- Publication number
- CN203213637U CN203213637U CN 201320150062 CN201320150062U CN203213637U CN 203213637 U CN203213637 U CN 203213637U CN 201320150062 CN201320150062 CN 201320150062 CN 201320150062 U CN201320150062 U CN 201320150062U CN 203213637 U CN203213637 U CN 203213637U
- Authority
- CN
- China
- Prior art keywords
- floor
- girder
- crawler crane
- subgrade case
- roadbed box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a roadbed box for walking on a floor of a larger crawler crane. The roadbed box comprises two main beams, wherein a plurality of secondary beams are connected between the two main beams at intervals; the main beams are arranged on the floor; and crawler belts of the larger crawler crane respectively walk on the two main beams. According to the roadbed box disclosed by the utility model, a roadbed box is arranged between a reinforced concrete floor and the large crawler crane, and the dead weight and maximum hoisting load of the large crawler crane are firstly transferred to the roadbed box and then transferred to the frame beams of the floor through the roadbed box, so that the load borne by the floor is reduced and slowed; the roadbed box adopts a connection manner of the main beams and the secondary beams, so that the working space of a strengthening layer is large, the construction activity is hardly affected, the strengthening cost of the floor is low, and the roadbed box is convenient to construct and high in safety.
Description
Technical field
The utility model relates to the construction field of walking on a kind of large-scale crawler crane floor, walking subgrade case on especially a kind of large-scale crawler crane floor.
Background technology
In many architectural designs, adopted steel structural form, a large amount of Heavy Type Steel Structure members need large-scale crawler crane to transport, lift, but because place restriction, large-scale crawler crane needs to carry out large-area steel structure hoisting walking operation at the concrete floor face, cause intrinsic reinforced concrete floor can not satisfy the requirement of the bearing capacity under the working load effect, must take reinforcement measure to it.Traditional reinforcement measure need be set up full hall scaffold or be set up a large amount of lattice columns under beam slab, so not only increased steel using amount, and wasted time and energy.Therefore be necessary to propose a kind of new job practices for track route reinforcement measure on the large-scale crawler crane floor.
The utility model content
It is clear and definite that technical problem to be solved in the utility model provides a kind of force transfer system, and the back-up coat working space is big, to walking subgrade case on the little large-scale crawler crane floor of construction activities influence.
For realizing above-mentioned technique effect, the utility model discloses walking subgrade case on a kind of large-scale crawler crane floor, comprise the twice girder, be connected with the complex trace secondary beam between the described twice girder at interval, described girder is located on the described floor, and the crawler belt of described large-scale crawler crane walks in respectively on the described twice girder.
The utility model further improves and is, is connected with the support angle steel between the described secondary beam of adjacent twice, and described support angle steel adopts L100 bugle steel.
The utility model further improves and is that described girder comprises three H shaped steel that weld together side by side, and the model of described H shaped steel is H650*300*12*18.
The utility model further improves and is that described secondary beam adopts No. 22 channel-section steels.
The utility model further improves and is, the two ends of described secondary beam connect steel plate by one respectively and fixedly connected with described girder, one side and the described Main Girder Welding of described connection steel plate are fixed, the opposite side of described connection steel plate is corresponding with the two ends of described secondary beam to offer plural bolt hole, is connected and fixed by bolt.
The utility model further improves and is that the two ends, bottom of described girder are respectively equipped with a pressure-bearing steel plate.
The utility model is owing to adopted above technical scheme, make it have following beneficial effect to be: by between reinforced concrete floor and large-scale crawler crane, a subgrade case being set, deadweight and the maximum of large-scale crawler crane are lifted by crane load by being delivered to earlier on the subgrade case, be delivered on the floor frame beam by subgrade case again, slow down the load that floor bears, subgrade case adopts the connected mode of girder and secondary beam, the back-up coat working space is big, little to the construction activities influence, the flooring reinforcement cost is low, and have easy construction, safe.
Description of drawings
Fig. 1 is the structural representation that subgrade case is used in walking on the large-scale crawler crane floor of the utility model.
Fig. 2 is the schematic cross-section that subgrade case is used in walking on the large-scale crawler crane floor of the utility model.
Fig. 3 is the structural representation that the connection steel plate of subgrade case is used in walking on the large-scale crawler crane floor of the utility model.
Fig. 4 is the structural representation that the inferior plate of subgrade case is used in walking on the large-scale crawler crane floor of the utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
At first consult illustrated in figures 1 and 2, walking mainly is made up of twice girder 11 and complex trace secondary beam 12 with subgrade case 1 on a kind of large-scale crawler crane floor of the present utility model, girder 11 is located on the floor, the H shaped steel 110 that to adopt three models be H650*300*12*18 welds formation side by side, girder 11 length are long for former design floor frame girder span, wide is selected large-scale crawler crane crawler width, the crawler belt of large-scale crawler crane walks in respectively on the twice girder 11, girder 11 height are 650mm, secondary beam 12 adopts No. 22 channel-section steels, be connected between the twice girder 11 at interval, the two ends of secondary beam 12 connect steel plate 13 by one respectively and fixedly connected with girder 11, the side and girder 11 welding that connect steel plate 13 are fixing, cooperate Fig. 3 and shown in Figure 4, the opposite side that connects steel plate 13 is corresponding with the two ends of secondary beam 12 to offer plural bolt hole 130, by bolt that both are fixedly connected, thus being connected between the girder 11 secondary beam 12.Be connected with one L100 number between the adjacent twice secondary beam 12 and support angle steel 15, by being welded to connect reinforcing, strengthen the rigidity of subgrade case 1.As preferred embodiments of the present utility model, at the two ends, bottom of girder 11 a pressure-bearing steel plate 14 is set respectively, as shown in Figure 2, employing is welded to connect, and pressure-bearing steel plate 14 is of a size of long 900mm, and is wide with girder 11 width, height is determined according to the maximum downwarp value of subgrade case 1 deformation analysis, load passes on the subgrade case by the crawler belt of large-scale crawler crane, is passed on the floor frame beam by subgrade case again, has avoided the subgrade case downwarp and the contact failure floor.Roadbed paving case 1 is layed in subgrade case 1 on the track route, and the pressure-bearing steel plate 14 of subgrade case 1 bottom and floor frame beam are to it.
Walking is as follows with the construction of subgrade case 1 on the large-scale crawler crane floor of the utility model:
At first, according to the characteristics of structural steelwork, determine to select for use the deadweight of large-scale crawler crane, maximum lifting load and large-scale crawler crane track route.
Then, design subgrade case 1, comprise type selecting and the size design of girder 11, secondary beam 12, support angle steel 15, connection steel plate 13 and pressure-bearing steel plate 14.
Then, set up subgrade case 1 and floor frame beam computation model, reinforce the checking computations process and be divided into two parts:
Subgrade case 1 intensity and deformation analysis, the subgrade case deformation analysis adopts sap2000;
The supporting capacity checking computations of floor frame beam, PKPM is adopted in the checking computations of floor frame beam.
Then, after the supporting capacity checking computations of subgrade case 1 intensity and distortion and floor frame beam meet the requirements, make subgrade case 1, girder 11 is installed earlier, at the two ends, bottom of girder 11 welding pressure-bearing steel plate 14, then connect by bolt secondary beam 12 is connected with girder 11, the two ends that to support angle steel 15 at last are welded on the secondary beam 12, wherein, girder 11 adopts the H shaped steel continuous welding side by side of three H650*300*12*18, weld bead height is 18mm, and secondary beam 12 is connected with girder 11 bolts by connecting steel plate 13, connects steel plate 13 and is welded on the girder 11.
At last, roadbed paving case 1 is layed in subgrade case 1 on the track route, and the pressure-bearing steel plate 14 of subgrade case 1 bottom and floor frame beam are to it.
Below the utility model of embodiment has been described in detail by reference to the accompanying drawings, and those skilled in the art can make the many variations example to the utility model according to the above description.Thereby some details among the embodiment should not constitute restriction of the present utility model, and the scope that the utility model will define with appended claims is as protection domain of the present utility model.
Claims (6)
1. walking subgrade case on one kind large-scale crawler crane floor, it is characterized in that: described subgrade case comprises the twice girder, be connected with the complex trace secondary beam at interval between the described twice girder, described girder is located on the described floor, and the crawler belt of described large-scale crawler crane walks in respectively on the described twice girder.
2. subgrade case as claimed in claim 1 is characterized in that: be connected with the support angle steel between the described secondary beam of adjacent twice, described support angle steel employing L100 bugle steel.
3. subgrade case as claimed in claim 1, it is characterized in that: described girder comprises three H shaped steel that weld together side by side, and the model of described H shaped steel is H650*300*12*18.
4. subgrade case as claimed in claim 1 is characterized in that: No. 22 channel-section steels of described secondary beam employing.
5. subgrade case as claimed in claim 1, it is characterized in that: the two ends of described secondary beam connect steel plate by one respectively and fixedly connected with described girder, one side and the described Main Girder Welding of described connection steel plate are fixed, the opposite side of described connection steel plate is corresponding with the two ends of described secondary beam to offer plural bolt hole, is connected and fixed by bolt.
6. subgrade case as claimed in claim 1, it is characterized in that: the two ends, bottom of described girder are respectively equipped with a pressure-bearing steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320150062 CN203213637U (en) | 2013-03-28 | 2013-03-28 | Roadbed box for walking on floor of larger crawler crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320150062 CN203213637U (en) | 2013-03-28 | 2013-03-28 | Roadbed box for walking on floor of larger crawler crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203213637U true CN203213637U (en) | 2013-09-25 |
Family
ID=49203185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320150062 Expired - Lifetime CN203213637U (en) | 2013-03-28 | 2013-03-28 | Roadbed box for walking on floor of larger crawler crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203213637U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912003A (en) * | 2015-05-19 | 2015-09-16 | 浙江八达建设集团有限公司 | Construction method for strengthening track crane |
CN105401741A (en) * | 2015-11-24 | 2016-03-16 | 中建钢构有限公司 | Basement roof reinforcing and construction device and construction method thereof |
CN105648866A (en) * | 2016-02-29 | 2016-06-08 | 成都绿迪科技有限公司 | Large caterpillar crane floor board roadbed box |
CN113821853A (en) * | 2021-07-06 | 2021-12-21 | 五冶集团上海有限公司 | Method for calculating structural floor bearing capacity during floor operation of hoisting machine |
-
2013
- 2013-03-28 CN CN 201320150062 patent/CN203213637U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912003A (en) * | 2015-05-19 | 2015-09-16 | 浙江八达建设集团有限公司 | Construction method for strengthening track crane |
CN105401741A (en) * | 2015-11-24 | 2016-03-16 | 中建钢构有限公司 | Basement roof reinforcing and construction device and construction method thereof |
CN105648866A (en) * | 2016-02-29 | 2016-06-08 | 成都绿迪科技有限公司 | Large caterpillar crane floor board roadbed box |
CN113821853A (en) * | 2021-07-06 | 2021-12-21 | 五冶集团上海有限公司 | Method for calculating structural floor bearing capacity during floor operation of hoisting machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203924696U (en) | Backform hanger fast-assembling system | |
CN204151666U (en) | A kind of steel trestle meeting meeting requirement | |
CN203213637U (en) | Roadbed box for walking on floor of larger crawler crane | |
CN202913337U (en) | Prestress combination box girder composed of concrete frange plates and corrugated steel webs | |
CN202090283U (en) | Bridge-detecting working platform capable of being spliced and disassembled | |
CN203583378U (en) | Floor plate truss trolley for mounting bridge deck slab of composite structure bridge | |
CN203461693U (en) | Ultrahigh steel support leg for combined gantry crane with Bailey truss | |
CN202220400U (en) | Lap-joint type formwork support beam | |
CN102251666B (en) | Overhanging type discharging platform | |
CN104533114A (en) | Seacoast flexible direct-current convertor station valve hall combined building structural system | |
CN202899639U (en) | Concrete column structure | |
CN102589913A (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
CN202864703U (en) | Device for movable tower crane to work on structure floor | |
CN105019360B (en) | A kind of construction method based on high-altitude crawler crane trestle | |
CN204311791U (en) | Seashore flexible direct current converter station valve Room associating architectural structure system | |
CN204212059U (en) | A kind of dilatory with large span heavy duty slipway beam | |
CN103306202B (en) | Steel panel used in fabricated Bailey truss in matching manner | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN203699682U (en) | Crane | |
CN109441088B (en) | Steel structure operation platform for super high-rise building core tube construction | |
CN204551271U (en) | A kind of reinforcement type Hanging Basket | |
CN202522428U (en) | Horizontal tunnel lining model test platform modularization loading machine frame | |
CN201679227U (en) | Template-supporting device of cast-in-place concrete floor slab of box-shaped beam with steel frame structure | |
CN202247556U (en) | CRTS I track slab uncovering and laying device of special line for passenger train | |
CN202012046U (en) | Supporting beam for formwork of high-speed rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |