CN204590606U - Support reserved by ground patch box - Google Patents

Support reserved by ground patch box Download PDF

Info

Publication number
CN204590606U
CN204590606U CN201520279147.9U CN201520279147U CN204590606U CN 204590606 U CN204590606 U CN 204590606U CN 201520279147 U CN201520279147 U CN 201520279147U CN 204590606 U CN204590606 U CN 204590606U
Authority
CN
China
Prior art keywords
pole
poles
positioning sleeve
cystosepiment
patch box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520279147.9U
Other languages
Chinese (zh)
Inventor
陈建
董效杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201520279147.9U priority Critical patent/CN204590606U/en
Application granted granted Critical
Publication of CN204590606U publication Critical patent/CN204590606U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a kind of ground patch box to reserve support, and relate to terminal bracket field, its structure comprises base and cystosepiment, and cystosepiment is arranged on base; Described base comprises two transverse directions and the pole be arranged in parallel, and one end of two poles is connected together by connecting rod, and two poles of this connecting rod connection is respectively arranged with vertical straddle and welds together with its upper end; Be respectively arranged with positioning sleeve at the other end of two poles, pole, through positioning sleeve, two positioning sleeves is also welded with straddle respectively.Can effectively reduce concrete and pick cutter, prevent spool from being picked bad, junction box and install irregular, and effectively ensure junction box installation quality.

Description

Support reserved by ground patch box
Technical field
The utility model relates to patch box support field, ground, specifically according to slab thickness and the prefabricated ground patch box mounting bracket of uncovered muscle floor.
Background technology
Along with the development of builing industry, more and more higher to the quality requirement of engineering, improve construction quality is also improve the Main Means of competition among enterprises simultaneously.Installing way at the ground patch box of routine is secretly be assigned in concrete cast-in-place slab by penetration pipe, until concealed installation insert time ground inserted with inserting ambient influence installation concrete reject, because engineering part floor is without negative bending moment rib floor, insert built-in pipe and be difficult to fix, and the concrete of rejecting junction box position is needed when junction box is installed, cause the waste of very large manpower and materials, the concrete surface of rejecting is difficult to ensure neatly, junction box is installed and easily occurs deviation, because penetration pipe is secretly assigned in concrete, penetration pipe is easy to pick bad during rejecting, larger difficulty is caused to construction.
Summary of the invention
In order to solve above technical problem, the utility model provides a kind of ground patch box mounting bracket.
Technical solution adopted in the utility model is:
Support reserved by ground patch box, and comprise base and cystosepiment, cystosepiment is arranged on base; Described base comprises two transverse directions and the pole be arranged in parallel, and one end of two poles is connected together by connecting rod, and two poles of this connecting rod connection is respectively arranged with vertical straddle and welds together with its upper end; Be respectively arranged with positioning sleeve at the other end of two poles, pole, through positioning sleeve, two positioning sleeves is also welded with straddle respectively.
Support reserved by described ground patch box, is also connected together by connecting rod between two positioning sleeves.
Support reserved by described ground patch box, and each straddle length is identical and be arranged in parallel each other.
Support reserved by described ground patch box, is slidably connected between positioning sleeve and pole, and positioning sleeve can be moved relative to pole on pole.
Support reserved by described ground patch box, welds together between positioning sleeve and pole.
Support reserved by described ground patch box, and the width of described cystosepiment is not less than the width of base.
The utility model adopts φ 6 steel bar meter base according to slab thickness, and substructure height 8cm, width 15cm, length 55cm, put the thick cystosepiment of 4cm at ground slot.Be arranged on patch box position, ground, owing to being uncovered muscle floor, support plays fixation to penetration pipe, prevent from reserving penetration pipe displacement during concreting, tilting, prefabricated cystosepiment is arranged on junction box position, when concreting complete installation junction box, cystosepiment is rejected, adopt and construct in this way: can effectively reduce concrete and pick cutter, prevent spool from being picked bad, junction box and install irregular, and effectively ensure junction box installation quality.
The beneficial effects of the utility model:
This stent preform can effectively be fixed penetration pipe, reduce concrete picks cutter amount, prevents from spool from being picked bad, junction box installing irregular, and effectively ensures junction box installation quality and cost-saving.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use schematic diagram of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail below.
As shown in Figure 1, support reserved by ground of the present utility model patch box, and comprise base and cystosepiment 1, cystosepiment 1 is arranged on base; Described base comprises two transverse directions and the one end of pole 2, two poles 2 be arranged in parallel is connected together by connecting rod 3, and two poles 2 of this connecting rod 3 connection is respectively arranged with vertical straddle 4 and welds together with its upper end; Be respectively arranged with positioning sleeve 5 at the other end of two poles 2, pole 2 is passed positioning sleeve 5 and is slidably connected with it, and two positioning sleeves 5 are also welded with straddle 4 respectively.Also be connected together by connecting rod 3 between positioning sleeve 5.Regulate the position of positioning sleeve 5 on pole 2 so that be suitable for different field conditions.After can having good positioning according to field condition during use, positioning sleeve 5 and pole 2 are welded together.
As shown in Figure 2, according to junction box position, the size of the thickness precast base of size and floor, deducting 4cm cystosepiment 1 thickness according to Bars In Poured Concrete Slab thickness is substructure height, adopt 6# reinforcement fabrication terminal bracket, substructure height 8cm, width 15cm, length 55cm, can effectively be fixed uncovered muscle floor embedded threading pipe 6, prevent from during concreting, reserving penetration pipe 6 to be shifted, tilt, prefabricated cystosepiment 1 is arranged on junction box position, when concreting complete installation junction box, cystosepiment 1 is rejected, adopt and construct in this way: can effectively reduce concrete and pick cutter, prevent penetration pipe 6 from being picked bad, junction box is installed irregular, and effective guarantee junction box installation quality.
Except the technical characteristic described in manual, be the known technology of those skilled in the art.

Claims (6)

1. support reserved by patch box, it is characterized in that, comprises base and cystosepiment, and cystosepiment is arranged on base; Described base comprises two transverse directions and the pole be arranged in parallel, and one end of two poles is connected together by connecting rod, and two poles of this connecting rod connection is respectively arranged with vertical straddle and welds together with its upper end; Be respectively arranged with positioning sleeve at the other end of two poles, pole, through positioning sleeve, two positioning sleeves is also welded with straddle respectively.
2. support reserved by patch box according to claim 1ly, it is characterized in that, is also connected together by connecting rod between two positioning sleeves.
3. support reserved by patch box according to claim 1 and 2ly, it is characterized in that, each straddle length is identical and be arranged in parallel each other.
4. support reserved by patch box according to claim 3ly, it is characterized in that, is slidably connected between positioning sleeve and pole, and positioning sleeve can be moved relative to pole on pole.
5. support reserved by patch box according to claim 3ly, it is characterized in that, welds together between positioning sleeve and pole.
6. support reserved by patch box according to claim 1ly, it is characterized in that, the width of described cystosepiment is not less than the width of base.
CN201520279147.9U 2015-05-04 2015-05-04 Support reserved by ground patch box Expired - Fee Related CN204590606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520279147.9U CN204590606U (en) 2015-05-04 2015-05-04 Support reserved by ground patch box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520279147.9U CN204590606U (en) 2015-05-04 2015-05-04 Support reserved by ground patch box

Publications (1)

Publication Number Publication Date
CN204590606U true CN204590606U (en) 2015-08-26

Family

ID=53926772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520279147.9U Expired - Fee Related CN204590606U (en) 2015-05-04 2015-05-04 Support reserved by ground patch box

Country Status (1)

Country Link
CN (1) CN204590606U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700471A (en) * 2019-08-30 2020-01-17 中国十七冶集团有限公司 Pre-buried positioning fixing device of floor water and electricity pipeline
CN115224645A (en) * 2022-07-08 2022-10-21 中国华冶科工集团有限公司 Wall pre-installation junction box structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700471A (en) * 2019-08-30 2020-01-17 中国十七冶集团有限公司 Pre-buried positioning fixing device of floor water and electricity pipeline
CN115224645A (en) * 2022-07-08 2022-10-21 中国华冶科工集团有限公司 Wall pre-installation junction box structure

Similar Documents

Publication Publication Date Title
CN105220808B (en) Large-span prestressed arch bar in-situ precast construction method of installation
CN101718090A (en) Process for constructing large-diameter steel reinforcement cage of steel reinforcement concrete grouting pile
CN204435638U (en) A kind of hollow laminated floor slab
CN104631674A (en) Composite floor slab and construction method thereof
CN204590606U (en) Support reserved by ground patch box
CN101205726A (en) Foundation bedplate post-pouring strip mud-leakage preventing method
CN110080296A (en) A unilateral glass muscle-steel reinforcement cage structure for shield tunnel portal ground is wall even
CN109972519A (en) The construction method of precast hollow pier mounting structure
CN217420496U (en) Device for intercepting high-strength concrete in beam
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN205444201U (en) Reinforced concrete waist rail structure
CN104831832B (en) Assembly of shear wall structure and its installation method
CN204626453U (en) The supporting device of pipeline in Urban Underground pipe gallery
CN104295001B (en) The construction technology of variable cross-section prestressing force cant beam
CN104164882B (en) Side slope builds construction method and the structure on supporting and protection structure beam basis
CN201268846Y (en) Clamping fixture for manufacturing reinforced concrete filling pile major diameter reinforcement cage
CN110593309B (en) Construction method of full-hall scaffold supporting system with slope comprehensive pipe gallery
CN202359742U (en) Steel bar locator with reinforced masonry structure
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN204456862U (en) The fixing guard member of pre-embedded pipe in a kind of cast-in-situ floor
CN207987925U (en) A kind of bored concrete pile intercommunication grouting device
CN204491947U (en) A kind of laminated floor slab
CN202509530U (en) Post-cast strip water stopping steel plate combined structure of foundation bottom plate
CN211058144U (en) Integral prefabricating and forming structure for embedded part and core cylinder reinforcing mesh of tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

CF01 Termination of patent right due to non-payment of annual fee