CN202012046U - Supporting beam for formwork of high-speed rail - Google Patents
Supporting beam for formwork of high-speed rail Download PDFInfo
- Publication number
- CN202012046U CN202012046U CN 201120051346 CN201120051346U CN202012046U CN 202012046 U CN202012046 U CN 202012046U CN 201120051346 CN201120051346 CN 201120051346 CN 201120051346 U CN201120051346 U CN 201120051346U CN 202012046 U CN202012046 U CN 202012046U
- Authority
- CN
- China
- Prior art keywords
- joint
- steel
- plate
- joints
- mould bases
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to the technical field of a steel structure, in particular to a supporting beam for a formwork of a high-speed rail. The problems of high site assembling workload and large number of fittings on the existing supporting for a concrete cast-in-place formwork of the high-speed rail and an urban elevated railway are solved. The supporting beam for the formwork of the high-speed rail comprises two I-shaped steel beams of which the upper planes are positioned on the same plane and is characterized in that the upper and the lower planes of the I-shaped steel beams are respectively provided with cover boards; first joints are arranged at one ends of the I-shaped steel beams; second joints are arranged at the other ends of the I-shaped steel beams; the first joints and the second joints are respectively formed by two parallel boards; an inner empty distance between the two boards of each first joint is greater than an outer side distance between the two boards of the corresponding second joint; and the first joints and the second joints are provided with connecting pin holes. One beam can replace a plurality of double-layer baileys. The supporting beam is convenient to install, transport and assemble. The site assembling workload is greatly reduced.
Description
Technical field
The utility model relates to the steel work technical field, relates in particular to the high ferro mould bases brace summer of the concrete cast-in-situ mould bases support of a kind of high ferro or overhead road of city.
Background technology
Be used for the support of the concrete cast-in-situ mould bases of high ferro and overhead road of city, what adopt mostly at present is to buckle or support with Bei Leiliang with steel pipe or bowl, loaded down with trivial details workload is big, and particularly on the high ferro engineering, the support of concrete cast-in-situ mould bases is supported with the shellfish thunder, shellfish thunder length is short, after the pin connection, connect into the length that needs by many shellfish thunders, and width generally is provided with tens row shellfish thunders, short transverse has two layers of shellfish thunder, also will connect bracing frame with bolt and nut and reinforce; During insufficient strength, also need to connect the reinforcement chord member with bolt and nut, shellfish thunder quantity is many especially, and number of fitting parts is also many, and the assembled on site workload is big.Existing steel support structure is varied, and the design main points are based on the working environment technical requirements, and the support interchangeability of different structure form is poor.As patent announcement number is CN201209237Y many beams of mobile formwork section carriage, it comprises the truss girder that level is provided with separately, the detachable support and connection leverage that connects between the truss girder, truss girder is removably connected by two carriage girders and constitutes, carriage girder junction is provided with bracket, the mobile mould frame support bracket of this structure is owing to adopt the interconnective carriage girder of more piece to constitute, adopt the structure of upper support simultaneously, be convenient to carriage partition transhipment, make carriage can be suitable for the Construction Through Form on Traveler on highly bigger light-duty only column pier.As patent announcement number is CN2713062Y template brace summer, includes a beam body and and is installed in batten in this beam body, and this beam body has concave space in, be arranged with toward in from this beam body roof, two grab members are located at two sidewalls of concave space in this respectively, and toward should in concave space protrude out; This batten is installed in this interior concave space, and its two side faces is subjected to this two grabs member institute dogging respectively, and can't deviate from interior concave space, and this brace summer is able to this batten for wooden template nail joint.
Summary of the invention
The purpose of this utility model is in order to solve the existing problem that support site assembly workload is big, number of fitting parts is many that is used for the concrete cast-in-situ mould bases of high ferro and overhead road of city, a kind of high ferro mould bases brace summer rational in infrastructure is provided, it is by type design plurality of specifications length, joint with quick connection, can be arbitrarily made with Len req, the bearing capacity of single beam is big, assembles easy for installation efficient.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: a kind of high ferro mould bases brace summer, comprise by two and go up plane steel I-beam in the same plane, it is characterized in that described steel I-beam on, be respectively equipped with cover plate on the lower plane, one end of steel I-beam is provided with first joint, the other end of steel I-beam is provided with second joint, first joint, second joint constitutes by two plates that are parallel to each other, interior Ullage between first joint, two plates is from greater than the outer lateral extent between second joint, two plates, first joint, second joint is provided with the connection pin-and-hole.This device is formed main framing by two i iron, cover plate is spliced into one to two i iron up and down, the size of first joint and second joint is a pair of size that cooperatively interacts, in many brace summer connection procedures, as long as second joint of a brace summer is plugged in first joint of another root brace summer, get final product with bearing pin or bolt connection.The length of single brace summer can design some kinds of length specifications from 1 meter to tens meters, and is required with the length that satisfies combination arbitrarily.
As preferably, the width of described cover plate equates with the width sum of two i iron wing plates.The both sides of cover plate and i iron welding, generally speaking, the width of cover plate is less than the width of two weld seams of i iron.
As preferably, two i iron webs that constitute in plate and the steel I-beam of described first joint be arranged in parallel; Two two of constituting the plate and first joint of second joint constitute the equidirectional setting of plate.When two I-shaped girder steels connect, connect bearing pin from side interts the hole of first joint and second joint, two planes of steel I-beam are provided with along the vertical direction.
As preferably, the position, two terminations of described steel I-beam is provided with end-plate, and first joint, second joint are connected with steel I-beam by end-plate respectively.First joint and second joint adopt sheet material system, all forms by two steel plates that are parallel to each other, the end of i iron can't be directly and flat-form material weld, end-plate must be housed.
As preferably, the web position, both sides of described steel I-beam is provided with some gussets.The length of steel I-beam does not wait from 1 meter to 12 meters, and gusset has been strengthened the curved intensity of doing of whole piece steel I-beam greatly, and gusset adds weldering in both sides again after two i iron splicings.
As preferably, described steel I-beam web position is provided with several hollow-out parts, and hollow-out parts is arranged between two adjacent gussets.Hollow-out parts can be removed the web that the steel I-beam anti-shearing force is not had influence, and hollow-out parts is made as circle or ellipse.
Effective effect of the present utility model is: a beam can replace double-deck a plurality of shellfish thunders, and installation, transportation, easy to assembly significantly reduce the site assembly workload.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model.
Fig. 2 is the A-A sectional structure schematic diagram of the utility model Fig. 1.
Fig. 3 is the plan structure schematic diagram of the utility model Fig. 1.
Among the figure: 1. first joint, 2. end-plate, 3. gusset, 4. hollow-out parts, 5. second joint, 6. steel I-beam, 7. cover plate.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Referring to Fig. 1, Fig. 2, a kind of high ferro mould bases of present embodiment brace summer, length is made as 6 meters, by two models is 45b i iron steel I-beam 6 side by side, the upper and lower plane of steel I-beam 6 flushes, throat thickness is the cover plate 7 of 25mm respectively on two planes up and down, and cover plate 7 is the last lower plane covering of whole i iron.
At the first end-plate 2 of burn-oning respectively in the two ends of steel I-beam 6, weld first joint 1 then on the end-plate 2 of steel I-beam 6 at one end, as shown in Figure 3, first joint 1 is made of two blocks of parallel plates, and first joint 1 is provided with two and connects pin-and-holes; Welding second joint 5, the second joints 5 are made of two plates that are parallel to each other on the end-plate 2 of steel I-beam 6 other ends, and second joint 5 is provided with two and connects pin-and-hole.Interior Ullage between 1 liang of plate of first joint is from than the big 2mm of outer lateral extent between 5 liang of plates of second joint, and the connecting pin hole size on first joint 1, second joint 5 equates that two distances that connect between the pin-and-hole equate.
Be welded with the thick gusset of 20mm 3 every 1000mm on the web of steel I-beam 6, have hollow-out parts 4 in two adjacent gusset 3 centre positions, hollow-out parts 4 is the waist circular port of 200*390.
During use, when two high ferro mould bases brace summers connect, among second joint, 5 insertions, first joint 1 of a high ferro mould bases brace summer, connect with bearing pin.
The foregoing description is to explanation of the present utility model, is not to qualification of the present utility model, any structure after the simple transformation of the present utility model, technology is all belonged to protection domain of the present utility model.
Claims (6)
1. high ferro mould bases brace summer, comprise by two and go up plane steel I-beam (6) in the same plane, it is characterized in that described steel I-beam (6) on, be respectively equipped with cover plate (7) on the lower plane, one end of steel I-beam (6) is provided with first joint (1), the other end of steel I-beam (6) is provided with second joint (5), first joint (1), second joint (5) constitutes by two plates that are parallel to each other, interior Ullage between first joint (1) two plate is from greater than the outer lateral extent between second joint (5) two plates, first joint (1), second joint (5) is provided with the connection pin-and-hole.
2. high ferro mould bases brace summer according to claim 1 is characterized in that the width of described cover plate (7) equates with the width sum of two i iron wing plates.
3. high ferro mould bases brace summer according to claim 1 is characterized in that two i iron webs that constitute in plate and the steel I-beam (6) of described first joint (1) be arranged in parallel; Two two of constituting the plate and first joint of second joint (5) constitute the equidirectional setting of plate.
4. according to claim 1 or 3 described high ferro mould bases brace summers, the position, two terminations that it is characterized in that described steel I-beam (6) is provided with end-plate (2), and first joint (1), second joint (5) are connected with steel I-beam (6) by end-plate (2) respectively.
5. according to claim 1 or 3 described high ferro mould bases brace summers, it is characterized in that the web position, both sides of described steel I-beam (6) is provided with some gussets (3).
6. high ferro mould bases brace summer according to claim 5 is characterized in that described steel I-beam (6) web position is provided with several hollow-out parts (4), and hollow-out parts (4) is arranged between adjacent two gussets (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120051346 CN202012046U (en) | 2011-03-01 | 2011-03-01 | Supporting beam for formwork of high-speed rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120051346 CN202012046U (en) | 2011-03-01 | 2011-03-01 | Supporting beam for formwork of high-speed rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202012046U true CN202012046U (en) | 2011-10-19 |
Family
ID=44782659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120051346 Expired - Fee Related CN202012046U (en) | 2011-03-01 | 2011-03-01 | Supporting beam for formwork of high-speed rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202012046U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395351A (en) * | 2020-02-25 | 2020-07-10 | 中铁第四勘察设计院集团有限公司 | Assembled supporting structure of foundation pit and supporting construction method |
CN114809285A (en) * | 2022-03-18 | 2022-07-29 | 鞍钢重型机械有限责任公司 | Assembled floor iron and using method |
-
2011
- 2011-03-01 CN CN 201120051346 patent/CN202012046U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395351A (en) * | 2020-02-25 | 2020-07-10 | 中铁第四勘察设计院集团有限公司 | Assembled supporting structure of foundation pit and supporting construction method |
CN114809285A (en) * | 2022-03-18 | 2022-07-29 | 鞍钢重型机械有限责任公司 | Assembled floor iron and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110747746B (en) | Temporary supporting system for small box girder type hidden cover beam prefabricated on road and bridge and construction method thereof | |
CN101603288B (en) | Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof | |
CN102493360B (en) | Reinforced concrete arch bridge construction method | |
KR101391637B1 (en) | Constrution methoed for Prestressed Composite Truss girder using steel truss member | |
CN102995755B (en) | RCS (reinforced concrete structure) combined node with continuous webs and partially-cut flanges | |
CN203247856U (en) | Short column inserted bar position fixing device for large-size bearing platform construction | |
CN107905083A (en) | A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection | |
CN113585075A (en) | Cast-in-place bridge deck formwork for steel-concrete composite beam | |
CN102979033A (en) | Steel truss girder all-welded joist slice and construction method thereof | |
CN202012046U (en) | Supporting beam for formwork of high-speed rail | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN202090283U (en) | Bridge-detecting working platform capable of being spliced and disassembled | |
CN203213637U (en) | Roadbed box for walking on floor of larger crawler crane | |
CN206329024U (en) | Hanging large-span steel-reinforced concrete structure construction steel platform | |
BR112020024195B1 (en) | CONCRETE AND STEEL BAR STRUCTURE SUITABLE FOR A HEAVY TRANSPORT RAILWAY | |
CN202220400U (en) | Lap-joint type formwork support beam | |
CN208702215U (en) | Overhead station | |
CN108824484B (en) | Vehicle section covered steel frame and covered reinforced concrete frame mixed structure | |
CN108487291B (en) | Installation method of contact net stand column foundation on railway steel-concrete composite beam | |
CN202913338U (en) | Steel truss full-welded truss piece | |
CN205295915U (en) | Wave form steel web nose girder | |
CN214402368U (en) | Detachment-free truss plate | |
CN212611890U (en) | Steel-concrete combined arch bridge crossing karst cave in tunnel | |
CN202248510U (en) | Transversely arranged brace rod type bailey | |
CN203022129U (en) | RSC combined node continuously cut on web and partially cut on flanges |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 310019 A05 building, No. nine, 9 Sheng Road, Hangzhou, Zhejiang, Jianggan District, 4 Patentee after: Zhejiang Huatie Construction Safety Technology Co., Ltd. Address before: 310009, Hangzhou City, Zhejiang Province, 59 Star Road, East Hangzhou building, 27 floor Patentee before: Zhejiang Huatie Construction Safety Technology Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111019 Termination date: 20160301 |
|
CF01 | Termination of patent right due to non-payment of annual fee |