CN204462203U - A kind of termination for transformer synthesis test - Google Patents

A kind of termination for transformer synthesis test Download PDF

Info

Publication number
CN204462203U
CN204462203U CN201520189413.9U CN201520189413U CN204462203U CN 204462203 U CN204462203 U CN 204462203U CN 201520189413 U CN201520189413 U CN 201520189413U CN 204462203 U CN204462203 U CN 204462203U
Authority
CN
China
Prior art keywords
terminals
transformer
test
terminal block
termination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520189413.9U
Other languages
Chinese (zh)
Inventor
肖颂勇
曾国忠
徐丽红
林明星
潘亦斌
洪雄伟
肖楠
傅炜
陈麟
苏文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520189413.9U priority Critical patent/CN204462203U/en
Application granted granted Critical
Publication of CN204462203U publication Critical patent/CN204462203U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of termination for transformer synthesis test, it comprises terminal block and test lead, terminal block is provided with terminals A1, terminals B1, terminals C1, terminals N1, and terminals A2, terminals B2, terminals C2, terminals N2; Terminals A1, terminals B1, terminals C1 and terminals N1 are by four leading-out terminals of described test lead connection transformer, and terminals A2, terminals B2, terminals C2 and terminals N2 are by test lead connecting test instrument; Terminals A1 and terminals A2, terminals B1 and terminals B2, terminals C1 and terminals C2, terminals N1 and terminals N2 are all connected by the connection wire be located on terminal block.The utility model structure is simple, cost is low; The repeatedly high-altitude wiring of script transformer is become ground wiring, simple to operate, easy to use, and test process is safer, more laborsaving.

Description

A kind of termination for transformer synthesis test
Technical field
The utility model relates to a kind of termination, particularly relates to a kind of termination for transformer synthesis test.
Background technology
Power transformer is one of major equipment of generating plant and electric substation.The effect of transformer is many-sided, boosted voltage electric energy can not only be delivered to electricity consumption area, voltage can also be reduced to use voltage at different levels, to meet the needs of electricity consumption.In a word, boosting and step-down all must have been come by transformer.Transmit in electric system in the process of electric energy, will inevitably produce voltage and the loss of power two parts, when carrying same power, voltage loss and voltage are inversely proportional to, square being inversely proportional to of power attenuation and voltage.Utilize transformer to improve voltage, decrease power transmission loss.
Voltage transformer is arranged on the height up to about 4 meters usually, and therefore, carrying out in the process of the test of carrying out for power transformer, wiring is carried out in the position needing staff to climb to 4 meters high, the more enterprising line transformer test in bottom surface.But same power transformer often needs to carry out Multitest, for this reason, often launching a test all needs staff's wiring that climbs up to climb down to detect again, so not only arduous but also lose time, therefore design a kind of can just seeming particularly necessity by the primary connection termination tested for transformer synthesis that just can meet test of many times needs.
Utility model content
The utility model provides a kind of termination for transformer synthesis test, which overcomes the deficiencies in the prior art described in background technology.
The utility model solves the technical scheme that its technical matters adopts:
For a termination for transformer synthesis test, it comprises terminal block and test lead, and described terminal block is provided with terminals A1, terminals B1, terminals C1, terminals N1, and terminals A2, terminals B2, terminals C2, terminals N2; Described terminals A1, terminals B1, terminals C1 and terminals N1 are by four leading-out terminals of described test lead connection transformer, and described terminals A2, terminals B2, terminals C2 and terminals N2 are by test lead connecting test instrument; Described terminals A1 and terminals A2, terminals B1 and terminals B2, terminals C1 and terminals C2, terminals N1 and terminals N2 are all connected by the connection wire be located on terminal block.
Among one embodiment: the test lead adjustable length between described transformer and terminal block.
Among one embodiment: described terminals A1, terminals B1, terminals C1, terminals N1, terminals A2, terminals B2, terminals C2 and terminals N2 are all equiped with the plastic cap nut for fastening test lead terminals.
Among one embodiment: described connection wire and plastic cap nut are located at the positive and negative of terminal block respectively.
The technical program is compared with background technology, and its tool has the following advantages:
The utility model structure is simple, cost is low; The repeatedly high-altitude wiring of script transformer is become ground wiring, simple to operate, easy to use, and test process is safer, more laborsaving.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 depicts the wiring schematic diagram of the termination for transformer synthesis test.
Fig. 2 depicts the structural representation of terminal block.
Embodiment
Please refer to Fig. 1 and Fig. 2, a kind of termination for transformer synthesis test, it comprises terminal block 10 and test lead 20, and described terminal block 10 is provided with terminals A1, terminals B1, terminals C1, terminals N1, and terminals A2, terminals B2, terminals C2, terminals N2; Described terminals A1, terminals B1, terminals C1 and terminals N1 are by four leading-out terminals of described test lead 20 connection transformer 30, and described terminals A2, terminals B2, terminals C2 and terminals N2 are by test lead 20 connecting test instrument 40; Described terminals A1 and terminals A2, terminals B1 and terminals B2, terminals C1 and terminals C2, terminals N1 and terminals N2 are all connected by the connection wire 11 be located on terminal block 10.Test lead adjustable length between described transformer 30 and terminal block 10.Described terminals A1, terminals B1, terminals C1, terminals N1, terminals A2, terminals B2, terminals C2 and terminals N2 are all equiped with the plastic cap nut (not shown) for fastening test lead 20 terminals.Described connection wire 11 and plastic cap nut are located at the positive and negative of terminal block 10 respectively.
A kind of termination structure for transformer synthesis test described in the utility model is simple, cost is low; The repeatedly high-altitude wiring of script transformer is become ground wiring, simple to operate, easy to use, and test process is safer, more laborsaving.
The above, be only the utility model preferred embodiment, therefore the scope that the utility model implements can not be limited according to this, the equivalence namely done according to the utility model the scope of the claims and description change with modify, all should still belong in scope that the utility model contains.

Claims (4)

1. the termination for transformer synthesis test, it is characterized in that: comprise terminal block and test lead, described terminal block is provided with terminals A1, terminals B1, terminals C1, terminals N1, and terminals A2, terminals B2, terminals C2, terminals N2; Described terminals A1, terminals B1, terminals C1 and terminals N1 are by four leading-out terminals of described test lead connection transformer, and described terminals A2, terminals B2, terminals C2 and terminals N2 are by test lead connecting test instrument; Described terminals A1 and terminals A2, terminals B1 and terminals B2, terminals C1 and terminals C2, terminals N1 and terminals N2 are all connected by the connection wire be located on terminal block.
2. a kind of termination for transformer synthesis test according to claim 1, is characterized in that: the test lead adjustable length between described transformer and terminal block.
3. a kind of termination for transformer synthesis test according to claim 1, it is characterized in that: described terminals A1, terminals B1, terminals C1, terminals N1, terminals A2, terminals B2, terminals C2 and terminals N2 are all equiped with the plastic cap nut for fastening test lead terminals.
4. a kind of termination for transformer synthesis test according to claim 3, is characterized in that: described connection wire and plastic cap nut are located at the positive and negative of terminal block respectively.
CN201520189413.9U 2015-03-31 2015-03-31 A kind of termination for transformer synthesis test Expired - Fee Related CN204462203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520189413.9U CN204462203U (en) 2015-03-31 2015-03-31 A kind of termination for transformer synthesis test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520189413.9U CN204462203U (en) 2015-03-31 2015-03-31 A kind of termination for transformer synthesis test

Publications (1)

Publication Number Publication Date
CN204462203U true CN204462203U (en) 2015-07-08

Family

ID=53669072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520189413.9U Expired - Fee Related CN204462203U (en) 2015-03-31 2015-03-31 A kind of termination for transformer synthesis test

Country Status (1)

Country Link
CN (1) CN204462203U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771394A (en) * 2016-12-16 2017-05-31 国家电网公司 A kind of power transformer test mode of connection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771394A (en) * 2016-12-16 2017-05-31 国家电网公司 A kind of power transformer test mode of connection

Similar Documents

Publication Publication Date Title
CN204462203U (en) A kind of termination for transformer synthesis test
CN202929093U (en) Multifunctional high-voltage electricity-testing device
CN104796079A (en) Plug-in outer-lead photovoltaic module junction box and solar photovoltaic module string
CN201974489U (en) Lightning arrester detector
CN203722573U (en) Plug-in outer-lead photovoltaic module junction box and solar photovoltaic module string
CN204651846U (en) Tower platform stepped on by wind power plant's cable
CN204645805U (en) Double back becomes single time angle steel tower
CN202002992U (en) Device for distinguishing cable
CN202634276U (en) DC-DC power conversion apparatus
CN202977934U (en) Signal output harness
CN206479599U (en) A kind of on off test device of TN system earths line
CN208456779U (en) Energy generation apparatus
CN205029483U (en) Wiring board
CN206164471U (en) Photovoltaic junction box
CN203352451U (en) Power supply system for electrical training cabinet
CN205336182U (en) Solar cell panel structure
CN204205287U (en) HVDC (High Voltage Direct Current) converter substation alternating current filter shunt capacitor group arrangement
CN204516923U (en) A kind of wiring card
CN204400368U (en) A kind of velocity limiter Wiring module for elevator control cabinet
CN203026863U (en) Wiring structure of direct current junction box
CN203691330U (en) Tree-shaped solar receiver
CN203551643U (en) One-time wiring apparatus for testing reference voltage and leakage current of 1000-kV lightning arrester
CN202600088U (en) Diode wire tracker
CN204945208U (en) Quick connection box of electric energy meter box
CN102141594B (en) Detection device of arresters

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

CF01 Termination of patent right due to non-payment of annual fee