CN204603627U - Steel tube tower welder - Google Patents

Steel tube tower welder Download PDF

Info

Publication number
CN204603627U
CN204603627U CN201520068347.XU CN201520068347U CN204603627U CN 204603627 U CN204603627 U CN 204603627U CN 201520068347 U CN201520068347 U CN 201520068347U CN 204603627 U CN204603627 U CN 204603627U
Authority
CN
China
Prior art keywords
welding
template
welding bench
steel pipe
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520068347.XU
Other languages
Chinese (zh)
Inventor
金德斌
陈榆锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Original Assignee
Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jin Sheng Steel Tube Tower Co Ltd filed Critical Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Priority to CN201520068347.XU priority Critical patent/CN204603627U/en
Application granted granted Critical
Publication of CN204603627U publication Critical patent/CN204603627U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel tube tower welder, comprise track and linearly shape be arranged in order C template support, for the first welding bench of the bracing frame of supporting steel pipe, adjustable connecting plate soldering angle, the second welding bench of adjustable connecting plate welding and assembling height and flange bracket, described flange bracket, C template support, bracing frame, the first welding bench and the second welding bench are located on track all movably; Flange bracket, bracing frame, the first welding bench and the second welding bench are equipped with brake gear.The utility model is originally provided with C template support, bracing frame, the first welding bench, the second welding bench and flange bracket can need the parts of welding to be all fixed to steel tube tower, the carrying out of convenient welding, and also can carry out accurate adjustment to the position of welding, improve the quality of production.

Description

Steel tube tower welder
Technical field
The utility model belongs to for the fixing of workpiece or positioner field, especially relates to a kind of steel tube tower welder.
Background technology
Steel tube tower is when producing, need C template and ring flange on the two ends of steel pipe are welded respectively, and the volume of steel tube tower is large, also need to add some inclined slabs between the adjacent steel pipe of steel tube tower, strengthen the fastness of steel tube tower, and in order to strengthen the fastness of inclined slab and fastener for connection, need at the side of steel pipe welding upper junction plate, by connecting plate, inclined slab is being connected and fixed, and the angle that the connecting plate on different steel pipes welds, position is all not identical, and to connecting plate position, the accuracy requirement of soldering angle is high, slightly deviation will affect the fastness that inclined slab connects, inclined slab is even caused to install.The volume of steel pipe is large, current is that then ring flange is put in ground to the welding method of ring flange and C template, steel pipe is removed the position to being connected with ring flange, then a people or many people are fixed steel pipe, have a people to weld ring flange and fastener for connection place again, this operating process amount of labour is large, and expend time in length, also easily weldering is askew, inefficiency.And the position of C template is difficult to adjustment, easily there is the askew phenomenon of weldering too.The welding of connecting plate then needs people's manual measurement, each welding all needs to measure with ruler, carry out testing and whether aim at getting inclined slab, certain error is there is in measuring process, and still there will be movement during welding, reduce further the accuracy of measurement, there is error in position adjustments, and highly cannot move accurately connecting plate when being welded to connect plate.Whole welding process expends time in length, and welding effect is poor, inefficiency, and the steel tube tower fastness made is poor.
Utility model content
The utility model, in order to overcome the deficiencies in the prior art, provides a kind of welding efficiency high, the steel tube tower welder that bonding accuracy is high.
To achieve these goals, the utility model is by the following technical solutions: a kind of steel tube tower welder, comprise track and linearly shape be arranged in order C template support, for the first welding bench of the bracing frame of supporting steel pipe, adjustable connecting plate soldering angle, the second welding bench of adjustable connecting plate welding and assembling height and flange bracket, described flange bracket, C template support, bracing frame, the first welding bench and the second welding bench are located on track all movably; Flange bracket, bracing frame, the first welding bench and the second welding bench are equipped with brake gear.Be provided with C template support to be fixed the C template that need weld, flange bracket can be fixed the ring flange that need weld, and bracing frame can support steel pipe; First welding bench can accurately control connection plate be relative to the soldering angle of steel pipe, and the second welding bench then conveniently can adjust connecting plate relative to the angle of steel pipe side and height, and then conveniently can carry out accurate welding operation to steel pipe; Track then removable flange bracket, C template support adapts to the steel pipe of different length, and the first welding bench, the second welding bench can move along steel pipe length direction, carries out the connecting plate welding of diverse location.
Described flange bracket comprise vertically place panel, connect the base plate bottom panel and be connected to the gusset plate of panel both sides; Panel is uniformly distributed circumferentially the elongated slot of extend radially, elongated slot is at least 2, and elongated slot has can the first connector of mounting flange.Described flange bracket can be fixed the ring flange that steel tube tower need weld, and this elongated slot can facilitate panel to adapt to the fixing of different large small flange plate, and the fastness of mounting flange is strong, and ring flange can be kept to be vertical state, facilitates welding of ring flange and steel pipe; Welding operation process is without the need to artificially supporting steel pipe, and it is time saving and energy saving to operate, and speed of welding is fast, effective.
Described C template bracing frame comprises the mainboard vertically placed and the position adjustable board be located at bottom mainboard, position adjustable board is removable to be located on track, mainboard extends the gripper shoe of level near the surface of flange bracket, this gripper shoe connects the fixed head of level by the second connector, fixed head is provided with connecting hole, and this connecting hole has the 3rd connector that can connect C template.The position of the relative steel pipe of position adjustable board conveniently adjusted C template is set, gripper shoe, the second connector make connecting plate be removably connected on fixed head, connecting hole and the 3rd connector can facilitate the fixing of C template and connecting plate, and replaceable different connecting plate is to adapt to the installation requirements of the C template of different screw quantity or screwhole position.
Support frame as described above comprises the main body extending into strip along direction, track both sides, main body is located on track movably, body top extends into protruding rail along its length, protruding rail is provided with the fixed block fixed position and can along the regulating block of protruding rail movement, fixed block top be provided with can along steel pipe length direction extend the first roller, regulating block top be provided with can with the second roller of the first roller common support steel pipe; Fixed block and regulating block are arranged in same first screw mandrel, and the first screw mandrel two ends connect main body, first screw mandrel one end pass main body connect one rotatably make regulating block close/away from the rotating handles of fixed block.Arrange bracing frame to be fixed steel pipe, the Support Position of movable body adjusting support frame, protruding rail is set, fixed block, regulating block then fixedly secures the steel pipe of different-diameter, also can realize the adjustment of penstock installation height, first roller, second roller can roll relatively with steel pipe when clamping steel pipe, steel pipe is avoided to be pressed from both sides bad, the movement that first screw mandrel and rotating handles conveniently can control to adjust block is set, when regulating block moves down away from making steel pipe integral during fixed block, and regulating block is when fixed block, body is moved on the whole, the penstock installation of different-diameter can not only be adapted to, the also setting height(from bottom) of adjustable steel pipe, the welding operation of convenient steel pipe, and regulating block position good fixing effect after movement.
Described first welding bench comprise track-movable slipping block and can the rotating disc of fixed connecting plate, rotating disc can from being rotatably located at slipping block top near steel pipe place, gap is formed between rotating disc and slipping block, described rotating disc outward flange one circle is provided with the first scale, slipping block is positioned at the peripheral place of rotating disc and is provided with the second scale; Also comprise one can insert in gap the first slotting pad that rotating disc is fixed.Removable slipping block adjusts the position of the first welding stage relative to steel pipe, and then facilitate connecting plate in the position adjustments of steel pipe length direction, rotating disc rotates and connecting plate can be driven to rotate, and then the soldering angle of adjustment connecting plate and steel pipe, first scale and the second scale can the position of rotation of fine adjustment rotating disc, and then accurately carry out the adjustment of connecting plate position, and first inserts pad can rotate at rotating disc and insert to needs position, carry out carrying out position to rotating disc to fix, ensure the accuracy of welding.
Described second welding bench comprises the lower body be slidably located on track, be positioned at upper plate body directly over lower body and can the circular discs of fixed connecting plate, the circle centre position of circular discs is arranged in upper plate body upper surface by vertical rod, this upper plate body upper surface is positioned at circular discs periphery and forms the 3rd scale, circular discs outward flange is provided with the 4th scale, form spacing between circular discs and upper plate body, also comprise one and can insert the slotting pad of second between circular discs and upper plate body; Hinged two first slide bar one end, described lower body one end, upper plate body is positioned at directly over the first slide bar and lower body hinged place and is hinged with two second slide bar one end; The lower body other end is provided with and slides for the two second slide bar other ends, and then the first slide rail that promotion upper plate body one end moves up and down; The described upper plate body other end is provided with for the second sliding bar, and then the second slide rail driving the upper plate body other end to move up and down; Described two second slide bars connect same intermediate near one end of lower body, second screw mandrel parallel with the second slide rail is worn in intermediate, second screw mandrel one end passes the stop collar that intermediate is connected and fixed on lower body, the second screw mandrel other end passes intermediate connection one and highly regulates handle, second screw mandrel is provided with a positioning sleeve between adjustment handle and intermediate, and this positioning sleeve is fixed on lower body.Lower body can drive whole second welding bench to move along steel pipe length direction, and then the welding position of convenient adjustment connecting plate, circular discs can drive connecting plate to rotate, regulate the soldering angle of connecting plate on steel pipe, 3rd scale and the 4th can ensure the accuracy that circular discs rotates, and then ensure the accuracy of connecting plate welding, second inserts pad after circular discs position of rotation regulates, can be fixed circular discs; Rotatable adjustment handle makes the second screw mandrel rotate, second screw mandrel drives intermediate movable relative to positioning sleeve, and then drive the first slide bar and the second slide bar to move along the first slide rail and the second slide rail, upper plate body is moved up and down, upper plate body moves and connecting plate can be driven to move up and down, and realizes regulating connecting plate welding and assembling height; Stop collar can strengthen the stability of the second screw mandrel movement further.
Described steel tube tower welder can be fixed steel pipe, ring flange, C template and terminal pad, and then facilitate the carrying out of welding operation, also can adjust accurately the welding and assembling height of connecting plate and soldering angle simultaneously, also can carry out transfer to the welding and assembling height of steel pipe, ensure the quality of steel tube tower welding, decrease the labour of use, operating process is time saving and energy saving, the production cost reduced, and accelerate speed of welding, improve welding efficiency.
Further, also comprise the C template link be located between flange bracket and C template support, the leg that this C template link comprises horizontal plane and vertically extended to ground by horizontal plane both sides, horizontal plane two ends are equipped with plugboard, this plugboard removably connects horizontal plane, and plugboard is provided with can the 4th connector of fixation of C template.This C template link is set, welding operation can be carried out to two steel pipes simultaneously, improve welding efficiency; This plugboard is changed, and then adapts to the installation requirements of different structure C template; In addition, also can fix a steel pipe needing two ends to weld C template and ring flange respectively between the other end of C template link and flange bracket, and install a C template at the other end of C template link, flange bracket is fixed a ring flange, welding flange is needed to one end, the steel pipe that the other end need weld C type frame carries out welding operation, and then improves the effect of welding, makes full use of device.
Further, described elongated slot both sides are respectively equipped with slide block, and two slide blocks are connected by adjusting bolt, described two slide blocks are equipped with the through hole passed for the first connector.Arrange this slide rail can on elongated slot the fixed position of mobile regulating flange dish, and position adjustment in height can be realized, further facilitate the fixing of ring flange, and this slide rail yet further enhances stability and fastness that ring flange installs.
In sum, the utility model is originally provided with C template support, bracing frame, the first welding bench, the second welding bench and flange bracket can need the parts of welding to be all fixed to steel tube tower, the carrying out of convenient welding, and also can carry out accurate adjustment to the position of welding, improve the quality of production.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is C template supporting structure schematic diagram of the present utility model.
Fig. 3 is flange bracket structural representation of the present utility model.
Fig. 4 is the first welding bench structural representation of the present utility model.
Fig. 5 is the second welding bench structural representation of the present utility model.
Fig. 6 is support frame structure schematic diagram of the present utility model.
Fig. 7 is C template link structural representation of the present utility model.
Detailed description of the invention
In order to make those skilled in the art person better understand the utility model scheme, below in conjunction with the accompanying drawing in the utility model embodiment, clear, complete description is carried out to the technical scheme in the utility model embodiment.
As shown in figs. 1-7, a kind of steel tube tower welder, comprise track 6, C template support 2, bracing frame 3, first welding bench 4, second welding bench 5 and flange bracket 1, described C template support 2, bracing frame 3, first welding bench 4, second welding bench 5 and flange bracket 1 are arranged in order the shape that is in line, C template support 2 can be used for supporting C template, bracing frame 3 is for supporting steel pipe, fixed connecting plate when first welding bench 4 and the second welding bench 5 are used in welding, angle when the adjustable connecting plate of first welding bench 4 welds, height when the adjustable connecting plate of second welding bench 5 welds, flange bracket 1 can be used for the fixing ring flange that need weld, simultaneously, described flange bracket 1, C template support 2, bracing frame 3, first welding bench 4 and the second welding bench 5 are located on track 6 all movably, namely bottom described flange bracket 1, C template support 2, bracing frame 3, first welding bench 4 and the second welding bench 5, all roller is set, and then can arbitrarily adjusts the welding position needing welding assembly, flange bracket 1, bracing frame 3, first welding bench 4 and the second welding bench 5 are equipped with brake gear, and brake gear is prior art, and no longer burden describes herein.
Concrete, as shown in Figure 3, described flange bracket 1 comprises panel 11, base plate 12 and the gusset plate 13 vertically placed, and described base plate 12 is welded in the bottom of panel 11, gusset plate 13 is welded in panel 11 both sides, and welding herein also can be add fixing bolt or reinforce screw rod to removably connect certainly.Rounded in the middle of described panel 11, elongated slot 14 has been uniformly distributed circumferentially between 11 in panel, this elongated slot 14 extends along panel 11 radial direction, in the present embodiment, described elongated slot 14 is 8, and in other embodiments, the quantity of described elongated slot 14 can also be 2-7 or more than 8, elongated slot 14 has the first connector, and this first connector can connect and need welding flange, and this first connector is the first bolt.Described elongated slot 14 both sides are respectively equipped with slide block 15, on the front surface that two slide blocks 15 lay respectively at panel 11 and rear surface, two slide blocks 15 are connected by adjusting bolt, and described two slide blocks 15 are equipped with through hole, and this through hole can pass for the first connector the ring flange connecting and need welding.
As shown in Figure 2, described C template bracing frame 2 comprises mainboard 21 and position adjustable board 24, mainboard 21 is vertically arranged, position adjustable board 24 is welded in the bottom of mainboard 21, position adjustable board 24 is removable to be located on track 6, gripper shoe 22 is extended on surface near flange bracket 1 on mainboard 21, this gripper shoe 22 is horizontally disposed with, gripper shoe 22 connects the fixed head 23 of level by the second connector, fixed head 23 is provided with connecting hole 231, and different C templates, the quantity of its connecting hole is not identical with arrangement mode yet, this arranges replaceable different fixed head 23 to adapt to the installation requirements of different C template, this connecting hole 231 has the 3rd connector that can connect C template, described second connector is the second bolt, and the 3rd connector is the 3rd bolt, and other union pieces such as screw certainly also can be adopted to be fixed.
As shown in figures 1 to 6, support frame as described above 3 comprises the main body 31 extending into strip along direction, track 6 both sides, main body 31 is located on track 6 movably, described main body 31 top extends into protruding rail 311 along its length, protruding rail 311 is provided with the fixed block 312 fixed position and can along the regulating block 313 of protruding rail 311 movement, fixed block 312 top be provided with can along steel pipe length direction extend the first roller 32, this first roller 32 is arranged on fixed block 312 by the first axle body, regulating block 313 top is provided with the second roller 33, this second roller 33 is arranged on regulating block 313 by the second axle body, first roller 32 and the second roller 33 can common support steel pipes, first roller 32 and the second roller 33 all can rotations, and then wear and tear when clamping steel pipe or damage steel pipe by pressure, fixed block 312 and regulating block 313 are arranged in same first screw mandrel 34, first screw mandrel 34 extends along main body 31 length direction, first screw mandrel 34 two ends connect main body 31, first screw mandrel 34 one end passes main body 31 and connects a rotating handles, rotate rotating handles can make regulating block 313 close/away from fixed block 312.During use, rotate counterclockwise rotating handles, regulating block 313, away from fixed block 312, can install the steel pipe that diameter is larger, steel pipe integral also can be made to move down simultaneously, plays the effect highly regulated; And rotating clockwise rotating handles, regulating block 313 moves to fixed block 312, drives on steel pipe simultaneously and moves.
As shown in Figure 4, described first welding bench 4 comprises slipping block 41 and rotating disc 42, slipping block 41 can move along track 6, rotating disc 42 can be used for the fixing connecting plate that need weld, rotating disc 42 can from being rotatably located at slipping block 41 top near steel pipe place, namely this rotating disc 42 center position is arranged on slipping block 41 by vertical shaft, gap is formed between described rotating disc 42 and slipping block 41, described rotating disc 42 outward flange one circle is provided with the first scale, slipping block 41 is positioned at the peripheral place of rotating disc 42 and is provided with the second scale; Also comprise one first and insert pad, the first slotting pad can insert in gap and be fixed rotating disc 42.During use, connecting plate can be placed on rotating disc 42, rotate rotating disc 42, the position rotated by the first scale and the adjustment of the second scale, inserts plate after rotating to desired position in gap, realizes rotating disc 42 fixing in current location.
As shown in Figure 5, described second welding bench 5 comprises lower body 51, upper plate body 52 and circular discs, shown lower body 51 is slidably located on track 6, upper plate body 52 is positioned at directly over lower body 51, circular discs is used for fixed connecting plate, the circle centre position of circular discs is arranged in upper plate body 52 upper surface by vertical rod, this upper plate body 52 upper surface is positioned at circular discs periphery and forms the 3rd scale, circular discs outward flange is provided with the 4th scale, spacing is formed between circular discs and upper plate body 42, also comprise one second and insert pad, this second slotting pad can insert between circular discs and upper plate body 52, circular discs is fixed, described upper plate body 52 is positioned at place below circular discs and is provided with arc-shaped slot, circular discs bottom surface is provided with the limited post that can slide along arc-shaped slot, this limited post can limit the rotating range of circular discs, do you (whether correct understand herein?) hinged two first slide bar 53 one end, described lower body 51 one end, upper plate body 52 is positioned at directly over the first slide bar 53 and lower body 51 hinged place and is hinged with two second slide bar 54 one end, lower body 51 other end is provided with the first slide rail 55, first slide bar 54 slided for two second slide bar 54 other ends and moves and can promote upper plate body 52 one end and move up and down.Described upper plate body 52 other end is provided with the second slide rail 56, second slide bar 54 slided for the second slide bar 54 and moves upper plate body 52 other end can be driven to move up and down; Described two second slide bars 54 connect same intermediate 57 near one end of lower body 51, one second screw mandrel 58 is worn in intermediate 57, second screw mandrel 58 and the second slide rail 56 be arranged in parallel, second screw mandrel 58 one end passes intermediate 57 and connects a stop collar, stop collar is fixed on lower body 51, second screw mandrel 58 other end passes intermediate 57 and connects one and highly regulate handle, and the second screw mandrel 58 is arranged with a positioning sleeve 59 between adjustment handle and intermediate 57, and this positioning sleeve 59 is fixed on lower body 51.Can another connecting plate that need weld be placed in circular discs during use, rotate circular discs, observe the 3rd scale and the 4th scale, the angle that circular discs rotates is adjusted, circular discs is rotated to desired location, inserts second and insert pad, realize fixing circular discs; Rotate clockwise again and highly regulate handle, handle is highly regulated to drive the second screw mandrel to rotate relative to positioning sleeve 59 and stop collar, and then the second screw mandrel 58 is moved to stop collar one end, second screw mandrel 58 moves and intermediate 57 can be driven to move, intermediate moves to stop collar one end, intermediate 57 moves drive first slide bar 53 and the second slide bar 54 moves along the first slide rail, second slide rail one end, makes upper plate body 52 moves, upper plate body 52 moves on the connecting plate that can drive and need weld and move.In like manner, be rotated counterclockwise adjustment handle, the first slide bar 53 and the second slide bar 54 are moved along the first slide rail, the second slide rail other end, and upper plate body 52 moves down, and upper plate body 52 moves down and drives the connecting plate that need weld to move down, and reaches the object that connecting plate welding and assembling height regulates.
During use, ring flange is fixed on flange bracket 1, C template is connected on C template support 2, the position of adjusting support frame 3 again, is placed on bracing frame 3 by steel pipe, along track 6 rotary flange support 2, the position of regulating flange support 2, makes steel pipe one end contact with ring flange.Rotating handles makes regulating block 313 move relative to fixed block 312, and when regulating block 313 is near fixed block 312, steel pipe moves, when regulating block 313 is away from fixed block 312, steel pipe moves down; After steel pipe position adjustments is good, by the steel pipe other end and the grafting of C template, locking brake gear, carries out spot welding at steel pipe and ring flange junction, more also carries out spot welding at steel pipe and C template splicing position, prevents whole device from occurring in welding process mobile; Then, firm welded still pipe and C template junction and steel pipe and ring flange junction, complete the welding operation of steel tube end part.Then mobile first welding bench 4 and the second welding bench 5 on track 6, be adjusted to the corresponding position, two positions needing to be welded to connect plate, a plate before the first welding stage 4 is placed, the position of adjustment welding, plug first and insert pad, then spot welding is carried out to this connecting plate; Again rear a plate is placed in circular discs, regulate rear a plate relative to the height of front a plate by the second screw mandrel 58, after being regulated by circular discs, a plate is relative to the angle of front a plate again, then plug second and insert pad, spot welding is carried out to rear a plate, more front a plate and rear a plate are all firmly welded.This steel tube tower welder can carry out accurate welding operation to steel pipe, and the accuracy of welding is high, to the angle of connecting plate and highly easy to adjust in adjustment process, fastness is good, and the steel tube tower quality made is high, operating process simultaneously, take efforts few, easily operate, the structure of device is also simple, easy realization, is easy to promote the use of.
In addition, in order to strengthen the welding capacity of this steel tube tower welder further, set up a C template link 7, this C template link 7 is between flange bracket 1 and C template support 2, concrete, as shown in Figure 7, C template link 7 comprises horizontal plane 71 and leg 72, this leg 72 vertically extends to ground by horizontal plane 71 both sides, plane 71 is played a supporting role, horizontal plane 71 two ends are equipped with plugboard 73, this plugboard 73 removably connects horizontal plane 71, plugboard 73 is provided with can the 4th connector of fixation of C template, described 4th connector is the 4th bolt, and shown plugboard 73 is connected and fixed by the 5th bolt and horizontal plane 71.Described C template link 7 is arranged near C template support 2 place, and also between C template support 2 and C template link 7, a bracing frame, the first welding bench and the second welding bench can be set up again in addition, can be used for two ends herein all needs the steel pipe welding C template to carry out welding operation, and its welding method is similar to the above.During use, the operation that C template is welded at steel pipe two ends can be carried out in C template link 7 one end together with C template bracing frame 2; C template link 7 other end then can carry out the welding of another steel pipe, another steel pipe carries out one end welding C template by C template link 7 and flange bracket 1 pair of steel pipe, the operation of other end welding flange, expand the scope of application, the welding of this two steel pipe can be carried out simultaneously, improve welding efficiency, also abundant use has been carried out to device.
Obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the utility model protection.

Claims (3)

1. a steel tube tower welder, it is characterized in that: comprise track (6) and linearly shape be arranged in order C template support (2), for first welding bench (4) of the bracing frame (3) of supporting steel pipe, adjustable connecting plate soldering angle, second welding bench (5) of adjustable connecting plate welding and assembling height and flange bracket (1), described flange bracket (1), C template support (2), bracing frame (3), the first welding bench (4) and the second welding bench (5) are located on track (6) all movably; Flange bracket (1), bracing frame (3), the first welding bench (4) and the second welding bench (5) are equipped with brake gear;
Described flange bracket (1) comprises the panel (11) of vertically placement, the base plate (12) of connection panel (11) bottom and is connected to the gusset plate (13) of panel (11) both sides; Panel (11) is uniformly distributed circumferentially the elongated slot (14) of extend radially, elongated slot (14) is at least 2, and elongated slot (14) has can the first connector of mounting flange;
Described C template bracing frame (2) comprises the mainboard (21) vertically placed and the position adjustable board (24) being located at mainboard (21) bottom, position adjustable board (24) is removable to be located on track (6), the gripper shoe (22) of level is extended on the upper surface near flange bracket (1) of mainboard (21), this gripper shoe (22) connects the fixed head (23) of level by the second connector, fixed head (23) is provided with connecting hole (231), and this connecting hole (231) has the 3rd connector that can connect C template;
Support frame as described above (3) comprises the main body (31) extending into strip along track (6) direction, both sides, main body (31) is located on track (6) movably, main body (31) top extends into protruding rail (311) along its length, protruding rail (311) is provided with the fixing fixed block (312) in position and can along the regulating block (313) of protruding rail (311) movement, fixed block (312) top be provided with can along steel pipe length direction extend the first roller (32), regulating block (313) top be provided with can with second roller (33) of the first roller (32) common support steel pipe, fixed block (312) and regulating block (313) are arranged in same first screw mandrel (34), first screw mandrel (34) two ends connect main body (31), the first screw mandrel (34) one end pass main body (31) connect one rotatably make regulating block (313) close/away from the rotating handles of fixed block (312),
Described first welding bench (4) comprises can along the slipping block (41) of track (6) movement and can the rotating disc (42) of fixed connecting plate, rotating disc (42) can from being rotatably located at slipping block (41) top near steel pipe place, gap is formed between rotating disc (42) and slipping block (41), described rotating disc (42) outward flange one circle is provided with the first scale, slipping block (41) is positioned at rotating disc (42) peripheral place and is provided with the second scale; Also comprise one can insert in gap the first slotting pad that rotating disc (42) is fixed;
Described second welding bench (5) comprises the lower body (51) be slidably located on track (6), be positioned at upper plate body (52) directly over lower body (51) and can the circular discs of fixed connecting plate, the circle centre position of circular discs is arranged in upper plate body (52) upper surface by vertical rod, this upper plate body (52) upper surface is positioned at circular discs periphery and forms the 3rd scale, circular discs outward flange is provided with the 4th scale, form spacing between circular discs and upper plate body (52), also comprise one and can insert the slotting pad of second between circular discs and upper plate body (52); Hinged two first slide bar (53) one end, (whether correct herein) described lower body (51) one end, upper plate body (52) is positioned at directly over the first slide bar (53) and lower body (51) hinged place and is hinged with two second slide bar (54) one end; Lower body (51) other end is provided with and slides for two second slide bar (54) other ends, and then the first slide rail (55) that promotion upper plate body (52) one end moves up and down; Described upper plate body (52) other end is provided with and slides for the second slide bar (54), and then the second slide rail (56) driving upper plate body (51) other end to move up and down; Described two second slide bars (54) connect same intermediate (57) near one end of lower body (51), second screw mandrel (58) parallel with the second slide rail (56) is worn in intermediate (57), second screw mandrel (58) one end passes the stop collar that intermediate (57) is connected and fixed on lower body, second screw mandrel (58) other end passes intermediate (57) connection one and highly regulates handle, second screw mandrel (58) is positioned to regulate between handle and intermediate (57) and is provided with a positioning sleeve (59), and this positioning sleeve (59) is fixed on lower body (51).
2. steel tube tower welder according to claim 1, it is characterized in that: also comprise the C template link (7) be located between flange bracket (1) and C template support (2), this C template link (7) comprises horizontal plane (71) and is vertically extended to the leg (72) on ground by horizontal plane (71) both sides, horizontal plane (71) two ends are equipped with plugboard (73), this plugboard (73) removably connects horizontal plane (71), and plugboard (73) is provided with can the 4th connector of fixation of C template.
3. steel tube tower welder according to claim 1, it is characterized in that: described elongated slot (14) both sides are respectively equipped with slide block (15), two slide blocks (15) are connected by adjusting bolt, described two slide blocks (15) are equipped with the through hole passed for the first connector.
CN201520068347.XU 2015-01-30 2015-01-30 Steel tube tower welder Withdrawn - After Issue CN204603627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520068347.XU CN204603627U (en) 2015-01-30 2015-01-30 Steel tube tower welder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520068347.XU CN204603627U (en) 2015-01-30 2015-01-30 Steel tube tower welder

Publications (1)

Publication Number Publication Date
CN204603627U true CN204603627U (en) 2015-09-02

Family

ID=53956210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520068347.XU Withdrawn - After Issue CN204603627U (en) 2015-01-30 2015-01-30 Steel tube tower welder

Country Status (1)

Country Link
CN (1) CN204603627U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104741850A (en) * 2015-01-30 2015-07-01 浙江金盛钢管塔有限公司 Steel tube tower welding device
CN105171328A (en) * 2015-09-16 2015-12-23 江苏振光电力设备制造有限公司 Tool for unequal-diameter pipe fitting two-end linkage flange
CN105499880A (en) * 2016-01-04 2016-04-20 江苏华电铁塔制造有限公司 General fixture for plate inserting and welding for steel tube towers
CN108326491A (en) * 2017-07-04 2018-07-27 广州增立钢管结构股份有限公司 The branch pipe group of power transmission and transformation steel tube tower is to equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104741850A (en) * 2015-01-30 2015-07-01 浙江金盛钢管塔有限公司 Steel tube tower welding device
CN105171328A (en) * 2015-09-16 2015-12-23 江苏振光电力设备制造有限公司 Tool for unequal-diameter pipe fitting two-end linkage flange
CN105499880A (en) * 2016-01-04 2016-04-20 江苏华电铁塔制造有限公司 General fixture for plate inserting and welding for steel tube towers
CN105499880B (en) * 2016-01-04 2018-02-23 江苏华电铁塔制造有限公司 A kind of steel tube tower plate general welding fixture
CN108326491A (en) * 2017-07-04 2018-07-27 广州增立钢管结构股份有限公司 The branch pipe group of power transmission and transformation steel tube tower is to equipment

Similar Documents

Publication Publication Date Title
CN104741850B (en) Steel tube tower welder
CN204603625U (en) Adjustable steel tube tower flange positioner
CN204603627U (en) Steel tube tower welder
CN210850087U (en) Adjusting device for butt joint of pipeline heads
CN205600215U (en) Transversal joint pipe welding automatic positioning device
CN204913141U (en) Axial fan impeller welding position device
CN201261115Y (en) Semiautomatic welding device for rectangular workpiece
CN202963872U (en) Automatic positioning and welding tool device for axle chassis
CN105436811A (en) Branch pipe welding fixing device
CN110952455A (en) Intelligent auxiliary robot for installing bridge guardrail
CN209424851U (en) A kind of tubing welding positioning tool
CN204603626U (en) The flange of steel tube tower and C template positioner
CN206811402U (en) A kind of moulding bed for steel-pipe welding assembling
CN204524680U (en) For the revolution fitting device welded
CN205200924U (en) Solid of revolution part welding auxiliary device
CN204524616U (en) Workpiece welding revolution frock
CN201268718Y (en) Deviation rectifying roller adjusting apparatus
CN105269205A (en) Guide mechanism for reinforcing bar mesh welding
CN205020999U (en) Semi -automatic submerged arc welding equipment
CN209476990U (en) A kind of positioning device for H profile steel wing straightening machine
CN207695910U (en) Mechanical curve automatic welder
CN207789186U (en) A kind of vertical and horizontal double cutting machine structure for sponge cutting machine
CN204545778U (en) Pole structure part welder
CN207139153U (en) A kind of automatic welding device
CN204673194U (en) Pipe tower connecting plate decorates tunable arrangement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150902

Effective date of abandoning: 20160629

C25 Abandonment of patent right or utility model to avoid double patenting