CN208417768U - Building pipe ruggedized construction - Google Patents
Building pipe ruggedized construction Download PDFInfo
- Publication number
- CN208417768U CN208417768U CN201821062560.XU CN201821062560U CN208417768U CN 208417768 U CN208417768 U CN 208417768U CN 201821062560 U CN201821062560 U CN 201821062560U CN 208417768 U CN208417768 U CN 208417768U
- Authority
- CN
- China
- Prior art keywords
- camber
- connecting plate
- camber pipeline
- folder
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses building pipe ruggedized constructions, including mounting plate, the upper surface right end of the mounting plate is equipped with connecting plate one, the connecting plate one is equipped with camber pipeline folder one far from one end of mounting plate, the sliding slot being parallel to each other is equipped in the upper surface of mounting plate positioned at one left side of connecting plate, sliding block is slidably connected on the sliding slot being parallel to each other, the upper surface right end of two sliding blocks is connected by connecting plate two, the connecting plate two is equipped with camber pipeline folder two far from one end of sliding block, the side both ends that the camber pipeline folder one and camber pipeline folder two are located remotely from each other are equipped with convex block, and the convex block on camber pipeline folder one and camber pipeline folder two corresponds to each other, the active force on pipe can be slowed down, avoid pipe or pipe junction damaged, simultaneously, second consolidation is carried out to pipe, prevent pipe from falling off, it avoids to the safety of user Hidden danger is brought, user is not influenced and normally uses.
Description
Technical field
The utility model relates to pipe-line equipment technical fields, specially building pipe ruggedized construction.
Background technique
Pipeline is connected into pipe, pipe connector and valve etc. for conveying gas, liquid or with solid particle
Fluid device, pipeline is widely applied and conglomerate because of its own unique feature, and multi-field, having many uses for pipeline is general,
It is used primarily in water supply, draining, heat supply, gives gas, long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various
In commercial plant, building pipe may bear the effect of many kinds of external force, push away including the weight of itself, fluid matasomatism pipe end
Power, expand with heat and contract with cold caused thermal stress and oscillating load etc., in order to guarantee the safety of pipeline, it is necessary to fixed frame is set, it is existing
Fixed frame be made up of support frame and fixed ring, heat caused by the thrust of pipe cannot be acted on to fluid, is expanded with heat and contract with cold is answered
Power and oscillating load preferably depressurize, and cause pipe or pipe junction damaged, while the loosening of fixed ring, and pipe is easily de-
It falls, increases safe hidden danger, influence user and normally use.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, provides building pipe ruggedized construction, can be with
Slow down the active force on pipe, avoids pipe or pipe junction damaged, meanwhile, second consolidation is carried out to pipe, prevents pipe
Son falls off, and the safety belt to user is avoided to carry out hidden danger, does not influence user and normally uses, and can effectively solve background technique
The problems in.
To achieve the above object, the utility model provides the following technical solutions: building pipe ruggedized construction, including installation
Plate, the upper surface right end of the mounting plate are equipped with connecting plate one, and the connecting plate one is equipped with camber pipe far from one end of mounting plate
Road folder one, positioned at one left side of connecting plate in the upper surface of mounting plate equipped with the sliding slot being parallel to each other, on the sliding slot being parallel to each other
Slidably connect sliding block, the upper surface right end of two sliding blocks is connected by connecting plate two, the connecting plate two far from sliding block one
End is equipped with camber pipeline folder two, and the side both ends that the camber pipeline folder one and camber pipeline folder two are located remotely from each other are equipped with convex
Block, and the convex block on camber pipeline folder one and camber pipeline folder two corresponds to each other, the side of mutual corresponding convex block is equipped with mutual
Corresponding threaded hole one, mutual corresponding threaded hole one are connected by screw rod, the camber pipeline folder one and camber pipeline folder two
Inside be equipped with interior camber pipeline folder, two interior camber pipelines folders are respectively close to camber pipeline folder one and camber pipeline folder two
Side is equipped with stud, and stud is each passed through camber pipeline folder one and camber pipeline folder two by threaded hole two and extends to outer
The inner side in portion, the interior camber pipeline folder is equipped with interior camber high density rubber pad.
As a kind of optimal technical scheme of the utility model, the sliding slot be it is trapezoidal, the sliding block be trapezoid block.
As a kind of optimal technical scheme of the utility model, the upper surface for stating mounting plate is equipped with six no less than and installs
Hole, six mounting holes no less than are equidistantly uniformly distributed.
As a kind of optimal technical scheme of the utility model, the bottom side for the sliding slot being parallel to each other is equipped with one and is ranked position
Hole is equipped with positioning column in the inside of location hole on the left of sliding block.
As a kind of optimal technical scheme of the utility model, it is equipped with positioned at one left side of connecting plate in the upper surface of mounting plate
Support plate one, the connecting plate one, support plate one and one casting of camber pipeline folder are integrated, and the right side positioned at connecting plate two is in cunning
Block is equipped with support plate two, and the support plate two, connecting plate two, sliding block and two casting of camber pipeline folder are integrated.
Compared with prior art, the utility model has the beneficial effects that this building pipe ruggedized construction, camber pipeline folder one
Pipe is clamped with camber pipeline folder two, screw rod passes through threaded hole one by being fixed for the first time, and passes through positioning by positioning column
Hole positions sliding block, and anti-limited slip block is mobile, rotates stud, fastens interior camber pipeline folder again to pipe, prevents pipe
It falls off, the safety belt to user is avoided to carry out hidden danger, meanwhile, interior camber high density rubber pad is close to pipe, slows down on pipe
Active force avoids pipe or pipe junction damaged.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
In figure: 1 mounting plate, 2 mounting holes, 3 support plates one, 4 camber pipelines press from both sides one, 5 convex blocks, 6 studs, 7 threaded holes one, 8
Interior camber high density rubber pad, camber pipeline folder, 10 camber pipelines press from both sides two, 11 positioning columns, 12 sliding blocks, 13 support plates two, 14 in 9
Connecting plate two, 15 sliding slots, 16 location holes, 17 connecting plates one.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution: building pipe ruggedized construction, including mounting plate 1, peace
The upper surface right end of loading board 1 is equipped with connecting plate 1, connecting plate one 17 supports and suspension pipe, and connecting plate 1 is far from installation
One end of plate 1 is equipped with camber pipeline folder 1, clamps pipe, is equipped with phase in the upper surface of mounting plate 1 positioned at one 17 left side of connecting plate
Mutually parallel sliding slot 15 slidably connects sliding block 12,15 movement along the chute of sliding block 12, convenient for pipe on the sliding slot 15 being parallel to each other
The installation of son, sliding slot 15 be it is trapezoidal, sliding block 12 is trapezoid block, can hang fastening pipe, increases usage, two sliding blocks 12
Upper surface right end by connecting plate 2 14 connect, connecting plate 2 14 support and suspension pipe, connecting plate 2 14 is far from sliding block
12 one end is equipped with camber pipeline folder 2 10, and the side both ends that camber pipeline folder 1 and camber pipeline folder 2 10 are located remotely from each other are equal
Equipped with convex block 5, and the convex block 5 on camber pipeline folder 1 and camber pipeline folder 2 10 corresponds to each other, mutual corresponding convex block 5
Side is equipped with mutual corresponding threaded hole 1, and mutual corresponding threaded hole 1 is connected by screw rod, camber pipeline folder 1 and arc
Type pipeline folder 2 10 clamps pipe by the screw rod connection screw thread hole 1 on convex block 5 for the first time, and camber pipeline presss from both sides one 4 Hes
The inside of camber pipeline folder 2 10 is equipped with interior camber pipeline folder 9, and two interior camber pipeline folders 9 are respectively close to camber pipeline folder one
4 and the side of camber pipeline folder 2 10 be equipped with stud 6, stud 6 is each passed through camber pipeline folder 1 and arc by threaded hole two
Type pipeline folder 2 10 simultaneously extends to outside, rotates stud 6, and two interior camber pipeline folders 9 can be made to clamp pipe again, increase peace
The inner side of Quan Xing, interior camber pipeline folder 9 are equipped with interior camber high density rubber pad 8, increase the work of frictional force and separator tube
Firmly, prevent pipe mobile and damaged, the upper surface of mounting plate 1 is equipped with six mounting holes 2 no less than, six peaces no less than
Dress hole 2 is equidistantly uniformly distributed, and is easily installed the installation of plate 1.The bottom side for the sliding slot 15 being parallel to each other is equipped with row's location hole 16,
It is equipped with positioning column 11 in the inside of location hole 16 positioned at 12 left side of sliding block, sliding block 12 is positioned, when preventing from installing pipe
Sliding block 12 is mobile, is equipped with support plate 1, connecting plate 1, support plate in the upper surface of mounting plate 1 positioned at one 17 left side of connecting plate
1 and camber pipeline folder 1 casting be integrated, positioned at the right side of connecting plate 2 14 on sliding block 12 be equipped with support plate 2 13, branch
Fagging 2 13, connecting plate 2 14, sliding block 12 and 2 10 casting of camber pipeline folder are integrated, and support plate 1 and support plate 2 13 can
So that more preferably firm when lateral stressed.
When in use: mounting plate 1 being installed by mounting hole 2, is easily installed, sliding slider 12 makes camber pipeline
It presss from both sides 1 and clamps pipe with camber pipeline folder 2 10, screw rod passes through threaded hole 1 by being fixed for the first time, and passes through positioning column
11 position sliding block 12 by location hole 16, and anti-limited slip block 12 is mobile, rotate stud 6, and interior camber pipeline is made to press from both sides 9 pairs of pipes
It fastens again, prevents pipe from falling off, the safety belt to user is avoided to carry out hidden danger, meanwhile, interior camber high density rubber pad 8 is close to
Pipe slows down the active force on pipe, avoids pipe or pipe junction damaged.
The utility model can slow down the active force on pipe, avoid pipe or pipe junction damaged, meanwhile, to pipe
Son carries out second consolidation, prevents pipe from falling off, the safety belt to user is avoided to carry out hidden danger, not influencing user normally makes
With.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. building pipe ruggedized construction, including mounting plate (1), it is characterised in that: the upper surface right end of the mounting plate (1) is equipped with
Connecting plate one (17), the connecting plate one (17) are equipped with camber pipeline far from the one end of mounting plate (1) and press from both sides one (4), are located at connection
It is equipped with the sliding slot (15) being parallel to each other on the left of plate one (17) in the upper surface of mounting plate (1), on the sliding slot being parallel to each other (15)
It slidably connects sliding block (12), the upper surface right end of two sliding blocks (12) is connected by connecting plate two (14), the connecting plate two
(14) one end far from sliding block (12) is equipped with camber pipeline and presss from both sides two (10), and the camber pipeline presss from both sides one (4) and camber pipeline folder two
(10) the side both ends being located remotely from each other are equipped with convex block (5), and convex on two (10) of camber pipeline one (4) of folder and camber pipeline folder
Block (5) corresponds to each other, and the side of mutual corresponding convex block (5) is equipped with mutual corresponding threaded hole one (7), mutual corresponding screw thread
Hole one (7) is connected by screw rod, and the camber pipeline presss from both sides one (4) and camber pipeline presss from both sides and is equipped with interior camber pipe on the inside of two (10)
Road presss from both sides (9), and the side that two interior camber pipeline folders (9) press from both sides two (10) of one (4) and camber pipeline folder respectively close to camber pipeline is equal
Equipped with stud (6), stud (6) is each passed through camber pipeline one (4) of folder and camber pipeline two (10) of folder by threaded hole two and prolongs
Outside is extended to, the inner side of the interior camber pipeline folder (9) is equipped with interior camber high density rubber pad (8).
2. building pipe ruggedized construction according to claim 1, it is characterised in that: the sliding slot (15) be it is trapezoidal, it is described
Sliding block (12) is trapezoid block.
3. building pipe ruggedized construction according to claim 1, it is characterised in that: the upper surface of the mounting plate (1) is set
There are six mounting holes (2) no less than, six mounting holes (2) no less than are equidistantly uniformly distributed.
4. building pipe ruggedized construction according to claim 1, it is characterised in that: the bottom side for the sliding slot (15) being parallel to each other
It is equipped with row's location hole (16), is located on the left of sliding block (12) and is equipped with positioning column (11) in the inside of location hole (16).
5. building pipe ruggedized construction according to claim 1, it is characterised in that: be located on the left of connecting plate one (17) and pacifying
The upper surface of loading board (1) is equipped with support plate one (3), and the connecting plate one (17), support plate one (3) and camber pipeline press from both sides one (4)
Casting is integrated, and the right side for being located at connecting plate two (14) is equipped with support plate two (13), the support plate two on sliding block (12)
(13), connecting plate two (14), sliding block (12) and camber pipeline press from both sides two (10) casting and are integrated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821062560.XU CN208417768U (en) | 2018-07-05 | 2018-07-05 | Building pipe ruggedized construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821062560.XU CN208417768U (en) | 2018-07-05 | 2018-07-05 | Building pipe ruggedized construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208417768U true CN208417768U (en) | 2019-01-22 |
Family
ID=65125449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821062560.XU Expired - Fee Related CN208417768U (en) | 2018-07-05 | 2018-07-05 | Building pipe ruggedized construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208417768U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111421294A (en) * | 2020-04-29 | 2020-07-17 | 国网河南省电力公司电力科学研究院 | Steel pipe welding device |
-
2018
- 2018-07-05 CN CN201821062560.XU patent/CN208417768U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111421294A (en) * | 2020-04-29 | 2020-07-17 | 国网河南省电力公司电力科学研究院 | Steel pipe welding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206419561U (en) | U-tube is pressed from both sides | |
CN205859360U (en) | Channel bend support means | |
CN104964096A (en) | Constant-force spring support and hanger | |
CN207539483U (en) | A kind of quick WR and hydropower construction clamp device | |
CN208417768U (en) | Building pipe ruggedized construction | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN208457343U (en) | A kind of petroleum pipeline bracket | |
CN104696658B (en) | Unstressed piping lane system | |
CN108775445A (en) | Building pipe ruggedized construction | |
CN209054181U (en) | A kind of suspension and support of variable torque | |
CN206873716U (en) | A kind of antidetonation type unitized curtain wall | |
CN207332050U (en) | A kind of marble dried hanging hang structure | |
CN108071744A (en) | A kind of good utility pipes suspension and support of stability | |
CN204328225U (en) | A kind of pipeline installation rack | |
CN210661658U (en) | Convenient fixed pipeline suspends bumper shock absorber in midair | |
CN208629313U (en) | A kind of metal corrugated pipe expansion joint installation position-limited rack | |
CN209484060U (en) | Piping shaft suspension and support and piping shaft | |
CN206980788U (en) | A kind of iron stand used in chemical industry | |
CN212407817U (en) | Pipeline erection supporting device for chemical engineering construction | |
CN203797162U (en) | Small-gap adjustable pipeline support device | |
CN204281129U (en) | Hoisting crane and counterbalanced weight thereof | |
CN107575651A (en) | Horizontal, vertical displacement slides suspension and support | |
CN205007960U (en) | High rigidity brittle material tower | |
CN204554206U (en) | Unstressed piping lane system | |
CN220891416U (en) | Glass fiber reinforced plastic pipeline elbow supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 Termination date: 20210705 |
|
CF01 | Termination of patent right due to non-payment of annual fee |