CN204508565U - A kind of suspender for handling photovoltaic module case - Google Patents
A kind of suspender for handling photovoltaic module case Download PDFInfo
- Publication number
- CN204508565U CN204508565U CN201420755654.0U CN201420755654U CN204508565U CN 204508565 U CN204508565 U CN 204508565U CN 201420755654 U CN201420755654 U CN 201420755654U CN 204508565 U CN204508565 U CN 204508565U
- Authority
- CN
- China
- Prior art keywords
- upper arm
- photovoltaic module
- module case
- described upper
- suspender
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of suspender for handling photovoltaic module case, comprise upper arm, the hanger be fixed on described upper arm, connect described hanger hoist cable, be fixed on the column bottom described upper arm and be fixed on the underarm of described column bottom; Described upper arm has 2, and described upper arm has 2 hangers, each hanger has guide rail, there is chute guide rail both sides, and the bearing pin of hoist cable end is embedded in described chute; Checkered plate is arranged at the top of described underarm front end; The end of described upper arm front end is provided with safety card, and described safety card is movably installed in the end of described upper arm front end.When the technical program is used for the photovoltaic module case of handling intensive stacking, hoist cable is installed and is easy to, and effectively reduces the engineering time, improves operating efficiency.
Description
Technical field
The utility model includes the suspender of rope, particularly relates to a kind of suspender for handling photovoltaic module case.
Background technology
Photovoltaic module case is transported to photovoltaic plant erecting stage after being freighted with fork truck by production plant area, first deposits, when mounted then by near crane for hoisting to installation site with fork truck or hoisting crane unloading temporarily.Generally photovoltaic module case is closely piled up on heavy goods vehicles during fork truck loading, the difficulty that Current Collector Sleave installs when erecting stage hoisting crane unload, to be run into if be transported to, need the time that cost is many.When goods is stacked, hanging belt is revealed all the details more difficult, cannot hang suspender belt, and the lifting angle limits quantity of a hanging device, efficiency is low.
Utility model content
The purpose of this utility model is to provide a kind of suspender for handling photovoltaic module case, the photovoltaic module case of the intensive stacking of handling, and hoist cable is installed easily, effectively can reduce the engineering time.
The technical solution of the utility model is a kind of suspender for handling photovoltaic module case, comprise upper arm, the hanger be fixed on described upper arm, connect described hanger hoist cable, be fixed on the column bottom described upper arm and be fixed on the underarm of described column bottom; Described upper arm has 2, and described upper arm has 2 hangers, each hanger has guide rail, there is chute guide rail both sides, and the bearing pin of hoist cable end is embedded in described chute; Checkered plate is arranged at the top of described underarm front end; The end of described upper arm front end is provided with safety card, and described safety card is movably installed in the end of described upper arm front end.Described upper arm and underarm are horizontally disposed with, and the two ends up and down of described column are fixed with the rear end of upper arm and underarm respectively.
Before lifting, suspender is lain on level land, pack up safety card, mobile hoist cable, the bearing pin of hoist cable end is slided into idle position along guide rail, hoist cable upper end is hung on the suspension hook of hoisting crane, the suspension hook that hoists hoist cable is tightened and bearing pin tension in the through hole of idle position, suspender is hung ground by the suspension hook level that continues to hoist.
During handling, by suspender handling to photovoltaic module case side, bracket bottom top, alignment light photovoltaic assembly case center, suspension bracket upper arm center, underarm alignment light photovoltaic assembly case, suspension bracket upper arm, underarm are all perpendicular to photovoltaic module case side, commander's hoisting crane makes the upper underarm translation of suspender enter photovoltaic module case, make the approximate coincidence of the geometric centre of the geometric centre of suspension bracket and photovoltaic module case, moving process notices that upper arm, underarm all should keep gap with photovoltaic module case, held stationary, does not swipe, collides with photovoltaic module case.
After handling, Panasonic's hook slightly, after allowing hoist cable relax, hoist cable is carried position at the bearing pin of guide rail by the band that moves to of idle position, the suspension hook that hoists is tightened by hoist cable and bearing pin tension carries position at the band of positioning groove, then hoisting crane is commanded steadily to hoist suspension hook, with suspender, photovoltaic module case is hung ground or lorry plate, optionally by safety card half-twist, can buckle well.
After the handling to assigned address of photovoltaic module case, after hoist cable is lax, opens safety card and packs up, hoist cable is carried position at the bearing pin of guide rail by the band of positioning groove and moves to idle position, then command hoisting crane to hook up and suspender is hung ground, upper arm, underarm is made all to keep gap with photovoltaic module case, suspender level is exited photovoltaic module case by held stationary, completes a photovoltaic module case unloading or handling task.
When the technical program is used for the photovoltaic module case of handling intensive stacking, hoist cable is installed and is easy to, and effectively reduces the engineering time, improves operating efficiency.
Further, described underarm is made up of case in and the telescopic boom be nested in this case in, described case in is fixed on column lower end, described checkered plate is positioned at the top of described telescopic boom front end, there is connecting bore the position that described case in and telescopic boom overlap, latch in described connecting bore is simultaneously through described case in and telescopic boom, spacing to telescopic boom.Before lifting, first according to the width of photovoltaic module case, extract the latch in case in connecting bore out, described telescopic boom is adjusted to correct position, then inserts latch, telescopic boom is fixed in described sleeve pipe, meet the requirement of handling without width photovoltaic module case.
Further, described column is made up of upper sleeve pipe and the pumping rod be nested on this in sleeve pipe, and the top of described pumping rod is fixed on upper arm lower end, and there is connecting bore the position that described upper sleeve pipe and pumping rod overlap, latch in described connecting bore is simultaneously through described upper sleeve pipe and pumping rod, spacing to pumping rod.Before lifting, first according to the height of photovoltaic module case, the latch in extraction in sleeve pipe connecting bore, adjusts to correct position by described pumping rod, then inserts latch, pumping rod is fixed in described sleeve pipe, meets the requirement of handling without width photovoltaic module case.
Beneficial effect: the technical program does not use the traditional construction technology of hanging belt pocket module case aft hook, insert from a side with the special suspender made, avoiding object only has a side periphery space can for when utilizing, and traditional construction technology need increase engineering time and the input in a side periphery space owing to adopting binding form need use the requirement of object two symmetric side peripheral spaces; And the technical program has two symmetric side peripheral spaces can for be also suitable for when utilizing and relatively the traditional construction technology of hanging belt pocket module case aft hook also has the low advantage of lifting requirements at object.
Accompanying drawing explanation
Lateral plan when Fig. 1 is suspender zero load;
Fig. 2 is the front elevation of suspender;
Lateral plan when Fig. 3 is suspender lade.
Mark in figure: 1-upper arm; 2-hanger; 3-hoist cable; 4-column; 5-underarm; 6-checkered plate; 7-safety card; 8-case in; 9-telescopic boom; The upper sleeve pipe of 10-; 11-pumping rod.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferably embodiment of the present utility model is described in further detail:
See Fig. 1 and Fig. 2, a kind of suspender for handling photovoltaic module case, comprise upper arm 1, the hanger 2 be fixed on described upper arm 1, the hoist cable 3 connecting described hanger 2, the underarm 5 that is fixed on the column 4 bottom described upper arm 1 and is fixed on bottom described column 4; Described upper arm 1 has 2, described upper arm 1 has 2 hangers 2, and each hanger 2 has guide rail, and there is chute guide rail both sides, and the bearing pin of hoist cable 3 end is embedded in described chute; Checkered plate 6 is arranged at the top of described underarm 5 front end; The end of described upper arm 1 front end is provided with safety card 7, and described safety card 7 is movably installed in the end of described upper arm 1 front end.Described upper arm 1 and underarm 5 are horizontally disposed with, and the two ends up and down of described column 4 are fixed with the rear end of upper arm 1 and underarm 5 respectively.
Before lifting, suspender is lain on level land, pack up safety card 7, mobile hoist cable 3, the bearing pin of hoist cable 3 end is slided into idle position along guide rail, hoist cable 3 upper end is hung on the suspension hook of hoisting crane, the suspension hook that hoists hoist cable 3 is tightened and bearing pin tension in the through hole of idle position, suspender is hung ground by the suspension hook level that continues to hoist.
During handling, by suspender handling to photovoltaic module case side, bracket bottom top, alignment light photovoltaic assembly case center, suspension bracket upper arm 1 center, underarm 5 alignment light photovoltaic assembly case, suspension bracket upper arm 1, underarm 5 are all perpendicular to photovoltaic module case side, commander's hoisting crane makes upper underarm 5 translation of suspender enter photovoltaic module case, make the approximate coincidence of the geometric centre of the geometric centre of suspension bracket and photovoltaic module case, moving process notices that upper arm 1, underarm 5 all should keep gap with photovoltaic module case, held stationary, does not swipe, collides with photovoltaic module case.Utilize the inner structure of bracket to carry out horizontal location, supporting plate laterally has three or four flitches, and flitch is fluted can be used as hanger supports position location, and longitudinal register adopts the checkered plate 6 of underarm 5 front end, after bracket forced contact, and anti-sliding stop.After suspender puts in bracket, rotation direction, locking safety card 7, guarantees Hoisting Security.
After handling, Panasonic's hook slightly, after making hoist cable 3 lax, hoist cable 3 is carried position at the bearing pin of guide rail by the band that moves to of idle position, the suspension hook that hoists is tightened by hoist cable 3 and bearing pin tension carries position at the band of positioning groove, then hoisting crane is commanded steadily to hoist suspension hook, with suspender, photovoltaic module case is hung ground or lorry plate, optionally by safety card 7 half-twist, can buckle well.
After the handling to assigned address of photovoltaic module case, after hoist cable 3 is lax, opens safety card 7 and packs up, hoist cable 3 is carried position at the bearing pin of guide rail by the band of positioning groove and moves to idle position, then command hoisting crane to hook up and suspender is hung ground, upper arm 1, underarm 5 is made all to keep gap with photovoltaic module case, suspender level is exited photovoltaic module case by held stationary, completes a photovoltaic module case unloading or handling task.
Described hoist cable 3 is different according to the size center of gravity of photovoltaic module, is arranged on the diverse location of suspension bracket, ensures the centering of center of gravity, balance.
When the technical program is used for the photovoltaic module case of handling intensive stacking, hoist cable 3 is installed and is easy to, and effectively reduces the engineering time, improves operating efficiency.
See Fig. 1 to Fig. 3, described underarm 5 is made up of case in 8 and the telescopic boom 9 be nested in this case in 8, described case in 8 is fixed on column 4 lower end, described checkered plate 6 is positioned at the top of described telescopic boom 9 front end, there is connecting bore the position that described case in 8 and telescopic boom 9 overlap, latch in described connecting bore is simultaneously through described case in 8 and telescopic boom 9, spacing to telescopic boom 9.Before lifting, first according to the width of photovoltaic module case, extract the latch in case in 8 connecting bore out, described telescopic boom 9 is adjusted to correct position, then inserts latch, telescopic boom 9 is fixed in described sleeve pipe, meet the requirement of handling without width photovoltaic module case.
See Fig. 1 to Fig. 3, described column 4 is made up of upper sleeve pipe 10 and the pumping rod 11 be nested on this in sleeve pipe 10, the top of described pumping rod 11 is fixed on upper arm 1 lower end, there is connecting bore the position that described upper sleeve pipe 10 and pumping rod 11 overlap, latch in described connecting bore is simultaneously through described upper sleeve pipe 10 and pumping rod 11, spacing to pumping rod 11.Before lifting, first according to the height of photovoltaic module case, the latch in extraction in sleeve pipe 10 connecting bore, adjusts to correct position by described pumping rod 11, then inserts latch, pumping rod 11 be fixed in described sleeve pipe, meets the requirement of handling without width photovoltaic module case.
See Fig. 2, during handling photovoltaic module case, described safety card 7 is vertical direction, prevents photovoltaic module case from skidding off and falling, has ensured construction safety; Before and after handling after handling, safety card 7 half-twist is horizontality.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, can not assert that concrete enforcement of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should be considered as belonging to protection domain of the present utility model.
Claims (3)
1., for a suspender for handling photovoltaic module case, it is characterized in that: comprise upper arm, the hanger be fixed on described upper arm, connect described hanger hoist cable, be fixed on the column bottom described upper arm and be fixed on the underarm of described column bottom; Described upper arm has 2, and described upper arm has 2 hangers, each hanger has guide rail, there is chute guide rail both sides, and the bearing pin of hoist cable end is embedded in described chute; Checkered plate is arranged at the top of described underarm front end; The end of described upper arm front end is provided with safety card, and described safety card is movably installed in the end of described upper arm front end.
2. the suspender for handling photovoltaic module case according to claim 1, it is characterized in that: described underarm is made up of case in and the telescopic boom be nested in this case in, described case in is fixed on column lower end, described checkered plate is positioned at the top of described telescopic boom front end, there is connecting bore the position that described case in and telescopic boom overlap, latch in described connecting bore is simultaneously through described case in and telescopic boom, spacing to telescopic boom.
3. the suspender for handling photovoltaic module case according to claim 2, it is characterized in that: described column is made up of upper sleeve pipe and the pumping rod be nested on this in sleeve pipe, the top of described pumping rod is fixed on upper arm lower end, there is connecting bore the position that described upper sleeve pipe and pumping rod overlap, latch in described connecting bore is simultaneously through described upper sleeve pipe and pumping rod, spacing to pumping rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420755654.0U CN204508565U (en) | 2014-12-05 | 2014-12-05 | A kind of suspender for handling photovoltaic module case |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420755654.0U CN204508565U (en) | 2014-12-05 | 2014-12-05 | A kind of suspender for handling photovoltaic module case |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204508565U true CN204508565U (en) | 2015-07-29 |
Family
ID=53706559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420755654.0U Expired - Fee Related CN204508565U (en) | 2014-12-05 | 2014-12-05 | A kind of suspender for handling photovoltaic module case |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204508565U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105905787A (en) * | 2016-06-02 | 2016-08-31 | 中船澄西船舶修造有限公司 | Tool for hoisting single segment of cylinder body |
CN108502701A (en) * | 2018-06-19 | 2018-09-07 | 中交公局海威工程建设有限公司 | Rigid tubing unilateral side interpolation type safety hook |
KR101908262B1 (en) * | 2018-05-02 | 2018-10-15 | 박정만 | Fork frame for crane |
CN110282536A (en) * | 2019-07-10 | 2019-09-27 | 绍兴文理学院 | A kind of prestressed cored slab suspension centre limiter |
CN110316650A (en) * | 2019-06-21 | 2019-10-11 | 中铁十六局集团第四工程有限公司 | A kind of Precast T-Beam L-type template suspension appliance |
CN110356952A (en) * | 2019-07-10 | 2019-10-22 | 浙江中清大建筑产业化有限公司 | A kind of application method of prestressed cored slab suspension centre limiter |
CN111069896A (en) * | 2019-12-09 | 2020-04-28 | 广州文冲船厂有限责任公司 | Leveling tool for rudder pintle blue fitting and using method thereof |
CN112520567A (en) * | 2020-12-09 | 2021-03-19 | 江苏筑港建设集团有限公司 | Frock suitable for dredge pump end cover |
CN116902749A (en) * | 2023-09-12 | 2023-10-20 | 江苏春兰机械制造有限公司 | Lifting equipment for split charging tray of engine |
-
2014
- 2014-12-05 CN CN201420755654.0U patent/CN204508565U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105905787A (en) * | 2016-06-02 | 2016-08-31 | 中船澄西船舶修造有限公司 | Tool for hoisting single segment of cylinder body |
KR101908262B1 (en) * | 2018-05-02 | 2018-10-15 | 박정만 | Fork frame for crane |
CN108502701A (en) * | 2018-06-19 | 2018-09-07 | 中交公局海威工程建设有限公司 | Rigid tubing unilateral side interpolation type safety hook |
CN108502701B (en) * | 2018-06-19 | 2024-05-14 | 中交一公局海威工程建设有限公司 | Single-side internally inserted safety lifting hook for rigid pipe |
CN110316650A (en) * | 2019-06-21 | 2019-10-11 | 中铁十六局集团第四工程有限公司 | A kind of Precast T-Beam L-type template suspension appliance |
CN110316650B (en) * | 2019-06-21 | 2021-10-01 | 中铁十六局集团第四工程有限公司 | Prefabricated T roof beam L section mould board hoist |
CN110282536A (en) * | 2019-07-10 | 2019-09-27 | 绍兴文理学院 | A kind of prestressed cored slab suspension centre limiter |
CN110356952A (en) * | 2019-07-10 | 2019-10-22 | 浙江中清大建筑产业化有限公司 | A kind of application method of prestressed cored slab suspension centre limiter |
CN111069896A (en) * | 2019-12-09 | 2020-04-28 | 广州文冲船厂有限责任公司 | Leveling tool for rudder pintle blue fitting and using method thereof |
CN112520567A (en) * | 2020-12-09 | 2021-03-19 | 江苏筑港建设集团有限公司 | Frock suitable for dredge pump end cover |
CN116902749A (en) * | 2023-09-12 | 2023-10-20 | 江苏春兰机械制造有限公司 | Lifting equipment for split charging tray of engine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204508565U (en) | A kind of suspender for handling photovoltaic module case | |
CN205442380U (en) | Guard gate hanging beam | |
CN208883341U (en) | Underground pipe gallery large-diameter pipeline transport device | |
CN206624553U (en) | Lifting component system | |
CN103072899B (en) | Hoisting technology for ultra-large type cylinder block | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN103058069B (en) | Flat-arm tower crane | |
CN203844767U (en) | Novel vehicle stop system of inclined roadway | |
CN206088728U (en) | Novel large -scale gallows of taking a trial run | |
CN204848138U (en) | Stacker close -coupled plays to rise leading wheel | |
CN202643090U (en) | Aluminium profile hanging basket | |
CN201952131U (en) | Small crane for construction foundation pit | |
CN204642850U (en) | A kind of wallboard piling bin | |
CN202577926U (en) | Fixed operating platform for elevator shaft | |
CN202609773U (en) | Bolt-type suspension point | |
CN202754704U (en) | Hoisting device for heating surface module of heat recovery boiler | |
CN204508512U (en) | Bottom loose-leaf cage | |
CN203612810U (en) | Offshore platform skid hoisting structure | |
CN201914830U (en) | Rope separator of tower hoist | |
CN102674134A (en) | Rotatable lifting beam for gantry crane | |
CN202828342U (en) | Novel shaft goods shelf | |
CN103058083B (en) | Bolt sphere truss gig | |
CN201647224U (en) | Novel brick suspending box | |
CN206219104U (en) | Steel wire rope overspeed preventer device | |
CN202245754U (en) | Radius crane free of rail blocking and derailing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 Termination date: 20181205 |