CN204605791U - Railway locomotive dual pipe air supply device - Google Patents
Railway locomotive dual pipe air supply device Download PDFInfo
- Publication number
- CN204605791U CN204605791U CN201420634731.7U CN201420634731U CN204605791U CN 204605791 U CN204605791 U CN 204605791U CN 201420634731 U CN201420634731 U CN 201420634731U CN 204605791 U CN204605791 U CN 204605791U
- Authority
- CN
- China
- Prior art keywords
- feed path
- passenger vehicle
- air feed
- total wind
- mouth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model railway locomotive dual pipe air supply device, passenger vehicle air feed path and heavily UNICOM road also connect, reducing valve and boiler check valve are serially connected in passenger vehicle air feed path, total wind entrance arranges the threeway cock that has a, b, c tri-ports, the a mouth of threeway cock is connected to total wind entrance, and c mouth is connected to the input end of passenger vehicle air feed path, and the mouth of b mouth and air feed path is jointly connected to total wind and exports, pull the valve handle of threeway cock, the conversion between passenger vehicle air feed path and heavy UNICOM road can be realized.The Interface integration of the boiler check valve of described total wind entrance, the outlet of total wind, passenger vehicle air feed path and heavy UNICOM road and threeway cock, reducing valve is on one piece of integrated air board.Gas circuit blocked operation is very simple, and can not make mistakes; Apparatus structure is simply compact, and inspection and maintenance is also very convenient.
Description
Technical field
The utility model relates to a kind of railway locomotive dual pipe air supply device, belongs to railway locomotive manufacturing technology field.
Background technology
Railway locomotive is generally provided with dual pipe air supply device, is made up of reducing valve, boiler check valve, cock, sensor and pipeline.Its Main Function one be locomotive main air reservoir by dual pipe air supply device, provide total reservoir pressure of 600kPa to Passenger Vehicle, for Passenger Vehicle air bellow, pneumatic car door, sanitary accomodation pressure flush; Two is when locomotive double heading uses, and train locomotive and multi-locomotive make the total reservoir intercommunication of two cars by dual pipe air supply device, and reach the object that total wind pressure is consistent, force value is 750 ~ 900kPa; Three is that pressure sensor in dual pipe air supply device provides numerical value to locomotive digital wash, understands air feed operation pressure situation for driver.
The dual pipe air supply device of prior art adopts tubular type mounting means, is namely coupled together by each valve steel pipe according to principle of work, sees Fig. 1.When locomotive needs to passenger vehicle air feed, by cock A close, cock B opens, total wind through cock B, reducing valve, boiler check valve, from d mouth supply vehicle; When locomotive double heading uses, opened by cock A, cock B closes, and total wind directly arrives being communicated with of d mouth and the total reservoir of multi-locomotive through cock A.This scheme is owing to being adopt tubular type mounting structure, and volume is large, and Heavy Weight, is unfavorable for that locomotive space mounting is arranged.In addition, owing to adopting the switching between two cock control 600kPa and 900kPa, during bus attendant blocked operation, need operation two cocks just can complete switching, occur the situation that operation is disorderly sometimes.
Utility model content
The purpose of this utility model overcomes the deficiency of above-mentioned prior art exactly, provides a kind of railway locomotive dual pipe air supply device.
The purpose of this utility model is achieved in that a kind of railway locomotive dual pipe air supply device, passenger vehicle air feed path and heavily UNICOM road also connect, reducing valve and boiler check valve are serially connected in passenger vehicle air feed path, it is characterized in that total wind entrance arranges the threeway cock that has a, b, c tri-ports, the a mouth of threeway cock is connected to total wind entrance, c mouth is connected to the input end of passenger vehicle air feed path, the mouth of b mouth and air feed path is jointly connected to total wind and exports, pull the valve handle of threeway cock, the conversion between passenger vehicle air feed path and heavy UNICOM road can be realized.
In order to better realize the purpose of this utility model, the Interface integration of the boiler check valve of described total wind entrance, the outlet of total wind, passenger vehicle air feed path and heavy UNICOM road and threeway cock, reducing valve is on one piece of integrated air board.
In order to better realize the purpose of this utility model, described integrated air board is made up of the stacked welding of two-layer aluminium alloy plate, aluminium alloy plate side, upper strata forms gas circuit by air drain, opposite side is provided with valve class bolt interface corresponding to air drain gas circuit, the air drain tight weld on lower floor's aluminium alloy plate and upper strata aluminium alloy plate.
The technical solution of the utility model, adopts a threeway cock, and make gas circuit blocked operation become very simple, and can not make mistakes, apparatus structure becomes compact; Adopt integrated air board, achieve modular design, there is little, the lightweight feature of volume, as long as total blast main is connected to the control that corresponding interface can realize export wind pressure, without the need to some independent valve bodies are connected by many pipelines.Structure is simple, and inspection and maintenance is also very convenient.
Accompanying drawing explanation
Fig. 1 is the railway locomotive dual pipe air supply principle of device schematic diagram of prior art.
Fig. 2 is the railway locomotive dual pipe air supply principle of device schematic diagram of the utility model embodiment.
Fig. 3 is the integrated air board installation design sketch by principle shown in Fig. 2.
Fig. 4 is the birds-eye view of Fig. 3.
Be labeled as in figure: the total wind entrance of 1-, 2-integrated air board, 2a-upper strata aluminium alloy plate, 2b-lower floor aluminium alloy plate, 3-threeway cock, 4-reducing valve, 5-boiler check valve, 6-pressure sensor, the total wind outlet of 7-, 8-mounting hole, 9-heavy UNICOM road, 10-passenger vehicle air feed path, 11-cock A, 12-cock B.
Detailed description of the invention
For making the object of the utility model embodiment, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Referring to accompanying drawing 2, the railway locomotive dual pipe air supply device of the present embodiment, passenger vehicle air feed path 10 is with heavy UNICOM road 9 and connect, reducing valve 4 and boiler check valve 5 are serially connected in passenger vehicle air feed path, total wind entrance 1 place arranges the threeway cock 3 that has a, b, c tri-ports, the a mouth of threeway cock 3 is connected to total wind entrance 1, c mouth is connected to input end and the reducing valve 4 of passenger vehicle air feed path, the mouth of b mouth and air feed path and boiler check valve 5 are jointly connected to total wind and export 7, pull the valve handle of threeway cock 3, the conversion between passenger vehicle air feed path and heavy UNICOM road can be realized.
Referring to accompanying drawing 3 and 4, the interface of described total wind entrance 1, total wind outlet 7, passenger vehicle air feed path 10 and heavy UNICOM road 9 and threeway cock 3, reducing valve 4, boiler check valve and pressure sensor, according to the principle shown in accompanying drawing 2, is integrated on one piece of integrated air board 2.Total wind entrance 1 and total wind outlet 7 are wire threaded insert structure, and the air-path interface of valve like members is hickey.The corner of integrated air board there are four through holes 8, integrated air board can be fixed on locomotive by bolt.
Integrated air board is made up of the stacked welding of two-layer aluminium alloy plate, air drain is processed in aluminium alloy plate 2a side, upper strata, the relative position design that the trend of air drain will be installed on integrated air board according to these valve like members is processed, opposite side is according to the position of the import of valve like members and outlet, and the trend of air drain is processed with air interface, corresponding with these valve like members air interfaces, this side is also processed with the bolt interface for being connected and fixed these valve like members.By lower floor aluminium alloy plate 2b and upper strata aluminium alloy plate 2a air drain tight weld, namely form cavity air flue, realize the gas circuit function of steel pipe.
Last it is noted that above embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of each embodiment technical scheme of the utility model.
Claims (3)
1. a railway locomotive dual pipe air supply device, passenger vehicle air feed path and heavily UNICOM road also connect, reducing valve and boiler check valve are serially connected in passenger vehicle air feed path, it is characterized in that total wind entrance arranges the threeway cock that has a, b, c tri-ports, the a mouth of threeway cock is connected to total wind entrance, and c mouth is connected to the input end of passenger vehicle air feed path, and the mouth of b mouth and air feed path is jointly connected to total wind and exports, pull the valve handle of threeway cock, the conversion between passenger vehicle air feed path and heavy UNICOM road can be realized.
2. railway locomotive dual pipe air supply device according to claim 1, it is characterized in that described total wind entrance, the outlet of total wind, passenger vehicle air feed path and heavy UNICOM road and threeway cock, reducing valve the Interface integration of boiler check valve on one piece of integrated air board.
3. railway locomotive dual pipe air supply device according to claim 2, it is characterized in that described integrated air board is made up of the stacked welding of two-layer aluminium alloy plate, aluminium alloy plate side, upper strata forms gas circuit by air drain, opposite side is provided with valve class bolt interface corresponding to air drain gas circuit, the air drain tight weld on lower floor's aluminium alloy plate and upper strata aluminium alloy plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420634731.7U CN204605791U (en) | 2014-10-29 | 2014-10-29 | Railway locomotive dual pipe air supply device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420634731.7U CN204605791U (en) | 2014-10-29 | 2014-10-29 | Railway locomotive dual pipe air supply device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204605791U true CN204605791U (en) | 2015-09-02 |
Family
ID=53958362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420634731.7U Expired - Fee Related CN204605791U (en) | 2014-10-29 | 2014-10-29 | Railway locomotive dual pipe air supply device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204605791U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105172805A (en) * | 2015-10-28 | 2015-12-23 | 安徽盛世高科轨道装备有限公司 | Gas circuit board with self-protection function |
CN109094583A (en) * | 2018-09-06 | 2018-12-28 | 中车株洲电力机车有限公司 | Vehicle air-supply pipeline control system and rail vehicle with the system |
CN111911678A (en) * | 2019-07-12 | 2020-11-10 | 中车大同电力机车有限公司 | Pressure reducing valve, air supply device and locomotive |
CN114056101A (en) * | 2021-11-29 | 2022-02-18 | 广州电力机车有限公司 | Wind source system of electric locomotive |
-
2014
- 2014-10-29 CN CN201420634731.7U patent/CN204605791U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105172805A (en) * | 2015-10-28 | 2015-12-23 | 安徽盛世高科轨道装备有限公司 | Gas circuit board with self-protection function |
CN109094583A (en) * | 2018-09-06 | 2018-12-28 | 中车株洲电力机车有限公司 | Vehicle air-supply pipeline control system and rail vehicle with the system |
CN109094583B (en) * | 2018-09-06 | 2019-12-17 | 中车株洲电力机车有限公司 | Vehicle air supply pipeline control system and rail vehicle with same |
CN111911678A (en) * | 2019-07-12 | 2020-11-10 | 中车大同电力机车有限公司 | Pressure reducing valve, air supply device and locomotive |
CN114056101A (en) * | 2021-11-29 | 2022-02-18 | 广州电力机车有限公司 | Wind source system of electric locomotive |
CN114056101B (en) * | 2021-11-29 | 2023-08-22 | 广州电力机车有限公司 | Wind source system of electric locomotive |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204605791U (en) | Railway locomotive dual pipe air supply device | |
CN103879394B (en) | The parking brake system of underground mine use towed vehicle | |
CN204701625U (en) | Locomotive integrated air brake cabinet | |
CN102963344A (en) | Control device of air braking system of rail vehicles | |
CN109204373A (en) | Integration air brake apparatus used for rail vehicle | |
CN201842085U (en) | Relay valve for rail transit vehicle brake system | |
CN202439719U (en) | Rail wagon braking system | |
CN202923629U (en) | Control device of railway vehicle air brake system | |
CN201544951U (en) | Relay valve | |
RU128586U1 (en) | RAILWAY BRAKE SYSTEM | |
CN205149845U (en) | Machine vehicle air brake valve | |
CN202674331U (en) | Pressurizing stop valve | |
CN201116110Y (en) | Air feeding device of engine | |
CN203819220U (en) | Parking brake system of trailer for underground coal mine | |
CN205469103U (en) | Rail vehicle modularization parking braking device | |
CN203439021U (en) | Double-pass quick release relay valve | |
CN207191065U (en) | A kind of mine car full power hydraulic brake system | |
CN203958123U (en) | The regenerative brake fast aeration system of servo control | |
CN201961307U (en) | Relay valve of heavy truck brake system | |
CN201300836Y (en) | Two-way quick release valve | |
CN205661442U (en) | Average gas circuit controlling means of pressure differential suitable for railway vehicle | |
CN107323480A (en) | A kind of mine car full power hydraulic brake system | |
CN202011391U (en) | Multi-axle adjustable quick-release synchronous emergency relay valve | |
CN205350673U (en) | Novel quick -operation joint that lead to more | |
CN203844745U (en) | Air brake valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150902 Termination date: 20171029 |