CN205555874U - Engineering is with loading and unloading anchor clamps - Google Patents

Engineering is with loading and unloading anchor clamps Download PDF

Info

Publication number
CN205555874U
CN205555874U CN201620321140.3U CN201620321140U CN205555874U CN 205555874 U CN205555874 U CN 205555874U CN 201620321140 U CN201620321140 U CN 201620321140U CN 205555874 U CN205555874 U CN 205555874U
Authority
CN
China
Prior art keywords
clamping
grip block
gallows
engineering
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620321140.3U
Other languages
Chinese (zh)
Inventor
何淑琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruizhou Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620321140.3U priority Critical patent/CN205555874U/en
Application granted granted Critical
Publication of CN205555874U publication Critical patent/CN205555874U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to an engineering is with loading and unloading anchor clamps, the gallows has been included, it is doughnut -shaped structure to play the gallows, rise to be provided with on the gallows both sides and lift by crane the couple, it is provided with a plurality of centre gripping subassembly on the circumferencial direction of gallows to rise, the centre gripping subassembly includes supporting rod, twist grip, grip block, fixed connection between supporting rod and the grip block, the grip block is located inside the adapter sleeve, the adapter sleeve is connected with the grip block, the grip block is connected with the tensioning spring, be provided with a plurality of non slipping spur on the clamping face of each grip block. The utility model discloses at the during operation, playing steel pipe cover between the gallows, rotating the twist grip, to drive the supporting rod rotatory, realizes that the grip block is close to to the steel pipe surface, realizes the centre gripping of non slipping spur, and can improve clamping -force this moment under the effect of non slipping spur, and clamping stability is good, and the power of centre gripping is big, and the wearing layer can reduce the wearing and tearing of lifting by crane rings, increase of service life.

Description

一种工程用装卸夹具An engineering loading and unloading fixture

技术领域technical field

本实用新型涉及工程技术领域,尤其涉及一种工程用装卸夹具。The utility model relates to the technical field of engineering, in particular to a loading and unloading fixture for engineering.

背景技术Background technique

工程是科学和数学的某种应用,通过这一应用,使自然界的物质和能源的特性能够通过各种结构、机器、产品、系统和过程,是以最短的时间和精而少的人力做出高效、可靠且对人类有用的东西。将自然科学的理论应用到具体工农业生产部门中形成的各学科的总称。Engineering is the application of science and mathematics by which the properties of matter and energy in nature can be manipulated through structures, machines, products, systems and processes in the shortest time and with the least amount of manpower Something efficient, reliable, and useful to humans. The general term for various disciplines formed by applying the theories of natural science to specific industrial and agricultural production sectors.

吊装是指吊车或者起升机构对设备的安装、就位的统称。吊装过程中的要求:(1)土法施工用的滚动法装卸移动设备,滚杠的粗细要一致,年度应比托排宽度长50cm,严禁带手套填滚杠。装卸车时滚边的坡度不得大于20°,滚道的搭设要平整、坚实,接头错开,滚动的速度不宜太快,必要时要用溜绳。(2)采用回转法或扳倒法吊装塔罐时,塔体底部安装的铰腕必须具有抵抗起吊过程中所产生水平推力的能力,起吊过程中塔体的左右溜绳必须牢靠,塔体回转就位高度时,使其慢慢落入基础,避免发生意外和变形。(3)在架体上或建筑物上安装设备时,其强度和稳定性要达到安装条件的要求。在设备安装定位后要按图纸的要求连接紧固或焊接,满足了设计要求的强度和具有稳固性后,才能脱钩,否则要进行临时固定。Hoisting refers to the general term for the installation and positioning of equipment by a crane or a lifting mechanism. Requirements during the hoisting process: (1) For the rolling method used in earth method construction to load and unload mobile equipment, the thickness of the roller bars should be consistent, and the annual length should be 50cm longer than the width of the supporting row. It is strictly forbidden to fill the roller bars with gloves. When loading and unloading the truck, the slope of the rolling edge shall not be greater than 20°. The raceway shall be set up flat and firm, the joints shall be staggered, and the rolling speed shall not be too fast. A slip rope shall be used if necessary. (2) When the tower tank is hoisted by the rotation method or the knock down method, the hinge installed at the bottom of the tower body must have the ability to resist the horizontal thrust generated during the hoisting process. When it is in place, let it slowly fall into the foundation to avoid accidents and deformation. (3) When installing equipment on a frame or a building, its strength and stability must meet the requirements of the installation conditions. After the equipment is installed and positioned, it must be connected and fastened or welded according to the requirements of the drawings. The decoupling can only be done after the strength and stability of the design requirements are met, otherwise it must be temporarily fixed.

现有工程施工时,当需要对不同直径的钢管进行起吊,在起吊过程中所用的起吊夹具所能够的夹持不方便,且在夹持过程中防滑性差,影响起吊的安全性。During the construction of existing projects, when it is necessary to lift steel pipes of different diameters, the lifting fixture used in the lifting process can not be clamped conveniently, and the anti-skid property is poor during the clamping process, which affects the safety of lifting.

实用新型内容Utility model content

本实用新型的目的是为了克服现有技术的不足,提供了一种工程用装卸夹具。The purpose of the utility model is to provide a loading and unloading fixture for engineering in order to overcome the deficiencies of the prior art.

本实用新型是通过以下技术方案实现:The utility model is realized through the following technical solutions:

一种工程用装卸夹具,包括起吊架,所述起吊架呈圆环形结构,所述起吊架两侧上设置有起吊挂钩,所述起吊架的圆周方向上设置有若干个夹持组件,所述夹持组件包括夹持杆、旋转手柄、夹持块,所述夹持杆与夹持块之间固定连接,所述夹持块位于连接套内部,所述连接套与夹持板相连接,所述夹持块与张紧弹簧相连接,所述每一个夹持板的夹持面上设置有若干个防滑块。A loading and unloading fixture for engineering, comprising a lifting frame, the lifting frame is in a circular structure, lifting hooks are arranged on both sides of the lifting frame, and several clamping assemblies are arranged on the circumferential direction of the lifting frame, the The clamping assembly includes a clamping rod, a rotating handle, and a clamping block, the clamping rod and the clamping block are fixedly connected, the clamping block is located inside the connecting sleeve, and the connecting sleeve is connected to the clamping plate , the clamping block is connected with the tension spring, and several anti-skid blocks are arranged on the clamping surface of each clamping plate.

作为本实用新型的优选技术方案,所述夹持杆与旋转手柄之间为固定连接。As a preferred technical solution of the utility model, the clamping rod and the rotating handle are fixedly connected.

作为本实用新型的优选技术方案,所述起吊挂钩外侧表面上设置有耐磨层。As a preferred technical solution of the present invention, a wear-resistant layer is provided on the outer surface of the lifting hook.

作为本实用新型的优选技术方案,所述防滑块均匀分布在夹持板的夹持面上。As a preferred technical solution of the present invention, the anti-slip blocks are evenly distributed on the clamping surface of the clamping plate.

与现有的技术相比,本实用新型的有益效果是:本实用新型结构简单,通过设置夹持组件、耐磨层,这样在工作时,将钢管套在起吊架之间,转动旋转手柄带动夹持杆旋转,实现夹持板向钢管表面靠近,实现防滑块的夹持,此时在防滑块的作用下可以提高夹持力,夹持稳定性好,且夹持的力大,且耐磨层可以减少起吊吊环的磨损,延长使用寿命。Compared with the existing technology, the beneficial effect of the utility model is: the utility model is simple in structure, by setting the clamping assembly and the wear-resistant layer, so that when working, the steel pipe is set between the lifting brackets, and the rotating handle drives the The clamping rod rotates to realize the clamping plate approaching the surface of the steel pipe and the clamping of the anti-slip block. At this time, the clamping force can be increased under the action of the anti-slip block, the clamping stability is good, and the clamping force is large and durable. The grinding layer can reduce the wear of the lifting ring and prolong the service life.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1中A处局部放大图。Fig. 2 is a partially enlarged view of A in Fig. 1 .

具体实施方式detailed description

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

请参阅图1、图2,图1为本实用新型的结构示意图;图2为图1中A处局部放大图。Please refer to Fig. 1 and Fig. 2. Fig. 1 is a schematic structural view of the present utility model; Fig. 2 is a partially enlarged view of A in Fig. 1 .

一种工程用装卸夹具,包括起吊架1,所述起吊架1呈圆环形结构,所述起吊架1两侧上设置有起吊挂钩2,其中所述起吊挂钩2外侧表面上设置有耐磨层201,耐磨层201可以减少起吊挂钩2的磨损,延长使用寿命。所述起吊架1的圆周方向上设置有若干个夹持组件3,所述夹持组件3包括夹持杆301、旋转手柄302、夹持块303,其中所述夹持杆301与旋转手柄302之间为固定连接。A loading and unloading fixture for engineering, comprising a lifting frame 1, the lifting frame 1 is in a circular structure, and lifting hooks 2 are arranged on both sides of the lifting frame 1, wherein the outer surface of the lifting hook 2 is provided with a wear-resistant Layer 201, the wear-resistant layer 201 can reduce the wear of the lifting hook 2 and prolong the service life. Several clamping assemblies 3 are arranged on the circumferential direction of the lifting frame 1, and the clamping assemblies 3 include a clamping rod 301, a rotating handle 302, and a clamping block 303, wherein the clamping rod 301 and the rotating handle 302 There is a fixed connection between them.

所述夹持杆301与夹持块303之间固定连接,所述夹持块303位于连接套304内部,所述连接套304与夹持板306相连接,所述夹持块303与张紧弹簧305相连接,所述每一个夹持板306的夹持面上设置有若干个防滑块307,其中所述防滑块307均匀分布在夹持板306的夹持面上。这样在工作时,将钢管套在起吊架1之间,转动旋转手柄302带动夹持杆301旋转,实现夹持板306向钢管表面靠近,实现防滑块307的夹持,此时在防滑块307的作用下可以提高夹持力,夹持稳定性好,且夹持的力大。The clamping rod 301 is fixedly connected with the clamping block 303, the clamping block 303 is located inside the connecting sleeve 304, the connecting sleeve 304 is connected with the clamping plate 306, and the clamping block 303 is connected with the tensioning The springs 305 are connected, and several anti-slip blocks 307 are arranged on the clamping surface of each clamping plate 306 , wherein the anti-slip blocks 307 are evenly distributed on the clamping surface of the clamping plate 306 . When working like this, the steel pipe is enclosed within between the hangers 1, and the rotating handle 302 drives the clamping rod 301 to rotate, so that the clamping plate 306 is approached to the steel pipe surface, and the clamping of the anti-slip block 307 is realized. Under the action of the clamping force, the clamping force can be improved, the clamping stability is good, and the clamping force is large.

在本实用新型的描述中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, unless otherwise clearly stipulated and limited, the terms "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connection, or integration; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (4)

1.一种工程用装卸夹具,包括起吊架(1),所述起吊架(1)呈圆环形结构,所述起吊架(1)两侧上设置有起吊挂钩(2),其特征在于:所述起吊架(1)的圆周方向上设置有若干个夹持组件(3),所述夹持组件(3)包括夹持杆(301)、旋转手柄(302)、夹持块(303),所述夹持杆(301)与夹持块(303)之间固定连接,所述夹持块(303)位于连接套(304)内部,所述连接套(304)与夹持板(306)相连接,所述夹持块(303)与张紧弹簧(305)相连接,所述每一个夹持板(306)的夹持面上设置有若干个防滑块(307)。1. A loading and unloading fixture for engineering, comprising a lifting frame (1), said lifting frame (1) is in a circular structure, said lifting frame (1) both sides are provided with lifting hooks (2), it is characterized in that : several clamping components (3) are arranged on the circumferential direction of the lifting frame (1), and the clamping components (3) include a clamping rod (301), a rotating handle (302), a clamping block (303 ), the clamping rod (301) is fixedly connected with the clamping block (303), the clamping block (303) is located inside the connecting sleeve (304), and the connecting sleeve (304) and the clamping plate ( 306), the clamping block (303) is connected with the tension spring (305), and several anti-skid blocks (307) are arranged on the clamping surface of each clamping plate (306). 2.根据权利要求1所述的工程用装卸夹具,其特征在于:所述夹持杆(301)与旋转手柄(302)之间为固定连接。2. The engineering loading and unloading fixture according to claim 1, characterized in that: the clamping rod (301) and the rotating handle (302) are fixedly connected. 3.根据权利要求1所述的工程用装卸夹具,其特征在于:所述起吊挂钩(2)外侧表面上设置有耐磨层(201)。3. The engineering loading and unloading fixture according to claim 1, characterized in that: a wear-resistant layer (201) is provided on the outer surface of the lifting hook (2). 4.根据权利要求1所述的工程用装卸夹具,其特征在于:所述防滑块(307)均匀分布在夹持板(306)的夹持面上。4. The engineering loading and unloading fixture according to claim 1, characterized in that: the anti-slip blocks (307) are evenly distributed on the clamping surface of the clamping plate (306).
CN201620321140.3U 2016-04-15 2016-04-15 Engineering is with loading and unloading anchor clamps Expired - Fee Related CN205555874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620321140.3U CN205555874U (en) 2016-04-15 2016-04-15 Engineering is with loading and unloading anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620321140.3U CN205555874U (en) 2016-04-15 2016-04-15 Engineering is with loading and unloading anchor clamps

Publications (1)

Publication Number Publication Date
CN205555874U true CN205555874U (en) 2016-09-07

Family

ID=56809088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620321140.3U Expired - Fee Related CN205555874U (en) 2016-04-15 2016-04-15 Engineering is with loading and unloading anchor clamps

Country Status (1)

Country Link
CN (1) CN205555874U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824908A (en) * 2017-02-17 2017-06-13 北京英安科技技术有限公司 Gun care device and maintenance method
CN107473083A (en) * 2017-10-13 2017-12-15 江苏中车电机有限公司 A kind of device for direct-drive permanent magnet wind power generator complete machine handling
CN107814307A (en) * 2017-10-29 2018-03-20 郦亚君 Electroslag refining ingot casting boom hoisting
CN107869627A (en) * 2017-09-27 2018-04-03 罗国球 A kind of four node server fixed mountings
CN108044671A (en) * 2017-11-24 2018-05-18 苏州沃森优金电子科技有限公司 A kind of hand cutting tool
CN108212612A (en) * 2017-12-31 2018-06-29 合肥林翔智能科技有限公司 The equipment that a kind of multi-work piece synchronizes spray painting
CN108339686A (en) * 2017-12-31 2018-07-31 合肥林翔智能科技有限公司 A kind of continuous jet printing appts
CN109238637A (en) * 2018-11-17 2019-01-18 大连四达高技术发展有限公司 Airplane model agile turning system for wind tunnel test
CN114871936A (en) * 2022-05-12 2022-08-09 江苏苏宇化工设备有限公司 Part polishing equipment of round block type graphite heat exchanger

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824908A (en) * 2017-02-17 2017-06-13 北京英安科技技术有限公司 Gun care device and maintenance method
CN107869627A (en) * 2017-09-27 2018-04-03 罗国球 A kind of four node server fixed mountings
CN107473083A (en) * 2017-10-13 2017-12-15 江苏中车电机有限公司 A kind of device for direct-drive permanent magnet wind power generator complete machine handling
CN107814307A (en) * 2017-10-29 2018-03-20 郦亚君 Electroslag refining ingot casting boom hoisting
CN108044671A (en) * 2017-11-24 2018-05-18 苏州沃森优金电子科技有限公司 A kind of hand cutting tool
CN108212612A (en) * 2017-12-31 2018-06-29 合肥林翔智能科技有限公司 The equipment that a kind of multi-work piece synchronizes spray painting
CN108339686A (en) * 2017-12-31 2018-07-31 合肥林翔智能科技有限公司 A kind of continuous jet printing appts
CN109238637A (en) * 2018-11-17 2019-01-18 大连四达高技术发展有限公司 Airplane model agile turning system for wind tunnel test
CN114871936A (en) * 2022-05-12 2022-08-09 江苏苏宇化工设备有限公司 Part polishing equipment of round block type graphite heat exchanger

Similar Documents

Publication Publication Date Title
CN205555874U (en) Engineering is with loading and unloading anchor clamps
CN203806941U (en) Hoisting overturning device of direct-drive wind power generator
CN101409434B (en) ground riser
CN201713215U (en) Flange pipe hanger
CN103545751A (en) Overhead transmission line ground wire optical cable fittings replacement bracket
CN211496659U (en) Prefabricated assembled floor hoisting machine
CN105366565B (en) Auxiliary lifting device for high-voltage line tower
CN106698276B (en) Cement pole lifter for distribution line and construction operation method thereof
CN205204680U (en) High -voltage line tower is with supplementary hoisting device
CN202321980U (en) Lifting hook special for steel tube
CN204213476U (en) Belt rolling type pipeline hanging basket
CN201312084Y (en) Ground wire raiser
CN204324745U (en) A kind of 35KV isolation switch hanging device
CN212475766U (en) A kind of plate hoisting equipment
CN209618679U (en) Claw and boom hoisting
CN207890902U (en) A kind of dual-purpose electric elevator shackle hook
CN204342245U (en) A kind of wind-power tower hoisting sling
CN205555866U (en) Engineering is with loading and unloading lifting hook
CN205740016U (en) Giant tire maintenance hook
CN202594571U (en) Suspension cage automatic telescopic platform
CN203855326U (en) Lifting device of cable cover plate
CN205603046U (en) Lifting device of spraying plastics electric power steel pipe pole
CN205555940U (en) Engineering is with equipment of lifting by crane
CN107055308B (en) A kind of installation fixed structure for Hydrodynamic transmission
CN111707123A (en) A kind of disassembly method for heat exchanger in workshop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Li Litan

Inventor before: He Shuqiong

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170725

Address after: 325117, Xie County, Yongjia County, Zhejiang City, Wenzhou Province

Patentee after: Li Litan

Address before: 311800 Zhejiang city of Shaoxing province Zhuji City mountain village town No. 209 bamboo shed oil

Patentee before: He Shuqiong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170804

Address after: Taishun County of Wenzhou City, Zhejiang province 325599 Luo Yang Zhen Yindu Garden Room 29 101-1

Patentee after: RUIZHOU CONSTRUCTION GROUP CO.,LTD.

Address before: 325117, Xie County, Yongjia County, Zhejiang City, Wenzhou Province

Patentee before: Li Litan

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907