CN204551433U - A kind of shaped steel inserts positioner - Google Patents

A kind of shaped steel inserts positioner Download PDF

Info

Publication number
CN204551433U
CN204551433U CN201520166829.9U CN201520166829U CN204551433U CN 204551433 U CN204551433 U CN 204551433U CN 201520166829 U CN201520166829 U CN 201520166829U CN 204551433 U CN204551433 U CN 204551433U
Authority
CN
China
Prior art keywords
shaped steel
pipe
positioning
groove guide
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520166829.9U
Other languages
Chinese (zh)
Inventor
毛红卫
伊伟
李元武
捷捷
杜轶贇
宣震鹰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Wall Zhejiang Province Construction Group Co Ltd
Original Assignee
Great Wall Zhejiang Province Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Wall Zhejiang Province Construction Group Co Ltd filed Critical Great Wall Zhejiang Province Construction Group Co Ltd
Priority to CN201520166829.9U priority Critical patent/CN204551433U/en
Application granted granted Critical
Publication of CN204551433U publication Critical patent/CN204551433U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of shaped steel and insert positioner, comprise groove guide pile, shaped steel positioning pipe and positioning bolt; Described groove guide pile has two, and groove guide pile upper surface is fixed wtih some positioning screws; Described shaped steel positioning pipe is " well " font, is made up of two longitudinal pipes and two transverse pipe, and described two transverse pipe are placed in the middle of two longitudinal pipes, and transverse pipe two ends are welded on two longitudinal pipes respectively; Described two longitudinal pipes are parallel to each other, and all vertical with two transverse pipe; Described longitudinal pipe two ends all have locating slot; Described shaped steel positioning pipe is placed in above two groove guide piles, and longitudinal pipe and the groove guide pile of shaped steel positioning pipe are orthogonal; Positioning screw on described groove guide pile, through the locating slot at longitudinal pipe two ends, is fixed by positioning bolt.Shaped steel positioning pipe of the present utility model and groove guide pile are fixed by positioning bolt, deviation can not occur when ensureing that shaped steel inserts.

Description

A kind of shaped steel inserts positioner
Technical field
The utility model belongs to technical field of building construction, and particularly a kind of shaped steel inserts positioner.
Background technology
According to the regulation of " shaped steel Soil-cement Wall tecnical regulations ", the allowable variation that shaped steel cement mixing method shaped steel inserts plan-position is: being parallel to direction, foundation ditch sideline is 50mm, is 10mm perpendicular to direction, foundation ditch sideline, and type heart corner allowable variation is 3 degree; " Construction of Deep Excavation Engineering technical specification of security " specifies, the insertion of shaped steel Soil-cement Wall shaped steel must adopt firmly positioning guiding rack.And current construction site is when laying shaped steel, generally release stake position according to design drawing and Survey control point, the stake heart carries out mark apart from painting, and ensures agitation pile accurate positioning; Then according to bracing of foundation pit inner edge control line excavation guiding ditch, and agitation pile location shaped steel is set at ditch trough rim, marks agitation pile position and shaped steel insertion position.This method not only operation is loaded down with trivial details, and very easily occurs the deviate exceeding permission, affects construction quality.
Utility model content
The purpose of this utility model is to provide simple, just can improve shaped steel insertion construction quality without the need to corollary equipment the shaped steel of a kind of structure to insert positioner.
For this reason, the technical solution of the utility model is: shaped steel inserts positioner, it is characterized in that: it comprises groove guide pile, shaped steel positioning pipe and positioning bolt; Described groove guide pile has two, and groove guide pile upper surface is fixed wtih some positioning screws; Described shaped steel positioning pipe is " well " font, is made up of two longitudinal pipes and two transverse pipe, and described two transverse pipe are placed in the middle of two longitudinal pipes, and transverse pipe two ends are welded on two longitudinal pipes respectively; Described two longitudinal pipes are parallel to each other, and all vertical with two transverse pipe; Described longitudinal pipe two ends all have locating slot; Described shaped steel positioning pipe is placed in above two groove guide piles, and longitudinal pipe and the groove guide pile of shaped steel positioning pipe are orthogonal; Positioning screw on described groove guide pile, through the locating slot at longitudinal pipe two ends, is fixed by positioning bolt.
Further, the longitudinal pipe of described shaped steel positioning pipe and transverse pipe form a rectangle, described rectangular size and the consistent size of radial section being inserted into shaped steel.
Further, the positioning screw of described groove guide pile upper surface has 4, is divided into two groups, and the spacing often organizing positioning screw is consistent with the spacing of two locating slots of one end with shaped steel positioning pipe.
Have a rectangle be made up of longitudinal pipe and transverse pipe in the middle of shaped steel positioning pipe of the present utility model, this rectangular size matches with the size of the shaped steel radial section that will insert; Shaped steel positioning pipe and groove guide pile are fixed by positioning bolt, deviation can not occur when ensureing that shaped steel inserts; Meanwhile, the locating slot of shaped steel positioning pipe is long slot bore, can according to the radial section size of shaped steel, after regulating, then is fixed by set bolt the position of shaped steel positioning pipe and groove guide pile.
Accompanying drawing explanation
Be described in further details below in conjunction with accompanying drawing and embodiment of the present utility model.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is job step 1 of the present utility model) schematic diagram.
Fig. 3 is job step 2 of the present utility model) schematic diagram.
Fig. 4 is job step 3 of the present utility model) schematic diagram.
Fig. 5 is job step 5 of the present utility model) schematic diagram.
Detailed description of the invention
See accompanying drawing.The present embodiment comprises groove guide pile 1, shaped steel positioning pipe 2 and positioning bolt 3; Described groove guide pile 1 has two, and groove guide pile 1 upper surface is fixed wtih some positioning screws 11; Described shaped steel positioning pipe 2 is " well " font, is made up of two longitudinal pipes 21 and two transverse pipe 22, and described two transverse pipe 22 are placed in the middle of two longitudinal pipes 21, and transverse pipe 22 two ends are welded on two longitudinal pipes 21 respectively; Described two longitudinal pipes 21 are parallel to each other, and all vertical with two transverse pipe 22; Described longitudinal pipe 21 two ends all have locating slot 23; Described shaped steel positioning pipe 2 is placed in above two groove guide piles 1, and the longitudinal pipe 21 of shaped steel positioning pipe 2 is orthogonal with groove guide pile 1; Positioning screw 11 on described groove guide pile 1, through the locating slot 23 at longitudinal pipe 21 two ends, is fixed by positioning bolt 3.
The present embodiment with common three axes agitating pile, interpolation shaped steel 4, to jump one be example in order to insert two to insert quantity, comprises the following steps:
1) after three axle mixers complete stirring, on-the-spot longitudinal axis 51 and the axis of pitch 52 again indicating engineering method stake 5, as shown in Figure 2;
2) two groove guide piles 1 are arranged into engineering method stake 5 both sides, and control the distance of groove guide pile 1 and engineering method stake longitudinal axis 51; Groove guide pile 1 draws the first orientation axis 12, and described first orientation axis 12 is positioned at same straight line with engineering method stake axis of pitch 52, as shown in Figure 3;
3) the second orientation axis 24, the 3rd orientation axis 25 is drawn on rectangle four limit that shaped steel positioning pipe 2 is placed in the middle, the locating slot 23 at shaped steel positioning pipe 2 two ends is inserted on the positioning screw 11 of groove guide pile 1, and again the second orientation axis 24, the 3rd orientation axis 25 are calibrated with engineering method stake longitudinal axis 51 and engineering method stake axis of pitch 52 respectively, after having calibrated, fastening positioning bolt 3, shaped steel positioning pipe 2 is fixed on groove guide pile 1, as shown in Figure 4;
4) carry out shaped steel 4 and insert construction, shaped steel 4 is inserted in shaped steel positioning pipe 2 rectangle placed in the middle;
5) completing steps 4) after the shaped steel 4 of position inserts, unclamp positioning bolt 3, shaped steel positioning pipe 2 is moved to the next position, again calibrate after axis, fastening positioning bolt 3, carry out shaped steel 4 and insert construction, as shown in Figure 5;
6) after continuous two root type steel 4 have inserted, whole positioner is moved to next region, the shaped steel 4 repeating step 1)-step 5) inserts construction.

Claims (3)

1. shaped steel inserts positioner, it is characterized in that: it comprises groove guide pile, shaped steel positioning pipe and positioning bolt; Described groove guide pile has two, and groove guide pile upper surface is fixed wtih some positioning screws; Described shaped steel positioning pipe is " well " font, is made up of two longitudinal pipes and two transverse pipe, and described two transverse pipe are placed in the middle of two longitudinal pipes, and transverse pipe two ends are welded on two longitudinal pipes respectively; Described two longitudinal pipes are parallel to each other, and all vertical with two transverse pipe; Described longitudinal pipe two ends all have locating slot; Described shaped steel positioning pipe is placed in above two groove guide piles, and longitudinal pipe and the groove guide pile of shaped steel positioning pipe are orthogonal; Positioning screw on described groove guide pile, through the locating slot at longitudinal pipe two ends, is fixed by positioning bolt.
2. shaped steel as claimed in claim 1 inserts positioner, it is characterized in that: the longitudinal pipe of described shaped steel positioning pipe and transverse pipe form a rectangle, described rectangular size and the consistent size of radial section being inserted into shaped steel.
3. shaped steel as claimed in claim 1 inserts positioner, and it is characterized in that: the positioning screw of described groove guide pile upper surface has 4, is divided into two groups, the spacing often organizing positioning screw is consistent with the spacing of two locating slots of one end with shaped steel positioning pipe.
CN201520166829.9U 2015-03-24 2015-03-24 A kind of shaped steel inserts positioner Withdrawn - After Issue CN204551433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520166829.9U CN204551433U (en) 2015-03-24 2015-03-24 A kind of shaped steel inserts positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520166829.9U CN204551433U (en) 2015-03-24 2015-03-24 A kind of shaped steel inserts positioner

Publications (1)

Publication Number Publication Date
CN204551433U true CN204551433U (en) 2015-08-12

Family

ID=53826566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520166829.9U Withdrawn - After Issue CN204551433U (en) 2015-03-24 2015-03-24 A kind of shaped steel inserts positioner

Country Status (1)

Country Link
CN (1) CN204551433U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746510A (en) * 2015-03-24 2015-07-01 浙江省长城建设集团有限公司 Profile steel insertion positioning device and construction method thereof
CN109537909A (en) * 2018-11-06 2019-03-29 金川集团股份有限公司 A kind of adjustment tool of fashioned iron splicing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746510A (en) * 2015-03-24 2015-07-01 浙江省长城建设集团有限公司 Profile steel insertion positioning device and construction method thereof
CN104746510B (en) * 2015-03-24 2016-08-24 浙江省长城建设集团有限公司 A kind of shaped steel inserts positioner and construction method thereof
CN109537909A (en) * 2018-11-06 2019-03-29 金川集团股份有限公司 A kind of adjustment tool of fashioned iron splicing

Similar Documents

Publication Publication Date Title
CN104746510B (en) A kind of shaped steel inserts positioner and construction method thereof
CN205088681U (en) Rectify positioner that steel protected section of thick bamboo center fast
CN204551433U (en) A kind of shaped steel inserts positioner
CN210659276U (en) Template positioning device for thickness of shear wall and concrete protective layer
CN105040830A (en) Construction method of beam longitudinal bar anchorage for stiffened steel structural column-beam column joints
CN204703186U (en) A kind of pre-embedded bolt positioning installation apparatus
CN107869309A (en) Track control method and device in the case of small hole deviation
CN201598638U (en) Profile steel centering device for tri-axial mixing pile construction
CN104801994B (en) Steel plate drilling-hole positioning device
CN207351367U (en) Stirrup spacing controller
CN211691431U (en) Detachable pipe group construction accurate positioning template combined system
CN217298931U (en) Floating type steel pipe pile inserting, driving and positioning device
CN203222798U (en) Guiding frame applied to piling of steel piles in trestle construction on exposed bedrock
CN104989101B (en) Discharging platform construction method
CN206591451U (en) A kind of positioner installed for vertical reinforcement
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN204023579U (en) A kind of contrary sequence method post joint bar tool rack
CN214575145U (en) Steel bar engineering positioning device
CN201588208U (en) Enclosure structure employing combination of steel sheet pile and churning pile
CN204782001U (en) Regulation formula post rebar positioning appearance
CN203905461U (en) Adjustable inhaul cable reinforcing device for thin-wall round concrete formwork reinforcing
CN209907967U (en) Tool for controlling main reinforcement spacing of cast-in-place pile reinforcement cage
CN208815512U (en) Engineering method stake stake heart positioning auxiliary device and engineering method pile driving construction system
CN214169135U (en) Preformed hole positioning device
CN206396782U (en) A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Mao Hongwei

Inventor after: Yin Wei

Inventor after: Li Yuanwu

Inventor after: Jie Jie

Inventor after: Du Diebin

Inventor after: Xuan Zhenying

Inventor before: Mao Hongwei

Inventor before: Yi Wei

Inventor before: Li Yuanwu

Inventor before: Jie Jie

Inventor before: Du Diebin

Inventor before: Xuan Zhenying

COR Change of bibliographic data
AV01 Patent right actively abandoned

Granted publication date: 20150812

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting