CN204559761U - Based on the high-speed railway supervisory control system of wireless network transmission technology - Google Patents

Based on the high-speed railway supervisory control system of wireless network transmission technology Download PDF

Info

Publication number
CN204559761U
CN204559761U CN201520126127.8U CN201520126127U CN204559761U CN 204559761 U CN204559761 U CN 204559761U CN 201520126127 U CN201520126127 U CN 201520126127U CN 204559761 U CN204559761 U CN 204559761U
Authority
CN
China
Prior art keywords
wireless network
control system
supervisory control
controller
speed railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520126127.8U
Other languages
Chinese (zh)
Inventor
曾毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Auspicious Acoustic Communication Ltd Co In Hangzhou
Original Assignee
Auspicious Acoustic Communication Ltd Co In Hangzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Auspicious Acoustic Communication Ltd Co In Hangzhou filed Critical Auspicious Acoustic Communication Ltd Co In Hangzhou
Priority to CN201520126127.8U priority Critical patent/CN204559761U/en
Application granted granted Critical
Publication of CN204559761U publication Critical patent/CN204559761U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

High-speed railway supervisory control system based on wireless network transmission technology of the present utility model, comprising: monitoring camera, monitoring camera has multiple, is installed on each position in high ferro train respectively, realizes the omnibearing monitoring of high ferro train; Wireless launcher, wireless launcher is connected with monitoring camera; Wireless receiver, for being emitted to the monitor video in wireless network by wireless network reception wireless launcher; Controller, controller connects wireless receiver; Display screen, display screen is connected with controller; Siren, siren is connected with controller.High-speed railway supervisory control system based on wireless network transmission technology of the present utility model has structure advantage simple, easy to use, the transmission of monitor video is carried out by wireless network, simplify the complexity of monitoring camera wiring in supervisory control system, make the easier for installation of supervisory control system, simultaneously when breaking down in supervisory control system, investigation and the maintenance of fault are more convenient.

Description

Based on the high-speed railway supervisory control system of wireless network transmission technology
Technical field
The utility model relates to field of wireless communication, is specifically related to the high-speed railway supervisory control system based on wireless network transmission technology.
Background technology
High-speed railway is a kind of novel trip mode, along with the fast development of high-speed railway, increasing passenger selects to carry out remote stroke by high-speed railway now, and high-speed railway is convenient, fast for passenger brings, and makes passenger can have the selection of multiple trip mode.
High-speed railway vehicle can be provided with a certain amount of monitoring camera usually; realize monitoring in compartment by monitoring camera; by related personnel, monitor video is monitored; realization is promptly prevented the dangerous situation occurred in compartment, fast reaction, guarantees the driving safety of vehicle in running.
But the installation of supervisory control system needs to carry out independent wiring to each monitoring camera in high speed rail system vehicle, make the installation work amount of supervisory control system in vehicle very huge, and complicated, and this just adds the manufacturing cost of video monitoring system greatly.After breaking down in video monitoring system, because system wiring is complicated, the work such as the malfunction elimination of system, maintenance also can be made to become more complicated, difficult.
It is a kind ofly can provide the mode of recreation for passenger that high-speed railway arranges wireless network, make passenger in riding process, have more joyful experiencing by bus, can also ensure that passenger realizes the process of office event by wireless network simultaneously, make in riding process, to delay nervous work.Due to the setting of wireless network on vehicle, the transmission being carried out monitor video by wireless network is made to have become possibility, also can be simultaneously that supervisory control system is more succinct, convenient, the malfunction elimination of supervisory control system can also be made simultaneously while simplification system wiring, overhaul convenient.
Therefore, how to design a kind of system using wireless network transmission technology to realize high-speed railway monitoring and just become thing urgently to be resolved hurrily.
Utility model content
For solving problems of the prior art, the utility model provides the high-speed railway supervisory control system based on wireless network transmission technology, effectively can be carried out the transmission of monitor video by the wireless network on high-speed railway vehicle.
The technical solution of the utility model is:
Based on the high-speed railway supervisory control system of wireless network transmission technology, it is characterized in that, comprising:
Monitoring camera, monitoring camera has multiple, is installed on each position in high ferro train respectively, realizes the omnibearing monitoring of high ferro train;
Wireless launcher, wireless launcher is connected with monitoring camera, is transmitted by wireless network for the monitor video taken by monitoring camera;
Wireless receiver, for being emitted to the monitor video in wireless network by wireless network reception wireless launcher;
Controller, controller connects wireless receiver, for carrying out typesetting process to the monitor video received;
Display screen, display screen is connected with controller, for the monitoring screen through controller typesetting process being shown;
Siren, siren is connected with controller, carries out alarm sounds when the monitoring screen for receiving when controller is certain or wrong.
Preferably, also comprise storage server, the output port of storage server connection control device, stores for the monitor video received by controller.
Preferably, also comprising control button, control the input port of button connection control device, for by controlling key-press input control command, realizing the control to supervisory control system.
Preferably, the PORT COM of wireless receiver connection control device.
Preferably, the display translation port of display screen connection control device.
Preferably, the output port of siren connection control device.
High-speed railway supervisory control system based on wireless network transmission technology of the present utility model has structure advantage simple, easy to use, the transmission of monitor video is carried out by wireless network, simplify the complexity of monitoring camera wiring in supervisory control system, make the easier for installation of supervisory control system, simultaneously when breaking down in supervisory control system, investigation and the maintenance of fault are more convenient.
Accompanying drawing explanation
Fig. 1 is the johning knot composition of the utility model based on a high-speed railway supervisory control system embodiment of wireless network transmission technology.
Fig. 2 is the structure chart of the utility model based on a high-speed railway supervisory control system embodiment of wireless network transmission technology.
Embodiment
For making the purpose of this utility model, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As depicted in figs. 1 and 2, the high-speed railway supervisory control system based on wireless network transmission technology of the present embodiment, is characterized in that, comprising:
Monitoring camera, monitoring camera has multiple, is installed on each position in high ferro train respectively, realizes the omnibearing monitoring of high ferro train;
Wireless launcher, wireless launcher is connected with monitoring camera, is transmitted by wireless network for the monitor video taken by monitoring camera;
Wireless receiver, for being emitted to the monitor video in wireless network by wireless network reception wireless launcher;
Controller, controller connects wireless receiver, for carrying out typesetting process to the monitor video received;
Display screen, display screen is connected with controller, for the monitoring screen through controller typesetting process being shown;
Siren, siren is connected with controller, carries out alarm sounds when the monitoring screen for receiving when controller is certain or wrong.
Concrete, in the often joint compartment of high ferro train, multiple monitoring camera is installed, monitoring camera is effectively monitored each corner in compartment, on monitoring camera, connect wireless launcher simultaneously, transmitted the monitor video that monitoring camera photographs by wireless launcher, the transmission path of monitor video is by the wireless network in high-speed railway compartment.The transmission carrying out monitor video by wireless network effectively can simplify the cabling requirement of supervisory control system in high ferro vehicle, each monitoring camera can only be powered to monitoring camera by connecting power line, connect the connection that wireless launcher carries out wireless network, thus eliminate complexity wiring monitoring camera being connected to controller, make to connect up in compartment more succinct, neatly, simultaneously in supervisory control system, can find which the monitoring camera that breaks down or wireless launcher be timely if there is the fault of monitoring camera or wireless launcher, and quick position, facilitate the inspection of supervisory control system, maintenance.
Wireless receiver is connected with controller, the PORT COM of wireless receiver connection control device, wireless receiver carries out the reception of monitoring camera monitor video by the wireless network of high ferro vehicle, and monitor video is sent in controller, the analyzing and processing of monitor video is carried out by controller, detect and whether have disappearance or there is abnormal monitor video, typesetting is carried out to monitor video, to carry out orderly display to monitor video simultaneously.
The display translation port of display screen connection control device, after monitoring screen is carried out typesetting by controller, monitor video is sent to display screen and shows by controller, in the process that display screen shows monitor video, remain identical DISPLAY ORDER, to guarantee occur disappearance at monitor video or when there are abnormal conditions, disappearance can be gone out or there is the concrete orientation of abnormal monitor video, so that staff reacts fast by Direct Analysis.
The output port of siren connection control device, when controller detects that its monitor video received exists disappearance or exception, alarm sounds is carried out by siren, the attention of staff is caused with this, relevant abnormalities situation is solved fast, ensures the operation that supervisory control system is normal, stable.
Further, supervisory control system also comprises storage server, is connected by storage server with the output port of controller, is stored by the monitor video from wireless network that controller is received by wireless receiver, is applying when needing so that follow-up.
Further, supervisory control system also comprises control button, control button is connected with the input port of controller, by controlling button to controller input control order, control controller by control command to operate accordingly, the operations such as the monitor video stored in the reception of monitor video, deletion storage server as stopped, the alarm sounds of cancellation siren, realize the effective control to supervisory control system with this.
The present embodiment is by using the high-speed railway supervisory control system based on wireless network transmission technology of the present utility model, the transmission of monitor video effectively can be realized by wireless network, make the wiring of supervisory control system simpler, facilitate malfunction elimination and the maintenance of supervisory control system, reduce the installation, maintenance cost of supervisory control system.
High-speed railway supervisory control system based on wireless network transmission technology of the present utility model has structure advantage simple, easy to use, the transmission of monitor video is carried out by wireless network, simplify the complexity of monitoring camera wiring in supervisory control system, make the easier for installation of supervisory control system, simultaneously when breaking down in supervisory control system, investigation and the maintenance of fault are more convenient.
The above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make and suitably improving and distortion, these improve and distortion also should be considered as protection range of the present utility model.

Claims (6)

1., based on the high-speed railway supervisory control system of wireless network transmission technology, it is characterized in that, comprising:
Monitoring camera, described monitoring camera has multiple, is installed on each position in high ferro train respectively, realizes the omnibearing monitoring of high ferro train;
Wireless launcher, described wireless launcher is connected with described monitoring camera, is transmitted by wireless network for the monitor video taken by described monitoring camera;
Wireless receiver, is emitted to monitor video in wireless network for being received described wireless launcher by wireless network;
Controller, described controller connects described wireless receiver, for carrying out typesetting process to the monitor video received;
Display screen, described display screen is connected with described controller, for the monitoring screen through described controller typesetting process being shown;
Siren, described siren is connected with described controller, for carrying out alarm sounds when the monitoring screen that described controller receives is certain or wrong.
2. the high-speed railway supervisory control system based on wireless network transmission technology according to claim 1, it is characterized in that, also comprise storage server, described storage server connects the output port of described controller, stores for the monitor video received by described controller.
3. the high-speed railway supervisory control system based on wireless network transmission technology according to claim 1, it is characterized in that, also comprise control button, described control button connects the input port of described controller, for by described control key-press input control command, realize the control to supervisory control system.
4. the high-speed railway supervisory control system based on wireless network transmission technology according to claim 1, it is characterized in that, described wireless receiver connects the PORT COM of described controller.
5. the high-speed railway supervisory control system based on wireless network transmission technology according to claim 1, is characterized in that, described display screen connects the display translation port of described controller.
6. the high-speed railway supervisory control system based on wireless network transmission technology according to claim 1, it is characterized in that, described siren connects the output port of described controller.
CN201520126127.8U 2015-03-04 2015-03-04 Based on the high-speed railway supervisory control system of wireless network transmission technology Expired - Fee Related CN204559761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520126127.8U CN204559761U (en) 2015-03-04 2015-03-04 Based on the high-speed railway supervisory control system of wireless network transmission technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520126127.8U CN204559761U (en) 2015-03-04 2015-03-04 Based on the high-speed railway supervisory control system of wireless network transmission technology

Publications (1)

Publication Number Publication Date
CN204559761U true CN204559761U (en) 2015-08-12

Family

ID=53834830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520126127.8U Expired - Fee Related CN204559761U (en) 2015-03-04 2015-03-04 Based on the high-speed railway supervisory control system of wireless network transmission technology

Country Status (1)

Country Link
CN (1) CN204559761U (en)

Similar Documents

Publication Publication Date Title
CN109677421B (en) Platform door control device based on two-by-two-out-of-two architecture
CN101580073B (en) Computer interlocking system code bit-level redundancy method
CN103389668A (en) Hot standby redundancy central control panel used for screen door
CN202617154U (en) Train communication system
CN104125114A (en) CIR (cab integrated radio) equipment operation status real-time monitoring system
CN103440850A (en) Redundancy display system
CN105882692B (en) A kind of central control unit for railway signals equipment system
CN202929446U (en) Remote control system applied to locomotive rolling platform test
CN204559761U (en) Based on the high-speed railway supervisory control system of wireless network transmission technology
CN202486564U (en) Electric control system for overhead manned equipment
CN203739890U (en) Train network control system
CN104268114A (en) Power source measurement and control system and control method thereof
CN104670247A (en) Train network control system
CN104468301A (en) Safety output method based on MVB communication
CN201383105Y (en) Centralized staircase control system
CN204256473U (en) Based on the marine air conditioning supervisory system of PLC
CN104901839A (en) CRH (China Railway High-Speed) main processor (MPU) redundancy method
CN105629913A (en) Railway machine room signal power supply and environment monitoring system
CN202615229U (en) Central control device in train network control system
CN205709262U (en) A kind of convenient elevator control gear used
CN204143243U (en) A kind of railway machine room signal power source and environmental monitoring system
CN210442679U (en) Air brake control system based on PLC and data bus technology
CN204538823U (en) A kind of step hydropower station is unattended and remote central control
CN204559762U (en) Based on the high-speed railway watch-dog of wireless network
CN203965912U (en) Factory's motor group real time monitoring apparatus based on CAN bus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20170304