CN107587497B - A method of improving hydraulic reclamation flatness - Google Patents
A method of improving hydraulic reclamation flatness Download PDFInfo
- Publication number
- CN107587497B CN107587497B CN201710748133.0A CN201710748133A CN107587497B CN 107587497 B CN107587497 B CN 107587497B CN 201710748133 A CN201710748133 A CN 201710748133A CN 107587497 B CN107587497 B CN 107587497B
- Authority
- CN
- China
- Prior art keywords
- hydraulic reclamation
- pipe
- tube head
- reclamation pipe
- hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The present invention provides a kind of methods for improving hydraulic reclamation flatness, comprising the following steps: is laying hydraulic reclamation pipe to hydraulic reclamation region, and is installing sinker in the hydraulic reclamation pipe end;Under hydraulic reclamation pipe not swing state, obtain hydraulic reclamation pipe tube head and hydraulic reclamation pipe tube head can between coverage area boundary point at a distance from line, hydraulic reclamation pipe tube head and hydraulic reclamation pipe tube head can the angle between line and hydraulic reclamation pipe tube head axis and the vertical range between hydraulic reclamation pipe tube head axis and Temporary Cofferdam between coverage area boundary point, calculate the swing angle for obtaining hydraulic reclamation pipe;Based on the swing angle of hydraulic reclamation pipe, hydraulic reclamation area is filled.A kind of method of raising hydraulic reclamation flatness of the invention, to improve the diffusion area of hydraulic reclamation pipe, reduces nozzle impulse force by adding sinker on hydraulic reclamation pipe, to accurately control hydraulic reclamation area absolute altitude to play, improves the purpose of hydraulic reclamation flatness.
Description
Technical field
The present invention relates to hydraulic engineering technical fields, more particularly, to a kind of method for improving hydraulic reclamation flatness.
Background technique
With deepening constantly for China's reform and opening-up, social economy is grown rapidly, populous, economically developed coastal
Area, especially coastal port, the demand to soil is growing, and project of reclaiming fields from the sea is increasing, and hydraulic reclamation is gradually extensive
Among these engineerings.More and more hydraulic reclamation technologies be used to reclaim fields from the sea now, development of harbor area, build the side.It blows
It needs to carry out the project under construction of some column such as later period piling prepressing in the sand face of hydraulic reclamation after filling out, so the flatness of hydraulic reclamation is to the later period
Construction has vital effect.
Hydraulic reclamation area flatness control methods generally have waterpower method, Mechanical Planarization method.Waterpower method in construction, passes through water flow
Hold mud ability under the arm, the reasonable flow direction for controlling mud, flow velocity, so that final flatness reaches design and code requirement.It is mechanical
Method mainly uses excavator, bull-dozer, dump truck etc. to carry out Secondary Transport in hydraulic reclamation area, by the soil of the high position of elevation
It is transported to the insufficient position of elevation, achievees the purpose that smooth location, control hydraulic reclamation flatness.One Dredger Filling Engineering, hydraulic reclamation area are dynamic
Often several square kilometres, it is very uneconomical to rely on Mechanical Planarization, and limited greatly by construction site condition.
In some reef Dredging and filling engineerings, sedimentation basin lower layer, hydraulic reclamation area is Extra-fine sand, and absolute altitude has been approached designed elevation, is needed
The hydraulic reclamation thickness to be re-blow is relatively thin, and the scouring force of conventional hydraulic reclamation pipe tube head is stronger, and diffusion area is small, and being unable to satisfy engineering needs
It wants.
Summary of the invention
The present invention provides a kind of method for improving hydraulic reclamation flatness, not high to solve upper existing hydraulic reclamation method hydraulic reclamation flatness
And the technical problem that accuracy is low.
According to an aspect of the present invention, a kind of method improving hydraulic reclamation flatness is provided, comprising the following steps:
S1, hydraulic reclamation pipe is being laid to hydraulic reclamation region, and is installing sinker in the hydraulic reclamation pipe end;
S2, under hydraulic reclamation pipe not swing state, obtaining the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can coverage area
Between boundary point the distance of line, the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can between coverage area boundary point line with
The vertical range between angle and the hydraulic reclamation pipe tube head axis and Temporary Cofferdam between the hydraulic reclamation pipe tube head axis calculates
Obtain the swing angle of hydraulic reclamation pipe;
S3, the swing angle based on the hydraulic reclamation pipe, are filled hydraulic reclamation area.
On the basis of above scheme preferably, the step S1 further include: install rubber additional in the sinker end of the hydraulic reclamation pipe
Glue swing pipe.
On the basis of above scheme preferably, the swing angle of the rubber swing pipe is 0 ° to 90 °.
On the basis of above scheme preferably, the formula of mathematical of the step S2 are as follows:
α=arcsin (Lb/La)-β;
Wherein, LaIndicate the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can between coverage area boundary point line away from
Indicate that the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can line and the hydraulic reclamation pipe pipes between coverage area boundary point from, β
Angle, L between head axisbIt indicates the vertical range between the hydraulic reclamation pipe tube head axis and Temporary Cofferdam, is blown described in α expression
Fill out the swing angle of pipe.
On the basis of above scheme preferably, the hydraulic reclamation pipe is rubber self floating pipe.
The method of a kind of raising hydraulic reclamation flatness of the invention, by adding sinker on hydraulic reclamation pipe, to improve hydraulic reclamation
The diffusion area of pipe reduces nozzle impulse force, to accurately control hydraulic reclamation area absolute altitude to play, improves the purpose of hydraulic reclamation flatness.
As it is a further advantage of the present invention that the present invention can also be according to hydraulic reclamation pipe tube head and to line between hydraulic reclamation region
Distance etc., with swing angle needed for accurately obtaining the different hydraulic reclamation pipes to hydraulic reclamation region, with further accurate control hydraulic reclamation area
Flatness and its absolute altitude.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the method for raising hydraulic reclamation flatness of the invention;
Fig. 2 is a kind of schematic diagram of the method for raising hydraulic reclamation flatness of the invention;
Fig. 3 is the structural schematic diagram of sinker of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below
Example is not intended to limit the scope of the invention for illustrating the present invention.
It should be noted that a kind of method of raising hydraulic reclamation flatness of the invention, be based on floating type Temporary Cofferdam into
It is capable, wherein floating type Temporary Cofferdam, including floating type breakwater, interior side closure dam and anti-reflux weir, floating type breakwater and anti-
Reflux weir is vertically arranged to form L-shaped fence, and interior side closure dam is installed on the outside of anti-reflux weir and is arranged in parallel with floating type breakwater,
And hydraulic reclamation pipe is installed on anti-reflux weir, hydraulic reclamation pipe passes through anti-reflux weir and extends to floating type breakwater side, and floating type anti-
Wave dike is spliced by rubber self floating pipe
In use, the region of hydraulic reclamation as needed first, floating type Temporary Cofferdam is installed on hydraulic reclamation boundary direction simultaneously
It is fixed, then according to the technical solution of the present invention, hydraulic reclamation is carried out to hydraulic reclamation area.
For the technical solution that present invention be described in more detail, blown refering to Figure 1, the present invention provides a kind of improve
The method for filling out flatness, comprising the following steps:
S1, hydraulic reclamation pipe is being laid to hydraulic reclamation region, and is installing sinker in hydraulic reclamation pipe end, to reduce hydraulic reclamation object at tube head
The flow velocity of material prevents from washing away, so that hydraulic reclamation material is evenly scattered in hydraulic reclamation area;
S2, under hydraulic reclamation pipe not swing state, obtain hydraulic reclamation pipe tube head by measuring and hydraulic reclamation pipe tube head can cover model
Enclosing the distance of line between boundary point, hydraulic reclamation pipe tube head and hydraulic reclamation pipe tube head can line and hydraulic reclamation between coverage area boundary point
Vertical range between angle between pipe tube head axis and hydraulic reclamation pipe tube head axis and Temporary Cofferdam calculates and obtains hydraulic reclamation pipe
Swing angle;
The swing angle of S3, the hydraulic reclamation pipe acquired according to calculating, the swing angle for adjusting hydraulic reclamation pipe carry out hydraulic reclamation area
Filling.
The present invention controls the flow velocity of hydraulic reclamation material using sinker due to having installed sinker in hydraulic reclamation pipe tube head, and
It is calculated by detection, to obtain the swing angle of hydraulic reclamation pipe, according to the swing angle of hydraulic reclamation pipe, to fill hydraulic reclamation area, thus with
The too low problem of the height of hydraulic reclamation caused by hydraulic reclamation excessive height or swing angle caused by preventing swing angle too small are excessive, with
Guarantee its hydraulic reclamation flatness, improves its construction efficiency.Wherein, the structure of sinker please refers to shown in Fig. 3.
In another preferred embodiment of the invention, step S1 of the invention further include: at the sinker end of hydraulic reclamation pipe
End installs rubber swing pipe additional, and the swing angle of hydraulic reclamation pipe is further increased by rubber swing pipe, is blown to can not only expand it
Area is filled out, its construction efficiency is improved, and due to the characteristic of rubber swing pipe, the flatness in hydraulic reclamation area can be effectively improved.It is preferred that
, the swing angle of the rubber swing pipe of the utility model is 0 ° to 90 °.
Please continue to refer to shown in Fig. 2, the formula of mathematical of step S2 of the invention are as follows:
α=arcsin (Lb/La)-β;
Wherein, LaIndicate the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can between coverage area boundary point line away from
Indicate that the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can line and the hydraulic reclamation pipe pipes between coverage area boundary point from, β
Angle, L between head axisbIt indicates the vertical range between the hydraulic reclamation pipe tube head axis and Temporary Cofferdam, is blown described in α expression
Fill out the swing angle of pipe.
It is worth noting that hydraulic reclamation pipe of the invention is rubber self floating pipe, and the laying of hydraulic reclamation pipe is divided into water borne conduit cloth
If being laid with continental line.
Wherein, waterborne pavement pipeline should determine reasonable pipeline connection type according to the natural conditions of job location, prevent
Occurs the construction accident of disconnected pipe when stormy waves is big.The hydraulic reclamation pipe of fixed pipeline section waterborne mostly uses self floating pipe or steel pipe and scratches
Property pipe be indirectly connected, lengths of steel pipes is and fixed with pipeline anchoring by binary platform bearer.Immersed tube can be used in special circumstances.It is waterborne floating
Pipe is usually first assembled into segmentation, and section length is advisable with 150-160m.It should will construct while assembling float tube waterborne segmentation
Anchor arrangement is appropriate.Then every section of float tube traction waterborne is in place to construction area, usually since immersed tube head or land and water frame head successively
Docking.
It is generally carried out using flood slack in sea area or tidal reach float tube.Its method is as follows: the float tube being first clamped
Sludge discharging area is clamped or is fixed on land spoil disposal tube head;Then the other end of float tube and dredger stern sludge pipe are clamped;
Tugboat or anchor ship top float tube downstream are finally used, will be risen in time, the pipe anchor in ebb tide direction is cast.
And land hydraulic reclamation line layout includes two part of land hydraulic reclamation pipe and land and water pipe support, land and water pipeline is connected with two kinds of sides
Method: coupling one is direct with hydraulic reclamation pipe hose waterborne, and one is centres to set up pipe support or platform connection.
During hydraulic reclamation pipe is laid, land hydraulic reclamation pipe should be laid as far as possible, and reduces laying hydraulic reclamation pipe waterborne, to subtract
Few sludge pipe hydraulic loss waterborne.
The method of a kind of raising hydraulic reclamation flatness of the invention, by adding sinker on hydraulic reclamation pipe, to improve hydraulic reclamation
The diffusion area of pipe reduces nozzle impulse force, to accurately control hydraulic reclamation area absolute altitude to play, improves the purpose of hydraulic reclamation flatness.
As it is a further advantage of the present invention that the present invention can also be according to hydraulic reclamation pipe tube head and to line between hydraulic reclamation region
Distance etc., with swing angle needed for accurately obtaining the different hydraulic reclamation pipes to hydraulic reclamation region, with further accurate control hydraulic reclamation area
Flatness and its absolute altitude.
Finally, the present processes are only preferable embodiment, it is not intended to limit the scope of the present invention.It is all
Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention
Within the scope of.
Claims (4)
1. a kind of method for improving hydraulic reclamation flatness, which comprises the following steps:
S1, hydraulic reclamation pipe is being laid to hydraulic reclamation region, and is installing sinker in the hydraulic reclamation pipe end;
S2, under hydraulic reclamation pipe not swing state, obtaining the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can coverage area boundary
Between point distance, the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head of line can between coverage area boundary point line with it is described
The vertical range between angle and the hydraulic reclamation pipe tube head axis and Temporary Cofferdam between hydraulic reclamation pipe tube head axis is calculated and is obtained
The swing angle of hydraulic reclamation pipe;The formula of mathematical of the swing angle are as follows:
α=arcsin (Lb/La)-β;
Wherein, LaIndicate that the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can be between coverage area boundary points at a distance from line, β
Indicate that the hydraulic reclamation pipe tube head and the hydraulic reclamation pipe tube head can line and the hydraulic reclamation pipe tube head axis between coverage area boundary point
Angle, L between linebIndicate the vertical range between the hydraulic reclamation pipe tube head axis and Temporary Cofferdam, α indicates the hydraulic reclamation pipe
Swing angle;
S3, the swing angle based on the hydraulic reclamation pipe, are filled hydraulic reclamation area.
2. a kind of method for improving hydraulic reclamation flatness as described in claim 1, which is characterized in that the step S1 further include:
Rubber swing pipe is installed additional in the sinker end of the hydraulic reclamation pipe.
3. a kind of method for improving hydraulic reclamation flatness as claimed in claim 2, which is characterized in that the pendulum of the rubber swing pipe
Dynamic angle is 0 ° to 90 °.
4. a kind of method for improving hydraulic reclamation flatness as described in claim 1, which is characterized in that the hydraulic reclamation pipe be rubber from
Float tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710748133.0A CN107587497B (en) | 2017-08-28 | 2017-08-28 | A method of improving hydraulic reclamation flatness |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710748133.0A CN107587497B (en) | 2017-08-28 | 2017-08-28 | A method of improving hydraulic reclamation flatness |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107587497A CN107587497A (en) | 2018-01-16 |
CN107587497B true CN107587497B (en) | 2019-09-27 |
Family
ID=61041763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710748133.0A Active CN107587497B (en) | 2017-08-28 | 2017-08-28 | A method of improving hydraulic reclamation flatness |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107587497B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109137943B (en) * | 2018-08-28 | 2020-06-23 | 中交上海航道局有限公司 | Earth filling construction process for sea reclamation |
CN110258690A (en) * | 2019-06-28 | 2019-09-20 | 中交天航港湾建设工程有限公司 | Anti-extrusion become silted up in hydraulic reclamation area dissipates paving construction energy dissipator and energy-dissipating system and construction method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1027328A1 (en) * | 1981-03-25 | 1983-07-07 | Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники И Мелиорации Им.А.Н.Костякова | Method and apparatus for hydraulic filling of dams |
CN202989978U (en) * | 2012-11-07 | 2013-06-12 | 中交天航南方交通建设有限公司 | Scattered energy dissipative device |
CN204570663U (en) * | 2015-05-07 | 2015-08-19 | 程义吉 | Hydraulic reclamation district barged-in fill isotropic deposit tapping equipment |
-
2017
- 2017-08-28 CN CN201710748133.0A patent/CN107587497B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107587497A (en) | 2018-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672195B (en) | Suction Dredging Construction engineering method is twisted under a kind of urban ecology urban river water | |
CN104196034A (en) | Foundation pit construction method employing steel sheet piles as support cofferdam | |
CN1256531C (en) | Construction method for river crossing pipeline | |
CN102605697A (en) | Sand dredger filling construction method of soft soil foundation embankment | |
CN107763307A (en) | A kind of water filling nature immersed tube crosses the installation method of river pipeline | |
CN109024525B (en) | Artificial island structure considering underground space development and utilization and construction method thereof | |
CN103628507B (en) | Push pipe passes through the shallow earthing anti-floating construction method in seabed | |
CN109137943B (en) | Earth filling construction process for sea reclamation | |
CN113957913A (en) | Construction method of film bag sand filling combined steel sheet pile cofferdam | |
CN107587497B (en) | A method of improving hydraulic reclamation flatness | |
CN104878779B (en) | The anti-silting cover plate of immersed tube tunnel rubble bedding cover type, anti-silting system and construction method | |
CN102561379A (en) | Novel bridge installation foundation and construction method thereof | |
CN104975612A (en) | Novel water open caisson construction technology | |
CN102767155A (en) | Reservoir dredging pipe system and layout method thereof | |
CN108532546B (en) | Method for reversed-order excavation of harbor basin and channel | |
Smith | Types of marine concrete structures | |
CN107338760B (en) | Low-tidal-difference harbor section wall caisson wharf structure and construction method thereof | |
CN209353400U (en) | A kind of totally-enclosed pipe-line transportation system of long range | |
CN115823351B (en) | Installation method and installation parameter design method for submarine pipeline at shoal section | |
CN209066440U (en) | Stake method jacket underwater grouting pipeline system after one kind | |
CN113047215B (en) | High stake pier structure of medium plate stake | |
CN201580547U (en) | Pontoon applicable to excavation operation on water surface | |
CN104878792A (en) | Rigid frame-type geotextile covering silt prevention system and method of immersed tunnel foundation bed | |
CN209353399U (en) | A kind of band draws the pipe-line transportation system of slope structure | |
CN202451974U (en) | Anti-floating structure of buried pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |