CN204549696U - A kind of novel elevator hoistway pit overhaul platform structure - Google Patents
A kind of novel elevator hoistway pit overhaul platform structure Download PDFInfo
- Publication number
- CN204549696U CN204549696U CN201520229421.1U CN201520229421U CN204549696U CN 204549696 U CN204549696 U CN 204549696U CN 201520229421 U CN201520229421 U CN 201520229421U CN 204549696 U CN204549696 U CN 204549696U
- Authority
- CN
- China
- Prior art keywords
- platform structure
- elevator hoistway
- supporting traverse
- novel elevator
- overhaul platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to technical field of elevator manufacturing, be specially a kind of novel elevator hoistway pit overhaul platform structure, comprise the supporting traverse be arranged on well enclosure of two arrangement in parallels, two arrangement in parallels are fixed with and perpendicular to the longeron of described supporting traverse between two described supporting traverses, the position of two described supporting traverses and two described longeron encirclements is provided with the bearing basement for carrying service personnel, described bearing basement is just being provided with the position of the energy disperser be arranged in hoistway below it and is being provided with for described energy disperser above-below direction and compensates second protective device of rope above-below direction through rear normal work through the first protective device of rear normal work and compensating the position on rope circuit current up and down for described, simple and stable structure, easy access work and elevator normally run and protection effect is good.
Description
Technical field
the utility model relates to technical field of elevator manufacturing, is specially a kind of novel elevator hoistway pit overhaul platform structure.
Background technology
the well pit inspection platform of elevator is as one station people's platform; when the well pit degree of depth is excessive to protection maintenance repair and maintenance personnel personal safety important role; also be conveniently keep in repair simultaneously; but existing platform structure stability is not high; the easy normal operation affecting elevator; need to improve to the protection effect of elevator and service personnel, the Energy and comfort degree that the convenience of installation and service personnel use is high not enough.
Utility model content
an object of the present utility model is to provide a kind of simple and stable structure, easy access work and elevator and normally runs and the good novel elevator hoistway pit overhaul platform structure of protection effect.
above-mentioned technical purpose of the present utility model is achieved by the following technical programs: a kind of novel elevator hoistway pit overhaul platform structure, comprise the supporting traverse be arranged on well enclosure of two arrangement in parallels, two arrangement in parallels are fixed with and perpendicular to the longeron of described supporting traverse between two described supporting traverses, the position of two described supporting traverses and two described longeron encirclements is provided with the bearing basement for carrying service personnel, described bearing basement is just being provided with the position of the energy disperser be arranged in hoistway below it and is being provided with for described energy disperser above-below direction and compensates second protective device of rope above-below direction through rear normal work through the first protective device of rear normal work and compensating the position on rope circuit current up and down for described.
in technique scheme, integral structure is simple, good integrity, intensity height is also more firm, stability is better, be more conducive to service personnel and carry out service work, supporting traverse is used for the agent structure of carrying out with well enclosure firmly installing, and by forming a stable shoring of foundation shelf structure with coordinating of longeron, then by arranging bearing basement, can for the maintenance of standing of service personnel, first protective device and the second protective device the impact that can effectively reduce and change this inspection platform and produce in elevator normal course of operation is set, be convenient to energy disperser and compensate rope in the operating normal operation of elevator, good protection effect is served to energy disperser and compensation rope simultaneously, above-mentioned setting, effective guarantee is also provided to the safety of the passenger in service personnel and lift car.
as to preferably of the present utility model, bearing basement have at least a part for wire net and the laying area of described wire net account for that described bearing basement always lays area more than 1/3rd.Due in the elevator oscilaltion operational process in hoistway, the change compared with air flow between upper-lower position can be produced, along with the change of air pressure, it similarly is the motion of piston, if bearing basement adopts solid material structure, make the running space of air-flow in hoistway compare exactly originally can diminish, there will be very large noise, larger disturbance etc. is produced to lift car and inspection platform, bring more bad factor, by laying the bearing basement structure of the wire net of up/down perforation, the operation of air-flow is kept clear, reduce because air-flow etc. changes the potential safety hazard etc. brought, in addition, wire net is convenient to install and is laid, there is unexpected buffering effect certain in addition.
as to preferably of the present utility model, the first protective device is the cylindrical structure run through up and down.There is better rock-steady structure and protection effect, be convenient to elevator and normally run.
as to preferably of the present utility model, the second protective device is the square cartridge structure run through up and down.There is better rock-steady structure and protection effect, be convenient to elevator and normally run.
as to preferably of the present utility model, the first protective device and the second protective device are all formed by connecting for carrying out splicing in the horizontal direction by plural stitching section.The structure such as arranging the mirror image that two are divided half-and-half is formed by assembling, is convenient to installation on the one hand fixing, and is more beneficial to adjustment and the contraposition of position, reduces energy disperser or the interference compensating the normal operation of rope and can play good protection effect.
as to preferably of the present utility model, supporting traverse and longeron are provided with steel tube guardrail, described steel tube guardrail are hinged with the steel pipe doorframe can come in and gone out for service personnel.Steel tube guardrail and steel pipe doorframe all can adopt steel pipe to bend, weld all technique and complete installation, steel tube guardrail can also pass through cable tie and fixed warning sign, improve safety precaution effect, cat ladder can be arranged between steel pipe doorframe place and the bottom position of well pit be convenient to personnel and enter, certainly, steel pipe doorframe is also play an effect of taking precautions against, and only has and could enter for service personnel when needs overhaul, avoid unrelated person arbitrarily to pass in and out, this structure facilitates service personnel to pass in and out.
as to preferably of the present utility model, the relative side that steel pipe doorframe is positioned at side hinged with steel tube guardrail is welded with switch fixed strip, described steel tube guardrail is hinged with and can rotates in perpendicular and the switch positive stop strip coordinating described steel tube guardrail spacing to described switch fixed strip horizontal direction.Switch positive stop strip be preferably arranged to the hinged place of steel tube guardrail the top being positioned at switch fixed strip, after switch positive stop strip rotates upward, it just loses the spacing pinning effect to switch fixed strip, because only reliable steel tube guardrail is one-side against realizing closing door state, also namely door opening state is in, and when steel pipe doorframe adjustment position, switch positive stop strip rotates, spacing space before and after can being formed in the horizontal direction between switch positive stop strip and steel tube guardrail, now, switch fixed strip is owing to being just in time in this spacing space after the adjustment of aforementioned steel pipe doorframe position, then namely switch fixed strip is defined pinning, just be in pass door state, this is simple for structure, also be convenient to install.
as to preferably of the present utility model, longeron is also provided with the skirting board arranged against steel tube guardrail.Improve the strength and stability of structure and play the better protection effect of service personnel.
as to preferably of the present utility model, the two ends of support crossbeam are provided with for installing with well enclosure the bracket fixed.Be convenient to mounting and adjusting, and improve structural strength and stability.
as to preferably of the present utility model, bracket comprises to be installed dull and stereotyped for directly installing fixing level with supporting traverse and installs dull and stereotyped perpendicular to described level and install flat board with described level and be integrally connected and fixing vertically install flat board for directly installing with well enclosure, plate face and this supporting traverse of the vertical installation flat board of two brackets wherein on a supporting traverse be arranged in parallel, and the plate face of the vertical installation flat board of two brackets on another root supporting traverse is vertical with this supporting traverse to be arranged.Further raising installability, further raising structural strength and stability, installation between each plate is fixed and the lock bolt of high strength can be used to carry out, and each plate needs certainly offer corresponding mounting hole, and one connects the realization such as the technique that can adopt welding, one-body molded or bending.
the beneficial effects of the utility model: integral structure is simple, good integrity, intensity height also more firmly, stability is better, be more conducive to service personnel and carry out service work, be beneficial to the normal operation of elevator, to the safety precaution better effects if of elevator itself, service personnel, passenger etc., dismounting is convenient, use convenient comfortable, safety is high.
Accompanying drawing explanation
fig. 1 is the perspective view of the utility model embodiment.
in figure: 2, supporting traverse, 70, longeron, 80, bearing basement, 6, the first protective device, the 5, second protective device, 8, wire net, 4, steel tube guardrail, 3, steel pipe doorframe, 10, switch fixed strip, 9, switch positive stop strip, 7, skirting board, 1, bracket, 11, level installs dull and stereotyped, 12, vertically flat board is installed.
Detailed description of the invention
following specific embodiment is only to explanation of the present utility model; it is not to restriction of the present utility model; those skilled in the art can make to the present embodiment the amendment not having creative contribution as required after reading this specification sheets, as long as but be all subject to the protection of patent law in right of the present utility model.
embodiment, as shown in Figure 1, a kind of novel elevator hoistway pit overhaul platform structure, comprise the supporting traverse 2 be arranged on well enclosure of two arrangement in parallels, two arrangement in parallels are fixed with and perpendicular to the longeron 70 of described supporting traverse 2 between two described supporting traverses 2, the position of two described supporting traverses 2 and two described longeron 70 encirclements is provided with the bearing basement 80 for carrying service personnel, described bearing basement 80 is just being provided with the position of the energy disperser be arranged in hoistway below it and is being provided with for described energy disperser above-below direction and compensates second protective device 5 of rope above-below direction through rear normal work through the first protective device 6 of rear normal work and compensating the position on rope circuit current up and down for described.
bearing basement 80 has at least a part for wire net 8 and the laying area of described wire net 8 accounts for more than 1/3rd of described bearing basement 80 total laying area.
first protective device 6 is the cylindrical structure run through up and down.Second protective device 5 is the square cartridge structure run through up and down.First protective device 6 and the second protective device 5 are all formed by connecting for carrying out splicing in the horizontal direction by plural stitching section.
supporting traverse 2 and longeron 70 are provided with steel tube guardrail 4, described steel tube guardrail 4 are hinged with the steel pipe doorframe 3 can come in and gone out for service personnel.Steel pipe doorframe 3 is positioned at and is welded with switch fixed strip 10 with the relative side of the hinged side of steel tube guardrail 4, described steel tube guardrail 4 is hinged with and can rotates in perpendicular and the switch positive stop strip 9 coordinating described steel tube guardrail 4 spacing to described switch fixed strip 10 horizontal direction.
the two ends of supporting traverse 2 are provided with for installing fixing bracket 1 with well enclosure.Longeron 70 is also provided with the skirting board 7 arranged against steel tube guardrail 4.Bracket 1 comprises installs dull and stereotyped 11 and installs dull and stereotyped 11 perpendicular to described level and installs flat board 11 with described level and be integrally connected and fixing vertically install flat board 12 for directly installing with well enclosure for directly installing fixing level with supporting traverse 2, the plate face that two brackets 1 wherein on a supporting traverse 2 vertical installs dull and stereotyped 12 be arranged in parallel with this supporting traverse 2, two brackets 1 on another root supporting traverse 2 vertical install the plate face of flat board 12 and this supporting traverse 2 is vertical arranges.
Claims (10)
1. a novel elevator hoistway pit overhaul platform structure, it is characterized in that: the supporting traverse (2) be arranged on well enclosure comprising two arrangement in parallels, two arrangement in parallels are fixed with and perpendicular to the longeron (70) of described supporting traverse (2) between two described supporting traverses (2), the position that two described supporting traverses (2) and two described longerons (70) are surrounded is provided with the bearing basement (80) for carrying service personnel, described bearing basement (80) is just being provided with the position of the energy disperser be arranged in hoistway below it and is being provided with for described energy disperser above-below direction and compensates second protective device (5) of rope above-below direction through rear normal work through first protective device (6) of rear normal work and compensating the position on rope circuit current up and down for described.
2. a kind of novel elevator hoistway pit overhaul platform structure according to claim 1, is characterized in that: bearing basement (80) has at least a part for wire net (8) and the laying area of described wire net (8) accounts for more than 1/3rd of described bearing basement (80) total laying area.
3. a kind of novel elevator hoistway pit overhaul platform structure according to claim 2, is characterized in that: the first protective device (6) is the cylindrical structure run through up and down.
4. a kind of novel elevator hoistway pit overhaul platform structure according to claim 3, is characterized in that: the second protective device (5) is the square cartridge structure run through up and down.
5. a kind of novel elevator hoistway pit overhaul platform structure according to claim 3 or 4, is characterized in that: the first protective device (6) and the second protective device (5) are all formed by connecting for carrying out splicing in the horizontal direction by plural stitching section.
6. a kind of novel elevator hoistway pit overhaul platform structure according to claim 5, it is characterized in that: supporting traverse (2) and longeron (70) are provided with steel tube guardrail (4), described steel tube guardrail (4) is hinged with the steel pipe doorframe (3) can come in and gone out for service personnel.
7. a kind of novel elevator hoistway pit overhaul platform structure according to claim 6, it is characterized in that: steel pipe doorframe (3) is positioned at and is welded with switch fixed strip (10) with the relative side of steel tube guardrail (4) hinged side, described steel tube guardrail (4) is hinged with and can rotates in perpendicular and the switch positive stop strip (9) coordinating described steel tube guardrail (4) spacing to described switch fixed strip (10) horizontal direction.
8. a kind of novel elevator hoistway pit overhaul platform structure according to claim 7, is characterized in that: longeron (70) is also provided with the skirting board (7) arranged against steel tube guardrail (4).
9. a kind of novel elevator hoistway pit overhaul platform structure according to claim 8, is characterized in that: the two ends of supporting traverse (2) are provided with for installing fixing bracket (1) with well enclosure.
10. a kind of novel elevator hoistway pit overhaul platform structure according to claim 9, it is characterized in that: bracket (1) comprises to be installed dull and stereotyped (11) and installs dull and stereotyped (11) perpendicular to described level and installs dull and stereotyped (11) with described level and be integrally connected for directly installing fixing level with supporting traverse (2) and fixing vertically install flat board (12) for directly installing with well enclosure, plate face and this supporting traverse (2) of the vertical installation dull and stereotyped (12) of two brackets (1) wherein on a supporting traverse (2) be arranged in parallel, the plate face of the vertical installation dull and stereotyped (12) of two brackets (1) on another root supporting traverse (2) is vertical with this supporting traverse (2) to be arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520229421.1U CN204549696U (en) | 2015-04-16 | 2015-04-16 | A kind of novel elevator hoistway pit overhaul platform structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520229421.1U CN204549696U (en) | 2015-04-16 | 2015-04-16 | A kind of novel elevator hoistway pit overhaul platform structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204549696U true CN204549696U (en) | 2015-08-12 |
Family
ID=53824833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520229421.1U Active CN204549696U (en) | 2015-04-16 | 2015-04-16 | A kind of novel elevator hoistway pit overhaul platform structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204549696U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105668371A (en) * | 2016-04-25 | 2016-06-15 | 上海爱登堡电梯(宜昌)有限公司 | Pit inspection platform device for elevator |
CN107524387A (en) * | 2017-09-12 | 2017-12-29 | 中山市鑫海精密制造科技有限公司 | The safety door of elevator pit inspection platform |
CN108238521A (en) * | 2018-01-26 | 2018-07-03 | 苏州沃诺斯精密机械有限公司 | A kind of frame elevator |
-
2015
- 2015-04-16 CN CN201520229421.1U patent/CN204549696U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105668371A (en) * | 2016-04-25 | 2016-06-15 | 上海爱登堡电梯(宜昌)有限公司 | Pit inspection platform device for elevator |
CN105668371B (en) * | 2016-04-25 | 2018-08-10 | 上海爱登堡电梯(宜昌)有限公司 | Elevator pit overhaul stage apparatus |
CN107524387A (en) * | 2017-09-12 | 2017-12-29 | 中山市鑫海精密制造科技有限公司 | The safety door of elevator pit inspection platform |
CN108238521A (en) * | 2018-01-26 | 2018-07-03 | 苏州沃诺斯精密机械有限公司 | A kind of frame elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204549696U (en) | A kind of novel elevator hoistway pit overhaul platform structure | |
CN103318768A (en) | Assembling method of quayside with low posture | |
CN202098951U (en) | Outdoor added elevator with hoistway in steel structure | |
CN203112302U (en) | Fixing support of elevator door motor | |
CN206126573U (en) | Machine -room -less goods elevator | |
CN203638924U (en) | Support for lift car guide rail and counter weight guide rail | |
CN206735587U (en) | Rotatable car top inspection box | |
CN202788597U (en) | Cat ladder device for going in/out lift pit | |
CN102991690A (en) | Synchronous boarding bridge rising and falling detection system | |
CN102953674A (en) | Hoistway ladder stand device for pit service and maintenance | |
CN212769259U (en) | Adjustable magnetic type traveling cable fixing structure | |
CN202575626U (en) | Installation device for machine-room-less lift traction machine | |
CN202542631U (en) | Non-pit connection guide rail base for high speed elevator | |
CN215666760U (en) | Sliding type horizontal wall-attached device for construction elevator | |
CN202249730U (en) | Shaft ladder stand device for overhauling and maintaining pit | |
CN205178966U (en) | Solar cell panel frame joint structure | |
CN207122122U (en) | Raise scaffold | |
CN201392761Y (en) | Load switch protective masking cover on rod | |
CN203638902U (en) | Multifunctional elevator guide rail support | |
CN205906868U (en) | Strenghthened type car with to a heavy rail brackets | |
CN208135695U (en) | A kind of hoistway with steel structure rail brackets installing mechanism | |
CN206422742U (en) | A kind of solar photovoltaic bracket | |
CN205187608U (en) | Goods lift room door sill support | |
CN205439948U (en) | Installation protective structure of power battery group | |
CN220950714U (en) | Down-travel preventing device and elevator device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |