CN204510015U - High span Steel Truss Beam takes assembling structure - Google Patents

High span Steel Truss Beam takes assembling structure Download PDF

Info

Publication number
CN204510015U
CN204510015U CN201520170872.2U CN201520170872U CN204510015U CN 204510015 U CN204510015 U CN 204510015U CN 201520170872 U CN201520170872 U CN 201520170872U CN 204510015 U CN204510015 U CN 204510015U
Authority
CN
China
Prior art keywords
lockage
steel truss
bailey beam
platform
assembling structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520170872.2U
Other languages
Chinese (zh)
Inventor
孙蔚
陈大庆
叶雷
刘辉
宋善昂
夏国法
谭仁兵
马马
李冰洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ts Traffic Design & Research Institute Co ltd
Original Assignee
JIANGSU HUAI'AN TRAFFIC SURVEY AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUAI'AN TRAFFIC SURVEY AND DESIGN INSTITUTE Co Ltd filed Critical JIANGSU HUAI'AN TRAFFIC SURVEY AND DESIGN INSTITUTE Co Ltd
Priority to CN201520170872.2U priority Critical patent/CN204510015U/en
Application granted granted Critical
Publication of CN204510015U publication Critical patent/CN204510015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses high span Steel Truss Beam and take assembling structure, comprise the main pier that spacing is erect, main pier inner side edge sets up bracing frame, sets up Bailey beam lockage between bracing frame, the lower chord of described Bailey beam lockage crosses many i iron and form platform, platform is taken dress steel truss girder.The utility model forms platform owing to crossing many i iron at the lower chord of Bailey beam lockage, and platform is taken dress steel truss girder, and Bailey beam lockage is as transition member, and then remove Bailey beam lockage and construct, under-clearance meets navigation requirement.

Description

High span Steel Truss Beam takes assembling structure
Technical field
The utility model relates to field of bridge construction, is specifically related to high span Steel Truss Beam and takes assembling structure.
Background technology
The general employing of Steel Truss Beam construction sets up rack construction at the bottom of beam, be specially main pier inner side edge and set up bracing frame, Bailey beam lockage is set up between bracing frame, then above Bailey beam lockage, dress Steel Truss Beam (as shown in Figure 3) is taken in construction, and this kind of constructure scheme is implemented when under-clearance can meet the demands.But in particular cases, open the navigation or air flight under will keeping bridge, bridge can not be raised again owing to limiting, and after setting up Bailey beam under causing bridge, clear height does not meet navigation requirement.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of high span Steel Truss Beam and takes assembling structure, cross many i iron at the lower chord of Bailey beam lockage and form platform, platform is taken dress steel truss girder, and then dismounting Bailey beam lockage and i iron are constructed, and under-clearance meets navigation requirement.
The utility model is achieved through the following technical solutions:
High span Steel Truss Beam takes assembling structure, and comprise the main pier that spacing is erect, main pier inner side edge sets up bracing frame, sets up Bailey beam lockage between bracing frame, the lower chord of described Bailey beam lockage crosses many i iron and forms platform, platform is taken dress steel truss girder.
The further improvement project of the utility model is, the lower chord of described Bailey beam lockage flushes with the bracing frame the superiors.
The utility model further improvement project is provided with support post below support frame as described above.
The utility model compared with prior art, has following obvious advantage:
The utility model forms platform owing to crossing many i iron at the lower chord of Bailey beam lockage, and platform is taken dress steel truss girder, and Bailey beam lockage is as transition member, and then dismounting Bailey beam lockage and i iron are constructed, and under-clearance meets navigation requirement.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation after the utility model removes Bailey beam lock and i iron.
Fig. 3 is that existing high span Steel Truss Beam takes assembling structure schematic diagram.
Detailed description of the invention
As shown in Figure 1, the utility model comprises the main pier 1 that spacing is erect, support post 6 is provided with inside main pier 1, support post 6 is set up bracing frame 2, Bailey beam lockage 3 is set up between bracing frame 2, the lower chord of Bailey beam lockage 3 flushes with bracing frame 2 the superiors, the lower chord of Bailey beam lockage 3 crosses many i iron 4 and forms platform, platform is taken dress steel truss girder 5.
The utility model Bailey beam lockage is as transition member, and steel truss girder is taken and installed into rear dismounting Bailey beam lockage and i iron carries out construct (as shown in Figure 2), and under-clearance meets navigation requirement.

Claims (3)

1. high span Steel Truss Beam takes assembling structure, comprise the main pier (1) that spacing is erect, main pier (1) inner side edge sets up bracing frame (2), Bailey beam lockage (3) is set up between bracing frame (2), it is characterized in that: the lower chord of described Bailey beam lockage (3) crosses many i iron (4) and form platform, platform is taken dress steel truss girder (5).
2. high span Steel Truss Beam according to claim 1 takes assembling structure, it is characterized in that: the lower chord of described Bailey beam lockage (3) flushes with bracing frame (2) the superiors.
3. high span Steel Truss Beam according to claim 1 takes assembling structure, it is characterized in that: support frame as described above (2) below is provided with support post (6).
CN201520170872.2U 2015-03-25 2015-03-25 High span Steel Truss Beam takes assembling structure Expired - Fee Related CN204510015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520170872.2U CN204510015U (en) 2015-03-25 2015-03-25 High span Steel Truss Beam takes assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520170872.2U CN204510015U (en) 2015-03-25 2015-03-25 High span Steel Truss Beam takes assembling structure

Publications (1)

Publication Number Publication Date
CN204510015U true CN204510015U (en) 2015-07-29

Family

ID=53708009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520170872.2U Expired - Fee Related CN204510015U (en) 2015-03-25 2015-03-25 High span Steel Truss Beam takes assembling structure

Country Status (1)

Country Link
CN (1) CN204510015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034788A (en) * 2017-05-09 2017-08-11 中铁大桥局集团有限公司 A kind of suspender tension device and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034788A (en) * 2017-05-09 2017-08-11 中铁大桥局集团有限公司 A kind of suspender tension device and its construction method
CN107034788B (en) * 2017-05-09 2019-02-15 中铁大桥局集团有限公司 A kind of suspender tension device and its construction method

Similar Documents

Publication Publication Date Title
CN107355037A (en) Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method
CN204510015U (en) High span Steel Truss Beam takes assembling structure
CN103061514B (en) Long-span steel structure corridor construction method
CN203514644U (en) Steel bar net rack of wall body and wall body with same
CN203144908U (en) Supporting system of urban steel box beam viaduct construction
CN204342306U (en) A kind of novel roofing crane foundation
CN205186218U (en) All -purpose transport vechicle of fan blade girder
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN203890893U (en) Supporting bracket for integral lifting of hollow slab girder
CN204152264U (en) A kind of Chimney in Fossil Power Plant access path
CN202280150U (en) Corner post configuration structure of monolayer door type rigid frame
CN204357020U (en) Ancient building eaves structure
CN204530988U (en) A kind of large span lattice crane beam
CN206090824U (en) Adopt archaize building steel frame structure system of I shape cross -section roof beam
CN205646736U (en) Optimalarc cable support
CN205441632U (en) A stand composite set for steel platform
CN203814270U (en) Flower box base pallet
CN203271193U (en) Large overhang stand with space structure
CN204389761U (en) Lightguide cable link emergency maintenance lift rack
CN204475851U (en) Without supporting cantilevered plate die mould steel work in housing beam
CN203602223U (en) Box girder steel external mold hoisting device
CN204174547U (en) The highway bridge paravent that can advertise
CN203742165U (en) Fabricated structure cast-in-place staircase shaping formwork
CN203603033U (en) Rotation continuous beam closure segment steel shell
CN203144910U (en) Frame structure for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 223005 No. 12, science and technology road, Huaian Economic Development Zone, Jiangsu

Patentee after: JIANGSU TS TRAFFIC DESIGN & RESEARCH INSTITUTE CO.,LTD.

Address before: 223005 No. 12, science and technology road, Huaian Economic Development Zone, Jiangsu

Patentee before: JIANGSU HUAI AN TRAFFIC SURVEY AND DESIGN INST Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

CF01 Termination of patent right due to non-payment of annual fee