtains power from the pump station part through the hydraulic pipeline, and then transmits the power to each actuator through the hydraulic pipeline, and cooperates with the control valve corresponding to each actuator to complete actions such as walking, drilling, and support.
电气系统9包括防爆电机、本质安全型电磁启动器、防爆照明灯、瓦斯断电仪、灯光语音信号装置、急停按钮、倒车报警仪、防爆接线盒和防爆电缆。其中防爆电机和泵站部分的液压油泵通过联轴器连接,防爆电机启动并带动液压油泵运转,为掘锚一体机提供动力,电气系统9是该掘锚一体机的电力中心。The electrical system 9 includes an explosion-proof motor, an intrinsically safe electromagnetic starter, an explosion-proof lighting lamp, a gas power-off device, a light and voice signal device, an emergency stop button, a backup alarm, an explosion-proof junction box and an explosion-proof cable. Wherein the explosion-proof motor and the hydraulic oil pump of the pump station part are connected by a coupling, the explosion-proof motor starts and drives the hydraulic oil pump to run, and provides power for the integrated bolter digging machine, and the electrical system 9 is the power center of the integrated bolter dredge machine.
液压系统8的油箱、泵站部分和电气系统9分别用螺栓固定在机体平台2的后部两侧。The oil tank, the pumping station part and the electrical system 9 of the hydraulic system 8 are fixed on both sides of the rear portion of the body platform 2 with bolts respectively.
本实用新型掘锚一体机的工作方式是:在掘进时采用纵向切割炮头进行切割落煤,落煤通过前部装载机构进行装载清理,再通过刮板运输机构进行转运,即完成割煤和运输过程;在完成一次割煤进尺后切割炮头落地、停机,将液压系统由“割煤作业”切换到“支护作业”,操作机身上的滑轨机构将两臂锚杆锚索钻孔机构延伸滑动到切割炮头前部,通过打钻机构和钻臂回转机构的操作,对巷道顶板的锚杆锚索及两侧帮的锚杆进行支护,同时将临时超前支护机构升起顶住迎头空顶,可防止作业工人在迎头空顶下作业,保护作业工人的安全。The working mode of the utility model integrated machine for digging and anchoring is: when excavating, the longitudinal cutting gun head is used to cut and drop the coal, and the falling coal is loaded and cleaned by the front loading mechanism, and then transferred by the scraper transport mechanism, that is, the coal cutting and coal cutting are completed. Transportation process: After completing a coal cutting footage, the cutting gun head lands and stops, the hydraulic system is switched from "coal cutting operation" to "supporting operation", and the slide rail mechanism on the fuselage is operated to drill the two-arm anchor rod and anchor cable The hole mechanism extends and slides to the front of the cutting gun head, and through the operation of the drilling mechanism and the drill arm rotary mechanism, the anchor bolts and cables on the roof of the roadway and the anchor bolts on both sides are supported, and the temporary advance support mechanism is lifted Standing up against the head-on roof can prevent the workers from working under the head-on roof and protect the safety of the workers.
本实用新型掘锚一体机将割煤作业和支护作业组成在一起,形成一种掘锚一体机,该掘锚一体机可实现掘进工作面“割煤作业”和“支护作业”的综合机械化作业,提高了支护效率及作业安全系数、降低劳动强度。The utility model combines coal cutting operation and support operation together to form an integrated anchor digging machine, which can realize the integration of "coal cutting operation" and "support operation" on the excavation working face Mechanized operation improves support efficiency and operation safety factor and reduces labor intensity.
本实用新型掘锚一体机液压系统采用“割煤作业”和“支护作业”两路,可相互切换并伴有保护。在割煤作业时,系统对“支护作业”不供液,支护各执行机构不工作;在支护作业时,系统对“割煤作业”不供液,割煤、装载、转运各机构不工作。这样就充分利用了掘锚一体机本身的空间进行液压系统的综合利用,使得掘锚一体机结构紧凑,并尽可能的减小了掘锚一体机的体积。The hydraulic system of the utility model integrated bolt digging machine adopts two circuits of "coal cutting operation" and "supporting operation", which can be switched mutually and accompanied by protection. During the coal cutting operation, the system does not supply liquid to the "supporting operation", and the supporting actuators do not work; during the supporting operation, the system does not supply liquid to the "coal cutting operation", and the coal cutting, loading, and transfer mechanisms Not working. In this way, the space of the integrated bolter mining machine itself is fully utilized for comprehensive utilization of the hydraulic system, which makes the integrated bolter miner compact in structure and reduces the volume of the integrated bolter miner as much as possible.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,本领域技术人员利用上述揭示的技术内容做出些许简单修改、等同变化或修饰,均落在本实用新型的保护范围内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model in any form. Those skilled in the art may use the technical content disclosed above to make some simple modifications, equivalent changes or modifications. Within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520053096.8U CN204609879U (en) | 2015-01-26 | 2015-01-26 | A kind of pick anchor all-in-one |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520053096.8U CN204609879U (en) | 2015-01-26 | 2015-01-26 | A kind of pick anchor all-in-one |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204609879U true CN204609879U (en) | 2015-09-02 |
Family
ID=53962452
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520053096.8U Expired - Lifetime CN204609879U (en) | 2015-01-26 | 2015-01-26 | A kind of pick anchor all-in-one |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204609879U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107130656A (en) * | 2017-04-14 | 2017-09-05 | 中国科学院武汉岩土力学研究所 | Mine underground bores anchor broken rock integrated digging formula loading machine |
| CN110905502A (en) * | 2019-12-27 | 2020-03-24 | 沈阳德智科技有限公司 | An on-board anchoring device for roadheader |
| CN112096407A (en) * | 2020-09-22 | 2020-12-18 | 廊坊景隆重工机械有限公司 | Mining equipment |
| CN112901198A (en) * | 2021-02-02 | 2021-06-04 | 中国矿业大学(北京) | Intelligent cantilever type digging and anchoring machine based on image recognition and construction method |
| CN114320385A (en) * | 2021-11-25 | 2022-04-12 | 中国煤炭科工集团太原研究院有限公司 | Anchor rod drill carriage net hanging equipment and anchor rod drill carriage |
| CN115559758A (en) * | 2022-10-08 | 2023-01-03 | 安徽理工大学 | Be applicable to quick tunnelling intelligence stock platform truck of easily removing |
| CN116241516A (en) * | 2022-12-26 | 2023-06-09 | 中国铁建重工集团股份有限公司 | Control system of bolter pumping station, bolter |
-
2015
- 2015-01-26 CN CN201520053096.8U patent/CN204609879U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107130656A (en) * | 2017-04-14 | 2017-09-05 | 中国科学院武汉岩土力学研究所 | Mine underground bores anchor broken rock integrated digging formula loading machine |
| CN107130656B (en) * | 2017-04-14 | 2020-08-04 | 中国科学院武汉岩土力学研究所 | Integrated backhoe loader for underground drilling, anchoring and rock breaking |
| CN110905502A (en) * | 2019-12-27 | 2020-03-24 | 沈阳德智科技有限公司 | An on-board anchoring device for roadheader |
| CN112096407A (en) * | 2020-09-22 | 2020-12-18 | 廊坊景隆重工机械有限公司 | Mining equipment |
| CN112901198A (en) * | 2021-02-02 | 2021-06-04 | 中国矿业大学(北京) | Intelligent cantilever type digging and anchoring machine based on image recognition and construction method |
| CN114320385A (en) * | 2021-11-25 | 2022-04-12 | 中国煤炭科工集团太原研究院有限公司 | Anchor rod drill carriage net hanging equipment and anchor rod drill carriage |
| CN115559758A (en) * | 2022-10-08 | 2023-01-03 | 安徽理工大学 | Be applicable to quick tunnelling intelligence stock platform truck of easily removing |
| CN116241516A (en) * | 2022-12-26 | 2023-06-09 | 中国铁建重工集团股份有限公司 | Control system of bolter pumping station, bolter |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103485717B (en) | The all-hydraulic anchor shaft anchor cable drill carriage of a kind of four arm | |
| CN204609879U (en) | A kind of pick anchor all-in-one | |
| US11459888B2 (en) | Auxiliary transportation and support system used after rapid excavation | |
| CN111520155B (en) | A kind of multifunctional roadway repairing machine and its construction method | |
| CN110318672B (en) | Multifunctional rock roadway drilling and anchoring integrated machine for coal mine | |
| WO2009155776A1 (en) | A dilling, loading, transporting and anchoring integration machine for laneway in coal mine | |
| CN102704929B (en) | Digging and anchoring machine integrated with digging, anchoring and drilling | |
| CN111997642B (en) | All-rock roadway and tunnel tunneling and anchoring all-in-one machine and control method thereof | |
| CN106948826B (en) | A multifunctional roadway repair machine | |
| CN101169036B (en) | Single-lane rapid excavation technology of crawler-type liftable roof anchor rod and anchor cable construction drilling rig | |
| CN212359776U (en) | Multifunctional hard rock tunneling integrated machine | |
| CN101769158A (en) | Excavating, supporting and bolting integrated self-contained machine | |
| CN204511432U (en) | A kind of four drill boom formula pick anchor all-in-ones | |
| CN205503122U (en) | Chisel dress anchor all -in -one | |
| CN203891763U (en) | Full-hydraulic anchor rod and anchor rope drill wagon | |
| CN107130656B (en) | Integrated backhoe loader for underground drilling, anchoring and rock breaking | |
| CN111411655A (en) | Multifunctional roadway maintenance repairing machine | |
| CN101881162A (en) | Drill loader | |
| CN102808623A (en) | Coal mine underground multipurpose vehicle | |
| CN108150177B (en) | Multi-functional hard-rock tunnel fast digging technique and equipment | |
| CN108999570B (en) | Tunnel drilling rig | |
| CN101781972B (en) | Crawler-type lifting top and slope bolt and anchor construction drill | |
| CN212389344U (en) | Hard rock cantilever tunneling machine | |
| CN200982195Y (en) | Small-sized cantilevered tunneller for coal roadway | |
| CN202882911U (en) | Driving-bolting machine with integrated driving-bolting drill |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 065300 Industrial Second Road, Chaobaihe Industrial Zone, Dachang, Langfang City, Hebei Province Patentee after: Hebei Jinglong Intelligent Equipment Co.,Ltd. Country or region after: China Address before: 065300 Industrial Second Road, Chaobaihe Industrial Zone, Dachang, Langfang City, Hebei Province Patentee before: LANGFANG JINGLONG HEAVY MACHINERY Co.,Ltd. Country or region before: China |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150902 |