CN204455838U - One is used for depositing the portable storage platform of steel truss girder purlin sheet - Google Patents

One is used for depositing the portable storage platform of steel truss girder purlin sheet Download PDF

Info

Publication number
CN204455838U
CN204455838U CN201520090294.1U CN201520090294U CN204455838U CN 204455838 U CN204455838 U CN 204455838U CN 201520090294 U CN201520090294 U CN 201520090294U CN 204455838 U CN204455838 U CN 204455838U
Authority
CN
China
Prior art keywords
truss girder
steel truss
sheet
girder purlin
portable storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520090294.1U
Other languages
Chinese (zh)
Inventor
吴明威
华勇
窦志明
白文虎
向梨梨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201520090294.1U priority Critical patent/CN204455838U/en
Application granted granted Critical
Publication of CN204455838U publication Critical patent/CN204455838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of for depositing the portable storage platform of steel truss girder purlin sheet, belongs to bridge construction equipment technical field.Comprise some main beams arranged in parallel, described main beam two ends are connected by outer lateral, centre connects and composes integral platform framework by interior lateral, by arranging shifting roller and spacing steel plate is slidably connected on the track of pre-splicing platform bottom described platform framework, two main beams being positioned at centre are provided with the vertical supporting frame for sheet top, fixing steel truss girder purlin, all the other main beams are respectively arranged with the symmetrical assembled buttress for sheet bottom, fixing steel truss girder purlin, traction otic placode is respectively set in the two main beam sides being positioned at outside.The utility model is first assembled good by steel truss girder purlin sheet, then entirety is transported by portable storage platform, decreases the number of times of transhipment, lifting, has saved construction cost widely, had higher economy.

Description

One is used for depositing the portable storage platform of steel truss girder purlin sheet
Technical field
The utility model belongs to bridge foundation construction method and device technique field thereof, is specifically related to a kind of portable storage platform for depositing steel truss girder purlin sheet.
Background technology
In bridge construction, steel truss girder has been widely used in bridge superstructure construction.In practice of construction, owing to being subject to complicated topographical conditions, impact such as factor such as lifting lifting means lifting capacity and the restriction of lifting scope etc., usually decomposed, the pattern of spelling steel truss girder purlin sheet is transported, lifting and installation, need so repeatedly a pieces decomposition part to be transported repeatedly, lifting, because steel truss girder purlin sheet self sectional dimension is larger with deadweight, steel truss girder purlin sheet is transported from assembled pedestal, during lifting, usually repeatedly need transport by means of large lifting equipment, lifting, therefore efficiency of construction is low, construction speed is slow, and transhipment, carrying cost is higher.
Utility model content
The purpose of this utility model is exactly for the deficiencies in the prior art, provides a kind of portable storage platform for depositing steel truss girder purlin sheet.Be applicable to assembled, deposit and short distance transport structure size larger steel truss girder purlin sheet.
The technical solution adopted in the utility model is: comprise some main beams arranged in parallel, described main beam two ends are connected by outer lateral, centre connects and composes integral platform framework by interior lateral, by arranging shifting roller and spacing steel plate is slidably connected on the translation track of pre-splicing platform bottom described platform framework, two main beams being positioned at centre are provided with the vertical supporting frame for sheet top, fixing steel truss girder purlin, all the other main beams are respectively arranged with symmetrical for supporting and the assembled buttress of sheet bottom, fixing steel truss girder purlin, in the two main beam sides being positioned at outside, traction otic placode is respectively set.
As preferably, described vertical supporting frame comprises two columns be separately fixed on main beam, connected by lateral bar between described column top, wherein be fixedly connected with hound between a root post upper end and another root post lower end, described column top is respectively equipped with cap, and described cap two ends protrude from column and and uprights vertical.
As preferably, described cap end face is provided with rubber pad.
As more preferably, described column side is furnished with cat ladder.
The utility model has the features such as simple and practical, cheap, easy to operate.Steel truss girder purlin sheet is first assembled good, entirety is transported by portable storage platform again, solve the large-scale steel structures such as steel truss girder purlin sheet in bridge construction in the problem storing, transporting difficulty temporarily, in addition, transport with routine, store compared with construction, decrease the use of large-scale lifting appliance, decrease the number of times of transhipment, lifting, save construction cost widely, there is higher economy.
Accompanying drawing explanation
Fig. 1 is the portable storage platform top view of the utility model;
Fig. 2 is A-A sectional schematic diagram in the utility model Fig. 1;
Fig. 3 is B-B sectional schematic diagram in the utility model Fig. 1;
Fig. 4 is the utility model traction translation schematic diagram.
In figure, 1-main beam; 2-outer lateral; 3-interior lateral; 4-vertical supporting frame (4.1-column; 4.2-lateral bar; 4.3-hound; 4.4-cap; 4.5-cat ladder; 4.6-rubber pad); 5-assembled buttress; 6-shifting roller; 7-spacing steel plate; 8-translation track; 9-traction otic placode; 10-steel truss girder purlin sheet; 11-pre-splicing platform; 12-hoist engine.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, is convenient to be well understood to the utility model, but they do not form restriction to the utility model.
As shown in Fig. 1-Fig. 4, the utility model comprises some main beams 1 arranged in parallel, described main beam 1 two ends are connected by outer lateral 2, centre connects and composes integral platform framework by interior lateral 3, by arranging shifting roller 6 and spacing steel plate 7 is slidably connected on the translation track 8 of pre-splicing platform 11 bottom described platform framework, two main beams 1 being positioned at centre are provided with the vertical supporting frame 4 for sheet 10 top, fixing steel truss girder purlin, all the other main beams 1 are respectively arranged with symmetrical for supporting and the assembled buttress 5 of sheet 10 bottom, fixing steel truss girder purlin, traction otic placode 9 is respectively set in two main beam 1 sides being positioned at outside, described traction otic placode 9 connects hoist engine 12 by wire rope.Wherein, described pre-splicing platform 11 by distribution beam 11.1, be placed in the steel plate 11.2 in distribution beam 11.1 and the translation track 8 be arranged in distribution beam 11.1 is formed.
In technique scheme, described vertical supporting frame 4 comprises two columns 4.1 be separately fixed on main beam 1, described column 4.1 side arrangement has cat ladder 4.5, connected by lateral bar 4.2 between described column 4.1 top, wherein be fixedly connected with hound 4.3 between root post 4.1 upper end and another root post 4.1 lower end, described column 4.1 top is respectively equipped with cap 4.4, described cap 4.4 two ends protrude from column 4.1 and and uprights vertical, described cap 4.4 end face is provided with rubber pad 4.6.
The utility model construction method: (1), set up distribution beam 11.1, distribution beam 11.1 is laid steel plate 11.2, and translation track 8 is installed in distribution beam 11.1 as pre-splicing platform 11, and relative elevation, the off normal of Survey control two translation tracks 8; (2), by main beam 1, outer lateral 2, interior lateral 3 be assembled into integral platform framework and assemble with vertical supporting frame 4, welding forms overall structure; (3), shifting roller 6 and the spacing steel plate 7 of integral platform base of frame are installed; (4), the lifting of integral platform framework is mounted on translation track 8; (5), carry out assembled to steel truss girder purlin sheet 10, assembled complete after be fixed overall for steel truss girder purlin sheet 10 with vertical supporting frame 4, wherein, sheet 10 top, steel truss girder purlin and cap 4.4 are fixed, and steel truss girder purlin sheet 10 lower support is on assembled buttress 5 and fix with it; (6), utilize hoist engine 12 to be connected as power traction by wire rope with traction otic placode 9, steel truss girder purlin sheet 10 is moved within the scope of lifting appliance by means of portable storage platform and lifts.
The content that this manual is not described in detail belongs to the known prior art of professional and technical personnel in the field.

Claims (4)

1. one kind for depositing the portable storage platform of steel truss girder purlin sheet, it is characterized in that: comprise some main beams arranged in parallel, described main beam two ends are connected by outer lateral, centre connects and composes integral platform framework by interior lateral, by arranging shifting roller and spacing steel plate is slidably connected on the translation track of pre-splicing platform bottom described platform framework, two main beams being positioned at centre are provided with the vertical supporting frame for sheet top, fixing steel truss girder purlin, all the other main beams are respectively arranged with symmetrical for supporting and the assembled buttress of sheet bottom, fixing steel truss girder purlin, in the two main beam sides being positioned at outside, traction otic placode is respectively set.
2. one according to claim 1 is used for depositing the portable storage platform of steel truss girder purlin sheet, it is characterized in that: described vertical supporting frame comprises two columns be separately fixed on main beam, connected by lateral bar between described column top, wherein be fixedly connected with hound between a root post upper end and another root post lower end, described column top is respectively equipped with cap, and described cap two ends protrude from column and and uprights vertical.
3. one according to claim 2 is used for depositing the portable storage platform of steel truss girder purlin sheet, it is characterized in that: described cap end face is provided with rubber pad.
4. one according to claim 2 is used for depositing the portable storage platform of steel truss girder purlin sheet, it is characterized in that: described column side is furnished with cat ladder.
CN201520090294.1U 2015-02-09 2015-02-09 One is used for depositing the portable storage platform of steel truss girder purlin sheet Expired - Fee Related CN204455838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520090294.1U CN204455838U (en) 2015-02-09 2015-02-09 One is used for depositing the portable storage platform of steel truss girder purlin sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520090294.1U CN204455838U (en) 2015-02-09 2015-02-09 One is used for depositing the portable storage platform of steel truss girder purlin sheet

Publications (1)

Publication Number Publication Date
CN204455838U true CN204455838U (en) 2015-07-08

Family

ID=53662747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520090294.1U Expired - Fee Related CN204455838U (en) 2015-02-09 2015-02-09 One is used for depositing the portable storage platform of steel truss girder purlin sheet

Country Status (1)

Country Link
CN (1) CN204455838U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631336A (en) * 2015-02-09 2015-05-20 中交第二航务工程局有限公司 Mobile storage platform for storing steel truss girder pieces and construction method of mobile storage platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631336A (en) * 2015-02-09 2015-05-20 中交第二航务工程局有限公司 Mobile storage platform for storing steel truss girder pieces and construction method of mobile storage platform

Similar Documents

Publication Publication Date Title
CN203923919U (en) Support cast-in-place case beam side sliding system
CN201250064Y (en) Front launching nose type bridge girder erection machine for bridge erection
CN202595580U (en) Subgrade box structure for gantry crane track
CN202416882U (en) Track for slippage installation of large-span pipe truss
CN203452009U (en) Self-walking device for mounting steel beam
CN201560539U (en) Tool car for long-span net rack roof space plate
CN202220327U (en) Moving pulley of side web plate of full space support cast-in-place box beam
CN204455838U (en) One is used for depositing the portable storage platform of steel truss girder purlin sheet
CN106639106A (en) Steel structure flexible shed frame
CN203213637U (en) Roadbed box for walking on floor of larger crawler crane
CN201826320U (en) Assembling and sinking device for double wall steel cofferdam
CN104631336A (en) Mobile storage platform for storing steel truss girder pieces and construction method of mobile storage platform
CN207260605U (en) A kind of super plane structure construction material transport system
CN202247682U (en) Bridge crane for installing curtain board
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN210794552U (en) Net rack color steel plate profiling rapid conveying device
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN201343871Y (en) Curtain wall moving plate support
CN203256614U (en) Large-span bent cap lower-bearing type Bailey frame formwork device
CN202990392U (en) Steel tube guide rail and multifunctional ring rail combined mechanism for overall lifting scaffold
CN203346804U (en) Accurate positioning device of bridge whole piggy back
CN202152441U (en) Bridge deck lifting station
CN103612042B (en) Crane girder girth welding Special frame
CN205223823U (en) Highway with stride a formula single track and build bilateral case section structure of bridge jointly
CN104074390A (en) 750kV transformer substation steel pipe concrete framework

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20220209