CN204607370U - Large-scale emery wheel handling instrument - Google Patents

Large-scale emery wheel handling instrument Download PDF

Info

Publication number
CN204607370U
CN204607370U CN201520181738.2U CN201520181738U CN204607370U CN 204607370 U CN204607370 U CN 204607370U CN 201520181738 U CN201520181738 U CN 201520181738U CN 204607370 U CN204607370 U CN 204607370U
Authority
CN
China
Prior art keywords
emery wheel
suspension ring
rings
gim peg
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520181738.2U
Other languages
Chinese (zh)
Inventor
马明
潘凯华
于金洲
李丰
胡宝友
罗军
王亮亮
张东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201520181738.2U priority Critical patent/CN204607370U/en
Application granted granted Critical
Publication of CN204607370U publication Critical patent/CN204607370U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a large-scale emery wheel handling instrument, includes emery wheel fixer, rings, wire rope, rings and the rings gim peg on the emery wheel fixer is connected, rings and rings gim peg clearance fit, rings can rotate on rings gim peg, a rings is respectively connected at wire rope's both ends, and when handling the emery wheel, the centre of wire rope is hung on the hook. Compared with the prior art, the beneficial effects of the utility model are that: a large grinding wheel hoisting tool can prevent the abrasion of a steel wire rope to a grinding wheel when the steel wire rope is directly used for hoisting the grinding wheel and the damage to the field safety caused by the twisting and winding of the steel wire rope. In addition because the utility model provides a rings can rotate on the rings gim peg, consequently, only can be with two emery wheel fixers the hoist and mount transportation of large-scale emery wheel safety and stability, saved the cost of manufacture.

Description

A kind of large-scale emery wheel hoist tool
Technical field
The utility model relates to hoisting technology field, particularly the large-scale emery wheel hoist tool of one.
Background technology
The roll dressing emery wheel volume that slab portion uses, weight are all comparatively large, and it is very inconvenient to carry.And in handling process, ensure that the surface of emery wheel is injury-free, therefore difficulty is larger.See Fig. 4, in the prior art, emery wheel 6 is pass in the middle part of emery wheel 6 with steel rope 4 when handling, then steel rope 4 is hung over handling on crane hook 5.In handling process, emery wheel 6 and the mutual friction of steel rope 4 phase, cause certain infringement to emery wheel 6, reduces service life of emery wheel 6, and in handling process, steel rope 4 easily twists winding, causes certain harm to site safety.
The patent No. is the patent document disclosed " emery wheel special hanger " of CN103159130A, and be made up of U-type groove, suspension ring, annulus, hanging belt, suspension ring are directly welded in U-type groove centre dot, and suspension ring connect hanging belt, then connect annulus with hanging belt.Due in the whole process that lifts at emery wheel, for being flexible coupling between emery wheel and crane hook, during lifting, whole Lift-on/Lift-off System plays pendulum, and easily produces and lays particular stress on.In order to solve the fugitiveness laying particular stress on phenomenon and cause to whole Lift-on/Lift-off System, " emery wheel special hanger " must use the assembly set of the U-type groove of more than three or three, suspension ring and hanging belt to form, making can increase certain material cost, too increase a procedure when mounted simultaneously, waste time and energy.
Summary of the invention
The purpose of this utility model is to provide a kind of large-scale emery wheel hoist tool, and when can prevent from directly using steel rope handling emery wheel, steel rope to the wearing and tearing of emery wheel, and to twist winding, to the harm that site safety causes due to steel rope.The utility model only uses two emery wheel fixers by the hoisting transportation of large-scale emery wheel safety and stability, can save cost of manufacture in addition.
For achieving the above object, the utility model realizes by the following technical solutions:
A kind of large-scale emery wheel hoist tool, comprise emery wheel fixer, suspension ring, steel rope, described suspension ring are connected with the suspension ring gim peg on emery wheel fixer, suspension ring and suspension ring gim peg free-running fit, suspension ring can rotate on suspension ring gim peg, the two ends of described steel rope respectively connect suspension ring, and during handling emery wheel, the intermediate hanging of steel rope is on crane hook.
Described emery wheel fixer comprises harpoon mouth clamp, suspension ring gim peg, and suspension ring gim peg is weldingly fixed on the upper flange of harpoon mouth clamp.
The axial cross section of described suspension ring gim peg is T-shaped.
Shown suspension ring comprise annular iron hoop, rings seat, and rings seat is fixed on one end of annular iron hoop, and rings seat inside is provided with through hole in the radial direction of annular iron hoop.
Compared with prior art, the beneficial effects of the utility model are:
A kind of large-scale emery wheel hoist tool, when can prevent from directly using steel rope handling emery wheel, steel rope to the wearing and tearing of emery wheel, and to twist winding, to the harm that site safety causes due to steel rope.In addition because the suspension ring in the utility model can rotate on suspension ring gim peg, therefore, in the process of handling due to slight lay particular stress on or motional inertia and make steel rope and suspension ring produce inclination angle time, suspension ring can transfer by automatic rotary the stressed inclination angle changed between steel rope, thus make whole handling process be in stable strained condition.Therefore the utility model only uses two emery wheel fixers by the hoisting transportation of large-scale emery wheel safety and stability, can save cost of manufacture.
Accompanying drawing explanation
Fig. 1 is the large-scale emery wheel hoist tool of the utility model structural representation in use;
Fig. 2 is the enlarged diagram of the A point of Fig. 1;
Fig. 3 is the connection diagram between emery wheel fixer and suspension ring;
Fig. 4 is the schematic diagram directly adopting steel rope handling emery wheel;
In figure: 1-harpoon mouth clamp 2-suspension ring gim peg 3-suspension ring 3-1 annular iron hoop 3-2 rings seat 4-steel rope 5-crane hook 6-emery wheel
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is described in detail, but it should be noted that enforcement of the present utility model is not limited to following embodiment.
As shown in Figure 1-Figure 3, a kind of large-scale emery wheel hoist tool, comprise emery wheel fixer, suspension ring 3, steel rope 4, suspension ring 3 are connected with the suspension ring gim peg 2 on emery wheel fixer, suspension ring 3 and suspension ring gim peg 2 free-running fit, suspension ring 3 can rotate on suspension ring gim peg 2, and the two ends of steel rope 4 respectively connect suspension ring 3, during handling emery wheel 6, the intermediate hanging of steel rope 4 is on crane hook 5.
Emery wheel fixer comprises harpoon mouth clamp 1, suspension ring gim peg 2, and suspension ring gim peg 2 is weldingly fixed on the upper flange of harpoon mouth clamp 1.
The axial cross section of suspension ring gim peg 2 is T-shaped.
Shown suspension ring comprise annular iron hoop 3-1, rings seat 3-2, and rings seat 3-2 is fixed on one end of annular iron hoop 3-1, and rings seat 3-2 inside is provided with through hole in the radial direction of annular iron hoop.
During making:
1) two spill harpoon mouth clamps 1 are made according to the thickness of handling emery wheel, the open height 3-5mm larger than the thickness of emery wheel of harpoon mouth clamp 1.
2) suspension ring gim peg 2 is pierced into the through hole rings seat 3-2 from the inside of suspension ring 3, traversing through end is welded on the upper flange of harpoon mouth clamp 1.
3) two suspension ring 3 are connected with the two ends of a steel rope 4 respectively.
During use:
1) two spill harpoon mouth clamps 1 are stuck in the two ends of emery wheel 6, during installation, will notice that the position of two harpoon mouth clamps 1 will be in the same of emery wheel 6 diametrically.
2) middle part of steel rope 4 is hung on crane hook 5, start crane and carry out hoisting transportation.
The same that two harpoon mouth clamps 1 may be made to fail to be in emery wheel 6 due to personal error when installing diametrically makes emery wheel 6 produce slight laying particular stress on; Or when transporting, the inertia produced due to motion makes produce some inclination angles between steel rope 4 and suspension ring 3; Now, suspension ring 3 can rotate freely on suspension ring gim peg 2, automatically regulate the stressed inclination angle between steel rope 4, thus make whole hoisting process all be in stable strained condition.
The utility model, in the use procedure of actual production, not only solves the practical problems existed in prior art, and safe, convenient, fast.

Claims (4)

1. one kind large-scale emery wheel hoist tool, it is characterized in that, comprise emery wheel fixer, suspension ring, steel rope, described suspension ring are connected with the suspension ring gim peg on emery wheel fixer, suspension ring and suspension ring gim peg free-running fit, suspension ring can rotate on suspension ring gim peg, and the two ends of described steel rope respectively connect suspension ring, during handling emery wheel, the intermediate hanging of steel rope is on crane hook.
2. the large-scale emery wheel hoist tool of one according to claim 1, is characterized in that, described emery wheel fixer comprises harpoon mouth clamp, suspension ring gim peg, and suspension ring gim peg is weldingly fixed on the upper flange of harpoon mouth clamp.
3. the large-scale emery wheel hoist tool of one according to claim 2, is characterized in that, the axial cross section of described suspension ring gim peg is T-shaped.
4. the large-scale emery wheel hoist tool of one according to claim 1, it is characterized in that, shown suspension ring comprise annular iron hoop, rings seat, and rings seat is fixed on one end of annular iron hoop, and rings seat inside is provided with through hole in the radial direction of annular iron hoop.
CN201520181738.2U 2015-03-28 2015-03-28 Large-scale emery wheel handling instrument Expired - Fee Related CN204607370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520181738.2U CN204607370U (en) 2015-03-28 2015-03-28 Large-scale emery wheel handling instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520181738.2U CN204607370U (en) 2015-03-28 2015-03-28 Large-scale emery wheel handling instrument

Publications (1)

Publication Number Publication Date
CN204607370U true CN204607370U (en) 2015-09-02

Family

ID=53959941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520181738.2U Expired - Fee Related CN204607370U (en) 2015-03-28 2015-03-28 Large-scale emery wheel handling instrument

Country Status (1)

Country Link
CN (1) CN204607370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107032227A (en) * 2017-06-06 2017-08-11 罗特新风科技无锡有限公司 Runner lifts by crane turning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107032227A (en) * 2017-06-06 2017-08-11 罗特新风科技无锡有限公司 Runner lifts by crane turning device
CN107032227B (en) * 2017-06-06 2018-06-19 罗特新风科技无锡有限公司 Runner lifts by crane turnover device

Similar Documents

Publication Publication Date Title
CN205555874U (en) Engineering is with loading and unloading anchor clamps
CN201801293U (en) Automatically tightening lifting tool
CN204607370U (en) Large-scale emery wheel handling instrument
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN207760859U (en) Pile pile lifts by crane collet
CN203536866U (en) Tripod line laying device
CN203269351U (en) Forceps clip used on crane and used for lifting barrel-shaped objects
CN205590168U (en) Overturning lifting device
CN104477754A (en) Lifting appliance system for rapidly hoisting suspended type vertical vessel
CN204384690U (en) A kind of hoist cable suspender
CN103264953B (en) Butt-joint adjusting device of steel bar cage
CN101734549A (en) Lifting sling
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN102211735A (en) Lifting appliance special for spool
CN205838345U (en) The barbed dropping-proof hook of a kind of band
CN205616439U (en) Vehicle wheel sling
CN209583384U (en) A kind of suspender lifting by crane jacking pipe joints
CN104495600A (en) Stone lifting belt
CN208054718U (en) A kind of U-shaped hanging apparatus for lifting Large-diameter Steel reinforced concrete pipe
CN208552909U (en) A kind of anti-pendant ring of electric power tower
CN204917623U (en) Long anchor rope hoisting accessory
CN102107817A (en) Connecting hook for hoisting
CN220537304U (en) Hoisting device for stably hoisting prefabricated pipeline
CN211998474U (en) Locking lifting appliance for lifting pipeline
CN211393532U (en) Large-scale bar stone anchor clamps for tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902