CN208135695U - A kind of hoistway with steel structure rail brackets installing mechanism - Google Patents

A kind of hoistway with steel structure rail brackets installing mechanism Download PDF

Info

Publication number
CN208135695U
CN208135695U CN201721900564.6U CN201721900564U CN208135695U CN 208135695 U CN208135695 U CN 208135695U CN 201721900564 U CN201721900564 U CN 201721900564U CN 208135695 U CN208135695 U CN 208135695U
Authority
CN
China
Prior art keywords
support plate
rail brackets
hoistway
mounting plate
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721900564.6U
Other languages
Chinese (zh)
Inventor
罗建林
杨晨曦
韩伟良
杨涛
赵晓杰
沈福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Meilun Complete Elevator Co Ltd
Original Assignee
Zhejiang Meilun Complete Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Meilun Complete Elevator Co Ltd filed Critical Zhejiang Meilun Complete Elevator Co Ltd
Priority to CN201721900564.6U priority Critical patent/CN208135695U/en
Application granted granted Critical
Publication of CN208135695U publication Critical patent/CN208135695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of hoistway with steel structure rail brackets installing mechanism, including rail brackets beam, rail brackets beam includes the first support plate, second support plate, third support plate, 4th support plate, 5th support plate, 1 or more the first positioning groove is offered in third support plate, first locating piece is installed in the first positioning groove, 1 or more the second positioning groove is offered in 5th support plate, second locating piece is installed in the second positioning groove, rail brackets mounting plate is installed between third support plate and the 5th support plate, rail brackets mounting plate side is connected with the first locating piece, the rail brackets mounting plate other side is connected with the second locating piece;Rail brackets mounting plate is connected by bolt with rail brackets.A kind of hoistway with steel structure rail brackets installing mechanism described in the utility model, installation is simple, and installation error is small, effectively improves installation effectiveness.

Description

A kind of hoistway with steel structure rail brackets installing mechanism
Technical field
The utility model relates to a kind of hoistway with steel structure rail brackets installing mechanisms.
Background technique
With social horizontal raising, increase in demand of the people to elevator, some old residential quarters for not installing elevator are needed Install elevator additional, mostly need to be in outdoor mounted elevator due to not reserving the hoistway of elevator before, thus hoistway structure is mostly steelframe Structure.The hoistway of original steel frame construction, rail brackets are site welding on steelframe, and such mode installs relatively complicated, installation Error is larger.
Utility model content
The purpose of this utility model is to provide a kind of hoistway with steel structure rail brackets installing mechanisms, and installation is simple, peace It is small to fill error, effectively improves installation effectiveness.
In order to achieve the above object, the technical solution of the utility model is:
A kind of hoistway with steel structure rail brackets installing mechanism, including rail brackets beam, the rail brackets beam include first Support plate, the second support plate, third support plate, the 4th support plate, the 5th support plate, second support plate one end with first Fagging is vertically connected, and the second support plate other end is vertically connected with third support plate, described 4th support plate one end and the One support plate is vertically connected, and the 4th support plate other end is vertically connected with the 5th support plate;It is opened in the third support plate Equipped with 1 or more the first positioning groove, the first locating piece is installed in first positioning groove, in the 5th support plate 1 or more the second positioning groove is offered, the second locating piece, the third support plate are installed in second positioning groove Rail brackets mounting plate is installed between the 5th support plate, rail brackets mounting plate side is connected with the first locating piece, The rail brackets mounting plate other side is connected with the second locating piece;The rail brackets mounting plate passes through bolt and rail brackets It is connected.
First reinforcing rib, the rail brackets mounting plate are installed between the rail brackets mounting plate and third support plate The second reinforcing rib is installed between the 5th support plate.
Sliding slot groove is offered on the rail brackets mounting plate, and buffer stopper is installed in the sliding slot groove, it is described slow It rushes block and rail brackets is pushed against and installed.
First support plate, the second support plate, third support plate, the 4th support plate and the 5th support plate it is integrally manufactured and At.
The utility model has the beneficial effects that:A kind of hoistway with steel structure rail brackets installing mechanism, installation is simple, installation Error is small, effectively improves installation effectiveness.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the mounting structure schematic diagram of rail brackets beam and rail brackets mounting plate;
Fig. 3 is the structural schematic diagram of rail brackets beam.
Specific embodiment
Embodiment 1
A kind of hoistway with steel structure rail brackets installing mechanism as shown in Figure 1, Figure 2, Figure 3 shows, including rail brackets beam, it is described to lead Rail rack beams include the first support plate 1, the second support plate 2, third support plate 3, the 4th support plate 4, the 5th support plate 5, described Second support plate, 2 one end is vertically connected with the first support plate 1,2 other end of the second support plate phase vertical with third support plate 3 Even, described 4th support plate, 4 one end is vertically connected with the first support plate 1,4 other end of the 4th support plate and the 5th support plate 5 are vertically connected;1 or more the first positioning groove 11 is offered in the third support plate 3, in first positioning groove 11 First locating piece 12 is installed, 1 or more the second positioning groove 13 is offered in the 5th support plate 5, described second is fixed The second locating piece 14 is installed in the groove 13 of position, rail brackets peace is installed between the third support plate 3 and the 5th support plate 5 Loading board 6,6 side of rail brackets mounting plate are connected with the first locating piece 12,6 other side of rail brackets mounting plate and the Two locating pieces 14 are connected;The rail brackets mounting plate 6 is connected by bolt 7 with rail brackets 8.
First reinforcing rib 15, the rail brackets peace are installed between the rail brackets mounting plate 6 and third support plate 3 Second reinforcing rib 16 is installed between loading board 6 and the 5th support plate 5.
Sliding slot groove 17 is offered on the rail brackets mounting plate 6, and buffer stopper 18 is installed in the sliding slot groove 17, The buffer stopper 18 is pushed against with rail brackets 8 to be installed.
First support plate 1, the second support plate 2,5 one of third support plate 3, the 4th support plate 4 and the 5th support plate It is fabricated.
Hoistway with steel structure rail brackets installing mechanism described in the present embodiment during installation, install by selection rail brackets first First locating piece 12 of 6 side of rail brackets mounting plate is embedded in the first positioning groove 11 by the installation site of plate 6, by the A positioning block 12 is connected with third support plate 3;By the second positioning of the second locating piece 14 insertion of 6 other side of rail brackets mounting plate Groove 13 is connected by the second locating piece 14 with the 5th support plate 5.Then rail brackets installation is improved by the first reinforcing rib 15 Degree of firmly installing between plate 6 and third support plate 3 improves rail brackets mounting plate 6 and the 5th by the second reinforcing rib 16 Degree of firmly installing between fagging 5.Then rail brackets mounting plate 6 is connected by bolt 7 with rail brackets 8, since sliding slot is recessed Buffer stopper 18 is installed, buffer stopper 18 has rubber to be made, and by the extruding force of rail brackets 8 shape is occurred for buffer stopper 18 in slot 17 Become, to improve the degree of firmly installing between rail brackets mounting plate 6 and rail brackets 8, and avoids frictionally damage.
A kind of hoistway with steel structure rail brackets installing mechanism of the present embodiment, installation is simple, and installation error is small, effectively mentions High installation effectiveness.

Claims (4)

1. a kind of hoistway with steel structure rail brackets installing mechanism, it is characterised in that:Including rail brackets beam, the rail brackets beam Including the first support plate(1), the second support plate(2), third support plate(3), the 4th support plate(4), the 5th support plate(5), institute State the second support plate(2)One end and the first support plate(1)It is vertically connected, second support plate(2)The other end and third support Plate(3)It is vertically connected, the 4th support plate(4)One end and the first support plate(1)It is vertically connected, the 4th support plate(4) The other end and the 5th support plate(5)It is vertically connected;The third support plate(3)On offer 1 or more the first positioning groove (11), first positioning groove(11)First locating piece is inside installed(12), the 5th support plate(5)On offer 1 The the second above positioning groove(13), second positioning groove(13)Second locating piece is inside installed(14), the third branch Fagging(3)With the 5th support plate(5)Between rail brackets mounting plate is installed(6), the rail brackets mounting plate(6)Side with First locating piece(12)It is connected, the rail brackets mounting plate(6)The other side and the second locating piece(14)It is connected;The guide rail branch Frame mounting plate(6)Pass through bolt(7)With rail brackets(8)It is connected.
2. a kind of hoistway with steel structure rail brackets installing mechanism according to claim 1, it is characterised in that:The guide rail branch Frame mounting plate(6)With third support plate(3)Between the first reinforcing rib is installed(15), the rail brackets mounting plate(6)With Five support plates(5)Between the second reinforcing rib is installed(16).
3. a kind of hoistway with steel structure rail brackets installing mechanism according to claim 1, it is characterised in that:The guide rail branch Frame mounting plate(6)On offer sliding slot groove(17), the sliding slot groove(17)Buffer stopper is inside installed(18), the buffer stopper (18)With rail brackets(8)Push against installation.
4. a kind of hoistway with steel structure rail brackets installing mechanism according to claim 1, it is characterised in that:Described first Fagging(1), the second support plate(2), third support plate(3), the 4th support plate(4)With the 5th support plate(5)It is integrally manufactured to form.
CN201721900564.6U 2017-12-29 2017-12-29 A kind of hoistway with steel structure rail brackets installing mechanism Expired - Fee Related CN208135695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721900564.6U CN208135695U (en) 2017-12-29 2017-12-29 A kind of hoistway with steel structure rail brackets installing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721900564.6U CN208135695U (en) 2017-12-29 2017-12-29 A kind of hoistway with steel structure rail brackets installing mechanism

Publications (1)

Publication Number Publication Date
CN208135695U true CN208135695U (en) 2018-11-23

Family

ID=64284691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721900564.6U Expired - Fee Related CN208135695U (en) 2017-12-29 2017-12-29 A kind of hoistway with steel structure rail brackets installing mechanism

Country Status (1)

Country Link
CN (1) CN208135695U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629866A (en) * 2019-01-28 2019-04-16 安徽凯旋智能停车设备有限公司 A kind of rear rail beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629866A (en) * 2019-01-28 2019-04-16 安徽凯旋智能停车设备有限公司 A kind of rear rail beam

Similar Documents

Publication Publication Date Title
KR100899787B1 (en) Fixed Bracket
CN104370193A (en) Tractor mounting structure of elevator without machine room
CN101837917A (en) Hollow cage guide
EP1978176A3 (en) Structural beam system
CN208135695U (en) A kind of hoistway with steel structure rail brackets installing mechanism
JP2014141842A (en) Solar battery panel installation structure and method of forming the same
CN101955106A (en) Elevator guide rail bracket
CN209799053U (en) J-shaped base
CN203715010U (en) Limit caging device of elevator
CN210693832U (en) Ground photovoltaic support
CN204823578U (en) Elevator guide rail connecting plate with high stability
CN210176286U (en) Side-opening door type door head for heightening lift car
CN208761927U (en) A kind of compact home lift hoistway frame
CN205472180U (en) Gearless machine base
CN208220977U (en) A kind of mounting rack of plant area's wind-driven generator
CN209100555U (en) A finished bracket used in the middle of subway engineering
CN103101827A (en) Elevator door sill
CN204326249U (en) Body of wall and beam connection
CN206553032U (en) A kind of traction system layout of machine-roomless lift
CN207759866U (en) Small-sized rail brackets
CN215883640U (en) Subway platform door top telescopic machanism
CN204823579U (en) Elevator guide rail support with simple to operate and high stability function
CN205647373U (en) A stabilizer blade for installation of solar photovoltaic board
CN104291181A (en) Guiding track support shared by elevator lift car and counter weight
CN103723594A (en) Elevator limitation limiting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123