CN107128794A - Prefabricated superimposed sheet hanging method - Google Patents

Prefabricated superimposed sheet hanging method Download PDF

Info

Publication number
CN107128794A
CN107128794A CN201710454462.4A CN201710454462A CN107128794A CN 107128794 A CN107128794 A CN 107128794A CN 201710454462 A CN201710454462 A CN 201710454462A CN 107128794 A CN107128794 A CN 107128794A
Authority
CN
China
Prior art keywords
laminated
hoisting
shaped steel
rigging
lug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710454462.4A
Other languages
Chinese (zh)
Inventor
刘树茂
王振波
张业军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710454462.4A priority Critical patent/CN107128794A/en
Publication of CN107128794A publication Critical patent/CN107128794A/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明涉及一种预制叠合板吊装方法,包括叠合板吊装梁,叠合板吊装梁顶部设置有用于连接塔吊与叠合板吊装梁的连接吊耳;H型钢底部与连接吊耳相对应的位置设置有内侧吊耳;内侧吊耳的外侧设置有外侧吊耳;将连接吊耳通过索具与塔吊的吊钩相连接;第一块叠合板与H型钢相连接;第二块叠合板与H型钢相连接;将第二块叠合板达到就位点,摘除索具与第二块叠合板连接,将第一块叠合板达到就位点摘除索具与第一块叠合板连接。本发明预制叠合板吊装方法,使用专用吊具吊装叠合板,通用性强,不易损坏,可长期使用,减少吊装时间,提高了塔吊的使用效率,提高叠合板安装效率,加快现场施工速度,减少人工,降低工程成本。

The invention relates to a method for hoisting a prefabricated laminated slab, comprising a laminated slab hoisting beam, the top of the laminated slab hoisting beam is provided with a connecting lug for connecting the tower crane and the laminated slab hoisting beam; Inner lifting lugs; outer lugs are provided on the outside of the inner lugs; connect the connecting lugs to the hooks of the tower crane through rigging; the first laminated plate is connected to the H-shaped steel; the second laminated plate is connected to the H-shaped steel Connection: bring the second laminated board to the in-place point, remove the sling and connect it with the second laminated board, and bring the first laminated board to the in-place point, remove the sling and connect it with the first laminated board. The hoisting method of the prefabricated laminated board of the present invention uses a special spreader to hoist the laminated board, has strong versatility, is not easy to be damaged, can be used for a long time, reduces the hoisting time, improves the use efficiency of the tower crane, improves the installation efficiency of the laminated board, speeds up the construction speed on site, reduces Labor, reducing engineering costs.

Description

预制叠合板吊装方法Prefabricated laminated panel hoisting method

技术领域technical field

本发明涉及一种建筑施工方法,具体的说,是涉及一种预制叠合板吊装方法。The invention relates to a building construction method, in particular to a method for hoisting prefabricated laminated panels.

背景技术Background technique

在装配式住宅施工中,传统预制叠合板吊装时,采用叠合板上的桁架筋做吊点,共设置四点,钢丝绳一端与塔吊的钢丝绳挂钩连接,另一端钩在桁架筋的吊点上,塔吊每次只能吊装一块,尤其在民用高层10至30层建筑中,因塔吊作业时较缓慢,楼层越高塔吊作业在升降过程中占用时间越久,且塔吊还要吊装钢筋、模板、木方等材料,现场预制叠合板吊装、安装速度慢,施工效率低。In the construction of prefabricated houses, when the traditional prefabricated laminated panels are hoisted, the truss bars on the laminated panels are used as the hanging points. There are four points in total. One end of the wire rope is connected to the steel wire rope hook of the tower crane, and the other end is hooked on the hanging point of the truss bars. The tower crane can only hoist one piece at a time, especially in civil high-rise buildings with 10 to 30 floors, because the tower crane operates slowly, the higher the floor, the longer the tower crane operation takes during the lifting process, and the tower crane also needs to hoist steel bars, templates, and wooden blocks. and other materials, the on-site prefabricated laminated panels are hoisted and installed slowly, and the construction efficiency is low.

发明内容Contents of the invention

针对上述现有技术中的不足,本发明提供一种结构简单,操作方便,安全可靠,提高施工效率的预制叠合板吊装方法。Aiming at the deficiencies in the above-mentioned prior art, the present invention provides a prefabricated laminated panel hoisting method with simple structure, convenient operation, safety and reliability, and improved construction efficiency.

本发明所采取的技术方案是:The technical scheme that the present invention takes is:

一种预制叠合板吊装方法,A method for hoisting prefabricated laminated panels,

包括叠合板吊装梁,叠合板吊装梁为H型钢;Including the laminated plate hoisting beam, the laminated plate hoisting beam is H-shaped steel;

所述H型钢顶部设置有用于连接塔吊与叠合板吊装梁的连接吊耳;The top of the H-shaped steel is provided with connecting lugs for connecting the tower crane and the composite plate hoisting beam;

所述H型钢底部与连接吊耳相对应的位置设置有内侧吊耳;内侧吊耳的外侧设置有外侧吊耳;The position corresponding to the bottom of the H-shaped steel and the connecting lug is provided with an inner lug; the outer side of the inner lug is provided with an outer lug;

内侧吊耳和外侧吊耳用于连接叠合板;The inner and outer lugs are used to connect the laminated panels;

具体吊装步骤如下:The specific lifting steps are as follows:

首先将连接吊耳通过索具与塔吊的吊钩相连接;First connect the connecting lug to the hook of the tower crane through the rigging;

第一块叠合板与H型钢相连接;The first laminated plate is connected with H-shaped steel;

将H型钢左端的内侧吊耳和右端的内侧吊耳分别通过索具与叠合板吊装点相连接;Connect the inner lug at the left end of the H-shaped steel and the inner lug at the right end of the H-shaped steel to the lifting point of the laminated plate through rigging;

H型钢左端的内侧吊耳与右端的内侧吊耳的距离等于第一块叠合板左侧吊装点与右侧吊装点距离;The distance between the inner lug at the left end of the H-shaped steel and the inner lug at the right end is equal to the distance between the left hoisting point and the right hoisting point of the first laminated plate;

第二块叠合板与H型钢相连接;The second laminated plate is connected with the H-shaped steel;

将第一块叠合板起升到1米高度并移至到第二块叠合楼上方;Lift the first laminated slab to a height of 1 meter and move it over the second laminated floor;

将H型钢左端的外侧吊耳和右端的外侧吊耳分别通过索具与第二块叠合板吊装点相连接;Connect the outer lug at the left end of the H-shaped steel and the outer lug at the right end to the hoisting point of the second laminated plate through rigging;

H型钢左端的外侧吊耳与右端的外侧吊耳的距离大于第二块叠合板左侧吊装点与右侧吊装点距离;The distance between the outer lug at the left end of the H-shaped steel and the outer lug at the right end is greater than the distance between the left hoisting point and the right hoisting point of the second laminated plate;

叠合板脱离H型钢步骤:Steps for the laminated plate to be separated from the H-shaped steel:

将第二块叠合板达到就位点,第二块叠合板就位后,摘除索具与第二块叠合板连接,并将索具放到第一块叠合板上部;Bring the second laminated slab to its place, and after the second laminated slab is in place, remove the rigging to connect with the second laminated slab, and place the rigging on top of the first laminated slab;

将第一块叠合板达到就位点,第一块叠合板就位后摘除索具与第一块叠合板连接。Bring the first laminated board to its place, remove the sling and connect it with the first laminated board after it is in place.

所述第一块叠合板吊装索具为1.5米*4根,第二块叠合板吊装索具为3米*4根的铁链。The hoisting rigging for the first laminated plate is 1.5 meters * 4, and the hoisting rigging for the second laminated plate is an iron chain of 3 meters * 4.

所述叠合板左侧吊装点和右侧吊装点均为两个。There are two hoisting points on the left side and two hoisting points on the right side of the laminated plate.

所述吊装第一块叠合板的左侧吊装索具与吊装第一块叠合板的右侧吊装索具相互平行。The left hoisting rigging for hoisting the first laminated plate and the right hoisting rigging for hoisting the first laminated plate are parallel to each other.

吊装第二块叠合板的左侧吊装索具与吊装第二块叠合板的右侧吊装索具以及H型钢和叠合板构成一个等腰梯形。The left hoisting rigging for hoisting the second laminated plate, the right hoisting rigging for hoisting the second laminated plate, the H-shaped steel and the laminated plate form an isosceles trapezoid.

所述连接吊耳分别设置在H型钢两端的内侧;所述连接吊耳到H型钢远端的距离是到近端距离的4-5倍。The connecting lugs are respectively arranged on the inner sides of the two ends of the H-shaped steel; the distance from the connecting lugs to the far end of the H-shaped steel is 4-5 times the distance to the proximal end.

本发明相对现有技术的有益效果:The beneficial effect of the present invention relative to prior art:

本发明预制叠合板吊装方法,使用专用吊具吊装叠合板,通用性强,不易损坏,可长期使用,减少吊装时间,提高了塔吊的使用效率,提高叠合板安装效率,加快现场施工速度,减少人工,降低工程成本。The hoisting method of the prefabricated laminated board of the present invention uses a special spreader to hoist the laminated board, has strong versatility, is not easy to be damaged, can be used for a long time, reduces the hoisting time, improves the use efficiency of the tower crane, improves the installation efficiency of the laminated board, speeds up the construction speed on site, and reduces Labor, reducing engineering costs.

附图说明Description of drawings

图1是本发明预制叠合板吊装方法的叠合板吊装结构示意图;Fig. 1 is the schematic diagram of the hoisting structure of the prefabricated laminated slab of the present invention;

图2是本发明预制叠合板吊装方法的第一块叠合板俯视结构示意图;Fig. 2 is the top view structure schematic diagram of the first laminated slab of the prefabricated laminated slab hoisting method of the present invention;

图3是本发明预制叠合板吊装方法的叠合板吊装立体结构示意图。Fig. 3 is a schematic diagram of the three-dimensional structure of the prefabricated laminated panel hoisting method of the present invention.

具体实施方式detailed description

以下参照附图及实施例对本发明进行详细的说明:The present invention is described in detail below with reference to accompanying drawing and embodiment:

附图1-3可知,一种预制叠合板吊装方法,Accompanying drawing 1-3 shows, a kind of method for hoisting of prefabricated laminated board,

包括叠合板吊装梁1,叠合板吊装梁1为H型钢;Including a laminated plate hoisting beam 1, the laminated plate hoisting beam 1 is H-shaped steel;

所述H型钢顶部设置有用于连接塔吊与叠合板吊装梁的连接吊耳2;The top of the H-shaped steel is provided with connecting lugs 2 for connecting the tower crane and the composite plate hoisting beam;

所述H型钢底部与连接吊耳2相对应的位置设置有内侧吊耳3;内侧吊耳的外侧设置有外侧吊耳4;The bottom of the H-shaped steel is provided with an inner lug 3 at a position corresponding to the connecting lug 2; an outer lug 4 is arranged outside the inner lug;

内侧吊耳3和外侧吊耳4用于连接叠合板;The inner lug 3 and the outer lug 4 are used to connect the laminated board;

具体吊装步骤如下:The specific lifting steps are as follows:

首先将连接吊耳2通过索具与塔吊的吊钩相连接;First connect the connecting lug 2 with the hook of the tower crane through the rigging;

第一块叠合板5与H型钢相连接;The first laminated plate 5 is connected with the H-shaped steel;

将H型钢左端的内侧吊耳和右端的内侧吊耳分别通过索具与叠合板吊装点相连接;Connect the inner lug at the left end of the H-shaped steel and the inner lug at the right end of the H-shaped steel to the lifting point of the laminated plate through rigging;

H型钢左端的内侧吊耳与右端的内侧吊耳的距离等于第一块叠合板5左侧吊装点7与右侧吊装点8距离;The distance between the inner lug at the left end of the H-shaped steel and the inner lug at the right end is equal to the distance between the left hoisting point 7 of the first laminated plate 5 and the right hoisting point 8;

第二块叠合板6与H型钢相连接;The second laminated plate 6 is connected with the H-shaped steel;

将第一块叠合板5起升到1米高度并移至到第二块叠合板6上方;Lift the first laminated board 5 to a height of 1 meter and move it to the top of the second laminated board 6;

将H型钢左端的外侧吊耳4和右端的外侧吊耳4分别通过索具与第二块叠合板6吊装点相连接;Connect the outer lug 4 at the left end of the H-shaped steel and the outer lug 4 at the right end to the hoisting point of the second laminated plate 6 through slings;

H型钢左端的外侧吊耳与右端的外侧吊耳的距离大于第二块叠合板左侧吊装点10与第二块叠合板右侧吊装点11距离;The distance between the outer lug at the left end of the H-shaped steel and the outer lug at the right end is greater than the distance between the left lifting point 10 of the second laminated plate and the right lifting point 11 of the second laminated plate;

叠合板脱离H型钢步骤:Steps for the laminated plate to be separated from the H-shaped steel:

将第二块叠合板6达到就位点,第二块叠合板6就位后,摘除索具9与第二块叠合板6连接,并将索具放到第一块叠合板5上部;When the second laminated plate 6 reaches the position, after the second laminated plate 6 is in place, the sling 9 is removed to connect with the second laminated plate 6, and the rigging is placed on the top of the first laminated plate 5;

将第一块叠合板5达到就位点,第一块叠合板5就位后摘除索具9与第一块叠合板5连接。When the first laminated plate 5 reaches the position, the first laminated plate 5 is in place, and the sling 9 is removed to connect with the first laminated plate 5 .

所述第一块叠合板吊装索具为1.5米*4根,第二块叠合板吊装索具为3米*4根的铁链。The hoisting rigging for the first laminated plate is 1.5 meters * 4, and the hoisting rigging for the second laminated plate is an iron chain of 3 meters * 4.

所述叠合板左侧吊装点和右侧吊装点均为两个。There are two hoisting points on the left side and two hoisting points on the right side of the laminated plate.

所述吊装第一块叠合板的左侧吊装索具与吊装第一块叠合板的右侧吊装索具相互平行。The left hoisting rigging for hoisting the first laminated plate and the right hoisting rigging for hoisting the first laminated plate are parallel to each other.

所述吊装第二块叠合板的左侧吊装索具与吊装第二块叠合板的右侧吊装索具呈V字形;The left hoisting rigging for hoisting the second laminated plate and the right hoisting rigging for hoisting the second laminated plate are V-shaped;

吊装第二块叠合板的左侧吊装索具与吊装第二块叠合板的右侧吊装索具以及H型钢和叠合板构成一个等腰梯形。The left hoisting rigging for hoisting the second laminated plate, the right hoisting rigging for hoisting the second laminated plate, the H-shaped steel and the laminated plate form an isosceles trapezoid.

所述连接吊耳分别设置在H型钢两端的内侧;所述连接吊耳到H型钢远端的距离是到近端距离的4-5倍。The connecting lugs are respectively arranged on the inner sides of the two ends of the H-shaped steel; the distance from the connecting lugs to the far end of the H-shaped steel is 4-5 times the distance to the proximal end.

叠合板吊装吊具的制作:Production of laminated plate hoisting slings:

吊具的主体选用热扎H型钢200*200*8*12长度为4米,在H型钢顶部两端1/3处设置两处吊耳(选用12mm*140mm*110mm),此吊耳为塔吊与吊具连接吊耳。在H型钢底部两端1/3与端部向内200mm处设置四处吊耳(选用10mm*140mm*110mm),此吊耳为叠合板与吊具连接吊耳;在H型钢有吊耳处设置加强劲,加强劲采用10mm厚钢板。The main body of the spreader is made of hot-rolled H-shaped steel 200*200*8*12, the length is 4 meters, and two lifting lugs (12mm*140mm*110mm are selected) are set at 1/3 of the top ends of the H-shaped steel. The lifting lugs are tower cranes. Connect the lifting lugs with the spreader. Set four lifting lugs (10mm*140mm*110mm) at the 1/3 of both ends of the bottom of the H-shaped steel and 200mm inward from the end. These lifting lugs are the connecting lugs between the laminated plate and the spreader; set it at the place where the H-shaped steel has lifting lugs Stronger, stronger use of 10mm thick steel plate.

本发明预制叠合板吊装方法,用于连接塔吊与叠合板吊装梁的连接吊耳的位置可以设置在内侧吊耳和外侧吊耳之间;连接吊耳数量根据需要可以增加到3个,一次吊装的叠合板数量可以增加到3-6块,相应的H型钢的长度因此而加长。In the hoisting method of the prefabricated laminated slab of the present invention, the position of the connecting lug used to connect the tower crane and the hoisting beam of the laminated slab can be set between the inner lug and the outer lug; the number of connecting lugs can be increased to 3 according to the need, and it can be hoisted at one time The number of laminated plates can be increased to 3-6, and the length of the corresponding H-shaped steel is thus lengthened.

本发明预制叠合板吊装方法,使用专用吊具吊装叠合板,通用性强,不易损坏,可长期使用,减少吊装时间,提高了塔吊的使用效率,提高叠合板安装效率,加快现场施工速度,减少人工,降低工程成本。The hoisting method of the prefabricated laminated board of the present invention uses a special spreader to hoist the laminated board, has strong versatility, is not easy to be damaged, can be used for a long time, reduces the hoisting time, improves the use efficiency of the tower crane, improves the installation efficiency of the laminated board, speeds up the construction speed on site, and reduces Labor, reducing engineering costs.

以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构作任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明的技术方案范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the structure of the present invention in any form. All simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention belong to the scope of the technical solution of the present invention.

Claims (6)

1.一种预制叠合板吊装方法,其特征在于,1. A method for hoisting prefabricated laminated panels, characterized in that, 包括叠合板吊装梁,叠合板吊装梁为H型钢;Including the laminated plate hoisting beam, the laminated plate hoisting beam is H-shaped steel; 所述H型钢顶部设置有用于连接塔吊与叠合板吊装梁的连接吊耳;The top of the H-shaped steel is provided with connecting lugs for connecting the tower crane and the composite plate hoisting beam; 所述H型钢底部与连接吊耳相对应的位置设置有内侧吊耳;内侧吊耳的外侧设置有外侧吊耳;The position corresponding to the bottom of the H-shaped steel and the connecting lug is provided with an inner lug; the outer side of the inner lug is provided with an outer lug; 内侧吊耳和外侧吊耳用于连接叠合板;The inner and outer lugs are used to connect the laminated panels; 具体吊装步骤如下:The specific lifting steps are as follows: 首先将连接吊耳通过索具与塔吊的吊钩相连接;First connect the connecting lug to the hook of the tower crane through the rigging; 第一块叠合板与H型钢相连接;The first laminated plate is connected with H-shaped steel; 将H型钢左端的内侧吊耳和右端的内侧吊耳分别通过索具与叠合板吊装点相连接;Connect the inner lug at the left end of the H-shaped steel and the inner lug at the right end of the H-shaped steel to the lifting point of the laminated plate through rigging; H型钢左端的内侧吊耳与右端的内侧吊耳的距离等于第一块叠合板左侧吊装点与右侧吊装点距离;The distance between the inner lug at the left end of the H-shaped steel and the inner lug at the right end is equal to the distance between the left hoisting point and the right hoisting point of the first laminated plate; 第二块叠合板与H型钢相连接;The second laminated plate is connected with the H-shaped steel; 将第一块叠合板起升到1米高度并移至到第二块叠合楼上方;Lift the first laminated slab to a height of 1 meter and move it over the second laminated floor; 将H型钢左端的外侧吊耳和右端的外侧吊耳分别通过索具与第二块叠合板吊装点相连接;Connect the outer lug at the left end of the H-shaped steel and the outer lug at the right end to the hoisting point of the second laminated plate through rigging; H型钢左端的外侧吊耳与右端的外侧吊耳的距离大于第二块叠合板左侧吊装点与右侧吊装点距离;The distance between the outer lug at the left end of the H-shaped steel and the outer lug at the right end is greater than the distance between the left hoisting point and the right hoisting point of the second laminated plate; 叠合板脱离H型钢步骤:Steps for the laminated plate to be separated from the H-shaped steel: 将第二块叠合板达到就位点,第二块叠合板就位后,摘除索具与第二块叠合板连接,并将索具放到第一块叠合板上部;Bring the second laminated slab to its place, and after the second laminated slab is in place, remove the rigging to connect with the second laminated slab, and place the rigging on top of the first laminated slab; 将第一块叠合板达到就位点,第一块叠合板就位后摘除索具与第一块叠合板连接。Bring the first laminated board to its place, remove the sling and connect it with the first laminated board after it is in place. 2.根据权利要求1所述预制叠合板吊装方法,其特征在于:所述第一块叠合板吊装索具为1.5米*4根,第二块叠合板吊装索具为3米*4根的铁链。2. The method for hoisting a prefabricated laminated panel according to claim 1, wherein the hoisting rigging for the first laminated panel is 1.5 meters * 4, and the hoisting rigging for the second laminated panel is 3 meters * 4 chains. 3.根据权利要求1所述预制叠合板吊装方法,其特征在于:所述叠合板左侧吊装点和右侧吊装点均为两个。3. The method for hoisting prefabricated laminated panels according to claim 1, wherein there are two lifting points on the left side and right side of the composite panel. 4.根据权利要求1所述预制叠合板吊装方法,其特征在于:所述吊装第一块叠合板的左侧吊装索具与吊装第一块叠合板的右侧吊装索具相互平行。4. The method for hoisting a prefabricated laminated slab according to claim 1, wherein the left hoisting rigging for hoisting the first laminated slab is parallel to the right hoisting rigging for hoisting the first laminated slab. 5.根据权利要求1所述预制叠合板吊装方法,其特征在于:吊装第二块叠合板的左侧吊装索具与吊装第二块叠合板的右侧吊装索具以及H型钢和叠合板构成一个等腰梯形。5. The method for hoisting a prefabricated laminated panel according to claim 1, wherein: the left side hoisting sling for hoisting the second laminated panel is composed of the right side hoisting rigging for hoisting the second laminated panel and the H-shaped steel and the laminated panel An isosceles trapezoid. 6.根据权利要求1所述预制叠合板吊装方法,其特征在于:所述连接吊耳分别设置在H型钢两端的内侧;所述连接吊耳到H型钢远端的距离是到近端距离的4-5倍。6. The method for hoisting prefabricated laminated panels according to claim 1, characterized in that: the connecting lugs are respectively arranged on the inner sides of the two ends of the H-shaped steel; 4-5 times.
CN201710454462.4A 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method Pending CN107128794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710454462.4A CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710454462.4A CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Publications (1)

Publication Number Publication Date
CN107128794A true CN107128794A (en) 2017-09-05

Family

ID=59733986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710454462.4A Pending CN107128794A (en) 2017-06-16 2017-06-16 Prefabricated superimposed sheet hanging method

Country Status (1)

Country Link
CN (1) CN107128794A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643431A (en) * 2018-05-23 2018-10-12 中国矿业大学 A kind of fire-resistance hollow superimposed sheet and floor plates
CN109083268A (en) * 2018-10-29 2018-12-25 中国冶集团有限公司 Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4327944A (en) * 1978-12-08 1982-05-04 Charles Langloy Tongs designed to lift and handle metal sheets and similar materials
KR20110037676A (en) * 2009-10-07 2011-04-13 고려대학교 산학협력단 Jig device for lifting wall and column prefabricated rebar in construction site and lifting method using the same
CN203333139U (en) * 2013-06-25 2013-12-11 中国十七冶集团有限公司 Retractable balance hanging rod device of superposed sheets
CN203754229U (en) * 2014-03-05 2014-08-06 曾福英 Building concrete prefabricated superimposed sheet hanger
CN204588444U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet special hanger
CN205527291U (en) * 2015-11-25 2016-08-31 中天建设集团有限公司 A frame type frame for hoisting two superimposed sheets
CN205838325U (en) * 2016-07-28 2016-12-28 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction special hanger
CN106429793A (en) * 2016-11-18 2017-02-22 成都建工工业化建筑有限公司 Hoisting balance beam provided with pulley device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4327944A (en) * 1978-12-08 1982-05-04 Charles Langloy Tongs designed to lift and handle metal sheets and similar materials
KR20110037676A (en) * 2009-10-07 2011-04-13 고려대학교 산학협력단 Jig device for lifting wall and column prefabricated rebar in construction site and lifting method using the same
CN203333139U (en) * 2013-06-25 2013-12-11 中国十七冶集团有限公司 Retractable balance hanging rod device of superposed sheets
CN203754229U (en) * 2014-03-05 2014-08-06 曾福英 Building concrete prefabricated superimposed sheet hanger
CN204588444U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet special hanger
CN205527291U (en) * 2015-11-25 2016-08-31 中天建设集团有限公司 A frame type frame for hoisting two superimposed sheets
CN205838325U (en) * 2016-07-28 2016-12-28 龙信建设集团有限公司 Fabricated construction superimposed sheet string hangs construction special hanger
CN106429793A (en) * 2016-11-18 2017-02-22 成都建工工业化建筑有限公司 Hoisting balance beam provided with pulley device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643431A (en) * 2018-05-23 2018-10-12 中国矿业大学 A kind of fire-resistance hollow superimposed sheet and floor plates
CN109083268A (en) * 2018-10-29 2018-12-25 中国冶集团有限公司 Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method
CN113264443A (en) * 2021-05-11 2021-08-17 中铁二局集团有限公司 Tandem type hoisting method

Similar Documents

Publication Publication Date Title
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN205296844U (en) Precast box girder steel strand wires hoisting point
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
CN205114861U (en) Hoist and mount lacing device
CN202575670U (en) Prefabricated member hoisting tool type lifting beam
CN205617651U (en) a precast concrete slab
CN205527291U (en) A frame type frame for hoisting two superimposed sheets
CN201132941Y (en) Mobile formwork self-floating lower shoulder beam
CN207536992U (en) A kind of cross combined type superimposed sheet suspender
CN211813046U (en) Hoisting device of pi shaped steel mixes combination bridge girder steel
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN210103281U (en) Concrete sleeper gang hoisting device
CN107165421A (en) A kind of construction method of concrete assembled building
CN204983692U (en) Concrete panel's hoist device
CN209353734U (en) For installing the double-track device of curtain wall
CN106088431B (en) Composite floor slab and construction method for hoisting same
CN202967862U (en) Lifting appliance for beam channel reinforcement cage
CN206940278U (en) A kind of O shapes gantry handling apparatus
CN107905379B (en) Totally-enclosed layer construction method in super high-rise building Core Walls Structure
CN209778062U (en) An extension spreader for hoisting steel pipe arch bridge lattice girders
CN206554485U (en) Hoisting type operating platform in a kind of vertical shaft
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device
CN205400094U (en) Pothook formula ligature device of glomeration mode hoist and mount building block brickwork wall piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905

RJ01 Rejection of invention patent application after publication