CN204456095U - The device of self-balancing approach process castinplace pile broken pile - Google Patents

The device of self-balancing approach process castinplace pile broken pile Download PDF

Info

Publication number
CN204456095U
CN204456095U CN201520077819.8U CN201520077819U CN204456095U CN 204456095 U CN204456095 U CN 204456095U CN 201520077819 U CN201520077819 U CN 201520077819U CN 204456095 U CN204456095 U CN 204456095U
Authority
CN
China
Prior art keywords
pile
iron
steel
channel
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520077819.8U
Other languages
Chinese (zh)
Inventor
单玉川
章雪峰
杨俊杰
周芬娟
闻卫东
郑丽海
郑曙光
金成�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jieli Construction Group Ltd
Zhejiang University Of Technology Engineering Design Group Co ltd
Original Assignee
Zhejiang Jieli Construction Group Ltd
Building Planning And Design Research Institute Co Ltd Zhejiang University Of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jieli Construction Group Ltd, Building Planning And Design Research Institute Co Ltd Zhejiang University Of Technology filed Critical Zhejiang Jieli Construction Group Ltd
Priority to CN201520077819.8U priority Critical patent/CN204456095U/en
Application granted granted Critical
Publication of CN204456095U publication Critical patent/CN204456095U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of device of self-balancing approach process castinplace pile broken pile, comprise steel pile casting, the screw rod of the hydraulic jack that described device also comprises driving described steel pile casting to press down, i iron and lower end and broken pile reinforcing cage reinforcement welding, described screw rod is vertically arranged in described steel pile casting, the lower wing plate of described i iron is arranged on the barrel top edge of described steel pile casting, the central part of the upper flange of described i iron is provided with lower bolster, described lower bolster is provided with described hydraulic jack, and the top of described hydraulic jack is provided with upper padding plate; The periphery of described upper padding plate is provided with the first hollow steel pipe, and the periphery of described lower bolster is provided with the second steel pipe, and described second steel pipe is moving up and down to be plugged in described first hollow steel pipe, and the upper end of described screw rod is connected with described upper padding plate.The utility model provides a kind of device of simple to operate, safety good self-balancing approach process castinplace pile broken pile.

Description

The device of self-balancing approach process castinplace pile broken pile
Technical field
The utility model belongs to civil engineering pile foundation construction mechanical field, is a kind of device of self-balancing approach process castinplace pile broken pile.
Background technology
In traditional breakage of cast-in-place bored pile process, for ensureing down-hole artificial Drilling security setting steel pile casting, usually adopt artificial hammering press-in steel pile casting.Traditional method long construction period, poor stability, manpower consumption is large, and steel pile casting cannot continue press-in after press-in certain depth.
Summary of the invention
In order to the construction period overcoming existing process castinplace pile broken pile is longer, safety is poor, the deficiency that manpower consumption is larger, the utility model provides a kind of device of simple to operate, safety good self-balancing approach process castinplace pile broken pile.
The utility model solves the technical scheme that its technical problem adopts:
A kind of device of self-balancing approach process castinplace pile broken pile, comprise steel pile casting, the screw rod of the hydraulic jack that described device also comprises driving described steel pile casting to press down, i iron, channel-section steel and lower end and broken pile reinforcing cage reinforcement welding, described screw rod is vertically arranged in described steel pile casting, described i iron is arranged on described steel pile casting, and described hydraulic jack is arranged on the top of described i iron;
The lower wing plate of described i iron is arranged on the barrel top edge of described steel pile casting, and the central part of the upper flange of described i iron is provided with lower bolster, and described lower bolster is provided with described hydraulic jack, and the top of described hydraulic jack is provided with upper padding plate;
The periphery of described upper padding plate is provided with the first hollow steel pipe, and the periphery of described lower bolster is provided with the second steel pipe, and described second steel pipe is moving up and down to be plugged in described first hollow steel pipe, and the upper end of described screw rod is connected with described upper padding plate.
Further, the two ends of described i iron are respectively arranged with the first channel-section steel and the second channel-section steel, the right-hand member of described first channel-section steel is connected with the left end bolt of the web of described i iron, the right-hand member of the web of described i iron is connected with the left end bolt of described second channel-section steel, and the left end of described first channel-section steel and the right-hand member of described second channel-section steel lay respectively on the upper end-face edge of described steel pile casting.
Further again, the left end of the web of described i iron and right-hand member have the first bolt hole, the right-hand member of described first channel-section steel, the left end of described second channel-section steel have second bolt hole corresponding with described first bolt hole, described first bolt hole is provided with two or more and layout in column, described second bolt hole is provided with two or more and becomes multiple row to arrange, is parallel to each other between adjacent two row second bolts hole.
Further, described first channel-section steel and described second channel-section steel arrange two respectively and are arranged symmetrically in the both sides of described i iron.
The beneficial effects of the utility model are mainly manifested in: this device is easily understood, and are conducive to universal utilization; Regulated the steel pile casting press-in being applicable to various diameter by junction plate, solve various diameter bores castinplace pile broken pile problem, can repeatedly recycle after producing once; Darker broken pile problem can be processed under the prerequisite ensureing drilling work personal security; The general job site of hydraulic jack used, screw rod, i iron and channel-section steel all has, draw materials convenient and after simple installation is installed, only screw rod and broken pile reinforcing cage reinforcement welding can need be carried out the press-in of steel pile casting, and only need repeat to weld after each press-in just can carry out further steel pile casting press-in.
Accompanying drawing explanation
Fig. 1 is the structural representation of the device of self-balancing approach process castinplace pile broken pile.
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.
See figures.1.and.2, a kind of device of self-balancing approach process castinplace pile broken pile, comprise steel pile casting 2, the screw rod 15 that the hydraulic jack 3 that described device also comprises driving described steel pile casting 2 to press down, i iron 7 and lower end are welded with broken pile reinforcing cage reinforcing bar 4, described screw rod 15 is vertically arranged in described steel pile casting 2, described i iron 7 is arranged on described steel pile casting 2, and described hydraulic jack 3 is arranged on the top of described i iron 7;
The lower wing plate of described i iron 7 is arranged on the barrel top edge of described steel pile casting 2, the central part of the upper flange of described i iron is provided with lower bolster 8, described lower bolster 8 is provided with described hydraulic jack 3, and the top of described hydraulic jack 3 is provided with upper padding plate 9;
The periphery of described upper padding plate 9 is provided with the first hollow steel pipe, and the periphery of described lower bolster 8 is provided with the second steel pipe, and described second steel pipe is moving up and down to be plugged in described first hollow steel pipe, and the upper end of described screw rod 15 is connected with described upper padding plate 9.
Further, the two ends of described i iron 7 are respectively arranged with channel-section steel 20 and are respectively the first channel-section steel and the second channel-section steel, the right-hand member of described first channel-section steel is connected by bolt 22 with the left end of the web of described i iron 7, the right-hand member of the web of described i iron 7 is connected by bolt 22 with the left end of described second channel-section steel, and the left end of described first channel-section steel and the right-hand member of described second channel-section steel lay respectively on the upper end-face edge of described steel pile casting 2.
Further again, described first channel-section steel and described second channel-section steel arrange two respectively and are arranged symmetrically in the both sides of described i iron 7.
Further, the left end of the web of described i iron and right-hand member have the first bolt hole, the right-hand member of described first channel-section steel, the left end of described second channel-section steel have second bolt hole 21 corresponding with described first bolt hole, described first bolt hole is provided with two or more and layout in column, described second bolt hole 21 is provided with two or more and becomes multiple row to arrange, is parallel to each other between adjacent two row second bolts hole 21.
In the present embodiment, the upper end of described screw rod 15 is connected with described upper padding plate 9 by nut; Described castinplace pile broken pile 1 is provided with broken pile reinforcing cage reinforcing bar 4, described steel pile casting 2 is all vertically arranged with described screw rod 15; Described i iron 7 comprises upper flange, web and lower wing plate; Described first hollow steel pipe is open circles steel pipe, and the second steel pipe is round steel pipe; Described lower bolster 8 is square and is welded with round steel pipe in corner everywhere, the corner of described upper padding plate 9 is welded with open circles steel pipe everywhere, the round steel pipe of described lower bolster 8 is placed in the open circles steel pipe of described upper padding plate 9, scalable when described hydraulic jack 3 operation, to balance the displacement that described hydraulic jack 3 operation produces; Be provided with pad 5 between described screw rod 15 and described broken pile reinforcing cage reinforcing bar 4, upper padding plate 9 top is walked around in the upper end of described screw rod 15, and its lower end connects broken pile reinforcing cage reinforcing bar 4, thus makes described screw rod 15 tension; Described lower bolster 8 is arranged on the central part of described i iron, and described hydraulic jack 3 is placed on described lower bolster 8, described first bolt hole aperture identical with the aperture of described second bolt hole 10; The described steel pile casting 2 of each replacing, all can move lattice or many lattice by outside the bolt 22 on described channel-section steel 20 as required, to regulate i iron 7 spacing, thus adapts to the steel pile casting 2 of different-diameter; Described i iron 7 is connected by bolt 22 with described channel-section steel 20, and regulates total length by the second bolt hole 21 preset, and length is determined according to steel pile casting 2 diameter.
Operating principle of the present utility model: pulling force is also passed to described broken pile reinforcing cage reinforcing bar 4 by pad 5 by screw rod 15 tension when described hydraulic jack 3 operation, and pad 5 is often pressed into and once again welds; Being acted on upper padding plate 9 and lower bolster 8 by described hydraulic jack 3 makes when described hydraulic jack 3 applies vertical load, the vertical tension of described castinplace pile broken pile 1, and described both steel pile casting 2 pressurized realizations self-balancing, thus described steel pile casting 2 is vertically pressed in soil by self-balancing.

Claims (4)

1. the device of a self-balancing approach process castinplace pile broken pile, comprise steel pile casting, it is characterized in that: the screw rod of the hydraulic jack that described device also comprises driving described steel pile casting to press down, i iron and lower end and broken pile reinforcing cage reinforcement welding, described screw rod is vertically arranged in described steel pile casting, described i iron is arranged on described steel pile casting, and described hydraulic jack is arranged on the top of described i iron;
The lower wing plate of described i iron is arranged on the barrel top edge of described steel pile casting, and the central part of the upper flange of described i iron is provided with lower bolster, and described lower bolster is provided with described hydraulic jack, and the top of described hydraulic jack is provided with upper padding plate;
The periphery of described upper padding plate is provided with the first hollow steel pipe, and the periphery of described lower bolster is provided with the second steel pipe, and described second steel pipe is moving up and down to be plugged in described first hollow steel pipe, and the upper end of described screw rod is connected with described upper padding plate.
2. the device of self-balancing approach process castinplace pile broken pile as claimed in claim 1, it is characterized in that: the two ends of described i iron are respectively arranged with the first channel-section steel and the second channel-section steel, the right-hand member of described first channel-section steel is connected with the left end bolt of the web of described i iron, the right-hand member of the web of described i iron is connected with the left end bolt of described second channel-section steel, and the left end of described first channel-section steel and the right-hand member of described second channel-section steel lay respectively on the upper end-face edge of described steel pile casting.
3. the device of self-balancing approach process castinplace pile broken pile as claimed in claim 2, it is characterized in that: the left end of the web of described i iron and right-hand member have the first bolt hole, the right-hand member of described first channel-section steel, the left end of described second channel-section steel have second bolt hole corresponding with described first bolt hole, described first bolt hole is provided with two or more and layout in column, described second bolt hole is provided with two or more and becomes multiple row to arrange, is parallel to each other between adjacent two row second bolts hole.
4. the device of self-balancing approach process castinplace pile broken pile as claimed in claim 3, is characterized in that: described first channel-section steel and described second channel-section steel arrange two respectively and be arranged symmetrically in the both sides of described i iron.
CN201520077819.8U 2015-02-04 2015-02-04 The device of self-balancing approach process castinplace pile broken pile Expired - Fee Related CN204456095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520077819.8U CN204456095U (en) 2015-02-04 2015-02-04 The device of self-balancing approach process castinplace pile broken pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520077819.8U CN204456095U (en) 2015-02-04 2015-02-04 The device of self-balancing approach process castinplace pile broken pile

Publications (1)

Publication Number Publication Date
CN204456095U true CN204456095U (en) 2015-07-08

Family

ID=53663004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520077819.8U Expired - Fee Related CN204456095U (en) 2015-02-04 2015-02-04 The device of self-balancing approach process castinplace pile broken pile

Country Status (1)

Country Link
CN (1) CN204456095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957883A (en) * 2021-11-11 2022-01-21 李汗 Concrete prefabricated foundation pile and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113957883A (en) * 2021-11-11 2022-01-21 李汗 Concrete prefabricated foundation pile and construction method thereof
CN113957883B (en) * 2021-11-11 2023-01-24 浙江荣森建设有限公司 Concrete prefabricated foundation pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN205999802U (en) A kind of continuous bridge zero number section, the new prepressing device of Cast-in-place Segment Support
CN204456095U (en) The device of self-balancing approach process castinplace pile broken pile
CN103437547B (en) A kind of aluminum alloy pattern plate
CN203188942U (en) Novel multifunctional racking platform
CN204252175U (en) Preformed pile Large strain method detects special guiding device
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN203097712U (en) Concrete bored pile rectangular hole forming device
CN202073297U (en) Assistant lifting device for boring of electric hammer
CN202519670U (en) Drilling-in tool of spiral ground auger
KR101528846B1 (en) Reactive forcing device using jack lifting apparatus and foundation reinforcing method therewith
CN202559746U (en) Continuing device for upper-lower-layer shear wall during pouring
CN203048458U (en) Drawing-connection piece for adhering tower crane to concrete wall
CN202000346U (en) Prestressed concrete square pile
CN202214742U (en) Anchor pile locking device in static load test
CN205296155U (en) Portable pressure stake machine
CN204898708U (en) Assembled steel construction conversion layer of tower crane
CN212426778U (en) Bracket pre-pressing structure
CN102444283A (en) Lateral bracing structure of building formwork
CN204940821U (en) One can be had enough to meet the need and utilize Finalized rebar operating desk
CN203175160U (en) Light, shaping, large and temporary construction enclosing wall
CN215669491U (en) Prefabricated square pile head butt joint horizontal displacement handling frame
CN214301889U (en) Lattice column correcting device
CN213387390U (en) Lifting appliance suitable for lifting steel members with different sizes
CN203795851U (en) Adjustable window opening form board device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHEJIANG UNIVERSITY OF TECHNOLOGY ENGINEERING DESI

Free format text: FORMER NAME: ZHEJIANG UNIVERSITY OF TECHNOLOGY BUILDING PLANNING AND DESIGN RESEARCH INSTITUTE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: The city Zhaohui six districts Chao Wang Road Hangzhou City, Zhejiang province 310014 18

Patentee after: ZHEJIANG UNIVERSITY OF TECHNOLOGY ENGINEERING DESIGN GROUP Co.,Ltd.

Patentee after: ZHEJIANG JIELI CONSTRUCTION Group Ltd.

Address before: The city Zhaohui six districts Chao Wang Road Hangzhou City, Zhejiang province 310014 18

Patentee before: BUILDING PLANNING AND DESIGN RESEARCH INSTITUTE CO LTD ZHEJIANG University OF TECHNOLOGY

Patentee before: ZHEJIANG JIELI CONSTRUCTION Group Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708