CN204573315U - The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange - Google Patents

The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange Download PDF

Info

Publication number
CN204573315U
CN204573315U CN201520277272.6U CN201520277272U CN204573315U CN 204573315 U CN204573315 U CN 204573315U CN 201520277272 U CN201520277272 U CN 201520277272U CN 204573315 U CN204573315 U CN 204573315U
Authority
CN
China
Prior art keywords
locking supporting
supporting post
post
pipeline
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520277272.6U
Other languages
Chinese (zh)
Inventor
程国华
郭先印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201520277272.6U priority Critical patent/CN204573315U/en
Application granted granted Critical
Publication of CN204573315U publication Critical patent/CN204573315U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange, belong to main equipment mounting technique field.The utility model comprises the first locking supporting post, the second locking supporting post and attachment post, first locking supporting post and the second locking supporting post are frustum cone structure, first locking supporting post is provided with groove at the end face contacted with attachment post with the second end face that locking supporting post is contacting with attachment post, attachment post is round column structure, and the two end part of attachment post are provided with helicoidal gear.The utility model can be fixedly connected with RTR pipeline valve two flange is stable, ensure that pipeline is in backfilling process, preset space between pipeline valve flange remains unchanged, not only device stability is strong, foreign material cannot enter pipeline, and are applicable to the pipeline of multiple diameter, and structure is simple, easy to use, fabricating cost is low.

Description

The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange
Technical field
The utility model relates to main equipment mounting technique field, more particularly, relates to the auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange.
Background technique
In Saudi Arabia area, the material that underground fire protection pipeline uses mostly is RTR (glass fibre reinforced plastics), valve flanges on fire_fighting pipe network is also RTR material, in the structure of underground fire line, socket joint is mostly selected to connect between the fire protection pipeline of below caliber 500mm, the connection of valve flanges and pipeline also adopts socket joint to connect, the method that mounted valve was comparatively general on the pipeline of fixed position in the past is first connected with pipeline by the flange of valve side, then the opposite side flange of valve is installed on valve, finally again valve opposite side flange is connected with pipeline spigot-and-socket, said method is applicable to the pipeline of the metal material fixed or the non-metallic material pipeline of flat mouth connection, but be not suitable for the RTR pipeline that socket joint connects, first the RTR pipeline that socket joint connects is mounted valve flange, after pipeline pressure test is qualified, mounted valve again.
In Saudi Arabia's project, the construction sequence of plant area's underground fire protection pipeline should be: after RTR pipeline is installed according to the pressure testing bag divided, carry out the pressure testing of pressure testing bag, mounted valve again after the pressure testing of each pressure testing bag is qualified, then overall pressure testing is carried out, can backfill after overall pressure testing is qualified, but in the work progress of reality, often there is the delayed problem of valve arrival, cannot mounted valve in time after fire line terminates according to the pressure testing bag pressure testing divided, in order to not affect other professional constructions, for more construction space is created in job site, unit in charge of construction often first backfills the qualified pipeline of pressure testing, valve location be temporarily available do not backfill or valve flanges do protective measure after backfill, by the time valve installation is carried out again after valve arrival, so just there will be the situation that improper or two valve flanges of spacing between valve and mounted two valve flanges misplace, finally cause valve installation unsuccessful, valve installation is unsuccessful mainly contains several situation: a, between flange, spacing is excessive, between b, flange, spacing is too small, bell mouth shape is formed between c, flange, the bolt hole of d, two flanges is asymmetric.If mounted valve by force in the inappropriate situation of flange spacing, there will be the quality problems such as RTR pipe welding port cracking, RTR piping failure, valve flanges damage when tightening flange bolt, not only construction speed can be affected, increase construction cost, affect unit in charge of construction's fame, also can bring potential safety hazard to construction, the spacing backfilled between RTR pipeline valve flange of how controlling well is very crucial.
By patent retrieval, in prior art, existing related art scheme is open.As, application number 201420645260.X, the applying date is on October 31st, 2014, model utility name is called: a kind of large-scale pipeline and valve adpting flange installation auxiliary device, this application case comprises full flight screw, symmetry is arranged on 2 groups of full flight screw both sides and loosens and compensate cover and locking element, described full flight screw is set in flange hole corresponding to companion flange, its side being positioned at companion flange is by loosening the end face and flange hole close contact that compensate cover, its side be positioned at outside companion flange is locked by locking element, the described compensation cover that loosens is conical surface with flange hole surface of contact, loosen compensation to put and establish locating slot, described locking element is nut and pad, although this application case can play the effect of fixing tube flange spacing, but the stability of assistant apparatus structure needs to strengthen, device dismounting is inconvenient, and foreign material easily enter the blocking that pipeline causes pipeline.
Model utility content
1. the model utility technical problem that will solve
The utility model is to overcome deficiency of the prior art, provide the auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange, adopt the technical solution of the utility model, can be fixedly connected with RTR pipeline valve two flange is stable, ensure that pipeline is in backfilling process, preset space between pipeline valve flange remains unchanged, and not only device stability is strong, and foreign material cannot enter pipeline, and be applicable to the pipeline of multiple diameter, structure is simple, and easy to use, fabricating cost is low.
2. technological scheme
For achieving the above object, the technical solution of the utility model is:
The auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, comprise the first locking supporting post, the second locking supporting post and attachment post, described first locking supporting post and the second locking supporting post are frustum cone structure, first locking supporting post is provided with groove at the end face contacted with attachment post with the second end face that locking supporting post is contacting with attachment post, described attachment post is round column structure, and the two end part of attachment post are provided with helicoidal gear.
Further improve as of the present utility model, the end face of the described first locking supporting post and tube contacts can wear in pipeline, first locking supporting post contacts end face circumscribed circle diameter with attachment post is greater than the diameter of pipeline, second locking supporting post can wear in pipeline at the end face of tube contacts, and the second locking supporting post contacts end face circumscribed circle diameter with attachment post is greater than the diameter of pipeline.
Further improve as of the present utility model, the bottom of described attachment post is also provided with tripod, for stablizing whole auxiliary device.
Further improve as of the present utility model, described helicoidal gear comprises nut and screw rod, by the engagement of nut and screw rod, the rotary motion of nut is converted to the straight line motion of screw rod.
Further improve as of the present utility model, screw rod and the groove of described helicoidal gear support the use.
Further improve as of the present utility model, the surface of the described first locking supporting post and tube contacts and the surface of the second locking supporting post and tube contacts are provided with cushion, for reducing the friction between pipeline and auxiliary device.
Further improve as of the present utility model, the first locking supporting post and the second locking supporting post symmetry are installed.
Further improve as of the present utility model, the described first locking supporting post, the second locking supporting post and attachment post all adopt wood materials.
3. beneficial effect
The technological scheme adopting the utility model to provide, compared with prior art, has following remarkable result:
(1) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, utilize the first locking supporting post, the second locking supporting post and attachment post to the acting in conjunction of RTR pipeline valve two flange, can stablize and be fixedly connected with valve flanges, ensure that pipeline is in backfilling process, the preset space between pipeline valve flange remains unchanged.
(2) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, first locking supporting post and the second locking supporting post adopt frustum cone structure, not only can support pipeline stabilization fixing, avoid foreign material to enter pipeline, the pipeline of various diameter can also be applicable to.
(3) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, supported the use by the screw rod of groove and helicoidal gear, the flexible of helicoidal gear screw rod is utilized to fix the locking supporting post of support first and the second locking supporting post, whole device is connected as one, auxiliary device can be dismantled flexibly, also be applicable to the fixing of the various spacing of valve flanges, guarantee the recycling of device.
(4) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, the bottom of attachment post is provided with tripod, the impact force of a part of backfill to pipeline can be born in pipeline backfill process, stable fixing effect can also be played to device.
(5) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, the cushion that first locking supporting post and the second locking supporting post surface are arranged, the frictionally damage to pipeline can be reduced, certain buffer function can also be played when device is stressed.
(6) auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange, structure is simple, and easy to use, fabricating cost is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of the auxiliary device of a kind of fixing large-scale pipeline of the present utility model and valve adpting flange.
Label declaration in schematic diagram:
1, the first locking supporting post; 2, the second locking supporting post; 3, attachment post; 41, nut; 42, screw rod; 5, tripod.
Embodiment
For understanding content of the present utility model further, by reference to the accompanying drawings and embodiment the utility model is described in detail.
Embodiment 1
As shown in Figure 1, a kind of fixing large-scale pipeline in the present embodiment and the auxiliary device of valve adpting flange, comprise the first locking supporting post 1, second locking supporting post 2 and attachment post 3, by the first locking supporting post 1, the acting in conjunction of the second locking supporting post 2 and attachment post 3 pairs of RTR pipeline valve two flanges, can stablize and be fixedly connected with valve flanges, ensure that pipeline is in backfilling process, preset space between pipeline valve flange remains unchanged, described first locking supporting post 1 and the second locking supporting post 2 are frustum cone structure, first locking supporting post 1 is provided with groove at the end face contacted with attachment post 3 with the second end face that locking supporting post 2 is contacting with attachment post 3, first locking supporting post 1 can wear in pipeline with the end face of tube contacts, first locking supporting post 1 contacts end face circumscribed circle diameter with attachment post is greater than the diameter of pipeline, second locking supporting post 2 can wear in pipeline with the end face of tube contacts, second locking supporting post 2 contacts end face circumscribed circle diameter with attachment post is greater than the diameter of pipeline, so not only can to pipeline stabilization fixed support, foreign material are avoided to enter pipeline, the pipeline of various diameter can also be applicable to, first locking supporting post 1 is provided with cushion with the surface of tube contacts and the surface of the second locking supporting post 2 and tube contacts, for reducing the friction between pipeline and auxiliary device, certain buffer function can also be played when device is stressed, first locking supporting post 1 and the second locking supporting post 2 symmetry are installed, described attachment post 3 is round column structure, the two end part of attachment post 3 are provided with helicoidal gear, helicoidal gear comprises nut 41 and screw rod 42, by the engagement of nut 41 and screw rod 42, the rotary motion of nut 41 is converted to the straight line motion of screw rod 42, torque conversion is become thrust, screw rod 42 and the groove of helicoidal gear support the use, the flexible of helicoidal gear screw rod 42 is utilized to fix the locking supporting post of support first 1 and the second locking supporting post 2, whole device is connected as one, auxiliary device not only can be dismantled flexibly, also be applicable to the fixing of the various spacing of valve flanges, guarantee the recycling of device, the bottom of attachment post 3 is also provided with tripod 5, for stablizing whole auxiliary device, the impact force of a part of backfill to pipeline can be born in pipeline backfill process, stable fixing effect can also be played to device, first locking supporting post 1, second locking supporting post 2 and attachment post 3 all adopt wood materials, conveniently to gather materials on the spot making.
During use, before the qualified rear backfilling of pipe canal of RTR pipeline pressure test, first fix the spacing of valve place two flange, after determining the spacing of two valve flanges, respectively the first locking supporting post 1 and the second locking supporting post 2 are worn in RTR pipeline, guarantee the first locking supporting post 1 and close contact between the second locking supporting post 2 and RTR pipeline, the plane of attachment post 3 bottom surface tripod 5 contact is slightly processed, make the first locking supporting post 1, second locking supporting post 2 and attachment post 3 are in one plane and ensure that the screw rod 42 of helicoidal gear and groove can be with the use of, the now nut 41 of rotating screw transmission device, with the engagement of screw rod 42, torque conversion is become thrust by nut 41, the screw rod 42 of helicoidal gear crosses out, make screw rod 42 and groove close contact, after will guaranteeing that the perpendicularity of valve two flange and levelness meet the requirements simultaneously, just compaction in layers can backfill pipe trench.
Schematically above be described the utility model and mode of execution thereof, this description does not have restricted, and also just one of the mode of execution of the present utility model shown in accompanying drawing, actual structure is not limited thereto.So, if those of ordinary skill in the art enlightens by it, when not departing from the utility model and creating aim, design the mode of structure similar to this technological scheme and embodiment without creationary, protection domain of the present utility model all should be belonged to.

Claims (8)

1. the auxiliary device of a fixing large-scale pipeline and valve adpting flange, it is characterized in that: comprise the first locking supporting post (1), second locking supporting post (2) and attachment post (3), described first locking supporting post (1) and the second locking supporting post (2) are frustum cone structure, first locking supporting post (1) is provided with groove at the end face contacted with attachment post (3) with the end face that the second locking supporting post (2) is contacting with attachment post (3), described attachment post (3) is round column structure, the two end part of attachment post (3) are provided with helicoidal gear.
2. the auxiliary device of a kind of fixing large-scale pipeline according to claim 1 and valve adpting flange, it is characterized in that: the described first locking supporting post (1) can wear in pipeline with the end face of tube contacts, first locking supporting post (1) contacts end face circumscribed circle diameter with attachment post (3) is greater than the diameter of pipeline, the end face of the second locking supporting post (2) and tube contacts can wear in pipeline, and the second locking supporting post (2) contacts end face circumscribed circle diameter with attachment post (3) is greater than the diameter of pipeline.
3. the auxiliary device of a kind of fixing large-scale pipeline according to claim 2 and valve adpting flange, is characterized in that: the bottom of described attachment post (3) is also provided with tripod (5), for stablizing whole auxiliary device.
4. the auxiliary device of a kind of fixing large-scale pipeline according to claim 3 and valve adpting flange, it is characterized in that: described helicoidal gear comprises nut (41) and screw rod (42), by the engagement of nut (41) and screw rod (42), the rotary motion of nut (41) is converted to the straight line motion of screw rod (42).
5. the auxiliary device of a kind of fixing large-scale pipeline according to claim 4 and valve adpting flange, is characterized in that: screw rod (42) and the groove of described helicoidal gear support the use.
6. the auxiliary device of a kind of fixing large-scale pipeline according to claim 5 and valve adpting flange, it is characterized in that: the described first locking supporting post (1) is provided with cushion, for reducing the friction between pipeline and auxiliary device with the surface of tube contacts and the surface of the second locking supporting post (2) and tube contacts.
7. the auxiliary device of a kind of fixing large-scale pipeline according to claim 6 and valve adpting flange, is characterized in that: the first locking supporting post (1) and the second locking supporting post (2) symmetry are installed.
8. the auxiliary device of a kind of fixing large-scale pipeline according to claim 7 and valve adpting flange, is characterized in that: the described first locking supporting post (1), the second locking supporting post (2) and attachment post (3) all adopt wood materials.
CN201520277272.6U 2015-04-30 2015-04-30 The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange Active CN204573315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520277272.6U CN204573315U (en) 2015-04-30 2015-04-30 The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520277272.6U CN204573315U (en) 2015-04-30 2015-04-30 The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange

Publications (1)

Publication Number Publication Date
CN204573315U true CN204573315U (en) 2015-08-19

Family

ID=53865951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520277272.6U Active CN204573315U (en) 2015-04-30 2015-04-30 The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange

Country Status (1)

Country Link
CN (1) CN204573315U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627308A (en) * 2020-12-21 2021-04-09 中国建筑第八工程局有限公司 Technical measure device for pipeline capable of being rapidly disassembled and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627308A (en) * 2020-12-21 2021-04-09 中国建筑第八工程局有限公司 Technical measure device for pipeline capable of being rapidly disassembled and construction method
CN112627308B (en) * 2020-12-21 2022-03-01 中国建筑第八工程局有限公司 Technical measure device for pipeline capable of being rapidly disassembled and construction method

Similar Documents

Publication Publication Date Title
CN111720637A (en) Machine room pipeline equipment integrated group assembling method
CN206329923U (en) Explosion-proof water supply line
CN107775305A (en) A kind of positioner for Pipe installing docking
CN204573315U (en) The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange
CN206233595U (en) Pump line sliding support
CN103558090B (en) The single seam crossing water test unit of major diameter bearing pipe and hydraulic test method
CN204573316U (en) The auxiliary device of a kind of fixing large-scale pipeline and valve adpting flange
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN205135488U (en) Oil well casing fixing device
CN204647550U (en) The rotary pipe lining device of Pipe installing
CN208767758U (en) A kind of fixed installation structure of cable tube
CN206861144U (en) A kind of water supply and sewerage pipeline rapid-maintenance pipe fitting
CN206247992U (en) The support of dial gauge is fixed in a kind of geomechanical model test
CN209146490U (en) A kind of pulley gear being laid with casing
CN204458887U (en) A kind of pipe detector universal joint
CN202056420U (en) Multi-purpose combined instrument pipeline support
CN208417768U (en) Building pipe ruggedized construction
CN107036588A (en) Tunnel surrounding rock displacement monitors point equipment
CN206888136U (en) A kind of construction drainage pipeline
CN201827581U (en) Copper insert of water pipe joint
CN211145650U (en) External tooth loose joint structure
CN206941780U (en) A kind of greasy dirt isolates well
CN210069137U (en) Town road drainage pipe protective cradle
CN219493785U (en) Adjustable bracket of shield measuring instrument
CN217502814U (en) Combined hydraulic engineering's pipeline strutting arrangement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant