CN204441813U - A kind of composite cable bridge-rack - Google Patents

A kind of composite cable bridge-rack Download PDF

Info

Publication number
CN204441813U
CN204441813U CN201520013443.4U CN201520013443U CN204441813U CN 204441813 U CN204441813 U CN 204441813U CN 201520013443 U CN201520013443 U CN 201520013443U CN 204441813 U CN204441813 U CN 204441813U
Authority
CN
China
Prior art keywords
straight
crane span
span structure
cable
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520013443.4U
Other languages
Chinese (zh)
Inventor
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU WANZHOU APPLICANCES COMPANY Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520013443.4U priority Critical patent/CN204441813U/en
Application granted granted Critical
Publication of CN204441813U publication Critical patent/CN204441813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of composite cable bridge-rack, comprise frid, cable sleeve, straight-through crane span structure and large sleeve pipe, described frid is provided with more than one piece, described frid is provided with casing clamp, described casing clamp is provided with more than one, described cable sleeve is fixedly connected with frid by casing clamp, described straight-through crane span structure is located at above cable sleeve, described large sleeve pipe is located at above straight-through crane span structure, described large sleeve pipe is fixedly connected with straight-through crane span structure, trailing arm is provided with below described straight-through crane span structure, described trailing arm is provided with expansion bolt, described trailing arm is fixedly connected with straight-through crane span structure, described straight-through crane span structure is provided with through hole, described through hole is provided with more than one, described cable sleeve is located in large sleeve pipe, the utility model can make cable be in independently in sleeve pipe, be easy to install and maintain, easy to use, lighter in weight.

Description

A kind of composite cable bridge-rack
Technical field
The utility model relates to a kind of composite cable bridge-rack.
Background technology
Cable testing bridge is general for petrochemical industry, metallurgical, electric power, school's communication, the fields such as skyscraper, there is good looking appearance, corrosion resistance is strong, versatility is extensive, convenient and flexible installation, the features such as great variety of goods, in line with " quality is first, prestige is attached most importance to, management is this, service be sincere " aim, company provides service accurately and timely for client, the product of high-quality, preferential price, we will base oneself upon and look forward to the future now, continuous developing, innovation, grow with each passing hour, some is then that passive electrical (light) cable is (as data cable, video coaxial cable etc.), therefore, when the arrangement of wire laying mode and Route Selection designs, should be distinguished, not only should meet the requirement of specification, also to consider the fail safe of connecting up, scalability, economy and attractive in appearance, be convenient to maintenance, cable testing bridge is as the carrier of the various cable laying of carrying, be subordinated to the needs of wiring, mentioned above principle should be followed equally implemented, due to pipeline level crossing multiple in building, limited space, particularly large-scale office building, finance mall, hotel, the buildings such as venue, information point is intensive, Cable runs is except adopting floor groove and within the walls except pipe laying mode, extensively cable testing bridge is adopted in ceiling suspended ceiling at vertical shaft with within doors, the wiring of different trend is provided, the various cable classification cloth of weak electricity system are placed in crane span structure, its best route selection and mounting means will according to the requirements of trend, and in conjunction with building structure and air-conditioning, electric position of waiting pipeline to consult is determined, passive cable can not be laid side by side with active cable, by in the same crane span structure of lay that condition is limit, metal partion (metp) must be adopted therebetween to set up separately, the cable of drawing avoids level-crossing as far as possible, crane span structure passing through floors, when body of wall or expansion joint, should mark to give on architectural drawing and stay corresponding cavity and position, avoid because boring sky when omitting and wait until construction temporarily, civil engineering structure may be injured, composite cable bridge-rack is a kind of Novel bridge frame, it is the second generation product in cable testing bridge series, it is suitable for every engineering, various unit, laying of various cable, it is simple that it has structure, flexible configuration, easy for installation, the features such as novel form, as long as composite cable bridge-rack adopts wide by 100, 150, three kinds of fundamental modes of 200mm just can form the cable testing bridge of size required for you, it does not need to produce curved leading to, the accessories such as threeway just can turn to arbitrarily according to in-site installation, broaden, divide and draw, under drawing, at any part, do not need punching, welding just available pipe is drawn, it both can facilitate engineering design, facilitate production and transport again, more convenient installation, it is optimal product in current cable testing bridge, but combined type bridge is when the cable that the construction of line is more at present, bad differentiation, cause difficult in maintenance.
Summary of the invention
The technical problems to be solved in the utility model is to provide one and cable can be made to be in independently in sleeve pipe, is easy to install and maintain, easy to use, the composite cable bridge-rack of lighter in weight.
For solving the problem, the utility model adopts following technical scheme:
A kind of composite cable bridge-rack, comprise frid, cable sleeve, straight-through crane span structure and large sleeve pipe, described frid is provided with more than one piece, described frid is provided with casing clamp, frid can make cable sleeve tile at grade, casing clamp is attached cable sleeve pipe effectively, can installing cables in cable sleeve, cable is kept to be in the environment of sealing, increase the service life, be easy to install and maintain simultaneously, described casing clamp is provided with more than one, described cable sleeve is fixedly connected with frid by casing clamp, described straight-through crane span structure is located at above cable sleeve, described large sleeve pipe is located at above straight-through crane span structure, described large sleeve pipe is fixedly connected with straight-through crane span structure, large sleeve pipe decreases cable sleeve establishing in erection and takes up room, trailing arm is provided with below described straight-through crane span structure, trailing arm can install fixing straight-through bridge formation, described trailing arm is provided with expansion bolt, described trailing arm is fixedly connected with straight-through crane span structure, described straight-through crane span structure is provided with through hole, described through hole is provided with more than one, through hole significantly reduces integrally-built weight, lighter, described cable sleeve is located in large sleeve pipe.
As preferably, described straight-through crane span structure side is provided with baffle plate, and baffle plate can make large sleeve pipe can be effectively fixing.
As preferably, described baffle plate is provided with through hole, reduces the weight of baffle plate.
As preferably, described through hole is slotted eye, keeps attractive appearance.
As preferably, described trailing arm is provided with more than one, can strengthen fixed effect.
This technical scheme has cable can be made to be in independently in sleeve pipe, is easy to install and maintain, easy to use, the feature of lighter in weight.
The beneficial effects of the utility model are: the frid of setting can make cable sleeve tile at grade, casing clamp is attached cable sleeve pipe effectively, can installing cables in cable sleeve, cable is kept to be in the environment of sealing, increase the service life, be easy to install and maintain simultaneously, large sleeve pipe decreases cable sleeve establishing in erection and takes up room, trailing arm can install fixing straight-through bridge formation, through hole significantly reduces integrally-built weight, lighter, baffle plate can make large sleeve pipe can be effectively fixing.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structure chart of a kind of composite cable bridge-rack of the present utility model.
Embodiment
Consult shown in Fig. 1, a kind of composite cable bridge-rack, comprise frid 1, cable sleeve 2, straight-through crane span structure 3 and large sleeve pipe 4, described frid 1 is provided with more than one piece, described frid 1 is provided with casing clamp 5, described casing clamp 5 is provided with more than one, described cable sleeve 2 is fixedly connected with frid 1 by casing clamp 5, described straight-through crane span structure 3 is located at above cable sleeve 2, in use, frid 1 and straight-through crane span structure 3 are fixed on working region, cable sleeve 2 is arranged on frid 1 by casing clamp 5, straight-through crane span structure 3 is fixed by trailing arm 6, installing cables in cable sleeve 2, and cable sleeve 2 is arranged in large sleeve pipe 4, can the different cable particular location of resolution place fast many, safeguard convenient, described large sleeve pipe 4 is located at above straight-through crane span structure 3, described large sleeve pipe 4 is fixedly connected with straight-through crane span structure 3, trailing arm 6 is provided with below described straight-through crane span structure 3, described trailing arm 6 is provided with expansion bolt (for diagram), described trailing arm 6 is fixedly connected with straight-through crane span structure 3, described straight-through crane span structure 3 is provided with through hole 7, described through hole 7 is provided with more than one, described cable sleeve 2 is located in large sleeve pipe 4.
Described straight-through crane span structure 3 side is provided with baffle plate 8.Baffle plate 8 in use, can prevent large sleeve pipe 4 from occurring sidesway.
Described baffle plate 8 is provided with through hole 7, reduces the weight of baffle plate 8.
Described through hole 7 is slotted eye, keeps attractive appearance.
Described trailing arm 6 is provided with more than one, improves the fixed effect of straight-through crane span structure 3.
In use, frid 1 and straight-through crane span structure 3 are fixed on working region, cable sleeve 2 is arranged on frid 1 by casing clamp 5, straight-through crane span structure 3 is fixed by trailing arm 6, installing cables in cable sleeve 2, and cable sleeve 2 is arranged in large sleeve pipe 4, can the different cable particular location of resolution place fast many, safeguard convenient.
The beneficial effects of the utility model are: the frid of setting can make cable sleeve tile at grade, casing clamp is attached cable sleeve pipe effectively, can installing cables in cable sleeve, cable is kept to be in the environment of sealing, increase the service life, be easy to install and maintain simultaneously, large sleeve pipe decreases cable sleeve establishing in erection and takes up room, trailing arm can install fixing straight-through bridge formation, through hole significantly reduces integrally-built weight, lighter, baffle plate can make large sleeve pipe can be effectively fixing.
The above; be only embodiment of the present utility model; but protection range of the present utility model is not limited thereto; any change of expecting without creative work or replacement; all should be encompassed within protection range of the present utility model; therefore, the protection range that protection range of the present utility model should limit with claims is as the criterion.

Claims (5)

1. a composite cable bridge-rack, it is characterized in that: comprise frid, cable sleeve, straight-through crane span structure and large sleeve pipe, described frid is provided with more than one piece, described frid is provided with casing clamp, described casing clamp is provided with more than one, described cable sleeve is fixedly connected with frid by casing clamp, described straight-through crane span structure is located at above cable sleeve, described large sleeve pipe is located at above straight-through crane span structure, described large sleeve pipe is fixedly connected with straight-through crane span structure, trailing arm is provided with below described straight-through crane span structure, described trailing arm is provided with expansion bolt, described trailing arm is fixedly connected with straight-through crane span structure, described straight-through crane span structure is provided with through hole, described through hole is provided with more than one, described cable sleeve is located in large sleeve pipe.
2. composite cable bridge-rack according to claim 1, is characterized in that: described straight-through crane span structure side is provided with baffle plate.
3. composite cable bridge-rack according to claim 2, is characterized in that: described baffle plate is provided with through hole.
4. composite cable bridge-rack according to claim 3, is characterized in that: described through hole is slotted eye.
5. composite cable bridge-rack according to claim 4, is characterized in that: described trailing arm is provided with more than one.
CN201520013443.4U 2015-01-09 2015-01-09 A kind of composite cable bridge-rack Expired - Fee Related CN204441813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520013443.4U CN204441813U (en) 2015-01-09 2015-01-09 A kind of composite cable bridge-rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520013443.4U CN204441813U (en) 2015-01-09 2015-01-09 A kind of composite cable bridge-rack

Publications (1)

Publication Number Publication Date
CN204441813U true CN204441813U (en) 2015-07-01

Family

ID=53609633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520013443.4U Expired - Fee Related CN204441813U (en) 2015-01-09 2015-01-09 A kind of composite cable bridge-rack

Country Status (1)

Country Link
CN (1) CN204441813U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967114A (en) * 2020-08-17 2020-11-20 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967114A (en) * 2020-08-17 2020-11-20 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram
CN111967114B (en) * 2020-08-17 2024-02-02 深圳市安冠科技有限公司 Drawing method of equipment wiring diagram

Similar Documents

Publication Publication Date Title
CN202520040U (en) Bifurcated pole tower for realizing double-T connection of double circuit power transmission line
CN204441813U (en) A kind of composite cable bridge-rack
CN205029274U (en) Fixed bolster that faces cable
CN204304337U (en) A kind of cable testing bridge
CN205745938U (en) The mounting bracket of a kind of LED display and hoisting structure
CN204230807U (en) A kind of power cable crane span structure supporting structure being easy to regulate
CN204243477U (en) A kind of cable laying structure of secondary screen cabinet
CN205452993U (en) Cable testing bridge of easy installation
CN205479755U (en) A synthesize integrated suspension system of pipe support that is used for motor car application storehouse of inspecting
CN102278533A (en) Three-way bridge connector
CN102064495B (en) Lead wire brace rod for double-circuit lines on same pole
CN102278532A (en) Two-directional bridge frame connector
CN204676757U (en) Suspended-ceiling suspension device
CN204179585U (en) A kind of novel cable lifting crane span structure
CN215185560U (en) Combined pipeline hook based on construction site enclosure
CN206016020U (en) A kind of acoustics room suspended ceiling reverse hangs system
CN213521208U (en) Wire hanging mechanism and wire hanging device
CN102278531A (en) Four-directional bridge frame connector
CN210274371U (en) Line erecting device for communication equipment
CN205844600U (en) A kind of fibre optic installations groove
CN204407808U (en) Communication easily extensible metal channels
CN203571348U (en) Mounting bracket
CN216625169U (en) Cable bridge
CN211900699U (en) Fixing and mounting system for pre-buried channel in subway section
CN220523437U (en) Comprehensive bearing bracket for station hall layer of subway station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Liao Xueyong

Inventor before: Li Cong

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20151127

Address after: Conghua Ao town Guangzhou City People's road, Guangdong province 510940 compound No. 308 No. 1-4

Patentee after: Guangzhou Wanzhou Applicances Company., Ltd.

Address before: South of the Five Ridges Industrial Park, Shiling Town, Huadu District of Guangzhou City, Guangdong province 510800

Patentee before: Li Cong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20190109