CN204497682U - A kind of cable testing bridge mounting bracket - Google Patents
A kind of cable testing bridge mounting bracket Download PDFInfo
- Publication number
- CN204497682U CN204497682U CN201520083109.6U CN201520083109U CN204497682U CN 204497682 U CN204497682 U CN 204497682U CN 201520083109 U CN201520083109 U CN 201520083109U CN 204497682 U CN204497682 U CN 204497682U
- Authority
- CN
- China
- Prior art keywords
- hold
- arm
- straight line
- down arm
- reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of cable testing bridge mounting bracket that the utility model proposes, comprising: many root posts, be no less than two reinforcement arm groups and be no less than three hold-down arm groups; Many install with uprights vertical, wherein a half column is arranged on the first straight line, second half column to be arranged on the second straight line with the first straight line parallel and with the column one_to_one corresponding on the first straight line; The upper and lower parallel distribution of different reinforcement arm group; Each reinforcement arm group by parallel installation and the first relative reinforcement arm and the second reinforcement arm form; The upper and lower parallel distribution of different hold-down arm group; Each hold-down arm group by parallel installation and the first hold-down arm be positioned in same level and the second hold-down arm form, be provided with multiple trailing arm between the first hold-down arm of each hold-down arm group and the second hold-down arm.The utility model can install multiple cable testing bridge, both can accommodate cable, ensures the in order clean and tidy of wiring, different cable can be carried out concluding and separate collecting again, avoid the signal cross-talk between different cable.
Description
Technical field
The utility model relates to cable erection unit technical field, particularly relates to a kind of cable testing bridge mounting bracket.
Background technology
Along with indoor electric appliance equipment increasing, indoor cable is also corresponding more and more, in order to make the cabling of house cable more orderly, attractive in appearance, thus has had the birth of cable testing bridge and mounting bracket.
In power engineering, cable testing bridge, as the supporting body of cable laying, has the function of protection cable simultaneously.Mounting bracket is used for installing cables crane span structure, is the supporting body of cable and cable testing bridge.At present, mounting bracket all designs according to cable testing bridge, causes each cable testing bridge to need configuration mounting bracket, takes up room large, and with high costs, underaction.
Utility model content
Based on the technical problem that background technology exists, the utility model proposes a kind of cable testing bridge mounting bracket.
A kind of cable testing bridge mounting bracket that the utility model proposes, comprising: many root posts, be no less than two reinforcement arm groups and be no less than three hold-down arm groups;
Many install with uprights vertical, wherein a half column is arranged on the first straight line, second half column to be arranged on the second straight line with the first straight line parallel and with the column one_to_one corresponding on the first straight line;
The upper and lower parallel distribution of different reinforcement arm group; Each reinforcement arm group by parallel installation and the first relative reinforcement arm and the second reinforcement arm form, first reinforcement arm is connected with each root post on the first straight line and is positioned at the side of the first straight line away from the second straight line, and the second reinforcement arm is connected with each root post on the second straight line and is positioned at the side of the second straight line away from the first straight line;
The upper and lower parallel distribution of different hold-down arm group; Each hold-down arm group by parallel installation and the first hold-down arm be positioned in same level and the second hold-down arm form, first hold-down arm is connected with each root post on the first straight line and is positioned at the side of the first straight line near the second straight line, and the second hold-down arm is connected with each root post on the second straight line and is positioned at the side of the second straight line near the first straight line; Multiple trailing arm is provided with between first hold-down arm of each hold-down arm group and the second hold-down arm.
Preferably, the multiple trailing arms arranged between the first hold-down arm of each hold-down arm group and the second hold-down arm are parallel to each other.
Preferably, trailing arm is arranged perpendicular to the first hold-down arm and the second hold-down arm.
Preferably, the quantity of hold-down arm group is three.
Preferably, be no less than on two trailing arms and be slidably fitted with deck.
Preferably, deck is provided with the connector of flexible connection, deck is fixedly connected with the trailing arm at place by connector.
Preferably, the first reinforcement arm in each reinforcement arm group and the second reinforcement arm are Collapsible structure, and removably connect with column; In each hold-down arm group, the first hold-down arm and the second hold-down arm are Collapsible structure, and removably connect with trailing arm.
The cable testing bridge mounting bracket that the utility model provides can install multiple cable testing bridge by the multiple hold-down arm groups distributed up and down, both can accommodate cable, ensure the in order clean and tidy of wiring, different cable can be carried out concluding and separate collecting again, avoid the signal cross-talk between different cable.In present embodiment, multiple hold-down arm group is setting up and down, thus can save horizontal space, improves space availability ratio.
In the utility model embodiment, the length of cable testing bridge mounting bracket and install width-adjustable joint, can meet the installation needs of cable testing bridge of different in width, length, thus achieve the more wide applicability of cable testing bridge mounting bracket.
Accompanying drawing explanation
Fig. 1 is a kind of cable testing bridge mounting bracket front view that the utility model proposes;
Fig. 2 is a kind of cable testing bridge mounting bracket end view that the utility model proposes;
Fig. 3 is a kind of cable testing bridge mounting bracket vertical view that the utility model proposes.
Embodiment
With reference to Fig. 1, Fig. 2, Fig. 3, a kind of cable testing bridge mounting bracket that the utility model proposes, comprising: many root posts 1, two reinforcement arm groups 2 and three hold-down arm groups 3.
It is many that with column 1 at right angle setting, wherein a half column 1 is arranged on the first straight line, second half column 1 to be arranged on the second straight line with the first straight line parallel and with column 1 one_to_one corresponding on the first straight line.
Two parallel distributions of reinforcement arm group about 2.Each reinforcement arm group 2 by parallel installation and the first relative reinforcement arm 21 and the second reinforcement arm 22 form, first reinforcement arm 21 is connected with each root post 1 on the first straight line and is positioned at the side of the first straight line away from the second straight line, and the second reinforcement arm 22 is connected with each root post 1 on the second straight line and is positioned at the side of the second straight line away from the first straight line.
In present embodiment, first reinforcement arm 21 of two reinforcement arm groups 2 is installed in parallel in the outside of multiple column 1 on the first straight line thus is fixed column 1 multiple on the first straight line, and the second reinforcement arm 22 of two reinforcement arm groups 2 is installed in parallel in the outside of multiple column 1 on the second straight line thus is fixed column 1 multiple on the second straight line.During concrete enforcement, also can adopt plural reinforcement arm group 2, improve the firm of many root posts 1 connection further.
Three parallel distributions of hold-down arm group about 3.Each hold-down arm group 3 by parallel installation and the first hold-down arm 31 be positioned in same level and the second hold-down arm 32 form, first hold-down arm 31 is connected with each root post 1 on the first straight line and is positioned at the side of the first straight line near the second straight line, and the second hold-down arm 32 is connected with each root post 1 on the second straight line and is positioned at the side of the second straight line near the first straight line.Be provided with multiple trailing arm 4 between first hold-down arm 31 of each hold-down arm group 3 and the second hold-down arm 32, the multiple trailing arms 4 arranged between the first hold-down arm 31 of each hold-down arm group 3 and the second hold-down arm 32 are parallel to each other and perpendicular to the first hold-down arm 31 and the second hold-down arm 32.
In present embodiment, the trailing arm 4 that hold-down arm group 3 is arranged is for load-bearing cable crane span structure.The setting of three hold-down arm groups 3 can make this cable testing bridge mounting bracket carry three cable testing bridges, thus concludes in different cable testing bridges by different circuit, and such as three cable testing bridges can be respectively used to accommodate power cable, signal cable and control cables.So, the cable testing bridge mounting bracket that present embodiment provides, by the multiple cable testing bridge of assembling, both can be accommodated cable, ensured the in order clean and tidy of wiring, different cable can be carried out concluding and separate collecting again, avoid the signal cross-talk between different cable.In present embodiment, three hold-down arm groups 3 are setting up and down, thus can save horizontal space, improve space availability ratio.
In present embodiment, cable testing bridge mounting bracket can install three cable testing bridges, and when specifically implementing, the needs can sorted out according to cable, increase hold-down arm group 3 quantity, thus install more cable testing bridge, carry out finer classification to cable.
In present embodiment, be no less than on two trailing arms 4 and be slidably fitted with deck 5, deck 5 is provided with the connector of flexible connection, deck 5 is fixedly connected with the trailing arm 4 at place by connector.So, thus regulate the distance of deck 5 and the first straight line or the second straight line, the installation requirements of the cable testing bridge of different in width can be met.
In present embodiment, the first reinforcement arm 21 in each reinforcement arm group 2 and the second reinforcement arm 22 are Collapsible structure, and removably connect with column 1; In each hold-down arm group 3, the first hold-down arm 31 and the second hold-down arm 32 are Collapsible structure, and removably connect with trailing arm 4.So, the length of adjustable mounting bracket, meets the installation needs of the cable testing bridge of different length.
In present embodiment, because cable testing bridge mounting bracket can meet the installation needs of cable testing bridge of different in width, length, thus achieve the more wide applicability of cable testing bridge mounting bracket.
The above; be only the utility model preferably embodiment; but protection range of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; be equal to according to the technical solution of the utility model and utility model design thereof and replace or change, all should be encompassed within protection range of the present utility model.
Claims (7)
1. a cable testing bridge mounting bracket, is characterized in that, comprising: many root posts (1), be no less than two reinforcement arm groups (2) and be no less than three hold-down arm groups (3);
It is many that with column (1) at right angle setting, wherein a half column (1) is arranged on the first straight line, second half column (1) to be arranged on the second straight line with the first straight line parallel and with the column one_to_one corresponding on the first straight line;
The different upper and lower parallel distribution of reinforcement arm group (2); Each reinforcement arm group (2) by parallel installation and relative the first reinforcement arm (21) and the second reinforcement arm (22) form, first reinforcement arm (21) is connected with each root post (1) on the first straight line and is positioned at the side of the first straight line away from the second straight line, and the second reinforcement arm (22) is connected with each root post (1) on the second straight line and is positioned at the side of the second straight line away from the first straight line;
The different upper and lower parallel distribution of hold-down arm group (3); Each hold-down arm group (3) by parallel installation and the first hold-down arm (31) be positioned in same level and the second hold-down arm (32) form, first hold-down arm (31) is connected with each root post (1) on the first straight line and is positioned at the side of the first straight line near the second straight line, and the second hold-down arm (32) is connected with each root post (1) on the second straight line and is positioned at the side of the second straight line near the first straight line; Multiple trailing arm (4) is provided with between first hold-down arm (31) of each hold-down arm group (3) and the second hold-down arm (32).
2. cable testing bridge mounting bracket as claimed in claim 1, it is characterized in that, the multiple trailing arms (4) arranged between first hold-down arm (31) of each hold-down arm group (3) and the second hold-down arm (32) are parallel to each other.
3. cable testing bridge mounting bracket as claimed in claim 2, is characterized in that, trailing arm (4) is arranged perpendicular to the first hold-down arm (31) and the second hold-down arm (32).
4. cable testing bridge mounting bracket as claimed in claim 1, it is characterized in that, the quantity of hold-down arm group (3) is three.
5. cable testing bridge mounting bracket as claimed in claim 1, is characterized in that, be no less than on two trailing arms (4) and be slidably fitted with deck (5).
6. cable testing bridge mounting bracket as claimed in claim 5, it is characterized in that, deck (5) is provided with the connector of flexible connection, deck (5) is fixedly connected with the trailing arm (4) at place by connector.
7. the cable testing bridge mounting bracket as described in any one of claim 1 to 6, it is characterized in that, the first reinforcement arm (21) in each reinforcement arm group (2) and the second reinforcement arm (22) are Collapsible structure, and removably connect with column (1); In each hold-down arm group (3), the first hold-down arm (31) and the second hold-down arm (32) are Collapsible structure, and removably connect with trailing arm (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520083109.6U CN204497682U (en) | 2015-02-05 | 2015-02-05 | A kind of cable testing bridge mounting bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520083109.6U CN204497682U (en) | 2015-02-05 | 2015-02-05 | A kind of cable testing bridge mounting bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204497682U true CN204497682U (en) | 2015-07-22 |
Family
ID=53576970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520083109.6U Expired - Fee Related CN204497682U (en) | 2015-02-05 | 2015-02-05 | A kind of cable testing bridge mounting bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204497682U (en) |
-
2015
- 2015-02-05 CN CN201520083109.6U patent/CN204497682U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298201B (en) | Transmission line cable termination solid draws lower device | |
CN105093455B (en) | Modular fiber optic connecton layout | |
CN209056872U (en) | A kind of slot type PVC cable testing bridge | |
CN204497682U (en) | A kind of cable testing bridge mounting bracket | |
CN103001165A (en) | Same-tower dual-loop single-line transposition tower | |
CN208127844U (en) | With four circuit single wire cable terminal tower of tower | |
CN204304337U (en) | A kind of cable testing bridge | |
CN207651967U (en) | A kind of high flame resistant cable crane span structure | |
CN209329595U (en) | For the horizontal four-way of composite cable bridge-rack in power distribution station | |
CN201845882U (en) | Split wire transformation connecting device on high-voltage power transmission line | |
CN205474042U (en) | Vertical continuous electroplating device | |
CN105155910B (en) | A kind of single loop that string is combined using V-shape cut-offs steel pipe tower | |
CN210380118U (en) | Novel cable bridge for photovoltaic power generation | |
CN105972316A (en) | Extensible pore type bridge | |
CN205046915U (en) | Adopt two sides in two return circuits of V style of calligraphy combination cluster to cut -off steel pipe shaft tower | |
CN103398219A (en) | Waterproof bridge connector for pump house | |
CN208299375U (en) | A kind of house cable gantry | |
CN208257315U (en) | A kind of removable grafting gantry | |
CN203374972U (en) | Water-proof tray connector special for pump house | |
CN209150495U (en) | A kind of control cabinet forceful electric power and signal wire mixing connecton layout | |
CN207967833U (en) | A kind of wind power equipment cable trunking crane span structure | |
CN206727573U (en) | A kind of cable wiring structure of staged bridge joint | |
CN202535003U (en) | Tubular bus-bar expansion wire clamp | |
CN216564434U (en) | Waterproof intensive bus duct | |
CN203911382U (en) | Vehicle wire harness adapter part fixing device, vehicle central power distribution box and vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150722 Termination date: 20160205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |