CN208767758U - A kind of fixed installation structure of cable tube - Google Patents

A kind of fixed installation structure of cable tube Download PDF

Info

Publication number
CN208767758U
CN208767758U CN201821671840.0U CN201821671840U CN208767758U CN 208767758 U CN208767758 U CN 208767758U CN 201821671840 U CN201821671840 U CN 201821671840U CN 208767758 U CN208767758 U CN 208767758U
Authority
CN
China
Prior art keywords
installing
fixed
cable tube
ring flange
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821671840.0U
Other languages
Chinese (zh)
Inventor
丁希伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fire Peak Electric Co Ltd
Original Assignee
Anhui Fire Peak Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fire Peak Electric Co Ltd filed Critical Anhui Fire Peak Electric Co Ltd
Priority to CN201821671840.0U priority Critical patent/CN208767758U/en
Application granted granted Critical
Publication of CN208767758U publication Critical patent/CN208767758U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of fixed installation structures of cable tube, including No.1 installing pipe, connecting shaft, No. two installing pipes and ring flange, No.1 installing pipe is installed by connecting shaft and No. two installing pipe activities, and the outer surface of No. two installing pipes is fixedly installed with spring, the outer surface of spring is bonded with rubber pad, one side external surface of No. two installing pipes is installed by welding with the fixed metalwork of No.1, and lock hole is provided on the outer wall of the fixed metalwork of No.1, one side external surface of No.1 installing pipe is installed by welding with No. two fixed metalworks, and a side external surface of No. two fixed metalworks is installed by welding with parallel plate.A kind of fixed installation structure of cable tube described in the utility model, equipped with No. two installing pipes, spring, rubber pad and ring flange, the effect of heat preservation can be played, play the role of antidetonation shatter-resistant adaptation cable tube to expand with heat and contract with cold, with better integraty and integrality, it is more uniform to carry active force, brings better prospect of the application.

Description

A kind of fixed installation structure of cable tube
Technical field
The utility model relates to cable tube fixed network, in particular to the fixed installation structure of a kind of cable tube.
Background technique
With the rapid development of imbedded power cable laying work, requirements at the higher level, mounting structure are proposed to mounting structure Suitable for fields such as telecommunication, power engineering, traffic, urban construction, general there are two types of the casings of type, first is that steel protection pipe, steel Protection pipe has thin-wall tube and thick-walled pipe and zinc-plated and not zinc-plated differentiation, and two be plastic tube, and plastic tube generally uses polyvinyl chloride plastic Material or U-PVC production, there is common and flame retardant type, easy for construction, will not get rusty, electric wire wiring sheath pipe largely uses plastics Pipe, glass fibre reinforced plastic cable conduit are using high-intensitive glass fibre as reinforcing material, and the polyester resin of insatiable hunger is basis material, is used Computer controller tool is entwined;There are certain drawbacks in existing fixed installation structure, can not play heat preservation when in use Effect, do not play the role of antidetonation shatter-resistant adapt to cable tube expand with heat and contract with cold, do not have better integraty and integrality, hold It is not uniform enough to carry active force, brings certain influence in actual use, for this purpose, it is proposed that a kind of fixed peace of cable tube Assembling structure.
Utility model content
The main purpose of the utility model is to provide a kind of fixed installation structures of cable tube, can effectively solve background The problems in technology.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of fixed installation structure of cable tube, including No.1 installing pipe, connecting shaft, No. two installing pipes and ring flange, institute It states No.1 installing pipe to install by connecting shaft and No. two installing pipe activities, and the outer surface of No. two installing pipes is fixedly installed with Spring, the outer surface of the spring are bonded with rubber pad, and it is solid that a side external surface of No. two installing pipes is installed by welding with No.1 Determine metalwork, and is provided with lock hole on the outer wall of the fixed metalwork of the No.1, the side external surface weldering of the No.1 installing pipe It connects and No. two fixed metalworks is installed, and a side external surface of described No. two fixed metalworks is installed by welding with parallel plate, it is described Butt hole is provided on the outer wall of parallel plate, and the interior of the butt hole is interspersed with parallel transistor, the outer surface center of the parallel transistor Retaining groove is provided at position, and the both ends outer surface of the parallel transistor is equipped with external screw thread, the parallel transistor passes through external screw thread It is fixedly mounted with flange disc spins, and is provided with flange bolt installation hole location on the outer wall of the ring flange.
Preferably, No. two installing pipes are flexibly connected by connecting shaft with No.1 installing pipe, and No. two installing pipes can The scope of activities upper limit is 180 degree, and No. two installing pipes and No.1 installing pipe, which are stitched together, constitutes complete fix Structure.
Preferably, the ring flange is hollow type internal thread structure, and the outer surface of ring flange is coated with oxidation-resistant corrosion-resistant Layer.
Preferably, the outer surface of the parallel transistor is rotatably installed with ring flange, and the quantity of ring flange is two groups, the method Blue disk is placed in parallel respectively.
Preferably, the parallel transistor is connected in the butt hole of parallel plate by retaining groove, and parallel transistor be it is a kind of not The component for steel material of becoming rusty.
Preferably, No. two installing pipes and rubber pad are a kind of component of semicircular structure, and No. two installing pipes Dimensions is greater than the dimensions of rubber pad.
Compared with prior art, the utility model has the following beneficial effects:
In the utility model, No. two installing pipes be can move in No.1 installing pipe, form the round fixed knot of a completion Structure has spring and rubber pad in No.1 installing pipe and No. two installing pipes, on the one hand can play the effect of heat preservation, prevent On the other hand influence degree caused by the high and internal cable tube of too low temperature can play antidetonation shatter-resistant and adapt to cable tube The effect expanded with heat and contract with cold has parallel plate on No. two fixed metalworks, has butt hole on parallel plate, parallel transistor can be interspersed in parallel connection In the butt hole of plate, and it is corresponding with clamping at the position of butt hole by the retaining groove on parallel transistor, have on parallel transistor outer Screw thread can be installed with the flange disc spins for internal thread structure and be fixed, when No.1 installing pipe and No. two installing pipes are constituted admittedly When determining structure, rotation installation can be docked with the parallel transistor on another set fixed structure by the ring flange on parallel transistor, is made Obtaining multiple fixed structures has better integraty and integrality, and carrying active force is more uniform, brings better prospect of the application.
Detailed description of the invention
Fig. 1 is a kind of overall schematic of the fixed installation structure of cable tube of the utility model;
Fig. 2 is a kind of expanded view of the fixed installation structure of cable tube of the utility model;
Fig. 3 is a kind of parallel transistor structure chart of the fixed installation structure of cable tube of the utility model.
In figure: 1, No.1 installing pipe;2, connecting shaft;3, No. two installing pipes;4, spring;5, rubber pad;6, the fixed gold of No.1 Belong to part;7, No. two fixed metalworks;8, parallel plate;9, butt hole;10, parallel transistor;11, retaining groove;12, external screw thread;13, method Blue disk;14, flange bolt installs hole location;15, lock hole.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figure 1-3, a kind of fixed installation structure of cable tube, including No.1 installing pipe 1, connecting shaft 2, two installations Pipe 3 and ring flange 13, No.1 installing pipe 1 is installed by connecting shaft 2 and No. two 3 activities of installing pipe, and the appearance of No. two installing pipes 3 Face is fixedly installed with spring 4, and the outer surface of spring 4 is bonded with rubber pad 5, and a side external surface of No. two installing pipes 3 welds installation There is the fixed metalwork 6 of No.1, and is provided with lock hole 15, the side appearance of No.1 installing pipe 1 on the outer wall of the fixed metalwork 6 of No.1 Face is installed by welding with No. two fixed metalworks 7, and a side external surface of No. two fixed metalworks 7 is installed by welding with parallel plate 8, and Butt hole 9 is provided on the outer wall of yoke plate 8, and the interior of butt hole 9 is interspersed with parallel transistor 10, the outer surface central location of parallel transistor 10 Place is provided with retaining groove 11, and the both ends outer surface of parallel transistor 10 is equipped with external screw thread 12, parallel transistor 10 by external screw thread 12 with The rotation of ring flange 13 is fixedly mounted, and flange bolt installation hole location 14 is provided on the outer wall of ring flange 13;
No. two installing pipes 3 are flexibly connected by connecting shaft 2 with No.1 installing pipe 1, and the movable range of No. two installing pipes 3 The upper limit is 180 degree, and No. two installing pipes 3 and No.1 installing pipe 1, which are stitched together, constitutes complete fixed structure;Flange Disk 13 is hollow type internal thread structure, and the outer surface of ring flange 13 is coated with oxidation-resistant corrosion-resistant layer;The outer surface of parallel transistor 10 It is rotatably installed with ring flange 13, and the quantity of ring flange 13 is two groups, ring flange 13 is placed in parallel respectively;Parallel transistor 10 passes through card Position groove 11 is connected in the butt hole 9 of parallel plate 8, and parallel transistor 10 is a kind of component of stainless steel material;No. two installing pipes 3 It is a kind of component of semicircular structure with rubber pad 5, and the dimensions of No. two installing pipes 3 is greater than the size of rubber pad 5 Specification.
It should be noted that the utility model is a kind of fixed installation structure of cable tube, when in use, No.1 installing pipe 1 and No. two installing pipes 3 be semicircular structure, while No.1 installing pipe 1 is by connecting shaft 2 and No. two 3 activity installations of installing pipes, When cable tube is placed in No.1 installing pipe 1, No. two installing pipes 3 be can move in No.1 installing pipe 1, form a completion Round fixed structure has spring 4 and rubber pad 5 in No.1 installing pipe 1 and No. two installing pipes 3, on the one hand can play guarantor The effect of temperature prevents influence degree caused by the excessively high and internal cable tube of too low temperature, on the other hand can play anti- Shake shatter-resistant adapts to the effect that cable tube expands with heat and contract with cold, and has lock hole on the fixed metalwork 6 of No.1 and No. two fixed metalworks 7 15, locking installation can be carried out by the firmware of adaptation, have parallel plate 8 on No. two fixed metalworks 7, have docking on parallel plate 8 Hole 9, parallel transistor 10 can be interspersed in the butt hole 9 of parallel plate 8, and pass through the retaining groove 11 and butt hole 9 on parallel transistor 10 Position at be clamped correspond to, have external screw thread 12 on parallel transistor 10, can with for internal thread structure ring flange 13 rotate pacify Dress is fixed, and when No.1 installing pipe 1 and No. two composition fixed structures of installing pipes 3, can pass through the ring flange 13 on parallel transistor 10 Docked with the parallel transistor 10 on another set fixed structure rotation installation so that multiple fixed structures have better integraty with Integrality, carrying active force is more uniform, more practical.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of fixed installation structure of cable tube, including No.1 installing pipe (1), connecting shaft (2), No. two installing pipes (3) and method Blue disk (13), it is characterised in that: the No.1 installing pipe (1) is installed by connecting shaft (2) and No. two installing pipe (3) activities, and The outer surface of No. two installing pipes (3) is fixedly installed with spring (4), and the outer surface of the spring (4) is bonded with rubber pad (5), it is fixed metalwork (6) to be installed by welding with No.1 for a side external surface of No. two installing pipes (3), and the No.1 is fixed golden Belong to and being provided with lock hole (15) on the outer wall of part (6), a side external surface of the No.1 installing pipe (1) is installed by welding with No. two fixations Metalwork (7), and a side external surface of described No. two fixed metalworks (7) is installed by welding with parallel plate (8), the parallel plate (8) it is provided on outer wall butt hole (9), and the interior of the butt hole (9) is interspersed with parallel transistor (10), the parallel transistor (10) Outer surface central position is provided with retaining groove (11), and the both ends outer surface of the parallel transistor (10) is equipped with external screw thread (12), the parallel transistor (10) is fixedly mounted by external screw thread (12) and ring flange (13) rotation, and the ring flange (13) Flange bolt installation hole location (14) is provided on outer wall.
2. a kind of fixed installation structure of cable tube according to claim 1, it is characterised in that: No. two installing pipes (3) it is flexibly connected by connecting shaft (2) with No.1 installing pipe (1), and the movable range limit of No. two installing pipes (3) is 100 80 degree, No. two installing pipes (3) and No.1 installing pipe (1) are stitched together and constitute complete fixed structure.
3. a kind of fixed installation structure of cable tube according to claim 1, it is characterised in that: the ring flange (13) is Hollow type internal thread structure, and the outer surface of ring flange (13) is coated with oxidation-resistant corrosion-resistant layer.
4. a kind of fixed installation structure of cable tube according to claim 1, it is characterised in that: the parallel transistor (10) Outer surface is rotatably installed with ring flange (13), and the quantity of ring flange (13) is two groups, and the ring flange (13) is put in parallel respectively It sets.
5. a kind of fixed installation structure of cable tube according to claim 1, it is characterised in that: the parallel transistor (10) is logical It crosses retaining groove (11) to be connected in the butt hole (9) of parallel plate (8), and parallel transistor (10) is a kind of structure of stainless steel material Part.
6. a kind of fixed installation structure of cable tube according to claim 1, it is characterised in that: No. two installing pipes (3) be with rubber pad (5) a kind of semicircular structure component, and the dimensions of No. two installing pipes (3) is greater than rubber pad (5) dimensions.
CN201821671840.0U 2018-10-16 2018-10-16 A kind of fixed installation structure of cable tube Active CN208767758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821671840.0U CN208767758U (en) 2018-10-16 2018-10-16 A kind of fixed installation structure of cable tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821671840.0U CN208767758U (en) 2018-10-16 2018-10-16 A kind of fixed installation structure of cable tube

Publications (1)

Publication Number Publication Date
CN208767758U true CN208767758U (en) 2019-04-19

Family

ID=66136528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821671840.0U Active CN208767758U (en) 2018-10-16 2018-10-16 A kind of fixed installation structure of cable tube

Country Status (1)

Country Link
CN (1) CN208767758U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040569A (en) * 2019-04-23 2019-07-23 刘战军 Multi-purpose cable tows device
CN111969517A (en) * 2020-09-03 2020-11-20 安徽恒振电力科技有限公司 Extra-strong high-voltage special-shaped power cable protection pipe and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040569A (en) * 2019-04-23 2019-07-23 刘战军 Multi-purpose cable tows device
CN111969517A (en) * 2020-09-03 2020-11-20 安徽恒振电力科技有限公司 Extra-strong high-voltage special-shaped power cable protection pipe and preparation method thereof
CN111969517B (en) * 2020-09-03 2022-03-29 安徽恒振电力科技有限公司 Extra-strong high-voltage special-shaped power cable protection pipe and preparation method thereof

Similar Documents

Publication Publication Date Title
CN208767758U (en) A kind of fixed installation structure of cable tube
CN205502577U (en) A thimble assembly for buried sleeve one shot forming construction in piping shaft
CN206816962U (en) A kind of pipeline layout support for basement common trench gut line layout
CN207880235U (en) Reinforced non-solder pipe joint hoop
CN107508213A (en) A kind of aluminium-magnesium alloy cable bridge-support
CN201795174U (en) Fixing support for erecting and laying ductile iron pipes
CN216564363U (en) Electrical installation structure for suspended ceiling
CN204004796U (en) A kind of tunnel cable bearer
CN207829302U (en) A kind of connection of FRP material and anchor
CN204141070U (en) Architectural Equipment connection set
CN109296850A (en) It is a kind of can more root canal roads simultaneously connect multi-pipeline connecting flange
CN206592672U (en) A kind of non-excavation rehabilitation compound pipeline complex pipeline
CN208107444U (en) A kind of distortion-free glass reinforced plastic push pipe of the sealing of multilayered structure
CN202913454U (en) Device connecting water pumps in parallel
CN104344084A (en) Layered horizontal tee joint
CN214119213U (en) Building plumbing is with preventing leaking pipeline
CN107916754A (en) A kind of connection of FRP material and anchor and method
CN203892767U (en) Bending intensifier for marine static hose
CN217307226U (en) Farmland hydraulic engineering construction pipe laying and line fixing device
CN206304956U (en) A kind of spraying system spool
CN104196213B (en) A kind of decorative thread ten thousand ties up rotating connector
CN205350646U (en) Pipe joint
CN211290230U (en) Heating system individual transmission and distribution pipeline component in pipe well and pipe well heating pipeline
CN210398086U (en) PP-R pipe and PVC pipe quick connect adapter
CN210687270U (en) Municipal works water supply and drainage pipe steady connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant