CN204456876U - A kind of two-part split bolt - Google Patents

A kind of two-part split bolt Download PDF

Info

Publication number
CN204456876U
CN204456876U CN201420849248.0U CN201420849248U CN204456876U CN 204456876 U CN204456876 U CN 204456876U CN 201420849248 U CN201420849248 U CN 201420849248U CN 204456876 U CN204456876 U CN 204456876U
Authority
CN
China
Prior art keywords
screw rod
split bolt
part split
sleeve
site concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420849248.0U
Other languages
Chinese (zh)
Inventor
丁宏
杨涛
赵晓龙
龙玉峰
王晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HUAYANG INTERNATIONAL ENGINEERING DESIGN CO., LTD.
Original Assignee
Huayang International Project Design Co Ltd Of Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huayang International Project Design Co Ltd Of Shenzhen filed Critical Huayang International Project Design Co Ltd Of Shenzhen
Priority to CN201420849248.0U priority Critical patent/CN204456876U/en
Application granted granted Critical
Publication of CN204456876U publication Critical patent/CN204456876U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of two-part split bolt, comprise the bolt sleeve be embedded on prefabricated units, the first screw rod for drawknot prefabricated units and site concrete be connected with described bolt sleeve, the second screw rod for drawknot site concrete and template removably connected with described first screw rod, described second spiro rod length direction is arranged with the sleeve pipe for described second screw rod and described site concrete being isolated.Adopt the utility model can ensure that prefabricated units are connected with the reliable of site concrete, template lacing wire use when can build as site concrete again, and simplify the production of prefabricated units and the construction at scene.

Description

A kind of two-part split bolt
Technical field
The utility model relates to construction work split bolt field, in particular a kind of two-part split bolt.
Background technology
Split bolt (Screw arbor with nut at both-ends), for the drawknot between the template of wall form medial and lateral, bear concrete lateral pressure and other loads, guarantee that the spacing of interior outboard template can meet design requirement, also be simultaneously the fulcrum of template and braced structures thereof, therefore the layout of split bolt is very large on the globality of formwork structure, Rigidity and strength impact.
Along with the development of precast concrete technology, precast unit is more and more extensive in the use of building trade, how to reduce the difficulty of prefabricated units in processes such as production, constructions, the optimization simplifying the connected mode of prefabricated units and site concrete becomes more and more urgent; Existing template support split bolt is to pull-type, if for prefabricated units, then need to bore a hole on prefabricated units, later stage plug-hole repairing can make facade impaired performance, repairs difficulty and there is infiltration hidden danger.
Therefore, prior art has yet to be improved and developed.
Utility model content
In view of above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of two-part split bolt, can reuse split bolt component, convenient construction.
The technical solution of the utility model is as follows:
A kind of two-part split bolt, comprise the bolt sleeve be embedded on prefabricated units, the first screw rod for drawknot prefabricated units and site concrete be connected with described bolt sleeve, the second screw rod for drawknot site concrete and template removably connected with described first screw rod, described second spiro rod length direction is arranged with the sleeve pipe for described second screw rod and described site concrete being isolated.
Preferably, in described two-part split bolt, one end that described second screw rod is connected with described first screw rod is provided with branch sleeve.
Described two-part split bolt, wherein, is provided with internal thread in described sleeve, and described sleeve is connected with described first screw flight.
Preferably, in described two-part split bolt, one end that described first screw rod is connected with described second screw rod is provided with internal thread hole.
Described two-part split bolt, wherein, described first screw rod is connected with described second screw flight.
Further, described two-part split bolt, wherein, the other end of described second screw rod adopts nut to be fixed in template.
Described two-part split bolt, wherein, described sleeve pipe is positioned at the port that the first screw rod is connected with the second screw rod and is provided with the blocking bar preventing concrete from entering described sleeve pipe.
Comparatively preferred, in described two-part split bolt, described sleeve pipe is set to PVC sleeve pipe.
Two-part split bolt provided by the utility model, owing to have employed pulling structure, is divided into two sections by bolt part, and reserved one section of bolt connects prefabricated units and site concrete, extracts out reusable by the bolt of another section from site concrete; Can ensure that prefabricated units are connected with the reliable of site concrete, template lacing wire use when can build as site concrete again, and simplify the production of prefabricated units and the construction at scene.
Accompanying drawing explanation
Fig. 1 is the sectional view of two-part split bolt preferred embodiment in the utility model.
Fig. 2 is the using state schematic diagram of two-part split bolt preferred embodiment in the utility model.
Fig. 3 is the partial enlarged drawing in A portion in Fig. 2.
In figure: 1, bolt sleeve; 2, the first screw rod; 3, bar is blocked; 4, branch sleeve; 5, sleeve pipe; 6, the second screw rod; 7, nut; 8, prefabricated units; 9, site concrete; 10, template.
Detailed description of the invention
The utility model provides a kind of two-part split bolt, for making the purpose of this utility model, technical scheme and effect clearly, clearly, further describes the utility model referring to accompanying drawing examples.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Refer to shown in Fig. 1, the two-part split bolt that the utility model provides, comprise the bolt sleeve 1 be embedded on prefabricated units 8, the first screw rod 2 be connected with described bolt sleeve 1, the second screw rod 6 of removably connecting with described first screw rod 2, wherein the first screw rod 2 for drawknot prefabricated units 8 and site concrete 9, second screw rod 6 for drawknot site concrete 9 and template 10; Described second screw rod 6 length direction is also arranged with a sleeve pipe 5, for what described second screw rod 6 and described site concrete 9 are isolated.
Concrete, described first screw rod 2 realizes dismountable connected mode with described second screw rod 6, and by arranging a branch sleeve 4 in one end of described second screw rod 6, this branch sleeve 4 is arranged on one end that described second screw rod 6 is connected with the first screw rod 2.Described branch sleeve 4 is connected by welding manner with described second screw rod 6; Be provided with internal thread in one end that described branch sleeve 4 is connected with described first screw rod 2, the link of described first screw rod 2 is provided with external screw thread, and described branch sleeve 4 can realize being threaded with described first screw rod 2.When dismantling the connection between the first screw rod 2 and the second screw rod 6, only need rotate the second screw rod 6 can disassemble coupling nut 7 and the first screw rod 2.Certain, also the contrary internal thread of rotation direction can be set respectively at branch sleeve 4 two ends, the link of the first screw rod 2 and the second screw rod 6 is set to external screw thread suitable with the reverse thread in described branch sleeve 4 respectively, and the external screw thread namely on described first screw rod 2 and the external thread rotary on the second screw rod 6 are on the contrary.Specifically when dismounting first screw rod 2 and the second screw rod 6, rotate the second screw rod 6, now turning to of the second screw rod 6 is locking state with coupling nut 7, and coupling nut 7 and the first screw rod 2 are then disassembly status.
Further, as specific embodiment of the utility model, also described first screw rod 2 directly can be threaded with described second screw rod 6.Concrete, the external diameter that can arrange described first screw rod 2 and the second screw rod 6 link is greater than the external diameter of described second screw rod 6 link, and internal thread hole is set in the link external diameter of the first screw rod 2, second screw rod 6 link arranges external screw thread, to reach the first screw rod 2 and the interconnective object of the second screw rod 6.The other end of described second screw rod 6 adopts nut 7 to be fixed in template 10, can complete the drawknot between the template of wall form medial and lateral, bear concrete lateral pressure and other loads.
When the utility model specifically uses, can consult shown in Fig. 2 and Fig. 3, Fig. 2 upper end is prefabricated units 8, two bolt sleeves 1 are embedded with in prefabricated units 8, bolt sleeve 1 is connected with the first screw rod 2 bolt, the other end of the first screw rod 2 is connected with the second screw rod 6 with coupling nut 7, and then described second screw rod 6 arranges a sleeve pipe 5, this sleeve pipe 5 is preferably pvc pipe, and at this pvc pipe, the blocking bar 3 for preventing concrete from entering described PVC sleeve pipe 5 is set near first screw rod 2 one end, described blocking bar 3 should be positioned at the screw tip of the first screw rod 2, accomplish to prevent concrete coagulation from living splicing sleeve 5.The other end of described second screw rod 6 adopts nut 7 to be fixed in template 10.As shown in Figure 2 vertical, the both sides of prefabricated units 8 are provided with two-part split bolt equally.Same, transversely also two-part split bolt should be set what connect prefabricated units 8 and site concrete 9.When fluid concrete, after connection completes two-part split bolt, carry out cast-in-place note, make site concrete 9 shaping.After site concrete 9 is shaping, pull down template 10, rotate the second screw rod 6 and coupling nut 7 is separated with the first screw rod 2, take out the second screw rod 6 and coupling nut 7 to recycle, the first screw rod 2 is stayed in cast component, connect prefabricated units 8 and site concrete 9.
In sum, two-part split bolt provided by the utility model, owing to have employed pulling structure, bolt part is divided into two sections, reserved one section of bolt connects prefabricated units 8 and site concrete 9, can ensure that prefabricated units 8 are connected with the reliable of site concrete 9, when can build as site concrete 9 again, template 10 lacing wire is used.And the second screw rod 6 and coupling nut 7 can be recycled, need not whole split bolt all be stayed in site concrete 9, then split bolt redundance be cut away, simplify the production of prefabricated units 8 and the construction at scene.
Should be understood that; application of the present utility model is not limited to above-mentioned citing, for those of ordinary skills, can be improved according to the above description or convert; such as, all these improve and convert the protection domain that all should belong to the utility model claims.

Claims (8)

1. a two-part split bolt, it is characterized in that, comprise the bolt sleeve be embedded on prefabricated units, the first screw rod for drawknot prefabricated units and site concrete be connected with described bolt sleeve, the second screw rod for drawknot site concrete and template removably connected with described first screw rod, described second spiro rod length direction is arranged with the sleeve pipe for described second screw rod and described site concrete being isolated.
2. two-part split bolt according to claim 1, is characterized in that, one end that described second screw rod is connected with described first screw rod is provided with branch sleeve.
3. two-part split bolt according to claim 2, is characterized in that, is provided with internal thread in described sleeve, and described sleeve is connected with described first screw flight.
4. two-part split bolt according to claim 1, is characterized in that, one end that described first screw rod is connected with described second screw rod is provided with internal thread hole.
5. two-part split bolt according to claim 4, is characterized in that, described first screw rod is connected with described second screw flight.
6. the two-part split bolt according to claim 2 or 4, is characterized in that, the other end of described second screw rod adopts nut to be fixed in template.
7. two-part split bolt according to claim 1, is characterized in that, described sleeve pipe is PVC sleeve pipe.
8. two-part split bolt according to claim 1, is characterized in that, described sleeve pipe is positioned at the port that the first screw rod is connected with the second screw rod and is provided with the blocking bar preventing concrete from entering described sleeve pipe.
CN201420849248.0U 2014-12-29 2014-12-29 A kind of two-part split bolt Active CN204456876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420849248.0U CN204456876U (en) 2014-12-29 2014-12-29 A kind of two-part split bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420849248.0U CN204456876U (en) 2014-12-29 2014-12-29 A kind of two-part split bolt

Publications (1)

Publication Number Publication Date
CN204456876U true CN204456876U (en) 2015-07-08

Family

ID=53663783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420849248.0U Active CN204456876U (en) 2014-12-29 2014-12-29 A kind of two-part split bolt

Country Status (1)

Country Link
CN (1) CN204456876U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143137A (en) * 2017-05-31 2017-09-08 中建科技成都有限公司 Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143137A (en) * 2017-05-31 2017-09-08 中建科技成都有限公司 Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure

Similar Documents

Publication Publication Date Title
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN205777098U (en) A kind of detachable assembling type concrete-filled circular steel tube column
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN105863167A (en) Dismountable assembly type circular steel tube concrete column
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN207277847U (en) A kind of assembled overlapped shear wall fixing templates
CN105507426A (en) Half-through bracket haunching type compound steel pipe concrete column-steel beam joint
CN103469967B (en) Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN104695708A (en) Construction method for expansion joint formwork erection in narrow space of high-rise building external wall
CN204456876U (en) A kind of two-part split bolt
CN201991142U (en) Composite sleeve type rebar connecting device
CN203741999U (en) Fabricated building corbel-free concrete beam steel column connecting node
CN103184768A (en) Screw thread sleeve joint for detachable grid structure
CN205259605U (en) Novel stagnant water split bolt
CN205077870U (en) It is split type to drawing screw rod and template drawknot structure
CN206408758U (en) A kind of concrete-filled circular steel tube column connecting node construction
CN203569888U (en) Water-stop split bolt structure capable of being reused
CN202945799U (en) Adjustable wall connecting rod of steel pipe scaffold
CN203440999U (en) Reinforced connecting sleeve for reinforced concrete members and assembling type building members
CN105178445A (en) Connection joint between endplate type concrete-filled steel tube column and steel beam with internal reinforcement ring
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN205077629U (en) Cavity intermediate layer steel core concrete column and girder steel connecting device
CN205329861U (en) Composite concrete -filled steel tube post - girder steel punching haunch node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Shi Hua Lu Ying Fu Building 518038 Guangdong province Shenzhen Futian Free Trade Zone, Huayang International Construction Industry Company

Patentee after: SHENZHEN HUAYANG INTERNATIONAL ENGINEERING DESIGN CO., LTD.

Address before: Shi Hua Lu Ying Fu Building 518038 Guangdong province Shenzhen Futian Free Trade Zone, Huayang International Construction Industry Company

Patentee before: Huayang international project design Co., Ltd of Shenzhen