Rubble bedding desilting equipment Download PDFInfo
- Publication number
- CN204530815U CN204530815U CN201520113354.7U CN201520113354U CN204530815U CN 204530815 U CN204530815 U CN 204530815U CN 201520113354 U CN201520113354 U CN 201520113354U CN 204530815 U CN204530815 U CN 204530815U
- Authority
- CN
- China
- Prior art keywords
- dredging tube
- desilting
- inlet pipe
- air inlet
- bedding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to deep water bedding technical field of construction, provides a kind of rubble bedding desilting equipment.This equipment comprises dredging tube and air inlet pipe, and dredging tube is connected with downward putting device, and the bottom of dredging tube is transferred to by downward putting device and treated desilting position, and top is used for spoil disposal; One end of air inlet pipe connects and is close to the bottom of dredging tube, and the other end is connected with air compressor machine, and air inlet pipe is used for injecting air in dredging tube.This rubble bedding desilting equipment structure is simple, and cost is extremely low, but dredging effect is fabulous, can not damage bedding at any time, also not by the impact of the depth of water and current, and can realize accurate desilting.
Description
Technical field
The utility model relates to deep water bedding technical field of construction, provides a kind of rubble bedding desilting equipment especially.
Background technology
Island tunnel engineering rubble bedding adopts furrow formula structure, rubble adopts 2mm ~ 63mm graded broken stone, rubble bedding is by hardcore bed laying construction realization under water, as shown in Figure 1, hardcore bed comprises bottom and lays layer 12 and top layer laying layer 11, hardcore bed bottom is that jackstone rams flat basis 13, because the hardcore bed laying construction cycle is long, extraneous weather circumstance condition is complicated, hardcore bed is laid in operation process or has been laid the dangerous that rear experience back-silts, inevitable more residual mud in block crack of stone gap after desilting, namely prominent silt 14 is formed in the top side of top layer laying layer 11 and bottom laying layer 12, may be extruded in hardcore bed process of deployment and be piled up, namely the edge laying layer 12 at bottom forms crowded silt 15 with the joining place ramming flat basis.
If rubble bedding back-silts after having laid, immersed tube is installed and causes extreme influence, installation accuracy cannot be ensured, if the immersed tube of installation is transferred there is the weak mud of one deck, finally cause extreme influence to tube coupling is stressed, local pressure may be caused uneven, and immersed tube is excessive by shearing, make a difference sedimentation etc., brings very large risk 120 year application life to immersed tube tunnel.
Construction period, by CORS system real-time reception SEA LEVEL VARIATION information, realizes the dynamic conditioning of drag head being transferred to the degree of depth; Utilize boats and ships to harrow pipe automatic winch control system (SPWC), realize the position controlling heave compensator, make drag head be in security standpoint scope and expect dredging depth; Utilize real-time underwater topography, the drag head three dimensions Presentation Function in dredging monitoring platform, instruct excavation technology.Adopt existing desilting equipment will inevitably destroy rubble bedding, this desilting equipment can realize fixed point desilting and not destroy rubble bedding.Adopt the dredger desilting mode of special "removing sludge desilting of eddy current to be put by eddy current suction nozzle and inhale mud to mud face, " affixing one's seal " mode of employing carries out desilting, the same with drag suction dredger desilting all affect by external condition larger.
Utility model content
(1) technical problem that will solve
The purpose of this utility model is to provide a kind of little by ectocine, the rubble bedding desilting equipment that simultaneously can not damage rubble bedding.
(2) technical scheme
For achieving the above object, the utility model provides a kind of rubble bedding desilting equipment, comprising:
Dredging tube, described dredging tube is connected with downward putting device, and the bottom of described dredging tube is transferred to by described downward putting device and treated desilting position, and top is used for spoil disposal; With
Air inlet pipe, one end of described air inlet pipe connects and is close to the bottom of described dredging tube, and the other end is connected with air compressor machine, and described air inlet pipe is used for injecting air in described dredging tube.
Preferably, described downward putting device is the jackstone pipe for flattening rubble bedding.
Preferably, also comprise control system, control system comprises and is arranged on console on hull and the fixing by gross bearings GPS be connected with described console communication and elevation location GPS.
(3) beneficial effect
A kind of rubble bedding desilting equipment that the utility model provides, comprise dredging tube and air inlet pipe, dredging tube is connected with downward putting device, and the bottom of dredging tube is transferred to by downward putting device and treated desilting position, and top is used for spoil disposal; One end of air inlet pipe connects and is close to the bottom of dredging tube, and the other end is connected with air compressor machine, and air inlet pipe is used for injecting air in dredging tube.This rubble bedding desilting equipment structure is simple, and cost is extremely low, but dredging effect is fabulous, can not damage bedding at any time, also not by the impact of the depth of water and current, and can realize accurate desilting.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of deep water bedding technical field of construction medium stone bedding;
Fig. 2 is the schematic diagram of a kind of rubble bedding desilting equipment of the utility model embodiment.
Reference numeral:
11, top layer lays layer; 12, layer laid by bottom; 13, jackstone rams flat basis; 14, prominent silt; 15, silt is squeezed; 21, dredging tube; 22, air inlet pipe; 23, downward putting device.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is described in further detail.Following examples for illustration of the utility model, but are not used for limiting scope of the present utility model.
In description of the present utility model, except as otherwise noted, term " on ", D score, " top ", " bottom ", the orientation of the instruction such as " longitudinal direction " or state relation be based on orientation shown in the drawings or state relation, only the utility model and simplified characterization for convenience of description, instead of the device of instruction or hint indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.
In description of the present utility model, it should be noted that, unless otherwise clearly defined and limited, term " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be directly be connected, also indirectly can be connected by intermediary.For the ordinary skill in the art, concrete condition the concrete meaning of above-mentioned term in the utility model can be understood.
As shown in Figure 2, a kind of rubble bedding desilting equipment that the utility model provides, comprise dredging tube 21 and air inlet pipe 22: dredging tube 21 is connected with downward putting device 23, the bottom of dredging tube 21 is transferred to by downward putting device 23 and is treated desilting position, downward putting device 23 is the jackstone pipe for flattening rubble bedding, jackstone pipe be rubble bedding shaping time for the device of jackstone, jackstone pipe itself comprises the discharging mechanism for being transferred its bottom to jackstone position, is connected to the bottom of dredging tube 21 on jackstone pipe namely without the need to arranging separately other downward putting devices 23 again; The top of dredging tube 21 connects mud pipe, and for spoil disposal, mud pipe is flexible pipe, has certain length surplus, can do accommodation with the transferring the degree of depth of dredging tube 21; One end of air inlet pipe 22 connects and is close to the bottom of dredging tube 21, and the other end is connected with air compressor machine, and for injecting air in dredging tube 21, air inlet pipe 22 is also flexible pipe, and has certain length surplus, can meet the change of transferring the degree of depth of dredging tube 21.
During work by jackstone pipe by below the bottom of dredging tube 21 to treating desilting position, start air compressor machine, by air inlet pipe 22, air is driven in dredging tube 21, the density of dredging tube 21 inside reduces, water then in dredging tube 21, gas and mud mixture move upward along dredging tube 21 under the effect of extraneous hydraulic pressure, flow out eventually through mud pipe, realize the desilting of rubble bedding thus.
Preferably, also comprise control system, control system comprises and is arranged on console on hull and the fixing by gross bearings GPS be connected with described console communication and elevation location GPS, fixing by gross bearings GPS and elevation location GPS is used for the positional information of hull to feed back to operation bench, operating personnel adjust according to the position of feedback information by hull, locate accurately until reach; Preferably, in operation process, hull is lifted away from water surface construction by four pile legs, can guarantee that card jackstone pipe does not affect by current, wave etc. so further, namely the accuracy of the plane positioning of dredging tube and high process control can be made, console is also connected with downward putting device 23, controls downward putting device 23 and transfer after precise positioning, can realize the accurate location of dredging tube 21 and high process control thus.
This rubble bedding desilting equipment structure is simple, and cost is extremely low, but dredging effect is fabulous, can not damage bedding at any time, also not by the impact of the depth of water and current, and can realize accurate desilting.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make some improvement and replacement, these improve and replace and also should be considered as protection domain of the present utility model.
Claims (3)
1. a rubble bedding desilting equipment, is characterized in that, comprising:
Dredging tube (21), described dredging tube (21) is connected with downward putting device (23), the bottom of described dredging tube (21) is transferred to by described downward putting device (23) and is treated desilting position, and top is used for spoil disposal; With
Air inlet pipe (22), one end of described air inlet pipe (22) connects and is close to the bottom of described dredging tube (21), the other end is connected with air compressor machine, and described air inlet pipe (22) for injecting air in described dredging tube (21).
2. rubble bedding desilting equipment according to claim 1, is characterized in that, described downward putting device (23) is the jackstone pipe for flattening rubble bedding.
3. rubble bedding desilting equipment according to claim 1 and 2, is characterized in that, also comprise control system, and described control system comprises and is arranged on console on hull and the fixing by gross bearings GPS be connected with described console communication and elevation location GPS.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520113354.7U CN204530815U (en) | 2015-02-16 | 2015-02-16 | Rubble bedding desilting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520113354.7U CN204530815U (en) | 2015-02-16 | 2015-02-16 | Rubble bedding desilting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204530815U true CN204530815U (en) | 2015-08-05 |
Family
ID=53744840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520113354.7U Active CN204530815U (en) | 2015-02-16 | 2015-02-16 | Rubble bedding desilting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204530815U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652514A (en) * | 2015-02-16 | 2015-05-27 | 中交一航局第二工程有限公司 | Detritus foundation bed dredging equipment |
CN110565646A (en) * | 2019-08-16 | 2019-12-13 | 南通振华重型装备制造有限公司 | Riprap leveling head and construction process thereof |
-
2015
- 2015-02-16 CN CN201520113354.7U patent/CN204530815U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652514A (en) * | 2015-02-16 | 2015-05-27 | 中交一航局第二工程有限公司 | Detritus foundation bed dredging equipment |
CN110565646A (en) * | 2019-08-16 | 2019-12-13 | 南通振华重型装备制造有限公司 | Riprap leveling head and construction process thereof |
CN110565646B (en) * | 2019-08-16 | 2021-03-19 | 南通振华重型装备制造有限公司 | Riprap leveling head and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204530661U (en) | Deep water bedding compacting system | |
CN107630485B (en) | Open sea deep water is spread rubble foundation bed surface desilting system and desilting ship earlier | |
CN106381870B (en) | A kind of deep concrete mixture ship pile frame system and pile making method | |
CN105240019A (en) | Pipe jacking construction method | |
CN106218828B (en) | Removable wellhead platform and application method for offshore marginal oilfield exploitation | |
CN103038426A (en) | Method and apparatus for auxilary seafloor mining | |
CN204530815U (en) | Rubble bedding desilting equipment | |
CN104250968B (en) | From installation suction pile formula moveable platform structure | |
CN104652406B (en) | Deep water bedding tamper system | |
CN204875912U (en) | Dredging mechanical device | |
CN203373716U (en) | Self-installation suction pile type movable platform structure | |
CN104975612A (en) | Novel water open caisson construction technology | |
CN104878779A (en) | Covering-type silt prevention cover plate, silt prevention system and construction method of immersed tunnel gravel foundation bed | |
Deepak et al. | Development and testing of underwater mining systems for long term operations using flexible riser concept | |
CN106400807B (en) | Extra large work barge grouting method and its equipment | |
CN104652514A (en) | Detritus foundation bed dredging equipment | |
CN205000973U (en) | Riverbed bottom heavy -calibre push pipe construction equipment | |
CN205036963U (en) | A line protection device patrols for subwater pipe line is trailed | |
CN204300506U (en) | Submarine cable, optical cable, flexible pipe laying machine | |
CN106948326A (en) | A kind of amphibious Multifunctional reverse shovel | |
CN107587497B (en) | A method of improving hydraulic reclamation flatness | |
CN206157803U (en) | Formula grab dredger is dug to automatic side of bridge type | |
CN106400745B (en) | A kind of sea work barge operational method and equipment | |
CN205776125U (en) | Spillway gate recess ice breaker in winter | |
JP2016204875A (en) | Seabed resource mining system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |