CN204588444U - Prefabricated superimposed sheet special hanger - Google Patents

Prefabricated superimposed sheet special hanger Download PDF

Info

Publication number
CN204588444U
CN204588444U CN201520144362.8U CN201520144362U CN204588444U CN 204588444 U CN204588444 U CN 204588444U CN 201520144362 U CN201520144362 U CN 201520144362U CN 204588444 U CN204588444 U CN 204588444U
Authority
CN
China
Prior art keywords
frame
movable rod
suspension ring
framework
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520144362.8U
Other languages
Chinese (zh)
Inventor
王军红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kong Linghai
Original Assignee
Dawn Building Material Science And Technology Ltd Of Handan City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dawn Building Material Science And Technology Ltd Of Handan City filed Critical Dawn Building Material Science And Technology Ltd Of Handan City
Priority to CN201520144362.8U priority Critical patent/CN204588444U/en
Application granted granted Critical
Publication of CN204588444U publication Critical patent/CN204588444U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型涉及一种预制叠合板专用吊具,其包括本体框架和调节装置;所述本体框架包括框架和起吊孔,所述框架为长方形,包括框架长部和框架宽部,所述框架长部包括两根平行的框架杆组成,两根框架杆上对称且均匀的设置有螺栓孔,所述起吊孔设置在长方形框架的四个端点处;所述调节装置包括两个活动杆和U型吊环,所述活动杆与框架宽部平行,活动杆的两端设置有螺栓,活动杆通过螺栓固定在框架长部上的螺栓孔中,所述U型吊环均匀设置在活动杆的下部,U型吊环中间设置有圆形孔洞;本实用新型结构简单,成本低,可根据叠合板的形状、大小而灵活调整使其科学受力。

The utility model relates to a special spreader for prefabricated laminated slabs, which comprises a body frame and an adjusting device; the body frame includes a frame and a lifting hole, the frame is rectangular, and includes a frame long part and a frame wide part, and the frame is long The upper part consists of two parallel frame rods, the two frame rods are symmetrically and uniformly provided with bolt holes, and the lifting holes are arranged at the four ends of the rectangular frame; the adjustment device includes two movable rods and U-shaped A suspension ring, the movable rod is parallel to the wide part of the frame, bolts are arranged at both ends of the movable rod, and the movable rod is fixed in the bolt hole on the long part of the frame through bolts, and the U-shaped suspension ring is evenly arranged on the lower part of the movable rod, U There is a circular hole in the middle of the type suspension ring; the utility model has simple structure and low cost, and can be flexibly adjusted according to the shape and size of the laminated plate to make it scientifically stressed.

Description

预制叠合板专用吊具Special spreader for prefabricated laminated panels

技术领域 technical field

本实用新型属于建筑技术领域,涉及一种建筑混凝土预制叠合板吊具。 The utility model belongs to the technical field of buildings and relates to a spreader for building concrete prefabricated laminated slabs.

背景技术 Background technique

随着我国住宅产业化的不断推进,装配式混凝土结构应用越来越广泛,预制叠合板作为一种重要构件,在其吊装运输过程中,对其成品保护十分重要,现在多采用直接从叠合板桁架钢筋上吊运叠合板,这种方法存在的弊病是叠合板在吊运过程中受力不均匀,极易产生细微裂纹,从而影响叠合板的使用性能,增加修复成本,提高了建筑混凝土行业的生产成本。 With the continuous advancement of my country's residential industrialization, prefabricated concrete structures are more and more widely used. As an important component, prefabricated laminated panels are very important for the protection of their finished products during hoisting and transportation. The disadvantage of this method is that the laminated slab is subjected to uneven force during the lifting process, and it is easy to produce fine cracks, which affects the performance of the laminated slab, increases the repair cost, and improves the construction concrete industry. Cost of production.

发明内容 Contents of the invention

本实用新型所要解决的技术问题是提供一种结构简单,成本低,可根据叠合板的形状、大小而灵活调整使其科学受力的预制叠合板专用吊具。 The technical problem to be solved by the utility model is to provide a special spreader for prefabricated laminated slabs which is simple in structure, low in cost, and can be flexibly adjusted according to the shape and size of the laminated slab so that it can be scientifically stressed.

为实现上述目的,本实用新型的技术方案包括本体框架和调节装置;所述本体框架包括框架和起吊孔,所述框架为长方形,包括框架长部和框架宽部,所述框架长部包括两根平行的框架杆组成,两根框架杆上对称且均匀的设置有螺栓孔,所述起吊孔设置在长方形框架的四个端点处;所述调节装置包括两个活动杆和U型吊环,所述活动杆与框架宽部平行,活动杆的两端设置有螺栓,活动杆通过螺栓固定在框架长部上的螺栓孔中,所述U型吊环均匀设置在活动杆的下部,U型吊环中间设置有圆形孔洞。 In order to achieve the above object, the technical solution of the utility model includes a body frame and an adjusting device; the body frame includes a frame and a lifting hole, the frame is rectangular, and includes a frame long part and a frame wide part, and the frame long part includes two The two frame rods are composed of two parallel frame rods, and the bolt holes are symmetrically and uniformly arranged on the two frame rods, and the lifting holes are arranged at the four ends of the rectangular frame; the adjustment device includes two movable rods and U-shaped lifting rings, the The movable rod is parallel to the wide part of the frame, bolts are arranged at both ends of the movable rod, and the movable rod is fixed in the bolt hole on the long part of the frame through bolts, and the U-shaped lifting ring is evenly arranged on the lower part of the movable rod, and the middle of the U-shaped lifting ring Provided with circular holes.

本实用新型积极效果如下: The positive effects of the utility model are as follows:

首先通过起重设备将本实用新型吊起,调整平衡;根据板跨不同,调节两个活动杆的间距,然后固定螺栓,以适应不同长度的叠合板;根据被吊起的预制叠合板的宽度不同,灵活选择活动杆上的U型吊环间距,以适应不同宽度的叠合板;本实用新型只需在吊运前调好平衡即可,由于横杆和U型吊环都是对称均匀设置的,无需再次调整即为平衡状态,根据被吊起的预制叠合板的尺寸,调整吊具,最后将选用的U型吊环穿过钢丝绳与叠合板桁架钢筋连接,最后用专用卡环固定与叠合板桁架相连的钢丝绳,保证叠合板吊装过程受力合理,运送至堆放位置后,拆除钢丝绳后可再进行其它叠合板的吊运,之后的吊运无需再调平衡。本实用新型结构简单,成本低,可根据叠合板的形状、大小而灵活调整使其科学受力。 Firstly, the utility model is hoisted by lifting equipment to adjust the balance; according to the difference of the board span, the distance between the two movable rods is adjusted, and then the bolts are fixed to adapt to the laminated boards of different lengths; according to the width of the lifted prefabricated laminated boards Different, flexibly choose the U-shaped lifting ring spacing on the movable rod to adapt to the laminated boards of different widths; the utility model only needs to adjust the balance before lifting, because the cross bar and U-shaped lifting rings are symmetrically and evenly arranged, It is in a balanced state without further adjustment. Adjust the spreader according to the size of the prefabricated laminated slab being hoisted, and finally connect the selected U-shaped lifting ring through the steel wire rope to the reinforced truss of the laminated slab, and finally fix it with the laminated slab truss with a special snap ring The connected steel wire rope ensures that the force of the laminated board is reasonable during the hoisting process. After being transported to the stacking position, other laminated boards can be lifted after removing the steel wire rope, and the subsequent lifting does not need to be rebalanced. The utility model has the advantages of simple structure and low cost, and can be flexibly adjusted according to the shape and size of the laminated board to make it bear scientific force.

附图说明 Description of drawings

图1为本实用新型结构示意图; Fig. 1 is a structural representation of the utility model;

附图中,1框架长部、2框架宽部、3螺栓孔、4起吊孔、5活动杆、6 U型吊环、7螺栓。 Among the accompanying drawings, 1 frame long part, 2 frame wide parts, 3 bolt holes, 4 hoisting holes, 5 movable rods, 6 U-shaped lifting rings, 7 bolts.

具体实施方式 Detailed ways

如图1所示,本实用新型包括本体框架和调节装置;所述本体框架包括框架和起吊孔4,所述框架为长方形,包括框架长部1和框架宽部2,所述框架长部1包括两根平行的框架杆组成,两根框架杆上对称且均匀的设置有螺栓孔3,所述起吊孔4设置在长方形框架的四个端点处,使用本实用新型吊装预制叠合板前,首先将起吊孔4与起重设备连接,使用本实用新型吊起预制叠合板前,调整好平衡;所述调节装置包括两个活动杆5和U型吊环6,所述活动杆5与框架宽部2平行,活动杆5的两端设置有与框架长部1上端设置的螺栓孔3相对应的螺栓7,活动杆5通过螺栓7固定在框架长部1上的螺栓孔3中,在本实用新型吊装预制叠合板前,可根据被吊起的叠合板的板跨不同,调节两个活动杆5的间距,然后固定螺栓7,以适应不同长度的叠合板;每个活动杆5底部均匀设置有4个U型吊环6,U型吊环6中间设置有圆形孔洞,使用时,可根据被吊起的叠合板的宽度不同,灵活选择活动杆5上的U型吊环6间距,以适应不同宽度的叠合板,由于螺栓孔3在框架长部1的两侧框架杆上是对称均匀分布的, U型吊环6在两个活动杆5上也都是对称且均匀分布的,所以无需再次调整即达到平衡状态,最后从U型吊环6内的孔洞中穿过钢丝绳与叠合板桁架钢筋连接,用专用卡环固定与叠合板桁架相连的钢丝绳,保证叠合板吊装过程受力合理,运送至堆放位置后,拆除钢丝绳后可再进行其它叠合板的吊运,在此后的吊运过程中,无需再次调整平衡即可保持平衡状态。 As shown in Figure 1, the utility model includes a body frame and an adjusting device; the body frame includes a frame and a lifting hole 4, the frame is rectangular, and includes a frame long part 1 and a frame wide part 2, and the frame long part 1 It consists of two parallel frame rods, on which bolt holes 3 are arranged symmetrically and evenly, and the lifting holes 4 are arranged at the four ends of the rectangular frame. Before using the utility model to hoist the prefabricated laminated board, first Connect the hoisting hole 4 with the hoisting equipment, and adjust the balance before using the utility model to hoist the prefabricated laminated board; 2 parallel, the two ends of the movable rod 5 are provided with bolts 7 corresponding to the bolt holes 3 provided on the upper end of the frame long part 1, and the movable rod 5 is fixed in the bolt holes 3 on the frame long part 1 by bolts 7. Before the new type of prefabricated laminated slab is hoisted, the distance between the two movable rods 5 can be adjusted according to the span of the lifted laminated slab, and then the bolts 7 can be fixed to suit the laminated slabs of different lengths; the bottom of each movable rod 5 is evenly arranged There are 4 U-shaped lifting rings 6, and a circular hole is arranged in the middle of the U-shaped lifting rings 6. When in use, the distance between the U-shaped lifting rings 6 on the movable rod 5 can be flexibly selected according to the width of the laminated board to be lifted, so as to adapt to different The width of the laminated plate, because the bolt holes 3 are symmetrically and evenly distributed on the frame rods on both sides of the frame long part 1, and the U-shaped lifting rings 6 are also symmetrically and evenly distributed on the two movable rods 5, so there is no need to adjust again That is, the equilibrium state is reached, and finally the steel wire rope is passed through the hole in the U-shaped lifting ring 6 to connect with the steel bar of the laminated truss, and the special snap ring is used to fix the steel wire rope connected to the laminated truss to ensure that the force of the laminated plate is reasonable during hoisting and transported to the stacking After the position, the steel wire rope can be removed and other laminated panels can be hoisted. In the subsequent hoisting process, the balance can be maintained without readjusting the balance.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其他实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。 The above description of the disclosed embodiments enables those skilled in the art to realize or use the utility model. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to these embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims (1)

1. a prefabricated superimposed sheet special hanger, is characterized in that: it comprises body frame and control apparatus; Described body frame comprises framework and lifting eye (4), described framework is oblong, comprise framework long portion (1) and the wide portion of framework (2), described framework long portion (1) comprises two parallel frame bars compositions, symmetrical and be provided with bolt hole (3) uniformly in two frame bars, described lifting eye (4) is arranged on four end points places of rectangular frame; Described control apparatus comprises two portable bars (5) and U-shaped suspension ring (6), described portable bar (5) is parallel with the wide portion of framework (2), the two ends of portable bar (5) are provided with bolt (7), portable bar (5) is fixed in the bolt hole (3) in framework long portion (1) by bolt (7), described U-shaped suspension ring (6) are evenly arranged on the bottom of portable bar (5), are provided with circular opening in the middle of U-shaped suspension ring (6).
CN201520144362.8U 2015-03-16 2015-03-16 Prefabricated superimposed sheet special hanger Expired - Lifetime CN204588444U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520144362.8U CN204588444U (en) 2015-03-16 2015-03-16 Prefabricated superimposed sheet special hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520144362.8U CN204588444U (en) 2015-03-16 2015-03-16 Prefabricated superimposed sheet special hanger

Publications (1)

Publication Number Publication Date
CN204588444U true CN204588444U (en) 2015-08-26

Family

ID=53924620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520144362.8U Expired - Lifetime CN204588444U (en) 2015-03-16 2015-03-16 Prefabricated superimposed sheet special hanger

Country Status (1)

Country Link
CN (1) CN204588444U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128794A (en) * 2017-06-16 2017-09-05 中国二十二冶集团有限公司 Prefabricated superimposed sheet hanging method
CN107662880A (en) * 2017-09-30 2018-02-06 山东住工装配建筑有限公司 A kind of adjustable lifting appliance of flat board lifting
CN109052152A (en) * 2018-08-06 2018-12-21 上海宝冶集团有限公司 Suspender for sled sled racing track modular construction
CN109051834A (en) * 2018-08-31 2018-12-21 上海汉石昀升住宅工业发展有限公司 A kind of superimposed sheet integral hoisting system
CN109230983A (en) * 2018-10-15 2019-01-18 浙江宝业幕墙装饰有限公司 A kind of cell curtain wall lifting balancing pole

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128794A (en) * 2017-06-16 2017-09-05 中国二十二冶集团有限公司 Prefabricated superimposed sheet hanging method
CN107662880A (en) * 2017-09-30 2018-02-06 山东住工装配建筑有限公司 A kind of adjustable lifting appliance of flat board lifting
CN107662880B (en) * 2017-09-30 2024-03-08 聊城职业技术学院 An adjustment method for an adjustable spreader for flat-panel hoisting
CN109052152A (en) * 2018-08-06 2018-12-21 上海宝冶集团有限公司 Suspender for sled sled racing track modular construction
CN109051834A (en) * 2018-08-31 2018-12-21 上海汉石昀升住宅工业发展有限公司 A kind of superimposed sheet integral hoisting system
CN109230983A (en) * 2018-10-15 2019-01-18 浙江宝业幕墙装饰有限公司 A kind of cell curtain wall lifting balancing pole

Similar Documents

Publication Publication Date Title
CN204588444U (en) Prefabricated superimposed sheet special hanger
CN209583387U (en) Be used for adjustable hoist of assembled stair hoist and mount
CN208009911U (en) A kind of pre-buried dismountable Combined type sling in part
CN103696373B (en) Construction method for adjustable triangular bracket
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN206590759U (en) Adjustable precast beam reinforced bar skeleton suspender
CN105836640B (en) Climbing tower-crane is from climbing fixing device and method
CN204778275U (en) But balancing jack -up hoist
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN201785702U (en) Lifting device for steel frame of continuous box girder
CN209554635U (en) A kind of GRC plate hangs drawing support frame
CN207536992U (en) A kind of cross combined type superimposed sheet suspender
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN209507411U (en) A lifting balance car
CN204079213U (en) Many lifting components hanger
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN105384057A (en) Lifting sling for prefabricated component
CN209635721U (en) A lifting balance device for fair-faced concrete GRC slab
CN205525748U (en) Portable material frame
CN204899246U (en) Scalable operation platform is used in precast floor plank installation
CN205222438U (en) Prefabricated component gallows and truss superimposed sheet system of lifting by crane
CN210084714U (en) Adjustable steel reinforcement cage hanger
CN208814490U (en) A new type of drainage ditch cover plate hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240929

Address after: No. 334, No.22 Tiexinan Street, Fuxing District, Handan City, Hebei Province, China

Patentee after: Kong Linghai

Country or region after: China

Address before: 056003 West of Dinanbao Village, Daizhao Township, Handan County, Handan City, Hebei Province (East District of Handan Industrial Park)

Patentee before: HANDAN SHUGUANG NEW BUILDING MATERIAL TECHNOLOGY CO.,LTD.

Country or region before: China

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20150826

CX01 Expiry of patent term