CN204463523U - 阶梯型独立基础实训装置 - Google Patents

阶梯型独立基础实训装置 Download PDF

Info

Publication number
CN204463523U
CN204463523U CN201520099488.8U CN201520099488U CN204463523U CN 204463523 U CN204463523 U CN 204463523U CN 201520099488 U CN201520099488 U CN 201520099488U CN 204463523 U CN204463523 U CN 204463523U
Authority
CN
China
Prior art keywords
wood
end muscle
reinforcing bar
stupefied
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520099488.8U
Other languages
English (en)
Inventor
王新亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taixue Technology Co., Ltd.
Original Assignee
王新亮
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王新亮 filed Critical 王新亮
Priority to CN201520099488.8U priority Critical patent/CN204463523U/zh
Application granted granted Critical
Publication of CN204463523U publication Critical patent/CN204463523U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种阶梯型独立基础实训装置,包括钢管、下楞木、下模板、基础底筋、柱钢筋、中楞木、上楞木和上模板,所述基础底筋设于地面上,所述下模板围护在基础底筋外侧,所述楞木通过钉子连接在下模板上,所述下楞木抵靠在钢管上,所述钢管通过扣件形成三角固定支架设于下楞木外侧;所述基础底筋中间设有柱钢筋,所述柱钢筋通过扎丝固定在基础底筋上。本实用新型的有益效果是:通过合理的结构设计,本专利的阶梯型独立基础模型将钢筋,模板,钢管,模板设置操作整合在同一个空间内容,减少了占地实训场地的面积。所有构件的安装使用到的连接件都是可以拆除的,可重复使用。综合了整个工艺流程,教学实训效果好,实训内容全面系统完整。

Description

阶梯型独立基础实训装置
技术领域
本实用新型涉及实训装置,具体来说是一种阶梯型独立基础实训装置。
背景技术
目前,建筑类院校的实训操作都是强调综合性和实践性,而阶梯型独立基础的综合性的操作没有,都是偏向独立钢筋、钢管、模板的操作,对学习者而言过于孤立,无法掌握工艺的要点精髓。同时传统的实训操作对场地的要求很大,一些学校受场地影响无法展开练习,同时每年的材料浪费情况也比较大。
实用新型内容
本实用新型的目的在于克服现有技术的不足,提供一种结构合理,可重复利用的阶梯型独立基础实训装置。
这种阶梯型独立基础实训装置,包括钢管、下楞木、下模板、基础底筋、柱钢筋、中楞木、上楞木和上模板,所述基础底筋设于地面上,所述下模板围护在基础底筋外侧,所述楞木通过钉子连接在下模板上,所述下楞木抵靠在钢管上,所述钢管通过扣件形成三角固定支架设于下楞木外侧;所述基础底筋中间设有柱钢筋,所述柱钢筋通过扎丝固定在基础底筋上;所述中楞木为两个,分别位于柱钢筋前后两侧,所述中楞木通过钉子架设在两相对的下楞木和下模板上;所述上楞木为两对,分别位于柱钢筋左右两侧并两端固定连接在两个中楞木上,所述上楞木通过钉子连接在上模板上。
作为优选:所述基础底筋为矩形;所述模板围护在基础底筋外侧四个面上。
作为优选:所述相邻的两块下模板互相正交重叠并通过钉子连接。
本实用新型的有益效果是:通过合理的结构设计,本专利的阶梯型独立基础模型将钢筋,模板,钢管,模板设置操作整合在同一个空间内容,减少了占地实训场地的面积。根据现场布置要求将加工成型的模板、钢筋、钢管,不大的场地空间内进行安装,体现了钢筋、钢管、模板操作的实践性和综合性。所有构件的安装使用到的连接件都是可以拆除的,可重复使用。综合了整个工艺流程,教学实训效果好,实训内容全面系统完整。
附图说明
图1为本实用新型立面示意图;
图2为本实用新型平面示意图;
图3为图1的A部放大示意图;
图4为图1的B部放大示意图;
图5为图1的C部放大示意图;
图6为图1的D部放大示意图;
图7为图2的E部放大示意图;
附图标记说明:钢管1、下楞木2、下模板3、基础底筋4、柱钢筋5、钉子6、扣件7、扎丝8、中楞木9、上楞木10、上模板11。
具体实施方式
下面结合附图和实施例对本实用新型做进一步描述。虽然本实用新型将结合较佳实施例进行描述,但应知道,并不表示本实用新型限制在所述实施例中。相反,本实用新型将涵盖可包含在有附后权利要求书限定的本实用新型的范围内的替换物、改进型和等同物。
如图1至图7所示,本实施例的这种阶梯型独立基础实训装置,、包括钢管1、下楞木2、下模板3、基础底筋4、柱钢筋5、中楞木9、上楞木10和上模板11,所述基础底筋4设于地面上,所述下模板3围护在基础底筋4外侧,所述楞木2通过钉子6连接在下模板3上,所述下楞木2抵靠在钢管1上,所述钢管1通过扣件7形成三角固定支架设于下楞木2外侧;所述基础底筋4中间设有柱钢筋5,所述柱钢筋5通过扎丝8固定在基础底筋4上;所述中楞木9为两个,分别位于柱钢筋5前后两侧,所述中楞木9通过钉子6架设在两相对的下楞木2和下模板3上;所述上楞木10为两对,分别位于柱钢筋5左右两侧并两端固定连接在两个中楞木9上,所述上楞木10通过钉子6连接在上模板11上。所述基础底筋4为矩形;所述模板3围护在基础底筋4外侧四个面上。所述相邻的两块下模板3互相正交重叠并通过钉子6连接。
使用时,先将柱钢筋5用扎丝8绑扎在基础底筋4上,形成钢筋工程内容的实训练习;通过下模板3通过钉子6将基础底筋4维护起来作为浇筑混凝土的模具,通过下楞木2将下模板3用钉子6固定来保证下模板3表面的平直度,为了保证下楞木2的强度,通过扣件7将钢管1连接成支架进行支撑,这样形成了基础的下阶外围围护。阶梯形基础的上阶需要上模板11和上楞木10用钉子6钉牢形成上阶外侧维护并架立在下阶下模板3和下楞木2上。这样就将整个阶梯形独立基础的整个工艺流程整合于一起。所有的练习都在同一个位置上依次结合完成,完成后可拆除钉子6、扣件7、扎丝8,将材料分类摆放,下次可重复使用。
操作时,将已经加工好的各个构件摆放于地面,先对基础钢筋底筋4和柱钢筋5进行绑扎安装操作练习;完成后,围绕基础钢筋底筋4进行上下阶的模板和楞木安装操作练习,然后加固上下阶的模板和楞木支撑进行钢管1支架的安装练习。

Claims (3)

1.一种阶梯型独立基础实训装置,其特征在于,包括钢管(1)、下楞木(2)、下模板(3)、基础底筋(4)、柱钢筋(5)、中楞木(9)、上楞木(10)和上模板(11),所述基础底筋(4)设于地面上,所述下模板(3)围护在基础底筋(4)外侧,所述楞木(2)通过钉子(6)连接在下模板(3)上,所述下楞木(2)抵靠在钢管(1)上,所述钢管(1)通过扣件(7)形成三角固定支架设于下楞木(2)外侧;所述基础底筋(4)中间设有柱钢筋(5),所述柱钢筋(5)通过扎丝(8)固定在基础底筋(4)上;所述中楞木(9)为两个,分别位于柱钢筋(5)前后两侧,所述中楞木(9)通过钉子(6)架设在两相对的下楞木(2)和下模板(3)上;所述上楞木(10)为两对,分别位于柱钢筋(5)左右两侧并两端固定连接在两个中楞木(9)上,所述上楞木(10)通过钉子(6)连接在上模板(11)上。
2.根据权利要求1所述的阶梯型独立基础实训装置,其特征在于:所述基础底筋(4)为矩形;所述模板(3)围护在基础底筋(4)外侧四个面上。
3.根据权利要求2所述的阶梯型独立基础实训装置,其特征在于:所述相邻的两块下模板(3)互相正交重叠并通过钉子(6)连接。
CN201520099488.8U 2015-02-11 2015-02-11 阶梯型独立基础实训装置 Expired - Fee Related CN204463523U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520099488.8U CN204463523U (zh) 2015-02-11 2015-02-11 阶梯型独立基础实训装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520099488.8U CN204463523U (zh) 2015-02-11 2015-02-11 阶梯型独立基础实训装置

Publications (1)

Publication Number Publication Date
CN204463523U true CN204463523U (zh) 2015-07-08

Family

ID=53670376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520099488.8U Expired - Fee Related CN204463523U (zh) 2015-02-11 2015-02-11 阶梯型独立基础实训装置

Country Status (1)

Country Link
CN (1) CN204463523U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105469697A (zh) * 2016-01-12 2016-04-06 南京工业职业技术学院 一种基础与框架结构连接部位钢筋排布施工教学模型
CN108301415A (zh) * 2018-04-10 2018-07-20 山西省工业设备安装集团有限公司 台阶式独立基础浇筑用模板的整体加固结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105469697A (zh) * 2016-01-12 2016-04-06 南京工业职业技术学院 一种基础与框架结构连接部位钢筋排布施工教学模型
CN108301415A (zh) * 2018-04-10 2018-07-20 山西省工业设备安装集团有限公司 台阶式独立基础浇筑用模板的整体加固结构

Similar Documents

Publication Publication Date Title
CN207392557U (zh) 一种矩形钢筋桁架空心叠合楼板
CN204463523U (zh) 阶梯型独立基础实训装置
CN207211728U (zh) 一种土木工程用建筑模板连接架
CN206487155U (zh) 墩柱钢筋定位胎具法整体加工装置
CN206554500U (zh) 钢结构混凝土浇筑用可调横向支撑杆
CN204463522U (zh) 伸缩缝基础实训装置
CN107558313A (zh) 地铁检查坑小立柱及轨道整体式施工结构及方法
CN204463684U (zh) 锥形基础实训装置
CN202433253U (zh) 一种弯钩锚杆拉拔试验辅助装置
CN208889184U (zh) 一种装配式建筑综合实训模型
CN204463686U (zh) 钢柱基础实训装置
CN208052253U (zh) 一种用于t梁腹板钢筋架预制的定位胎架
CN204463683U (zh) 沉降缝基础实训装置
CN205722573U (zh) 个性化实训集成箱普通抗震楼层框架梁
CN209000378U (zh) 模拟梁筋入柱型屋面框架边节点钢筋布置教学模型
CN205444897U (zh) 个性化实训集成箱斜梁抗震楼层框架梁
CN206538123U (zh) 一种可循环使用的塔式起重非预埋扶墙耳板抱箍件
CN205810251U (zh) 个性化实训集成箱二型梁式楼梯
CN214796307U (zh) 一种框架梁教学实训装置
CN205712849U (zh) 个性化实训集成箱特别抗震楼层框架梁
CN205722570U (zh) 个性化实训集成箱梁式弧形楼梯
CN205722574U (zh) 个性化实训集成箱板式弧形楼梯
CN205444899U (zh) 个性化实训集成箱ct型板式楼梯
CN205444750U (zh) 个性化实训集成箱四型梁式楼梯
CN106097876A (zh) 板式混凝土楼梯结构模型及制作方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160420

Address after: 310020, Hangzhou, Zhejiang, Jianggan District triumph Road, No. 343 floor, room B1047

Patentee after: Zhejiang Taixue Technology Co., Ltd.

Address before: Hangzhou City, Zhejiang province 310013 Xihu District three Dunzhen lantern Street No. 567 International Building 4 12F

Patentee before: Wang Xinliang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20170211