CN204590050U - Earth and rockfill dam spillway on bank lets out groove foundation drainage structure - Google Patents

Earth and rockfill dam spillway on bank lets out groove foundation drainage structure Download PDF

Info

Publication number
CN204590050U
CN204590050U CN201520004104.XU CN201520004104U CN204590050U CN 204590050 U CN204590050 U CN 204590050U CN 201520004104 U CN201520004104 U CN 201520004104U CN 204590050 U CN204590050 U CN 204590050U
Authority
CN
China
Prior art keywords
bank
earth
gutter
out groove
rockfill dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520004104.XU
Other languages
Chinese (zh)
Inventor
王党在
伍小玉
刘志
王晓安
何顺宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201520004104.XU priority Critical patent/CN204590050U/en
Application granted granted Critical
Publication of CN204590050U publication Critical patent/CN204590050U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of earth and rockfill dam spillway on bank and lets out groove foundation drainage structure, and particularly a kind of earth and rockfill dam spillway on bank being applied to Hydraulic and Hydro-Power Engineering technical field lets out groove foundation drainage structure.The utility model provides a kind of simple and reasonable for structure, reliable, and effectively can discharge the infiltration of Spillway chute basis, the earth and rockfill dam spillway on bank reducing chute bottom slab osmotic pressure lets out groove foundation drainage structure.Earth and rockfill dam spillway on bank lets out groove foundation drainage structure, comprises gutter, and the both sides in described gutter are provided with and grout stone walling.The two ends of described geotextiles by bolt with grout stone walling and be connected.First build stone masonry parapet by laying bricks or stones, then between stone masonry parapet, spread guanovulite draining material, stone masonry parapet and cobble drainage are constructed and can be adapted to different gutter basement rock and excavate build, and cobble draining material plays draining reverse filter effect.Geotextiles can prevent chute bottom slab concrete slurry from infiltrating cobble draining material, infiltration current can be made to enter cobble draining material, play filter sand drainage.

Description

Earth and rockfill dam spillway on bank lets out groove foundation drainage structure
Technical field
The utility model relates to a kind of earth and rockfill dam spillway on bank and lets out groove foundation drainage structure, and particularly a kind of earth and rockfill dam spillway on bank being applied to Hydraulic and Hydro-Power Engineering technical field lets out groove foundation drainage structure.
Background technology
Flood spillway is the important component part in Hydraulic and Hydro-Power Engineering, carries out the percolating water current control on flood spillway basis, and the Water drainage system design especially carrying out Spillway chute basis is one of key factor ensureing that flood spillway engineering safety runs.
The infiltration current on Spillway chute basis mainly contain following several source: storehouse water infiltrates through flood spillway weir base and bank slope, bank slope underground water is infiltrated by bedrock fracture, let out groove under sluice and to infiltrate through base plate parting.The discharge structure design on Spillway chute basis must be carried out, generally by letting out vertical transverse drain ditch or the gallery excretion percolating water on groove basis, to reduce the osmotic pressure of letting out groove basis, gutter should take to prevent silting measure simultaneously, discharges in order to infiltration smooth in water flow.
Existing Spillway chute foundation drainage structure is generally: establish vertical and horizontal draining sewer pipe or collector drain at chute bottom slab.For gutter structure, generally first press design section excavation gutter, and adopt filter material or the levelling basal plane of non-fine concrete, prevent the blocking of convex body place, local gutter.In ditch, bury PVC floral tube or plastic blind-ditch underground again, floral tube outsourcing geotextiles anti-filter, or in gutter, directly bury UPVC pipe, prefabricated sand-free concrete tube underground, then fill out rubble anti-filter to chute bottom slab design altitude on gutter upper berth.Before chute bottom slab concreting, when the laying of gutter end face asphaltic felt or building paper etc. prevent chute bottom slab concrete construction, slurries infiltrate blocking gutter.
There are the following problems for prior art: one, design section size is generally tens centimetres to about 2 meters, basement rock excavates small size gutter like this, according to blasting method excavation, guarantee design section build, and blast working is difficult to control; According to hand excavation, then cost higher and duration is difficult to ensure; Two, construction sequence is complicated, and cost is high, and construction quality is difficult to control; Though three, gutter end face is laid asphaltic felt or building paper and can be prevented chute bottom slab concrete slurry from infiltrating gutter, asphaltic felt or building paper itself waterproof, cause the lower infiltration via chute bottom slab parting smooth and easyly not discharge, it is unfavorable to stablize chute bottom slab.Therefore also do not have a kind of simple and reasonable for structure, reliable in prior art, effectively can discharge the infiltration of Spillway chute basis, the earth and rockfill dam spillway on bank reducing chute bottom slab osmotic pressure lets out groove foundation drainage structure.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of simple and reasonable for structure, reliable, and effectively can discharge the infiltration of Spillway chute basis, the earth and rockfill dam spillway on bank reducing chute bottom slab osmotic pressure lets out groove foundation drainage structure.
For solving the problems of the technologies described above, the earth and rockfill dam spillway on bank that the utility model adopts lets out groove foundation drainage structure, and comprise gutter, the both sides in described gutter are provided with and grout stone walling.
Further, the inside paving in described gutter is filled with the cobble draining bed of material.
Further, described gutter end face is provided with geotextiles.
Further, described geotextiles two ends by bolt with grout stone walling and be connected.
The beneficial effects of the utility model are: first build stone masonry parapet by laying bricks or stones, then between stone masonry parapet, spread guanovulite draining material, and stone masonry parapet and cobble drainage are constructed and can be adapted to different gutter basement rock and excavate build.Stone masonry parapet and cobble gutter building stones used can be gathered materials on the spot, and construction technology is simple, can construct on a large scale.Chute bottom slab infiltration directly enters in earth and rockfill dam enrockment by vertical transverse drain ditch, and cobble draining material itself plays draining reverse filter effect, simple and practical.The geotextiles of gutter end face both can prevent chute bottom slab concrete slurry from infiltrating cobble draining material, infiltration current can be made again to enter cobble draining material, play filter sand drainage.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Component, position and numbering in figure: gutter 1, grout stone walling 2, the cobble draining bed of material 3, geotextiles 4, bolt 5.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, earth and rockfill dam spillway on bank of the present utility model lets out groove foundation drainage structure, comprises gutter 1, and the both sides in described gutter 1 are provided with and grout stone walling 2.That sets up in both sides, gutter 1 grouts stone walling 2 and can repair gutter 1 section, makes it more press close to design section.During concrete enforcement, arrange vertical transverse drain ditch 1, vertical transverse drain ditch 1 is arranged in Spillway chute basis.
The inside paving in described gutter 1 is filled with the cobble draining bed of material 3.Spread in the inside in gutter 1 the cobble draining bed of material 3 filled out to repair gutter 1 section, make it more press close to design section.
Described gutter 1 end face is provided with geotextiles 4.
The two ends of described geotextiles 4 by bolt 5 with grout stone walling 2 and be connected.
During concrete enforcement, gutter 1 sequence of construction is: gutter 1 excavates → both sides grout stone walling 2 constructs → ditch in the cobble draining bed of material 3 paving fill out → gutter 1 end face geotextiles 4 lays → bolt 5 anchoring.Due to the reason such as Excavation blasting, construction control, gutter 1 section is generally difficult to coincide with design section, the utility model proposes first to build by laying bricks or stones in both sides, gutter 1 and grout stone walling 2, between stone masonry parapet, spread the guanovulite draining bed of material 3 again, stone masonry parapet and cobble draining material can play repairing effect to actual excavation face.The geotextiles 4 of gutter 1 end face both can prevent chute bottom slab concrete slurry from infiltrating cobble draining material, infiltration current can be made again to enter cobble draining material, play filter sand draining " effect.Stone masonry parapet and cobble draining material building stones used of constructing can be gathered materials on the spot, and construction technology is simple, can construct on a large scale.

Claims (3)

1. earth and rockfill dam spillway on bank lets out groove foundation drainage structure, comprise gutter (1), it is characterized in that: the both sides of described gutter (1) are provided with and grout stone walling (2), the inside paving of described gutter (1) is filled with the cobble draining bed of material (3).
2. earth and rockfill dam spillway on bank as claimed in claim 1 lets out groove foundation drainage structure, it is characterized in that: described gutter (1) end face is provided with geotextiles (4).
3. earth and rockfill dam spillway on bank as claimed in claim 2 lets out groove foundation drainage structure, it is characterized in that: the two ends of described geotextiles (4) by bolt (5) with grout stone walling (2) and be connected.
CN201520004104.XU 2015-01-05 2015-01-05 Earth and rockfill dam spillway on bank lets out groove foundation drainage structure Active CN204590050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520004104.XU CN204590050U (en) 2015-01-05 2015-01-05 Earth and rockfill dam spillway on bank lets out groove foundation drainage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520004104.XU CN204590050U (en) 2015-01-05 2015-01-05 Earth and rockfill dam spillway on bank lets out groove foundation drainage structure

Publications (1)

Publication Number Publication Date
CN204590050U true CN204590050U (en) 2015-08-26

Family

ID=53926219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520004104.XU Active CN204590050U (en) 2015-01-05 2015-01-05 Earth and rockfill dam spillway on bank lets out groove foundation drainage structure

Country Status (1)

Country Link
CN (1) CN204590050U (en)

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN107938692A (en) A kind of draining and recharge construction method and structure
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN103758123A (en) Method for constructing protecting wall lining of cast-in-place manual hole digging pile
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN112412496A (en) Full-section advanced curtain grouting construction method for water-rich broken geological zone tunnel
CN108457249A (en) A kind of structure design and construction method of novel composite panel sand-gravel dam
CN102966072A (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN105569071A (en) Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN103806433A (en) Foundation backfill reinforcement method
CN103343690B (en) Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN102995601B (en) Municipal flood control integrated engineering construction technology for strong flushing embankment
CN205035768U (en) Enrockment concrete permeable dike
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN106761914B (en) A kind of routed water water damage prevention and controls of shallow buried coal seam mine raceway groove flood
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN218148458U (en) Deep water deep foundation pit drainage system of fissure development rock stratum
CN207828994U (en) It is a kind of draining and recharge constructing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant