CN204457591U - Single channel Oil/gas Well casing programme - Google Patents

Single channel Oil/gas Well casing programme Download PDF

Info

Publication number
CN204457591U
CN204457591U CN201520093694.8U CN201520093694U CN204457591U CN 204457591 U CN204457591 U CN 204457591U CN 201520093694 U CN201520093694 U CN 201520093694U CN 204457591 U CN204457591 U CN 204457591U
Authority
CN
China
Prior art keywords
oil
cement sheath
oil pipe
pipe
single channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520093694.8U
Other languages
Chinese (zh)
Inventor
李勇
重成兴
吴志勇
郭士生
李三喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sky Energy Science Co Ltd Of River South Airways
Original Assignee
Sky Energy Science Co Ltd Of River South Airways
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sky Energy Science Co Ltd Of River South Airways filed Critical Sky Energy Science Co Ltd Of River South Airways
Priority to CN201520093694.8U priority Critical patent/CN204457591U/en
Application granted granted Critical
Publication of CN204457591U publication Critical patent/CN204457591U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of single channel Oil/gas Well casing programme, be made up of sleeve pipe, cement sheath, oil pipe and storm valve, storm valve is arranged on oil pipe top, and oil pipe top is arranged in sleeve pipe, oil pipe bottom is arranged in cement sheath, and oil-pipe external wall and cement sheath are sealed and matched, and cement sheath upper end and its lower end are sealed and matched, cement sheath lower end closed, forms flow channel in oil pipe.The operation of the utility model perforation completion does not take rig time, can improve oil and gas development efficiency, reduce and bore Completion cost and oil field whole development cost.

Description

Single channel Oil/gas Well casing programme
Technical field
The utility model relates to a kind of brill completion system, particularly relates to a kind of single channel Oil/gas Well casing programme, belongs to oil-gas field development technical field.
Background technology
Traditional Oil/gas Well casing programme has two flow channels, is called for short binary channels.One is the oil pipe for production of hydrocarbons, and another is oil, casing annulus for the kill-job that circulates.Namely one is the passage formed in oil pipe, and oil pipe is arranged storm valve and circulating valve, one is the passage formed between oil pipe and sleeve pipe, arranges packer between oil pipe and sleeve pipe.Such as, the disclosed a kind of horizontal cementing of China Patent No. " 201410372272.4 " exempts to bore blind plate circulation cementing method, and publication date is on October 22nd, 2014.
The subject matter adopting this kind of Oil/gas Well casing programme to exist is:
(1) bored shaft diameter is large, and rig workload is large, and the activity duration is long;
(2) well is large, and drilling fluid consumption is large;
(3) because well is large, the annular space of bore hole inside wall and sleeve outer wall is large, and cementing concrete consumption is large;
(4) drilling tool size is large, and use large scale sleeve pipe, rolled steel dosage is large;
(5) because well is large, drilling machine power is large, and equipment volume is large, and energy consumption is high;
(6) freight volume of equipment and material is huge;
(7) bore Completion cost expensive, cause well quantity little, substantially additionally do not find the possibility of reservoir.
Summary of the invention
The purpose of this utility model is the problems referred to above overcoming prior art existence, provides a kind of single channel Oil/gas Well casing programme.The operation of the utility model perforation completion does not take rig time, can improve oil and gas development efficiency, reduce and bore Completion cost and oil field whole development cost.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of single channel Oil/gas Well casing programme, it is characterized in that: be made up of sleeve pipe, cement sheath, oil pipe and storm valve, storm valve is arranged on oil pipe top, and oil pipe top is arranged in sleeve pipe, oil pipe bottom is arranged in cement sheath, and oil-pipe external wall and cement sheath are sealed and matched, and cement sheath upper end and its lower end are sealed and matched, cement sheath lower end closed, forms flow channel in oil pipe.
Described cement sheath bottom is formed with perforated interval.
The thickness of described cement sheath is 5-10mm.
Employing the utility model has the advantage of:
One, the utility model is adopted to reach following effect:
(1) perforation completion operation does not take rig time;
(2) well is little, saves drilling fluid consumption;
(3) annular space is little, saves cementing concrete;
(4) drilling tool size used and casing size little, saving steel;
(5) rig and corollary equipment little, energy consumption is low;
(6) rig selected is little, drilling tool and casing size little, decrease freight volume;
(7) little to the pollution of environment;
(8) also there is a lot of benefit to oil recovery in slim-hole, as: rod weight alleviates, and pumping unit diminishes, energy-conservation etc.
Two, the utility model single channel is compared with existing binary channels, and the large scale in former binary channels is overlapped effective small size oil pipe and replace, the thickness of cementing concrete ring is at 5-10mm, and the cement sheath more than routine is thin, greatly saves the consumption of cementing concrete.
To sum up, the utility model oil pipe replaces sleeve pipe, and implements a kind of production of hydrocarbons well brill completion structure of well cementation and perforation to oil pipe, adopts this technology that brill completion practice expense will be made to reduce by 20% to 30%.Casing programme only has oil pipe flow channel, and this casing programme saves sleeve pipe, packer, circulating valve etc. and bores completion equipment, under enter these equipment operation just can correspondingly save.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation
Be labeled as in figure: 1, sleeve pipe, 2, cement sheath, 3, oil pipe, 4, storm valve, 5, perforated interval.
Detailed description of the invention
A kind of single channel Oil/gas Well casing programme, be made up of sleeve pipe 1, cement sheath 2, oil pipe 3 and storm valve 4, storm valve 4 is arranged on oil pipe 3 top, and oil pipe 3 top is arranged in sleeve pipe 1, oil pipe 3 bottom is arranged in cement sheath 2, and oil pipe 3 outer wall and cement sheath 2 are sealed and matched, and cement sheath 2 upper end and sleeve pipe 1 lower end are sealed and matched, cement sheath 2 lower end closed, forms flow channel in oil pipe 3.
Preferred embodiment of the present utility model is, described cement sheath 2 bottom is formed with perforated interval 5.
Another preferred embodiment of the present utility model is, the thickness of described cement sheath 2 is 5-10mm.
The utility model is mainly applicable to the little oil gas field of reserves abundance, and can the Oil/gas Well of blowing in whole product term.The mining term of single channel Oil/gas Well is general shorter, and well yield is low.The oil gas field adopting single channel to bore completion technique exploitation needs to bore many wells, and well spacing scope can be wider.From the angle of geological prospecting, drilling well more being conducive to finds more fluvial facies oil gas field reserves.

Claims (3)

1. a single channel Oil/gas Well casing programme, it is characterized in that: be made up of sleeve pipe (1), cement sheath (2), oil pipe (3) and storm valve (4), storm valve (4) is arranged on oil pipe (3) top, and oil pipe (3) top is arranged in sleeve pipe (1), oil pipe (3) bottom is arranged in cement sheath (2), oil pipe (3) outer wall and cement sheath (2) are sealed and matched, cement sheath (2) upper end and sleeve pipe (1) lower end are sealed and matched, cement sheath (2) lower end closed, forms flow channel in oil pipe (3).
2. single channel Oil/gas Well casing programme according to claim 1, is characterized in that: described cement sheath (2) bottom is formed with perforated interval (5).
3. single channel Oil/gas Well casing programme according to claim 1 and 2, is characterized in that: the thickness of described cement sheath (2) is 5-10mm.
CN201520093694.8U 2015-02-10 2015-02-10 Single channel Oil/gas Well casing programme Active CN204457591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520093694.8U CN204457591U (en) 2015-02-10 2015-02-10 Single channel Oil/gas Well casing programme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520093694.8U CN204457591U (en) 2015-02-10 2015-02-10 Single channel Oil/gas Well casing programme

Publications (1)

Publication Number Publication Date
CN204457591U true CN204457591U (en) 2015-07-08

Family

ID=53664493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520093694.8U Active CN204457591U (en) 2015-02-10 2015-02-10 Single channel Oil/gas Well casing programme

Country Status (1)

Country Link
CN (1) CN204457591U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593382A (en) * 2017-02-09 2017-04-26 撒占东 Method for collecting natural gas from producing well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593382A (en) * 2017-02-09 2017-04-26 撒占东 Method for collecting natural gas from producing well

Similar Documents

Publication Publication Date Title
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN110029938A (en) A kind of air reverse circulation drilling method
CN103161434A (en) Mining method for low permeability reservoir of shale gas and the like
CN205117236U (en) Geology resource prospection bores well casing ball formula rigidity righting device
CN103912304A (en) Method for locally extracting gas of soft coal seams
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN202108424U (en) Perforating, fracturing and draining integrated tubular column for oil well
CN204457591U (en) Single channel Oil/gas Well casing programme
CN203716919U (en) Open hole packer
Miao et al. Development status and prospect of staged fracturing technology in horizontal wells
CN205211283U (en) Experimental device for two gradient well drillings of efflux under simulation well
CN202381046U (en) Negative pressure flow string for oilfield pumping well
RU138113U1 (en) CHISEL WITH ADVANCED BLADES
CN203756034U (en) Hydraulic expansion drilling following hole opener
CN216517904U (en) Well mouth sealing device for oil extraction in oil field
CN102758616B (en) Multi-point formation pressure measuring instrument
CN202215193U (en) Water-swelling self-sealing type packer
CN201225121Y (en) Oil gas well selective completion tool
CN204532329U (en) Borehole accuracy precise control device
CN203022620U (en) Drilling equipment used in petroleum exploitation process
CN201810213U (en) Hydraulic mechanical cave forming tool
CN203499618U (en) Gas drive oil production annular test decentralized wellhead device
CN202483513U (en) Sliding sleeve for separate layer reconstruction
CN205858270U (en) A kind of selectivity cementing unit
CN202673258U (en) Filling device for well completion in oil exploitation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant