CN204463685U - Cup foundation actual training device - Google Patents
Cup foundation actual training device Download PDFInfo
- Publication number
- CN204463685U CN204463685U CN201520099445.XU CN201520099445U CN204463685U CN 204463685 U CN204463685 U CN 204463685U CN 201520099445 U CN201520099445 U CN 201520099445U CN 204463685 U CN204463685 U CN 204463685U
- Authority
- CN
- China
- Prior art keywords
- wood
- stupefied
- nail
- deck
- lower bolster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002023 wood Substances 0.000 claims abstract description 50
- 210000003205 muscle Anatomy 0.000 claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 235000007756 Akebia quinata Nutrition 0.000 abstract description 7
- 240000008027 Akebia quinata Species 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 5
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 238000000465 moulding Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000008093 supporting effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of cup foundation actual training device, comprise steel pipe, lower stupefied wood, lower bolster, deck wood, upper stupefied wood, basis end muscle and bucket type wood mould, described basis end muscle is located on ground, described lower bolster is gone along with sb. to guard him outside the end muscle of basis, described deck akebi crosses nail and is erected on lower stupefied wood and lower bolster, described middle template is gone along with sb. to guard him outside bucket type wood mould, and described deck akebi crosses nail and is connected in middle template; The rim of a cup of described bucket type wood mould is fixed by upper stupefied wood, and described stupefied akebi crosses nail and is erected in deck wood and middle template.The beneficial effects of the utility model are: in basic model Outside Dimensions fixed range, the assembly operation exercise carrying out reinforcing bar, template, steel pipe project content successively can be described according to technological process.Without the need to providing the respective operating space of reinforcing bar, template, steel pipe separately.After having operated, can by each web member nail, tied silk, fastening relieving, material is placed by class, and subsequent operation can retrieve use.
Description
Technical field
The utility model relates to actual training device, specifically a kind of cup foundation actual training device.
Background technology
Ge great colleges and universities architectural discipline real training factory building cup foundation training operation content is isolated, practical operation is less, independent reinforcing bar technical ability, independent template skill operation, independent steel tube fastener skill operation, whole technological process do not combined, the disposable operation of every material, causes great waste simultaneously.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of rational in infrastructure, the cup foundation actual training device that can reuse.
This cup foundation actual training device, comprise steel pipe, lower stupefied wood, lower bolster, deck wood, upper stupefied wood, basis end muscle and bucket type wood mould, described basis end muscle is located on ground, described lower bolster is gone along with sb. to guard him outside the end muscle of basis, described lower stupefied akebi crosses nail and is connected on lower bolster, described lower stupefied wood is resisted against on steel pipe, and described steel pipe forms triangle fixed support by fastener and is located at lower stupefied wood outside; Described deck akebi crosses nail and is erected on lower stupefied wood and lower bolster, and described middle template is gone along with sb. to guard him outside bucket type wood mould, and described deck akebi crosses nail and is connected in middle template; The rim of a cup of described bucket type wood mould is fixed by upper stupefied wood, and described stupefied akebi crosses nail and is erected in deck wood and middle template.
As preferably: described basis end muscle is rectangle; Described lower bolster to be gone along with sb. to guard him outside the end muscle of basis on four faces.
As preferably: described two pieces of adjacent mutually orthogonal overlaps of lower bolster are also connected by nail.
The beneficial effects of the utility model are: in basic model Outside Dimensions fixed range, the assembly operation exercise carrying out reinforcing bar, template, steel pipe project content successively can be described according to technological process.Without the need to providing the respective operating space of reinforcing bar, template, steel pipe separately.After having operated, can by each web member nail, tied silk, fastening relieving, material is placed by class, and subsequent operation can retrieve use.
Accompanying drawing explanation
Fig. 1 is the utility model elevational schematic view;
Fig. 2 is the utility model floor map;
Fig. 3 is the A portion enlarged diagram of Fig. 1;
Fig. 4 is the B portion enlarged diagram of Fig. 1;
Fig. 5 is the C portion enlarged diagram of Fig. 1;
Fig. 6 is the D portion enlarged diagram of Fig. 1;
Fig. 7 is the E portion enlarged diagram of Fig. 2;
Description of reference numerals: steel pipe 1, lower stupefied wooden 2, lower bolster 3, basis end muscle 4, fastener 5, nail 6, bucket type wood mould 7, deck wood 8, upper stupefied wooden 9, middle template 10.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described further.Although the utility model will be described in conjunction with preferred embodiment, should know, not represent the utility model restriction in the described embodiment.On the contrary, the utility model will contain can be included in attached claims limit scope of the present utility model in alternative, modified and equivalent.
As shown in Figures 1 to 7, the cup foundation actual training device of the present embodiment, comprise steel pipe 1, lower stupefied wooden 2, lower bolster 3, deck wood 8, upper stupefied wooden 9, basis end muscle 4 and bucket type wood mould 7, described basis end muscle 4 is located on ground, described lower bolster 3 is gone along with sb. to guard him outside basis end muscle 4, described lower stupefied wooden 2 are connected on lower bolster 3 by nail 6, and described lower stupefied wooden 2 are resisted against on steel pipe 1, and described steel pipe 1 forms triangle fixed support by fastener 5 and is located at outside stupefied wooden 2; Described deck wood 8 is erected on lower stupefied wooden 2 and lower bolster 3 by nail 6, and described middle template 10 is gone along with sb. to guard him outside bucket type wood mould 7, and described deck wood 8 is connected in middle template 10 by nail 6; The rim of a cup of described bucket type wood mould 7 is fixed by upper stupefied wooden 9, and described stupefied wooden 9 are erected in deck wood 8 and middle template 10 by nail 6.Described basis end muscle 4 is rectangle; Described lower bolster 3 to be gone along with sb. to guard him outside the end muscle 4 of basis on four faces.Described two pieces of adjacent mutually orthogonal overlaps of lower bolster 3 are also connected by nail 6.
By being nailed together by nail 6 between lower bolster 3, end muscle 4 is safeguarded, peg lower stupefied wooden 2 the flatness that lower bolster 3 ensures lower bolster 3 surface with nail 6, in order to ensure lower enough support strengths of stupefied wooden 2, by fastener 5, steel pipe 1 is connected into support to support, the lower periphery that result in formation of cup foundation is gone along with sb. to guard him.During the top of cup foundation needs equally, template 10 and the supportings of deck wood 8 form moulding outside rims of a cup and stand on the peripheral lower bolster 3 and lower stupefied wooden 2 of subfoundation with overhanging deck wood 8 framves, the moulding of rim of a cup inwall select the bucket type wood mould 7 processed to see node D frame stands on top cup type rim of a cup outboard template and upper stupefied wooden 9.
During operation, each component processed is put in ground, first colligation is carried out to basis end muscle 4 and operation practice is installed; Realize the operating procedure of reinforced bar engineering.After completing, at the bottom of reinforcement foundation, muscle 4 carries out template and stupefied wood installation operation practice, then first carry out the template of infrastructure and the installation exercise of stupefied wood and steel pipe 1 support, then carry out the template on basis, top and stupefied wood installation operation, bucket mould D node is finally installed.Achieve the operation technological process of the reinforced bar engineering of cup foundation, form work engineering and steel-tube die support.So just the whole technological process of whole cup foundation is integrated in together.All exercises have all combined successively on same position, and after completing, dismountable steel pipe 1, nail 6 and tied silk etc., put materials classification, and next time is reusable.
Claims (3)
1. a cup foundation actual training device, it is characterized in that, comprise steel pipe (1), lower stupefied wood (2), lower bolster (3), deck wood (8), upper stupefied wood (9), basis end muscle (4) and bucket type wood mould (7), described basis end muscle (4) is located on ground, described lower bolster (3) is gone along with sb. to guard him in basis end muscle (4) outside, described lower stupefied wood (2) is connected on lower bolster (3) by nail (6), described lower stupefied wood (2) is resisted against on steel pipe (1), described steel pipe (1) forms triangle fixed support by fastener (5) and is located at lower stupefied wood (2) outside, described deck wood (8) is erected on lower stupefied wood (2) and lower bolster (3) by nail (6), described middle template (10) is gone along with sb. to guard him in bucket type wood mould (7) outside, and described deck wood (8) is connected in middle template (10) by nail (6), the rim of a cup of described bucket type wood mould (7) is fixed by upper stupefied wood (9), and described stupefied wood (9) is erected in deck wood (8) and middle template (10) by nail (6).
2. cup foundation actual training device according to claim 1, is characterized in that: described basis end muscle (4) is rectangle; Described lower bolster (3) is gone along with sb. to guard him on four faces, basis end muscle (4) outside.
3. cup foundation actual training device according to claim 2, is characterized in that: described two pieces of adjacent mutually orthogonal overlaps of lower bolster (3) are also connected by nail (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520099445.XU CN204463685U (en) | 2015-02-11 | 2015-02-11 | Cup foundation actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520099445.XU CN204463685U (en) | 2015-02-11 | 2015-02-11 | Cup foundation actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204463685U true CN204463685U (en) | 2015-07-08 |
Family
ID=53670537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520099445.XU Expired - Fee Related CN204463685U (en) | 2015-02-11 | 2015-02-11 | Cup foundation actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204463685U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482747A (en) * | 2020-11-23 | 2021-03-12 | 中国建筑第二工程局有限公司 | Indefinite-length aluminum die reinforcing device and die assembly and assembly method |
-
2015
- 2015-02-11 CN CN201520099445.XU patent/CN204463685U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482747A (en) * | 2020-11-23 | 2021-03-12 | 中国建筑第二工程局有限公司 | Indefinite-length aluminum die reinforcing device and die assembly and assembly method |
CN112482747B (en) * | 2020-11-23 | 2022-08-19 | 中国建筑第二工程局有限公司 | Indefinite-length aluminum die reinforcing device and die assembly and assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204463685U (en) | Cup foundation actual training device | |
CN206545386U (en) | Sheet metal forming formwork drops in a kind of toilet | |
CN105201204B (en) | A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column | |
CN110761557A (en) | Reverse construction method major diameter ring beam makes up movable template system of consolidating | |
CN204463523U (en) | Notch cuttype isolated footing actual training device | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
CN206505821U (en) | A kind of casting mold of dry-type transformer | |
CN206562765U (en) | For the alter-pouring strips mould plate and ahead of time branch stake tool of dismantling concrete framework template | |
CN204463522U (en) | Basis, expansion joint actual training device | |
CN204463684U (en) | Cone-shaped footing actual training device | |
CN204463686U (en) | Steel-column foundation actual training device | |
CN202012195U (en) | Divergent steel moulding plate for arc bracket of machine pier | |
CN204035432U (en) | A kind of Figure of eight grid steel frame processing mold | |
CN205722573U (en) | Personalized real training integral box common antidetonation floor Vierendeel girder | |
CN204463683U (en) | Subsiding crack basis actual training device | |
CN205722563U (en) | Personalized real training integral box antidetonation simply supported beam | |
CN205444898U (en) | Individualized real integration box D t -shaped plate formula stair of instructing | |
CN207131078U (en) | A kind of post mould in construction | |
CN205894640U (en) | A safety protection and construction platform for construction of elevator well | |
CN206052762U (en) | Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column | |
CN204370796U (en) | Hoistway formwork platform | |
CN205722568U (en) | Personalized real training integral box not antidetonation floor Vierendeel girder | |
CN205722574U (en) | The personalized board-like curved stairs of real training integral box | |
CN205444897U (en) | Individualized real integration box sloping antidetonation floor frame roof beam of instructing | |
CN203924708U (en) | The vertical plugging structure in a kind of concrete wall ater-casting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160419 Address after: 310020, Hangzhou, Zhejiang, Jianggan District triumph Road, No. 343 floor, room B1047 Patentee after: Zhejiang Taixue Technology Co., Ltd. Address before: Hangzhou City, Zhejiang province 310013 Xihu District three Dunzhen lantern Street No. 567 International Building 4 12F Patentee before: Qi Ganhong |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150708 Termination date: 20170211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |