CN204603626U - The flange of steel tube tower and C template positioner - Google Patents

The flange of steel tube tower and C template positioner Download PDF

Info

Publication number
CN204603626U
CN204603626U CN201520066367.3U CN201520066367U CN204603626U CN 204603626 U CN204603626 U CN 204603626U CN 201520066367 U CN201520066367 U CN 201520066367U CN 204603626 U CN204603626 U CN 204603626U
Authority
CN
China
Prior art keywords
flange
template
connector
panel
elongated slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520066367.3U
Other languages
Chinese (zh)
Inventor
金德斌
陈榆锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Original Assignee
Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jin Sheng Steel Tube Tower Co Ltd filed Critical Zhejiang Jin Sheng Steel Tube Tower Co Ltd
Priority to CN201520066367.3U priority Critical patent/CN204603626U/en
Application granted granted Critical
Publication of CN204603626U publication Critical patent/CN204603626U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of flange and C template positioner of steel tube tower, comprise flange bracket, C template support and bracing frame, flange bracket comprises the base plate bottom a panel vertically placed, connection panel and is connected to the gusset plate of panel both sides; Panel is uniformly distributed circumferentially the radial elongated slot extended, elongated slot is at least 2, and elongated slot has the first connector of mounting flange; The mainboard that described C type frame comprises, mainboard extends the gripper shoe of level near the surface of bracing frame, gripper shoe connects the connecting plate of level by the second connector, and connecting plate is provided with connecting hole, and connecting hole wears the 3rd connector of a connection C template; Be provided with slide rail bottom flange bracket, base plate bottom surface is provided with the roller that can move axially along slide rail, and base plate is also provided with a brake gear.The utility model is originally provided with flange bracket, C template support, bracing frame, time saving and energy saving in welding C type frame, ring flange process, and the efficiency of welding is high.

Description

The flange of steel tube tower and C template positioner
Technical field
The utility model belongs to for the fixing of workpiece or positioner field, especially relates to a kind of flange and C template positioner of steel tube tower.
Background technology
Current steel tube tower is when producing, need C template and ring flange on the two ends of steel pipe are welded respectively, the volume of steel pipe is large, and existing welding method is that ring flange is put in ground, steel pipe is removed the position to being connected with ring flange, then a people or many people are fixed steel pipe, have a people to weld ring flange and fastener for connection place again, this operating process amount of labour is large, and expend time in length, also easily weldering is askew, inefficiency.And the position of C template is difficult to adjustment, easily there is the askew phenomenon of weldering too.
Utility model content
The utility model, in order to overcome the deficiencies in the prior art, provides a kind of welding efficiency high, the flange of easy to operate steel tube tower and C template positioner.
To achieve these goals, the utility model is by the following technical solutions: a kind of flange of steel tube tower and C template positioner, the bracing frame comprising flange bracket, C template support and be located at for supporting steel pipe between flange bracket and C template support, described flange bracket comprises the base plate bottom a panel vertically placed, connection panel and is connected to the gusset plate of panel both sides; Panel is uniformly distributed circumferentially the radial elongated slot extended, elongated slot is at least 2, and elongated slot has the first connector of mounting flange; The mainboard that described C type frame comprises, mainboard extends the gripper shoe of level near the surface of bracing frame, this gripper shoe connects the connecting plate of level by the second connector, and connecting plate is provided with connecting hole, and this connecting hole wears the 3rd connector of a connection C template; Be provided with slide rail bottom described flange bracket, described base plate bottom surface is provided with the roller that can move axially along slide rail, and base plate is also provided with a brake gear.The utility model is provided with flange bracket and can be fixed the ring flange of steel tube tower, and C template support can be fixed C template, bracing frame then can support steel pipe, and then facilitate the carrying out of whole welding operation, and welding operation process is without the need to artificially supporting steel pipe, it is time saving and energy saving to operate, and speed of welding is fast, effective; And this C template support, flange bracket and bracing frame can realize, to C type frame, ring flange and steel pipe position control, ensure that the accuracy of C type frame, ring flange and steel-pipe welding automatically; This elongated slot can facilitate the connection of panel and the ring flange of different size, and the fastness of mounting flange is strong, and ring flange can be kept to be vertical state, facilitates welding of ring flange and steel pipe; And connecting plate is connected by the second connector with gripper shoe, replaceable different connecting plate, to adapt to the demand of the installation of different C template, accommodation is wider; And this mainboard can keep the horizontal positioned of C template, and then control the welding position of C template and steel pipe; Arrange slide rail, roller then removable flange bracket, and then make this positioner can be adapted to the steel pipe of different length, brake gear then can be fixed after flange bracket position is moved.
Further, support frame as described above comprises cross bar and the montant being connected cross bar two ends, and montant top is extended cross bar straight up and formed steel pipe positive stop end, and montant lower weld has the support bar tilting to extend to ground; Montant is provided with the reinforced pole connecting cross bar.Arrange steel pipe positive stop end to position steel pipe, support bar then can strengthen the stability that bracing frame supports, and reinforced pole then can strengthen the fastness that cross bar is connected with montant.
Further, described elongated slot both sides are respectively equipped with slide block, and two slide blocks are connected by adjusting bolt, and described slide block is provided with the through hole passed for the first connector.The position of adjusting bolt to two slide blocks can be unscrewed and move adjustment, tighten adjusting bolt afterwards again and realize fixing two slide positions, and through hole is set can facilitates the fixing of the first connector, further enhancing stability when the first connector is connected with ring flange and fastness.
Further, the cross section of described slide rail is in " work " font, and roller is stuck in the both sides of slide rail.The slide rail sliding effect of this setting is good, and roller and slide rail not easily depart from, and the good stability in moving process.
In sum, the utility model is originally provided with flange bracket, C template support, bracing frame, and time saving and energy saving in welding C type frame, ring flange process, the efficiency of welding is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is C template supporting structure schematic diagram of the present utility model.
Fig. 3 is flange bracket structural representation of the present utility model.
Fig. 4 is support frame structure schematic diagram of the present utility model.
Detailed description of the invention
In order to make those skilled in the art person better understand the utility model scheme, below in conjunction with the accompanying drawing in the utility model embodiment, clear, complete description is carried out to the technical scheme in the utility model embodiment.
As Figure 1-4, a kind of flange of steel tube tower and C template positioner, comprise flange bracket, C template support and bracing frame 6, support frame as described above 6 is located between flange bracket and C template support, bracing frame 6 is for supporting steel pipe, and this bracing frame can move freely, the convenient Support Position regulating steel pipe.Concrete, support frame as described above 6 comprises cross bar 61 and montant 62, montant 62 is welded in cross bar 61 two ends, certainly also connect by bolt, two montant 62 tops are extended cross bar 61 all straight up and are formed steel pipe positive stop end, this steel pipe positive stop end can prevent steel pipe from rolling or dropping, and montant 62 lower weld has the support bar 63 tilting to extend to ground, and this support bar 63 can strengthen the fixed effect on montant 62 and ground; Montant 62 is provided with the reinforced pole 64 connecting cross bar 61, the fastness that this reinforced pole 64 can strengthen montant 62 and be connected with cross bar 61.
Concrete, described flange bracket comprises a panel 1 vertically placed, base plate 2 and gusset plate 3.Described panel 1 bottom welding is on base plate 2, and gusset plate 3 is welded in the both sides of panel 1, and the bottom of gusset plate 3 is welded with base plate 2; Described panel 1 is uniformly distributed circumferentially the radial elongated slot 11 extended, elongated slot 11 is 8, and certainly in other embodiments, the quantity of described elongated slot 11 can also be 2-7 or more than 8.Described elongated slot 11 has the first connector of mounting flange, and this first connector is the first bolt.Moreover as shown in Figure 2, described elongated slot 11 both sides are respectively equipped with slide block, and two slide blocks are connected by adjusting bolt, described slide block is provided with the through hole passed for the first connector.Unscrew adjusting bolt, can in elongated slot 11 moving slider, tighten adjusting bolt again after slide block being moved to desired location, realize fixing in current location of two slide blocks, this slide block can carry out moving adjustment according to the ring flange of different size, expands the scope of application of flange bracket.
Concrete, the vertical mainboard 8 that described C type frame comprises, mainboard 8 extends the gripper shoe 4 of level near the surface of bracing frame 6, this gripper shoe 4 connects the connecting plate 5 of level by the second connector, this second connector is the second bolt, and described connecting plate 5 is provided with connecting hole 51, and this connecting hole 51 wears the 3rd connector of a connection C template, 3rd connector is the 3rd bolt, and detachable 3rd bolt realizes changing to be suitable for the fixing of different C template to different connecting plate 5.
Preferably, slide rail 7 is provided with bottom described flange bracket, this slide rail 7 linearly type, one end of slide rail 7 extends to C template frame bottom, and described base plate 2 bottom surface is provided with roller, and roller can move axially along slide rail 7, and then drive flange bracket to move, distance between regulating flange support and C type frame, base plate 2 is also provided with a brake gear, and this brake gear can be fixed flange bracket apart from rear regulating.The cross section of described slide rail 7 is in " work " font, and roller is stuck in the both sides of slide rail 7, namely arranges in roller periphery the annular groove adapted with slide rail, arranges this annular groove and can strengthen the stability that roller rolls on slide rail.
During use, ring flange is fixed on flange bracket, C template is connected on C template support, bracing frame is placed on appropriate location, releasing of brake device, put steel pipe, the position of first regulating flange support, steel pipe one end is contacted with ring flange, the steel pipe other end and the grafting of C template, locking brake gear carries out spot welding at steel pipe and ring flange junction, also spot welding is carried out again at steel pipe and C template splicing position, prevent whole device from occurring in welding process mobile, then, firm welded still pipe and C template junction and steel pipe and ring flange junction, complete welding operation.
Obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the utility model protection.

Claims (4)

1. the flange of a steel tube tower and C template positioner, it is characterized in that: comprise flange bracket, C template support and be located at the bracing frame (6) for supporting steel pipe between flange bracket and C template support, described flange bracket comprises a panel (1) vertically placed, connects the base plate (2) of panel (1) bottom and be connected to the gusset plate (3) of panel (1) both sides; Panel (1) is uniformly distributed circumferentially the radial elongated slot (11) extended, elongated slot (11) is at least 2, and elongated slot (11) has the first connector of mounting flange; The mainboard (8) that described C type frame comprises, the gripper shoe (4) of level is extended on the upper surface near bracing frame (6) of mainboard (8), this gripper shoe (4) connects the connecting plate (5) of level by the second connector, connecting plate (5) is provided with connecting hole (51), and this connecting hole (51) wears the 3rd connector of a connection C template; Be provided with slide rail (7) bottom described flange bracket, described base plate (2) bottom surface is provided with the roller that can move axially along slide rail (7), and (2) are also provided with a brake gear to base plate.
2. the flange of steel tube tower according to claim 1 and C template positioner, it is characterized in that: support frame as described above (6) comprises cross bar (61) and the montant (62) being connected cross bar (61) two ends, montant (62) top is extended cross bar (61) straight up and is formed steel pipe positive stop end, and montant (62) lower weld has the support bar (63) tilting to extend to ground; Montant (62) is provided with the reinforced pole (64) connecting cross bar (61).
3. the flange of steel tube tower according to claim 1 and C template positioner, is characterized in that: described elongated slot (11) both sides are respectively equipped with slide block, and two slide blocks are connected by adjusting bolt, and described slide block is provided with the through hole passed for the first connector.
4. the flange of steel tube tower according to claim 1 and C template positioner, is characterized in that: the cross section of described slide rail (7) is in " work " font, and roller is stuck in the both sides of slide rail (7).
CN201520066367.3U 2015-01-30 2015-01-30 The flange of steel tube tower and C template positioner Expired - Fee Related CN204603626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520066367.3U CN204603626U (en) 2015-01-30 2015-01-30 The flange of steel tube tower and C template positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520066367.3U CN204603626U (en) 2015-01-30 2015-01-30 The flange of steel tube tower and C template positioner

Publications (1)

Publication Number Publication Date
CN204603626U true CN204603626U (en) 2015-09-02

Family

ID=53956209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520066367.3U Expired - Fee Related CN204603626U (en) 2015-01-30 2015-01-30 The flange of steel tube tower and C template positioner

Country Status (1)

Country Link
CN (1) CN204603626U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106271238A (en) * 2016-08-15 2017-01-04 中建三局基础设施工程有限公司 A kind of adjustable steel tubing string processing platform and construction method thereof
CN109382552A (en) * 2018-11-23 2019-02-26 张家港市三林金泰新能源有限公司 The beveling bracket of new energy internal combustion engine flange
CN112648264A (en) * 2020-12-22 2021-04-13 张斌 Independent oil radiator motor support for engineering machinery
CN114211145A (en) * 2021-11-23 2022-03-22 中铁九局集团第四工程有限公司 Welding equipment for automatically welding round pipe or pipe ball connecting piece

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106271238A (en) * 2016-08-15 2017-01-04 中建三局基础设施工程有限公司 A kind of adjustable steel tubing string processing platform and construction method thereof
CN106271238B (en) * 2016-08-15 2018-10-23 中建三局基础设施工程有限公司 A kind of adjustable steel tubing string processing platform and its construction method
CN109382552A (en) * 2018-11-23 2019-02-26 张家港市三林金泰新能源有限公司 The beveling bracket of new energy internal combustion engine flange
CN112648264A (en) * 2020-12-22 2021-04-13 张斌 Independent oil radiator motor support for engineering machinery
CN112648264B (en) * 2020-12-22 2023-12-29 张斌 Independent oil radiator motor support for engineering machinery
CN114211145A (en) * 2021-11-23 2022-03-22 中铁九局集团第四工程有限公司 Welding equipment for automatically welding round pipe or pipe ball connecting piece

Similar Documents

Publication Publication Date Title
CN204603625U (en) Adjustable steel tube tower flange positioner
CN204603626U (en) The flange of steel tube tower and C template positioner
CN202199990U (en) Support platform for welding tubular bus-bars
CN202428154U (en) Tube-rod welding riding wheel carrier
CN103586618A (en) Large pipe welding platform
CN104741850A (en) Steel tube tower welding device
CN203592268U (en) Large pipe welding platform
CN203531924U (en) Lifting type moving trolley provided with tracks, wheels and templates
CN204603627U (en) Steel tube tower welder
CN204308448U (en) A kind of ball connects railing automatic welding device
CN205020999U (en) Semi -automatic submerged arc welding equipment
CN204195037U (en) A kind of main shipboard tube submerged arc welding track moulding bed
CN202388594U (en) Grouting line
CN204662922U (en) For the movable integral type scaffold of box-structure
CN202317360U (en) Semiautomatic steel pipe opening device
CN202544399U (en) Supporting frame for overhang floor slab with steel structure
CN204818543U (en) Lamp pole welding machine
CN205464583U (en) Horizontal cutting equipment
CN212926945U (en) Building site is with scaffold frame of just dismantling
CN211840780U (en) Steel bar framework supporting device
CN204641806U (en) A kind of easy cement electric pole transfer device
CN109227028B (en) Installation device and method for pressure steel pipe water collection channel steel of energy storage power station
CN201868789U (en) Portable paying-off frame
CN205600196U (en) Rack of welding section of jurisdiction steel construction
CN218581181U (en) Movable formwork for large-channel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20200130