CN204498895U - Expressway greening planting facility - Google Patents

Expressway greening planting facility Download PDF

Info

Publication number
CN204498895U
CN204498895U CN201520064454.5U CN201520064454U CN204498895U CN 204498895 U CN204498895 U CN 204498895U CN 201520064454 U CN201520064454 U CN 201520064454U CN 204498895 U CN204498895 U CN 204498895U
Authority
CN
China
Prior art keywords
hurdle
planting
steel
angle steel
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520064454.5U
Other languages
Chinese (zh)
Inventor
胡羡聪
柯欢
张学平
谭家得
罗昭润
薛克娜
丁岳炼
陈香
陈杰
李鑫
殷爱华
王志云
赵鸿杰
万利鑫
田雪琴
玄祖迎
翁小羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Rongchang Landscape Architecture Engineering Co ltd
Foshan Institute Of Forestry
Original Assignee
Guangzhou Rongchang Landscape Architecture Engineering Co ltd
Foshan Institute Of Forestry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Rongchang Landscape Architecture Engineering Co ltd, Foshan Institute Of Forestry filed Critical Guangzhou Rongchang Landscape Architecture Engineering Co ltd
Priority to CN201520064454.5U priority Critical patent/CN204498895U/en
Application granted granted Critical
Publication of CN204498895U publication Critical patent/CN204498895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of expressway greening planting facility, comprise the planting pot for planting green plants, for support fixing planting pot planting groove and for planting groove is fixedly connected on protection rail post on connecting hoop, plant in planting pot and be implanted with green plants, planting groove comprises the first hurdle, side, second hurdle, side, for connecting first angle steel on the first hurdle, side and the second hurdle, side and the second angle steel for supporting planting pot, second hurdle, side is identical with the first hurdle, side structure and be arranged in parallel, connecting hoop comprises the hoop body be close to guard rail column outer wall for connecting protection rail post and the connecting plate for being fixedly connected with planting groove, hoop body is extended with engaging lug and is connected by bolt and is fixedly mounted on protection rail post by hoop body, connecting plate is provided with installing hole, hoop body and connecting plate are welded to connect.The utility model can be arranged on existing expressway barrier post quickly and easily, effectively can shorten expressway greening construction period, time saving and energy saving, reduction greening construction cost.

Description

Expressway greening planting facility
Technical field
The utility model belongs to expressway greening auxiliary facility, is specifically related to a kind of green plants planting facility be arranged on existing expressway barrier post.
Background technology
Building of highway can destroy the original view of the earth, reduces the area coverage of the earth green plants; And the automobile noise of running on expressway, vibrations, exhaust emissions also can pollute natural environment.Therefore, while construction and development highway, must environmental protection be paid close attention to, pay attention to greening work.By greening, conservation of nature environment, the environment of Creating Comfort.The green plants of current highway both sides and central partition plantation is planted in hand excavation and is built by laying bricks or stones by armored concrete in the plantation hole or planting groove that are formed, excavate and build above-mentioned plantation hole or planting groove time and effort consuming by laying bricks or stones, adding duration and the cost of expressway greening construction.
Summary of the invention
For the deficiencies in the prior art, the utility model aims to provide the expressway greening planting facility be arranged on existing expressway barrier post that a kind of greening construction duration is short, cost is relatively low, time saving and energy saving.
For achieving the above object, the utility model adopts following technical scheme:
Expressway greening planting facility, comprise the planting pot for planting green plants, for support fixing planting pot planting groove and for planting groove being fixedly connected on the connecting hoop on expressway barrier post, plant in described planting pot and be implanted with green plants, planting groove comprises the first hurdle, side, second hurdle, side, for connecting first angle steel on the first hurdle, side and the second hurdle, side and the second angle steel for supporting planting pot, described first hurdle, side comprises triangular steel, 4th angle steel and the first band steel, triangular steel and the 4th angle steel be arranged in parallel, first band steel is vertically set between triangular steel with the 4th angle steel for being connected triangular steel and the 4th angle steel, second hurdle, side is identical with the first hurdle, side structure and be arranged in parallel, two ends and two ends between the first hurdle, side and the 4th angle steel on the second hurdle, side between the triangular steel that first angle steel is separately positioned on the first hurdle, side and the second hurdle, side, second angle steel is arranged between the first hurdle, side and the 4th angle steel on the second hurdle, side,
Connecting hoop comprises the hoop body be close to guard rail column outer wall for connecting protection rail post and the connecting plate for being fixedly connected with planting groove, described hoop body is extended with engaging lug and is connected by bolt and is fixedly mounted on protection rail post by hoop body, described connecting plate is provided with installing hole, and hoop body and connecting plate are welded to connect;
Its hoop body installation sleeve of described connecting hoop is on protection rail post, and its connecting plate of connecting hoop is fixedly connected with the first angle steel of planting groove through its installing hole by bolt, and planting pot is placed on the 4th angle steel between the first hurdle, side and the second hurdle, side.
Further, the second band steel for reinforcing triangular steel and the 4th angle steel bonding strength is provided with, between the triangular steel that described second band steel is oblique is connected to the first hurdle, side and the 4th angle steel between the triangular steel on its hurdle, the first side of described planting groove and the 4th angle steel.
Further, also comprise the 3rd band steel for reinforcing the first hurdle, side and the second hurdle, side bonding strength, described 3rd band steel is connected between the triangular steel on the first hurdle, side and the second hurdle, side.
Further, described connecting hoop is provided with the reinforcement for reinforcing its hoop body and connecting plate bonding strength, this reinforcement is arranged on the junction of hoop body and connecting plate.
Preferably, the inner ring that its hoop body of described connecting hoop is formed is set with rubber blanket, this rubber blanket is sleeved on protection rail post.
The utility model has following beneficial effect:
The utility model expressway greening planting facility, its planting pot is placed in planting groove, planting groove is fixedly connected with expressway barrier post by connecting hoop, can be arranged on existing expressway barrier post quickly and easily, effectively can shorten expressway greening construction period, time saving and energy saving, reduction greening construction cost.
Accompanying drawing explanation
Fig. 1 is the vertical view of a kind of embodiment of the utility model expressway greening planting facility;
Fig. 2 is the front view of the planting of expressway greening shown in Fig. 1 facility;
Fig. 3 is the vertical view of the another kind of embodiment of the utility model expressway greening planting facility;
Fig. 4 is the front view of the planting of expressway greening shown in Fig. 3 facility;
Fig. 5 is the vertical view of another embodiment of the utility model expressway greening planting facility;
Fig. 6 is the front view of the planting of expressway greening shown in Fig. 5 facility;
Fig. 7 is the vertical view of another embodiment of the utility model expressway greening planting facility;
Fig. 8 is the vertical view of another embodiment of the utility model expressway greening planting facility;
Fig. 9 be the utility model expressway greening planting facility with cylindrical protective rail post, a kind of form connecting hoop mated is installed;
Figure 10 be the utility model expressway greening planting facility with cylindrical protective rail post, the another kind of form connecting hoop mated is installed;
Figure 11 be the utility model expressway greening planting facility with cylindrical protective rail post, another the form connecting hoop mated is installed;
Figure 12 is protecting rail post with square column type and installing a kind of form connecting hoop mated of the utility model expressway greening planting facility;
Figure 13 is protecting rail post with square column type and installing the another kind of form connecting hoop mated of the utility model expressway greening planting facility.
Embodiment
Below in conjunction with drawings and the specific embodiments, the utility model will be further described, understands the technological thought that the utility model is claimed so that clearer.
As Fig. 1, 2, the 9 a kind of embodiments being depicted as the utility model expressway greening planting facility, comprise the planting pot 1 for planting green plants, for support fixing planting pot 1 planting groove 2 and for planting groove 2 being fixedly connected on the connecting hoop 3 on expressway barrier post, planting in planting pot 1 to be implanted with afforests with plant, planting groove 2 comprises the first hurdle, side 21a, second hurdle, side 21b, first angle steel 22 and the second angle steel 24, described first hurdle, side 21a comprises triangular steel 210, 4th angle steel 211 and the first band steel 212, triangular steel 210 and the 4th angle steel 211 be arranged in parallel, first band steel 212 is vertically set between triangular steel 210 with the 4th angle steel 211 for being connected triangular steel 210 and the 4th angle steel 211, second hurdle, side 21b is identical with the first hurdle, side 21a structure and be arranged in parallel, first angle steel 22 is for connecting the first hurdle, side 21a and the second hurdle, side 21b and two ends between two ends and the 4th angle steel 211 of the first hurdle, side 21a and the second hurdle, side 21b between the triangular steel 210 being separately positioned on the first hurdle, side 21a and the second hurdle, side 21b, second angle steel 24 is for supporting planting pot 1 and between the 4th angle steel 211 being arranged on the first hurdle, side 21a and the second hurdle, side 21b.
In order to reinforce the bonding strength of triangular steel 210 and the 4th angle steel 211, be provided with between the triangular steel 210 of its first side of described planting groove 2 hurdle 21a and the 4th angle steel 211 second band steel 213, the second band steel 213 oblique be connected to the first hurdle, side 21a triangular steel 210 and the 4th angle steel 211 between.
In order to reinforce the bonding strength of the first hurdle, side 21a and the second hurdle, side 21b, the 3rd band steel the 23, three band steel 23 that described planting groove 2 also comprises for reinforcing the first hurdle, side 21a and the second hurdle, side 21b bonding strength is connected between the triangular steel 210 of the first hurdle, side 21a and the second hurdle, side 21b.
As shown in Figure 9, connecting hoop 3 comprises the first hoop body 30a, second hoop body 30b, first connecting plate 31a and the second connecting plate 31b, described first hoop body 30a and the second hoop body 30b are for being connected protection rail post and being close to guard rail column outer wall, first connecting plate 31a is used for being fixedly connected with planting groove 2 with the second connecting plate 31b, described first hoop body 30a and the first connecting plate 31a is welded to connect, second hoop body 30b and the second connecting plate 31b is welded to connect, first hoop body 30a and the second hoop body 30b is fixedly mounted on protection rail post with the second hoop body 30b being extended with engaging lug and being connected by bolt 30c by the first hoop body 30a, first connecting plate 31a is provided with the first installing hole 31a-1, second connecting plate 31b is provided with the second installing hole 31b-1.
In order to reinforce the first hoop body 30a and the first connecting plate 31a, bonding strength between the second hoop body 30b and the second connecting plate 31b, described connecting hoop 3 is provided with and is respectively used to reinforcing first hoop body 30a and the first connecting plate 31a, the first reinforcement 31a-2 of bonding strength and the second reinforcement 31b-2 between the second hoop body 30b and the second connecting plate 31b, this first reinforcement 31a-2 is arranged on the junction of the first hoop body 30a and the first connecting plate 31a, and the second reinforcement 31b-2 is arranged on the junction of the second hoop body 30b and the second connecting plate 31b.
In order to hoop 3 and the installation of protection rail post of reinforcing the connection, the inner ring that its first hoop body 30a of described connecting hoop 3 and the second hoop body 30b is formed is set with rubber blanket 32, and this rubber blanket 32 is sleeved on protection rail post.
Its first hoop body 30a of described connecting hoop 3 and the second hoop body 30b installation sleeve are on protection rail post, its first connecting plate of connecting hoop 3 31a is fixedly connected with the first angle steel 22 of planting groove 2 through the first installing hole 31a-1 on it by bolt 30c, its second connecting plate 31b is fixedly connected with the first angle steel 22 of planting groove 2 through the second installing hole 31b-1 on it by bolt 30c, and planting pot 1 is placed on the 4th angle steel 211 between the first hurdle, side 21a and the second hurdle, side 21b.
As Fig. 3,4,10 is depicted as the another kind of embodiment of the utility model expressway greening planting facility, Fig. 5,6,11 is depicted as another embodiment of the utility model expressway greening planting facility, and described three kinds of embodiments are all install to be applicable on cylindrical protective rail post.
As Fig. 7,12 is depicted as another embodiment of the utility model expressway greening planting facility, as Fig. 8,13 is depicted as another embodiment of the utility model expressway greening planting facility, described two kinds of embodiments are all install to be applicable on square column type protection rail post.
For a person skilled in the art, according to technical scheme described above and design, other various corresponding change and distortion can be made, and all these change and distortion all should belong within the protection domain of the utility model claim.

Claims (5)

1. expressway greening planting facility, it is characterized in that: comprise the planting pot (1) for planting green plants, for support fixing planting pot (1) planting groove (2) and for planting groove (2) being fixedly connected on the connecting hoop (3) on expressway barrier post, plant in described planting pot (1) and be implanted with green plants, planting groove (2) comprises the first hurdle, side (21a), second hurdle, side (21b), for connecting the first hurdle, side (21a) and first angle steel (22) on the second hurdle, side (21b) and the second angle steel (24) for supporting planting pot (1), described first hurdle, side (21a) comprises triangular steel (210), 4th angle steel (211) and the first band steel (212), triangular steel (210) and the 4th angle steel (211) be arranged in parallel, first band steel (212) is vertically set between triangular steel (210) with the 4th angle steel (211) for being connected triangular steel (210) and the 4th angle steel (211), second hurdle, side (21b) is identical with the first hurdle, side (21a) structure and be arranged in parallel, two ends and two ends between the first hurdle, side (21a) and the 4th angle steel (211) on the second hurdle, side (21b) between the triangular steel (210) that first angle steel (22) is separately positioned on the first hurdle, side (21a) and the second hurdle, side (21b), second angle steel (24) is arranged between the first hurdle, side (21a) and the 4th angle steel (211) on the second hurdle, side (21b),
Connecting hoop (3) comprises the hoop body (30a, 30b) be close to guard rail column outer wall for connecting protection rail post and the connecting plate (31a, 31b) for being fixedly connected with planting groove (2), described hoop body (30a, 30b) is extended with engaging lug and is connected by bolt (30c) and is fixedly mounted on protection rail post by hoop body (30a, 30b), described connecting plate (31a, 31b) is respectively arranged with installing hole (31a-1,31b-1), hoop body (30a, 30b) and connecting plate (31a, 31b) are welded to connect;
Described connecting hoop (3) its hoop body (30a, 30b) installation sleeve is on protection rail post, connecting hoop (3) its connecting plate (31a, 31b) is fixedly connected with first angle steel (22) of planting groove (2) through its installing hole (31a-1,31b-1) by bolt (30c), and planting pot (1) is placed on the 4th angle steel (211) between the first hurdle, side (21a) and the second hurdle, side (21b).
2. expressway greening planting facility as claimed in claim 1, it is characterized in that: between the triangular steel (210) on its hurdle, the first side (21a) of described planting groove (2) and the 4th angle steel (211), be provided with the second band steel (213) for reinforcing triangular steel (210) and the 4th angle steel (211) bonding strength, between the triangular steel (210) that described second band steel (213) is oblique is connected to the first hurdle, side (21a) and the 4th angle steel (211).
3. expressway greening planting facility as claimed in claim 1, it is characterized in that: also comprise the 3rd band steel (23) for reinforcing the first hurdle, side (21a) and the second hurdle, side (21b) bonding strength, described 3rd band steel (23) is connected between the triangular steel (210) on the first hurdle, side (21a) and the second hurdle, side (21b).
4. expressway greening planting facility as claimed in claim 1, it is characterized in that: described connecting hoop (3) is provided with the reinforcement (31a-2,31b-2) for reinforcing its hoop body (30a, 30b) and connecting plate (31a, 31b) bonding strength, this reinforcement (31a-2,31b-2) is arranged on the junction of hoop body (30a, 30b) and connecting plate (31a, 31b).
5. the expressway greening planting facility as described in claim 1 or 4, is characterized in that: the inner ring that described connecting hoop (3) its hoop body (30a, 30b) is formed is set with rubber blanket (32), and this rubber blanket (32) is sleeved on protection rail post.
CN201520064454.5U 2015-01-30 2015-01-30 Expressway greening planting facility Active CN204498895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520064454.5U CN204498895U (en) 2015-01-30 2015-01-30 Expressway greening planting facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520064454.5U CN204498895U (en) 2015-01-30 2015-01-30 Expressway greening planting facility

Publications (1)

Publication Number Publication Date
CN204498895U true CN204498895U (en) 2015-07-29

Family

ID=53696915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520064454.5U Active CN204498895U (en) 2015-01-30 2015-01-30 Expressway greening planting facility

Country Status (1)

Country Link
CN (1) CN204498895U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505239A (en) * 2018-12-06 2019-03-22 上海旗华水上工程建设股份有限公司 Rail structure and pontoon bridge with the rail structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505239A (en) * 2018-12-06 2019-03-22 上海旗华水上工程建设股份有限公司 Rail structure and pontoon bridge with the rail structure

Similar Documents

Publication Publication Date Title
CN204984441U (en) It backfills novel section of jurisdiction of quality behind one's back to change single shield TBM section of jurisdiction
CN205742175U (en) A kind of steel construction protection wall of bored pile
CN203639005U (en) Reinforcing device of tower crane
CN203080537U (en) High-strength bolt connecting steel cofferdam
CN204498895U (en) Expressway greening planting facility
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN203905009U (en) Supporting structure for internal corner of foundation pit
CN205171532U (en) Permanent side slope supporting construction
CN205387716U (en) Communication tower pipe pile foundation
CN204125963U (en) A kind of communication tower steel pipe pile foundation
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN203939061U (en) A kind of pipe jacking tool pipe turnover hole antipriming
CN201981836U (en) Anti-climbing JC plastic dipping fence
CN203113871U (en) Inner flange assembled concrete pole
CN212177148U (en) Symmetrical horseshoe-shaped assembled concrete tunnel
CN201169781Y (en) Cap digging pit structure
CN204282921U (en) A kind of direct burial single-pipe tower
CN206360326U (en) A kind of anti-lower sinking device of rack leg
CN203393721U (en) Inner support main purlin component
CN103388336B (en) Main purline part for inner support
CN205399270U (en) A base for monitoring rod and traffic signal lamp fixed mounting
CN203336137U (en) Petroleum pipeline connector protection tube
CN205676915U (en) Prefabricated step narrow base tower basis
CN204849808U (en) Basis is assembled in prefabrication of large -scale tower machine concrete
CN203668791U (en) Temporary concrete split mounting type constructed pavement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant