CN204510148U - 一种吹填施工辅助装置 - Google Patents

一种吹填施工辅助装置 Download PDF

Info

Publication number
CN204510148U
CN204510148U CN201520110339.7U CN201520110339U CN204510148U CN 204510148 U CN204510148 U CN 204510148U CN 201520110339 U CN201520110339 U CN 201520110339U CN 204510148 U CN204510148 U CN 204510148U
Authority
CN
China
Prior art keywords
pipe
pool
steel pipe
tube connector
hydraulic reclamation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520110339.7U
Other languages
English (en)
Inventor
胡宏军
沈林
吴国强
朱宇
王丽建
黄昌满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Conservancy and Hydropower Construction Co., Ltd.
Original Assignee
SDC WATERWAY CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SDC WATERWAY CONSTRUCTION CO Ltd filed Critical SDC WATERWAY CONSTRUCTION CO Ltd
Priority to CN201520110339.7U priority Critical patent/CN204510148U/zh
Application granted granted Critical
Publication of CN204510148U publication Critical patent/CN204510148U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本实用新型涉及吹填施工辅助装置,其特征在于:包括多组首尾连通的进塘管,每组进塘管均包括:钢管;连接管,连接管的第一端与钢管第一端连接,连接管的第二端与相连一组的进塘管中钢管的第二端连接;多个间隔设置在钢管上的自浮体;前述多组进塘管首尾连通后,并推入吹填区,而靠近陆地一侧的连接管第二端与吹填管线连通。与现有技术相比,本实用新型的优点在于:采用本实用新型提供的吹填施工辅助装置,出泥口位置可以延伸至泥塘中间,并且能灵活变换,彻底解决了大面积吹填施工平整度控制的问题。施工过程中,进塘管通过陆上挖机与水陆两栖挖机的配合推拉入吹填区即可,操作简便,施工费用低廉,具有很大的推广价值。

Description

一种吹填施工辅助装置
技术领域
本实用新型涉及一种吹填施工辅助装置。
背景技术
围海造地项目中,先吹填淤泥然后进行软基处理的工艺在我国沿海一带被广泛采用,但为了减少修筑围堰的费用而降低造地成本,吹填区的面积变的越来越大。大面积吹填区在施工过程中很难保证吹填区内的平整度。
针对吹填海底淤泥而言,常规的施工工艺中出泥口位置只能沿围堰四周进行布置,这样在吹填区中部区域易造成低洼地带,严重影响造陆后的土地平整度。为此,施工人员通过各种方法将吹填管口向吹填区内移动,如搭设临时的排架、吹填粗颗粒土等工程措施,但对于大面积的吹填工程而言,上述工程措施不仅施工费用较高,且出泥口深入吹填区的距离十分有限,出泥口方向也很固定,根本无法满足大面积吹填条件下的平整度要求。
实用新型内容
本实用新型所要解决的技术问题是针对上述现有技术提供一种能提高大面积吹填平整度的吹填施工辅助装置。
本实用新型解决上述技术问题所采用的技术方案为:一种吹填施工辅助装置,其特征在于:包括多组首尾连通的进塘管,每组进塘管均包括:
钢管;
连接管,连接管的第一端与钢管第一端连接,连接管的第二端与相连一组的进塘管中钢管的第二端连接;
多个间隔设置在钢管上的自浮体;
前述多组进塘管首尾连通后,并推入吹填区,而靠近陆地一侧的连接管第二端与吹填管线连通。
较好的,每组进塘管线由4节长度为6m的钢管,4个自浮体,和1节长度为2m的橡胶连接管组成。
与现有技术相比,本实用新型的优点在于:采用本实用新型提供的吹填施工辅助装置,出泥口位置可以延伸至泥塘中间,并且能灵活变换,彻底解决了大面积吹填施工平整度控制的问题。施工过程中,进塘管通过陆上挖机与水陆两栖挖机的配合推拉入吹填区即可,操作简便,施工费用低廉,具有很大的推广价值。
附图说明
图1为本发明实施例中一组进塘管的结构图。
具体实施方式
以下结合附图实施例对本实用新型作进一步详细描述。
如图1所示的吹填施工辅助装置,其包括多组首尾连通的进塘管,每组进塘管均包括:
4节长度为6m的首位相接的钢管1;
长度为2m的橡胶连接管2,连接管的第一端与第一节钢管1的第一端连接,连接管2的第二端与相邻一组的进塘管中第四节钢管的第二端连接;
每节钢管上均设有一个自浮体3;
前述多组进塘管首尾连通后,并推入吹填区,而靠近陆地一侧的连接管第二端与吹填管线连通。
具体组装过程为:一组进塘管装完毕后,利用岸上挖机将其顶入吹填区,然后组装下一组进塘管,然后将下一组进塘管与上一组进塘管连接,再将其顶入吹填区,如此反复进行。若进塘距离较远,水陆两用挖机可在吹填管口拉,岸上挖机将吹填管线往里顶,如此配合施工可以最大限度的将吹填管线接入吹填区。进塘管拆除时,按照相反的步骤操作即可。当需要整体移动进塘管位置时,也勿需拆掉全部管线进行重新接管,可使用水陆挖机拖带进塘管在吹填区内自由移动,达到其它围堤边后接管即可。

Claims (2)

1.一种吹填施工辅助装置,其特征在于:包括多组首尾连通的进塘管,每组进塘管均包括:
钢管;
连接管,连接管的第一端与钢管第一端连接,连接管的第二端与相连一组的进塘管中钢管的第二端连接;
多个间隔设置在钢管上的自浮体;
前述多组进塘管首尾连通后,并推入吹填区,而靠近陆地一侧的连接管第二端与吹填管线连通。
2.根据权利要求1所述的吹填施工辅助装置,其特征在于:每组进塘管线由4节长度为6m的钢管,4个自浮体,和1节长度为2m的橡胶连接管组成。
CN201520110339.7U 2015-02-15 2015-02-15 一种吹填施工辅助装置 Active CN204510148U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520110339.7U CN204510148U (zh) 2015-02-15 2015-02-15 一种吹填施工辅助装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520110339.7U CN204510148U (zh) 2015-02-15 2015-02-15 一种吹填施工辅助装置

Publications (1)

Publication Number Publication Date
CN204510148U true CN204510148U (zh) 2015-07-29

Family

ID=53708140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520110339.7U Active CN204510148U (zh) 2015-02-15 2015-02-15 一种吹填施工辅助装置

Country Status (1)

Country Link
CN (1) CN204510148U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110747865A (zh) * 2019-11-01 2020-02-04 中冶沈勘秦皇岛工程设计研究总院有限公司 细尾矿快速成滩的装置及方法
CN113699974A (zh) * 2021-09-24 2021-11-26 华电重工股份有限公司 用于海上风机基础的固化土吹填装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110747865A (zh) * 2019-11-01 2020-02-04 中冶沈勘秦皇岛工程设计研究总院有限公司 细尾矿快速成滩的装置及方法
CN113699974A (zh) * 2021-09-24 2021-11-26 华电重工股份有限公司 用于海上风机基础的固化土吹填装置

Similar Documents

Publication Publication Date Title
CN103981898B (zh) 一种整体明挖节点逆作的地下工程施工方法
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN205778883U (zh) 一种隧道内顶管施工与盾构施工的连接转换装置
CN102011391A (zh) 一种软弱地基的加固处理方法
CN103114599A (zh) 深基坑封闭降水装置及其施工方法
CN205116247U (zh) 水利冲沉沉井施工设备
CN203242968U (zh) 海底电缆深埋铺缆机
CN204510148U (zh) 一种吹填施工辅助装置
CN102261519B (zh) 气囊辅助管道滑移漂浮下沟方法
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN202925588U (zh) 一种龟步履带行走式清淤机
CN103276752A (zh) 一种地下连续墙膨胀混凝土接头的施工方法
CN102116031A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN107460881A (zh) 一种软地基水冲法土方开挖施工工艺
CN103031838A (zh) 一种桥位深层挤淤方法
CN102619214B (zh) 一种u形接口钢板桩及其在基坑围护中的应用
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN104328814A (zh) 大深度海底管道后挖沟工艺
CN203113361U (zh) 深基坑封闭降水装置
CN202543857U (zh) 一种新型分离组合圆筒结构
CN205604273U (zh) 一种砂质粉土上的围堰
CN108755721A (zh) 一种新型过水河道内管廊施工的围堰支护方法
CN204139229U (zh) 一种地铁深基坑降水井清淤装置
CN205171501U (zh) 一种工字钢接头式地下连续墙绕流处理装置
CN105297774A (zh) 一种用于建造隧道的沉管施工装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee after: China Water Conservancy and Hydropower Construction Co., Ltd.

Address before: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee before: SDC Waterway Construction Co., Ltd.

CP01 Change in the name or title of a patent holder