CN204585763U - Electric smelting pipe cooling system - Google Patents

Electric smelting pipe cooling system Download PDF

Info

Publication number
CN204585763U
CN204585763U CN201520183082.8U CN201520183082U CN204585763U CN 204585763 U CN204585763 U CN 204585763U CN 201520183082 U CN201520183082 U CN 201520183082U CN 204585763 U CN204585763 U CN 204585763U
Authority
CN
China
Prior art keywords
holes
arc
air supply
electric smelting
supply duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520183082.8U
Other languages
Chinese (zh)
Inventor
方敏明
畅明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PIONEDA INTELLIGENT AUTOMATION TECHNOLOGY (NINGBO) Co Ltd
Original Assignee
PIONEDA INTELLIGENT AUTOMATION TECHNOLOGY (NINGBO) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PIONEDA INTELLIGENT AUTOMATION TECHNOLOGY (NINGBO) Co Ltd filed Critical PIONEDA INTELLIGENT AUTOMATION TECHNOLOGY (NINGBO) Co Ltd
Priority to CN201520183082.8U priority Critical patent/CN204585763U/en
Application granted granted Critical
Publication of CN204585763U publication Critical patent/CN204585763U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to electric smelting pipe cooling system.Comprise air supply duct, described air supply duct air inlet is provided with fan, some arc block plates are provided with in described air supply duct, be interconnected by arc baffle plate between adjacent described arc block plate, described arc block plate offers several No. six through holes in top-down direction, described arc block plate is by front to direction, the back side offering several No. seven through holes, the opening of all described No. seven through holes is all towards on the arc convex face of a described arc baffle plate of correspondence, described No. six through holes and described No. seven through holes are interconnected, and in described No. six through holes on the most forward arc block plate, be provided with the nozzle spraying water smoke, described nozzle is connected with water inlet pipe.The utility model falls fan by Water curtain filter and blows to the dust that the wind on electric smelting pipe brings, and in the process of wind movement, separate in wind with moisture, ensure the quality of product.

Description

Electric smelting pipe cooling system
Technical field
The present utility model relates to electric smelting pipe cooling system.
Background technology
In the production process of electric smelting pipe, the electric smelting pipe complete to injection moulding is needed to cool, at present the normal mode adopted adopts fan or directly complete to the injection moulding electric smelting pipe of air-cooler to cool, this there will be a problem, exactly when fan or directly complete to the injection moulding electric smelting pipe of air-cooler cool, a lot of dusts floating in air also can be blown on electric smelting pipe in the lump, directly cause dust to rest on electric smelting pipe and forever rest on electric smelting tube-surface after the cooling of electric smelting pipe, part dust also can be attached on coil, affect the normal use of electric smelting pipe, reduce the quality of product.
Summary of the invention
The utility model is not enough for prior art, provides electric smelting pipe cooling system, and it falls fan by Water curtain filter and blows to the dust that the wind on electric smelting pipe brings, and in the process of wind movement, separate in wind with moisture, ensure the quality of product.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals: electric smelting pipe cooling system, comprise air supply duct, described air supply duct air inlet is provided with fan, some arc block plates are provided with in described air supply duct, be interconnected by arc baffle plate between adjacent described arc block plate, described arc block plate offers several No. six through holes in top-down direction, described arc block plate is by front to direction, the back side offering several No. seven through holes, the opening of all described No. seven through holes is all towards on the arc convex face of a described arc baffle plate of correspondence, described No. six through holes and described No. seven through holes are interconnected, and in described No. six through holes on the most forward arc block plate, be provided with the nozzle spraying water smoke, described nozzle is connected with water inlet pipe.
During use, fan is dried in air supply duct, nozzle will flow into water ejection from water inlet pipe, make, in No. seven through holes, there is water curtain, the wind of fan blowout is after water curtain, by water curtain adsorb in wind with dust, afterwards, wind front blows on the arc convex face of an arc baffle plate, part water is stayed on the surface of an arc baffle plate, after multiple arc baffle plate, wind becomes more and more drier, with water fewer and feweri, this part water final cools electric smelting pipe, dry wind carries out cooling to electric smelting pipe and ensures electric smelting pipe quality, avoid because portion excess moisture causes electric smelting pipe to be out of shape.
In technique scheme, described air supply duct lower wall offers several apopores.Setting out water hole makes the water of nozzle spray can flow out from apopore, and anti-sealing is accumulated and on runner machine, caused the damage to machine in air supply duct.
In technique scheme, described air supply duct inwall is also rotatably connected to arc No. two baffle plates, the arc convex of described arc No. two baffle plates is facing to described arc block plate, and described arc No. two baffle plates are positioned at the air outlet place of described air supply duct.Arc No. two baffle plates be rotationally connected are set, at it along with in the wiggly process of wind, again stop are carried out to the steam in wind and be separated, make from the wind of air supply duct blowout drier.
In technique scheme, described arc baffle plate offers tank, the curved shape of described tank and offer direction from top to bottom.Arrange tank, time in wind a to curved baffle, the depressed area of tank, adds the blocking time to wind, simultaneously little again on the impact of wind speed, the better effects if of Separation of Water, and water is flowed down along tank.
The utility model compared with prior art, has following beneficial effect: the utility model falls fan by Water curtain filter and blows to the dust that the wind on electric smelting pipe brings, and in the process of wind movement, separate in wind with moisture, ensure the quality of product.Setting out water hole makes the water of nozzle spray can flow out from apopore, and anti-sealing is accumulated and on runner machine, caused the damage to machine in air supply duct.Arc No. two baffle plates be rotationally connected are set, at it along with in the wiggly process of wind, again stop are carried out to the steam in wind and be separated, make from the wind of air supply duct blowout drier.Arrange tank, time in wind a to curved baffle, the depressed area of tank, adds the blocking time to wind, simultaneously little again on the impact of wind speed, the better effects if of Separation of Water, and water is flowed down along tank.
Accompanying drawing explanation
Fig. 1 is the utility model electric smelting pipe automatic producing device overall schematic.
Fig. 2 is vibrating disk schematic diagram in the feed mechanism of the utility model copper post.
Fig. 3 is the schematic cross-section that in the feed mechanism of the utility model copper post, on blanking channel, each parts connect.
Fig. 4 is fixed strip schematic top plan view in the feed mechanism of the utility model copper post.
Fig. 5 is attitude reference device's schematic diagram of the utility model copper post.
Fig. 6 is that in the utility model injection mold, dynamic model is separated schematic diagram (check for convenience, eliminate the structure of No. three cylinders of side, depression bar, curved support sheet and No. three baffle plates) with cover half.
Fig. 7 is dynamic model schematic diagram in the utility model injection mold (checks for convenience, eliminate the structure of No. three cylinders of side, depression bar, curved support sheet and No. three baffle plates).
Fig. 8 is each block diagram on No. two supports in the utility model fuel manipulator crane structure.
Fig. 9 is manipulator schematic diagram in the utility model fuel manipulator crane structure.
Figure 10 is schematic diagram when connecting plate being installed in the utility model fuel manipulator crane structure three-limb tube.
Figure 11 is connecting plate schematic diagram in the utility model fuel manipulator crane structure.
Figure 12 is the utility model electric smelting pipe demolding structure schematic diagram.
Figure 13 is the utility model electric smelting pipe demolding structure bottom schematic view.
Figure 14 is a fixture schematic diagram in the utility model electric smelting pipe demolding structure.
Figure 15 is fixed head, stator and gripper shoe connection diagram in the utility model electric smelting pipe demolding structure.
Figure 16 is air supply duct schematic diagram in the utility model cooling system.
Figure 17 is arc baffle plate schematic diagram in the utility model cooling system.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described in further detail: see Fig. 1, electric smelting pipe automatic producing device, comprises the feed mechanism of copper post, the attitude reference device of copper post, injection mold 93, fuel manipulator crane structure 94, electric smelting pipe demolding structure 95 and cooling system 96.
See Fig. 2-4, the feed mechanism of copper post, involving vibrations dish, described vibrating disk involving vibrations dish body 11 and track 12, described vibrating disk body 11 splendid attire workpiece, described track 12 to be arranged on described vibrating disk body 11 and to transport described workpiece, described track 12 offers several breach 13, described breach 13 rotated down is connected with blanking channel 14, described blanking channel 13 lower wall is provided with pulley support frame 15, described pulley support frame 15 is provided with pulley 151, on described vibrating disk body 11 inner bottom surface, offer the chute 111 slidably reciprocated for described pulley 151 simultaneously, the conduit wall of described blanking channel 13 offers No. four through holes 141, No. three connectors 16 are equipped with in described No. four through holes 141, described No. three connectors 16 are rotationally connected with described No. four through holes 141, described No. three connectors 16 comprise the buffer part 161 being positioned at described blanking channel 13 and the hook part 162 be positioned at outside described blanking channel 13, an elastic parts 163 is provided with between described buffer part 161 and described blanking channel 13 inwall, an elastic parts is spring, described hook part 162 end is provided with snap fit 1621, described snap fit 1621 and one with several groove 171 fixed strip 17 with the use of, described fixed strip 17 two ends are separately fixed on the madial wall of described vibrating disk body 11.
Described chute 111 be arranged in parallel with described fixed strip about 17.Ensure that blanking channel is when moving along chute, snap fit can be connected from different groove part.
Described buffer part 161 is arc, and described buffer part about 161 sidewall is all rotatably connected to several balls.The buffer part of arc helps avoid the damage to copper post, and ball be provided with the wearing and tearing helped between buffer part and blanking channel, the service life of extension fixture.
Described No. four through hole 141 inwalls are provided with and semicircle connect ball 142, described No. three connectors 16 are provided with to be connected with described semicircle ball 142 with the use of arc brace 164.Connected the combination of ball and arc brace by semicircle, make to be rotationally connected between No. three connectors and No. four through holes, and reduce mutual wearing and tearing.
During use, in copper post is mobile on the track of vibrating disk, when the lighter head of copper post is when front, by the effect of that copper post is heavier, its lighter head, when encountering breach, can not drop down from indentation, there through breach, and finally makes copper post continue to be transported to follow-up location place; When the heavier head of copper post is when front, because its gravity is comparatively large, one, to indentation, there, just directly can drop down from indentation, there, get back in vibrating disk body, when so just determining transport copper post copper post towards.Do not meet towards copper post drop from indentation, there in, its heavier one end is when touching buffer part, buffer part is exerted a force, make buffer part close toward blanking vias inner walls, an elastic parts shrinks, meanwhile, hook part moves along with the movement of buffer part, hook part is close toward blanking channel outer wall, snap fit leaves a connected groove, in the vibration along with vibrating disk, blanking channel by pulley in chute left or move right, and vibrating disk rocks vibration around its vertical axis, therefore, blanking channel is turned left or is depended on the vibrating disk at a moment of movement just in time rocks vibration toward which direction toward moving right, thus make copper post from blanking channel out time can not pile up, each position out all can change, avoid because copper post causes copper post cannot fall from indentation, there in the place's accumulation of blanking channel mouth.
See Fig. 5, the attitude reference device of copper post, comprise a support 21, the charging line 22 transporting copper post is connected with above a described support 21, a described support 21 offers one number service hole 23, described charging line 22 is interconnected with described one number service hole 23, No. two grooves 24 are offered in described one number service hole 23, impeller 25 is provided with in described No. two grooves 24, described impeller 25 is driven by blowning installation and rotates, the air-supply pipe of blowning installation penetrates in a support 21, the air outlet of air-supply pipe aims at impeller 25, impeller 25 is blown, described blowning installation is fan, be positioned in described one number service hole 23 below described No. two grooves 24 and be provided with directed block 26, described directed block 26 offers No. two through holes 27 with copper column end mating shapes.
Described No. two through hole 27 edge of opening offer a circle angle.Arranging angle facilitates copper post to drop in No. two through holes, and the mistake preventing the position because of copper post and No. two through holes from staggering is convinced by patient analysis and caused the mode that copper post cannot be driven by wheel rotation and make it enter in No. two through holes.
Described directed block 26 also offers several No. three through holes 28, be provided with air nozzle 29 in all described No. three through holes 28, described air nozzle 29 is jet above directed block by air pump air feed.Air nozzle is set and provides cushion effect when copper post falls to copper post, reduce the speed that copper post falls, reduce the wearing and tearing between copper post and directed block.
Described charging line 22 inwall is rotatably connected to some buffer substrate tablets 221, and being provided with No. two elastic parts 222, No. two elastic parts 222 between described buffer substrate tablet 221 and described charging line 22 inwall is spring.Buffer substrate tablet being set in order to reduce copper post falling speed, reducing the wearing and tearing between copper post and directed block.
Described impeller 25 inner ring is provided with some tooth bars 251.Tooth bar is set and increases frictional force to impeller and copper post, facilitate impeller to drive copper post to rotate.
During use, copper post is transported from charging line 22, send from the discharging opening of charging line 22, enter in one number service hole 23, move down along one number service hole 23, through the position reaching directed block 26 after impeller 25, here two kinds of situations are had, the first is that copper post is in the right direction, namely directly can enter and pass No. two through holes 27, and copper post can not rest on No. two through hole 27 places of directed block; The second is that copper post poor direction is true, and it is after passing impeller 25, and one end rests on No. two through hole 27 edges of locating piece 26, the other end leans against on impeller 25 inner ring sidewall, and impeller 25 is driven by blowning installation and is in rotary state, along with the rotation of impeller 25, copper post also rotation slightly slowly itself, in rotary course, copper post will certainly rotate into and match with No. two through holes 27, and after matching, copper post enters and passes No. two through holes 27, complete directional operation, then carry out subsequent production.
See Fig. 6 and Fig. 7, injection mold, comprise cover half 31 and dynamic model 32, described cover half 31 and described dynamic model 32 side bonded to each other all offer No. three grooves 33, the side contacted with each other when side bonded to each other i.e. matched moulds, and described No. three grooves about 33 are through and be interconnected with die cavity, No. three groove 33 one end are communicated with die cavity, opposite side leads to mould side, in described No. three grooves 33 of described dynamic model 32, be provided with depression bar 34, and described depression bar 34 is controlled mobile by No. three cylinders 35.
Described depression bar 34 end is provided with the projection 341 matched with the recess on core rod.The projection of depression bar leans the recess on core rod, plays a supportive role, and facilitates depression bar to support core rod and can prevent core rod from rocking.
Described depression bar 34 matches with described No. three grooves 33, and is provided with flange 331 in described No. three grooves 33.The placement that flange is the three-limb tube in order to two core rods that are connected on the one hand is set, plays the effect that when preventing injection moulding, injection moulding liquid flows out from No. three grooves on the other hand.
The shape of No. three grooves 33 near one end of die cavity and the mating shapes of three-limb tube end, two connectors that three-limb tube is located along the same line connect different core rods respectively, another connector is placed in No. three grooves 33, after matched moulds, depression bar to extend in this connector and withstands core rod.
Described dynamic model 32 is provided with curved support sheet 36, and described curved support sheet 36 end is provided with No. three baffle plates 37, described No. three cylinders 35 are arranged in described curved support sheet 36.Curved support sheet is set and No. three baffle plates are not only convenient to the fixing of No. three cylinders, and plays the effect of protection No. three cylinders.
During use, core rod is put in cover half 31 by manipulator, No. three cylinders 35 are started after matched moulds, depression bar 34 to extend in three-limb tube and withstands core rod, carry out injection moulding again, after injection moulding, open dynamic model 32, be positioned at the connector of three-limb tube due to depression bar 34 and withstood core rod, core rod rests on dynamic model 32 after dynamic model 32 is opened, manipulator can directly be put in cover half 31 after needing the core rod of injection moulding to pick up, again core rod complete for injection moulding in dynamic model 32 is picked up, No. three cylinders 35 are closed, core rod complete for injection moulding is put on the position of next step operation, recirculation above-mentioned steps.
Fig. 8-Figure 11, fuel manipulator crane structure, comprise filling place and manipulator 42, described manipulator 42 is arranged on described filling place, described filling place is provided with No. two supports 43, described No. two supports 43 slidably connect connecting rod 44, described connecting rod 44 is provided with a stator 45, a described stator 45 is provided with several suckers 46 for connecting tee tube connector, described manipulator 42 is provided with the connecting plate 47 for connecting tee tube connector, described connecting plate 47 side offers several No. four grooves 471, buckle 472 is all rotatably connected in all described No. four grooves 471, all described buckle 472 ends are all rotatably connected to No. three push rods 473, all described No. three push rods 473 all control mobile by being arranged on No. four cylinders 474 corresponding to described connecting plate 47 downside.
Described connecting plate 47 upper side is provided with the limited block 475 for spacing core rod.By arranging limited block, core rod cannot be moved on connecting plate, ensureing that core rod cannot drop from connecting plate.
Described manipulator 42 comprises a base 421, support member 422, connector 423, No. two support members 424 and No. two connectors 425, a described base 421 is fixedly connected with a described support member 422, a described support member 422 is rotationally connected with a described connector 423, a described connector 423 is rotationally connected with described No. two support members 424, and described No. two support members 424 are rotationally connected with described No. two connectors 425.
During use, three-limb tube is held by sucker 46, again core rod is encased in three-limb tube, then connecting plate 47 moves to below three-limb tube by manipulator 42, manipulator 42 up moves subsequently, by No. four cylinders 474, No. three push rods 473 is moved, and No. three push rods 473 drive buckle 472 to fasten core rod, manipulator 42 moves and sucker 46 just can be made to be separated with three-limb tube, and injection step is carried out in core rod to be transported to injection moulding by manipulator 42 again position by connecting plate 47.
See Figure 12-Figure 15, electric smelting pipe demolding structure, comprise fixed head 51, described fixed head 51 is fixed with No. two stators 52 and some gripper shoes 53 arranged in parallel, described No. two stators 52 are arranged with described gripper shoe 53 is mutually vertical, all described gripper shoes 53 all offer the recess 531 for placing electric smelting pipe, described No. two stators 52 offer the opening 521 for placing three-limb tube connector, described gripper shoe 53 side is fixed with some groups of air cylinder group, each described air cylinder group comprises two and pushes a contrary cylinder 54 of direction, a described cylinder 54 is connected with a push rod 541, a described push rod 541 is fixedly connected with a fixture 55, No. two fixtures 552 that a described fixture 55 comprises No. two bases 551 and is arranged on described No. two bases 551, described No. two fixtures 552 comprise No. two cylinders 5521, No. two push rods 5522, back-up block 5523 and briquetting 5524, described back-up block 5523 is fixed on described No. two cylinders 5521, described No. two push rods 5522 control to move up and down by described No. two cylinders 5521, described briquetting 5524 is arranged on the end of described No. two push rods 5522 and moves along with the movement of described No. two push rods 5522, a described fixture 55 is slidably connected on slide rail 56, described slide rail 56 is arranged on described gripper shoe 53 side.
Described No. two fixtures 552 are slidably connected on described No. two bases 551.No. two fixtures be slidably connected can carry out adjusting thus fixing core rod when deviation occurs in core rod installation site.
Described fixed head 51 offers several No. five through holes 511.Fixed head arranges No. five through holes facilitates part waste material to drop, and prevents waste material from piling up on fixed head, not only causes electric smelting pipe installation site to diminish, cannot be fixed, but also can cause damage to electric smelting tube-surface.
During use, the complete core rod of injection moulding is put in the recess 531 of gripper shoe 53, and the connector of the non-attaching parts of three-limb tube is put in the opening 521 of No. two stators 52, briquetting 5524 is controlled toward pressing down by No. two cylinders 5521, briquetting 5524 is made to fix the end of core rod with the combination of back-up block 5523, restart a cylinder 54, by a fixture 55 along slide rail 56 toward extrapolation, now, because three-limb tube is opened at opening part motionless, thus make core rod can directly along with a fixture 55 is drawn out outward, be separated with electric smelting pipe, complete the stripping operation of electric smelting pipe.
See Figure 16 and Figure 17, electric smelting pipe cooling system, comprise air supply duct 61, described air supply duct 61 air inlet is provided with fan 62, some arc block plates 63 are provided with in described air supply duct 61, be interconnected by arc baffle plate 64 between adjacent described arc block plate 63, described arc block plate 63 offers several No. six through holes 631 in top-down direction, described arc block plate 63 is by front to direction, the back side offering several No. seven through holes 632, the opening of all described No. seven through holes 632 is all towards on the arc convex face of a described arc baffle plate 64 of correspondence, described No. six through holes 631 are interconnected with described No. seven through holes 632, and in described No. six through holes 631 on the most forward arc block plate 63, be provided with the nozzle 65 spraying water smoke, described nozzle 65 is connected with water inlet pipe 66.
Described air supply duct 61 lower wall offers several apopores 67.Setting out water hole makes the water of nozzle spray can flow out from apopore, and anti-sealing is accumulated and on runner machine, caused the damage to machine in air supply duct.
Described air supply duct 61 inwall is also rotatably connected to arc No. two baffle plates 68, the arc convex of described arc No. two baffle plates 68 is facing to described arc block plate 63, and described arc No. two baffle plates 68 are positioned at the air outlet place of described air supply duct 61.Arc No. two baffle plates be rotationally connected are set, at it along with in the wiggly process of wind, again stop are carried out to the steam in wind and be separated, make from the wind of air supply duct blowout drier.
Described arc baffle plate 64 offers tank 641, the curved shape of described tank 641 and offer direction from top to bottom.Arrange tank, time in wind a to curved baffle, the depressed area of tank, adds the blocking time to wind, simultaneously little again on the impact of wind speed, the better effects if of Separation of Water, and water is flowed down along tank.
During use, fan 62 is toward blowing in air supply duct 61, nozzle 65 will flow into water ejection from water inlet pipe 66, make, in No. seven through holes 632, there is water curtain, the wind that fan 62 blows out is after water curtain, by water curtain adsorb in wind with dust, afterwards, wind front blows on the arc convex face of an arc baffle plate 64, part water is stayed on the surface of an arc baffle plate 64, after multiple arc baffle plate 64, wind becomes more and more drier, with water fewer and feweri, this part water final cools electric smelting pipe, dry wind carries out cooling to electric smelting pipe and ensures electric smelting pipe quality, avoid because portion excess moisture causes electric smelting pipe to be out of shape.

Claims (4)

1. electric smelting pipe cooling system, comprise air supply duct (61), described air supply duct (61) air inlet is provided with fan (62), it is characterized in that: in described air supply duct (61), be provided with some arc block plates (63), be interconnected by arc baffle plate (64) between adjacent described arc block plate (63), described arc block plate (63) offers several No. six through holes (631) in top-down direction, described arc block plate (63) is by front to direction, the back side offering several No. seven through holes (632), the opening of all described No. seven through holes (632) is all towards on the arc convex face of a described arc baffle plate (64) of correspondence, described No. six through holes (631) and described No. seven through holes (632) are interconnected, and in described No. six through holes (631) on the most forward arc block plate (63), be provided with the nozzle (65) spraying water smoke, described nozzle (65) is connected with water inlet pipe (66).
2. electric smelting pipe cooling system as claimed in claim 1, is characterized in that: described air supply duct (61) lower wall offers several apopores (67).
3. electric smelting pipe cooling system as claimed in claim 1, it is characterized in that: described air supply duct (61) inwall is also rotatably connected to arc No. two baffle plates (68), the arc convex of described arc No. two baffle plates (68) is facing to described arc block plate (63), and described arc No. two baffle plates (68) are positioned at the air outlet place of described air supply duct (61).
4. electric smelting pipe cooling system as claimed in claim 1, is characterized in that: described arc baffle plate (64) offers tank (641), described tank (641) curved shape and offer direction from top to bottom.
CN201520183082.8U 2015-03-30 2015-03-30 Electric smelting pipe cooling system Expired - Fee Related CN204585763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520183082.8U CN204585763U (en) 2015-03-30 2015-03-30 Electric smelting pipe cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520183082.8U CN204585763U (en) 2015-03-30 2015-03-30 Electric smelting pipe cooling system

Publications (1)

Publication Number Publication Date
CN204585763U true CN204585763U (en) 2015-08-26

Family

ID=53921955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520183082.8U Expired - Fee Related CN204585763U (en) 2015-03-30 2015-03-30 Electric smelting pipe cooling system

Country Status (1)

Country Link
CN (1) CN204585763U (en)

Similar Documents

Publication Publication Date Title
CN104708758B (en) A kind of electric smelting pipe automatic producing device
CN104708756B (en) A kind of IML is molded automated system
CN204585717U (en) Injection mold
CN105660904A (en) Automatic Pu'er tea cake press
CN103318634A (en) Lifting type automatic arranging and conveying mechanism for ball valve spools
CN107127570A (en) A kind of outer rail annex automatic assembling machine
CN204585702U (en) Fuel manipulator crane structure
CN104708767B (en) Injection mold
CN104708760B (en) Electric smelting pipe automatic producing device
CN204585740U (en) Electric smelting pipe demolding structure
CN204585692U (en) The feed mechanism of copper post
CN204585695U (en) Electric smelting pipe automatic producing device
CN204585693U (en) The attitude reference device of copper post
CN205969631U (en) Novel sinciput die sinking device
CN201941162U (en) Automatic welder
CN204585694U (en) A kind of electric smelting pipe automatic producing device
CN104741488A (en) Winding machine
CN204585763U (en) Electric smelting pipe cooling system
CN204584133U (en) Coil winding machine
CN104708775A (en) Electric-fusion pipe demolding structure
CN204585639U (en) Electric smelting pipe mold
CN104708759B (en) The feed mechanism of copper post
CN104708762B (en) Fuel manipulator crane structure
CN204211095U (en) A kind of cylindrical articles feedway
CN111113224B (en) Automatic machining equipment for hot runner mold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20180330

CF01 Termination of patent right due to non-payment of annual fee