CN205452993U - Cable testing bridge of easy installation - Google Patents
Cable testing bridge of easy installation Download PDFInfo
- Publication number
- CN205452993U CN205452993U CN201521115371.0U CN201521115371U CN205452993U CN 205452993 U CN205452993 U CN 205452993U CN 201521115371 U CN201521115371 U CN 201521115371U CN 205452993 U CN205452993 U CN 205452993U
- Authority
- CN
- China
- Prior art keywords
- crane span
- span structure
- fixed
- structure body
- testing bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 18
- 238000003466 welding Methods 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 abstract 2
- 230000006978 adaptation Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000008188 pellet Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a cable testing bridge of easy installation, it has the cable duct to open on the crane span structure body, fixed slot has all been opened to the relative lateral wall of crane span structure body, the fixed slot has all been opened to the top both sides of crane span structure body, the fixed slot is through establishing the fixture block and crane span structure lid joint in crane span structure lid bottom, the relative lateral wall of crane span structure lid all is fixed with locking and detains, and the relative lateral wall of crane span structure body is fixed with and locks the locking device who detains the looks adaptation, the top of base left side is fixed with two sets of fixed blocks that are parallel to each other, and two sets of fixed block supports have a U type skeleton through elasticity pivot swing joint, the right -hand member of U type skeleton is fixed with the clamp handle, swing joint has the regulating spindle between the relative inner wall of U type skeleton, and the regulating spindle has the one end of adjusting the pole through interior matching the external screw swing joint, and the other end of adjusting the pole is fixed with the locking ring. This cable testing bridge simple structure, the installation of being convenient for.
Description
Technical field
This utility model relates to cable testing bridge technical field, the cable testing bridge of a kind of easy installation.
Background technology
Cable testing bridge is divided into slot type, pellet type and the structure such as ladder-type, grid type, is made up of support, trailing arm and installation adnexa etc..In building, crane span structure can independently set up, it is also possible to is attached on various building and piping lane support, should embody simple in construction, and handsome in appearance, flexible configuration and the feature such as easy to maintenance, whole parts are both needed to carry out zinc-plated process, are arranged on building the most outdoor outer crane span structure.Cable testing bridge, as the carrier of the various cable layings of carrying, is subordinated to the needs of wiring, should follow mentioned above principle equally and be carried out.Due to pipeline level crossing multiple in building, limited space, the most large-scale office building, finance mall, hotel, venues etc. are built, information point is intensive, Cable runs is except using floor groove and within the walls in addition to pipe laying mode, at vertical shaft and widely used cable testing bridge in ceiling suspended ceiling within doors, the wiring of difference trend is provided, the various cables classification cloth of weak electricity system is placed in crane span structure, its best route selection and mounting means will be according to the requirements of trend, and combine building structure and air-conditioning, the position electrically waiting pipeline to consult is determined, passive cable can not be laid side by side with active cable.
But, traditional cable testing bridge mounting means is the most all to use nut or bolt that it is carried out installation to fix so that whole installation process is the most loaded down with trivial details, so that work efficiency is the lowest.
Utility model content
The purpose of this utility model is to provide the cable testing bridge of a kind of easy installation, with the problem solving to propose in above-mentioned background technology.
nullFor achieving the above object,This utility model following technical scheme of offer: the cable testing bridge of a kind of easy installation,Including crane span structure body,Cable trough is had on described crane span structure body,The opposing sidewalls of described crane span structure body all has fixed card slot,The both sides, top of described crane span structure body all have fixing groove,Described fixing groove is by being located at the fixture block in crane span structure lid bottom and crane span structure lid clamping,The opposing sidewalls of described crane span structure lid is respectively and fixedly provided with tight locking button,And the opposing sidewalls of crane span structure body is fixed with the locking device suitable with tight locking button,Described locking device includes base,The top left hand of described base is fixed with two groups of fixed blocks being parallel to each other,And two groups of fixed block supports are connected with U-shaped skeleton by elastic rotation shaft,The right-hand member of described U-shaped skeleton is fixed with set lever,It is connected with regulation axle between the opposed inner walls of described U-shaped skeleton,And regulation axle coordinates the one end being connected with adjusting rod by internal and external threads,And the other end of adjusting rod is fixed with retaining ring.
Preferably, described fixed card slot is T-shaped, and the two ends of fixed card slot are also connected with limited block.
Preferably, described locking device is fixing with the opposing sidewalls of crane span structure body by the way of being spirally connected or welding is connected.
Preferably, the outer wall of described adjusting rod is integrally formed with external screw thread, and adjusting rod is bolted with stop collar away from one end of retaining ring.
Compared with prior art, the beneficial effects of the utility model are: this easy-to-install cable testing bridge simple in construction, by having fixed card slot in the opposing sidewalls of crane span structure body, when it is fixed installation, can directly be connected to install on T-shape fixture block, eliminate and use the loaded down with trivial details of the installations such as nut so that it is more easily install;Further, crane span structure body is locked by quick-locking device with crane span structure lid, eliminates use nut bolt to carry out installing loaded down with trivial details so that it is be easier to install, be greatly improved work efficiency.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model A portion schematic enlarged-scale view.
In figure: Bridge 1 frame body, 2 cable troughs, 3 fixed card slots, 4 fix groove, 5 fixture blocks, 6 crane span structure lids, 7 tight locking buttons, 8 locking devices, 81 bases, 82 fixed blocks, 83 elastic rotation shafts, 84U type skeleton, 85 set levers, 86 regulation axle, 87 adjusting rods, 88 retaining rings.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1-2,A kind of technical scheme of this utility model offer: the cable testing bridge of a kind of easy installation,Including crane span structure body 1,Cable trough 2 is had on crane span structure body 1,The opposing sidewalls of crane span structure body 1 all has fixed card slot 3,Fixed card slot 3 is T-shaped,And the two ends of fixed card slot 3 are also connected with limited block,Limited block can effectively solve cable testing bridge and install unstable problem,The both sides, top of crane span structure body 1 all have fixing groove 4,Fixing groove 4 is by being located at the fixture block 5 in crane span structure lid 6 bottom and crane span structure lid 6 clamping,The opposing sidewalls of crane span structure lid 6 is respectively and fixedly provided with tight locking button 7,And the opposing sidewalls of crane span structure body 1 is fixed with the locking device 8 suitable with tight locking button 7,Locking device 8 is fixing with the opposing sidewalls of crane span structure body 1 by the way of being spirally connected or welding to be connected,Locking device 8 includes base 81,The top left hand of base 81 is fixed with two groups of fixed blocks being parallel to each other 82,And two groups of fixed block 82 supports are connected with U-shaped skeleton 84 by elastic rotation shaft 83,The right-hand member of U-shaped skeleton 84 is fixed with set lever 85,Regulation axle 86 it is connected with between the opposed inner walls of U-shaped skeleton 84,And regulation axle 86 coordinates the one end being connected with adjusting rod 87 by internal and external threads,And the other end of adjusting rod 87 is fixed with retaining ring 88,The outer wall of adjusting rod 87 is integrally formed with external screw thread,And adjusting rod 87 is bolted with stop collar away from one end of retaining ring 88,Stop collar can depart from regulation axle 86 by mode adjusting rod 87,Ensure that this device is normally carried out work,By having fixed card slot 3 in the opposing sidewalls of crane span structure body 1,When it is fixed installation,Can directly be connected to install on T-shape fixture block,Eliminate and use the loaded down with trivial details of the installations such as nut,It is made more easily to install;Further, crane span structure body 1 is locked by quick-locking device with crane span structure lid 6, eliminates use nut bolt to carry out installing loaded down with trivial details so that it is be easier to install, be greatly improved work efficiency.
Embodiment the most of the present utility model, for the ordinary skill in the art, being appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can carry out multiple change, revise, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
- null1. the cable testing bridge of an easy installation,Including crane span structure body (1),Cable trough (2) is had on described crane span structure body (1),It is characterized in that: the opposing sidewalls of described crane span structure body (1) all has fixed card slot (3),The both sides, top of described crane span structure body (1) all have fixing groove (4),Described fixing groove (4) is by being located at the fixture block (5) in crane span structure lid (6) bottom and crane span structure lid (6) clamping,The opposing sidewalls of described crane span structure lid (6) is respectively and fixedly provided with tight locking button (7),And the opposing sidewalls of crane span structure body (1) is fixed with the locking device (8) suitable with tight locking button (7),Described locking device (8) includes base (81),The top left hand of described base (81) is fixed with two groups of fixed blocks being parallel to each other (82),And two groups of fixed block (82) supports are connected with U-shaped skeleton (84) by elastic rotation shaft (83),The right-hand member of described U-shaped skeleton (84) is fixed with set lever (85),Regulation axle (86) it is connected with between the opposed inner walls of described U-shaped skeleton (84),And regulation axle (86) coordinates the one end being connected with adjusting rod (87) by internal and external threads,And the other end of adjusting rod (87) is fixed with retaining ring (88).
- The cable testing bridge of a kind of easy installation the most according to claim 1, it is characterised in that: described fixed card slot (3) is T-shaped, and the two ends of fixed card slot (3) are also connected with limited block.
- The cable testing bridge of a kind of easy installation the most according to claim 1, it is characterised in that: described locking device (8) is fixing with the opposing sidewalls of crane span structure body (1) by the way of being spirally connected or welding to be connected.
- The cable testing bridge of a kind of easy installation the most according to claim 1, it is characterised in that: the outer wall of described adjusting rod (87) is integrally formed with external screw thread, and adjusting rod (87) is bolted with stop collar away from one end of retaining ring (88).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521115371.0U CN205452993U (en) | 2015-12-29 | 2015-12-29 | Cable testing bridge of easy installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521115371.0U CN205452993U (en) | 2015-12-29 | 2015-12-29 | Cable testing bridge of easy installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205452993U true CN205452993U (en) | 2016-08-10 |
Family
ID=56572657
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521115371.0U Expired - Fee Related CN205452993U (en) | 2015-12-29 | 2015-12-29 | Cable testing bridge of easy installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205452993U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109066515A (en) * | 2018-09-29 | 2018-12-21 | 河南亚诺电气设备有限公司 | A kind of cable testing bridge facilitating installation |
| CN115693547A (en) * | 2022-11-23 | 2023-02-03 | 广东宏际线管实业有限公司 | Buckle lock for cable bridge and cable bridge |
-
2015
- 2015-12-29 CN CN201521115371.0U patent/CN205452993U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109066515A (en) * | 2018-09-29 | 2018-12-21 | 河南亚诺电气设备有限公司 | A kind of cable testing bridge facilitating installation |
| CN115693547A (en) * | 2022-11-23 | 2023-02-03 | 广东宏际线管实业有限公司 | Buckle lock for cable bridge and cable bridge |
| CN115693547B (en) * | 2022-11-23 | 2023-10-24 | 广东宏际线管实业有限公司 | Cable bridge rack is with padlock and cable bridge rack |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9725921B2 (en) | Kit for mounting one or more appliances on a pole | |
| CN103296623B (en) | Tube busbar suspension fitting for converter station valve hall | |
| CN205452993U (en) | Cable testing bridge of easy installation | |
| CN104022459A (en) | 10 KV distribution line pole-mounted wire suspension device | |
| CN204243477U (en) | A kind of cable laying structure of secondary screen cabinet | |
| CN207967833U (en) | A kind of wind power equipment cable trunking crane span structure | |
| CN201598761U (en) | Wiring device for electric system high altitude steel rope mounting | |
| CN203374991U (en) | Steel structure electric line pipe and trunking hanging connecting piece | |
| CN204401904U (en) | Siphon rainwater suspension pipe fixing device | |
| CN204441813U (en) | A kind of composite cable bridge-rack | |
| CN205804586U (en) | A kind of 12m span comprehensive hanger system of bridge-type heavily loaded, assembled | |
| CN207234231U (en) | A kind of buried electricity box of overhead type | |
| CN217557378U (en) | Building ceiling combined track system | |
| CN105972316A (en) | Extensible pore type bridge | |
| CN221263321U (en) | Ground connection pipeline for overhead line | |
| CN213846154U (en) | A wiring device for computer room | |
| CN222052477U (en) | Overhead cable laying device | |
| CN205118436U (en) | Lid formula water pipe installation mechanism for interior decoration | |
| CN205991243U (en) | A kind of Pipe installing hangs code | |
| CN221574763U (en) | Cable supporting device for underground laying of electric power pipeline | |
| CN213125459U (en) | Novel waterproof cable bridge | |
| CN220254018U (en) | Three-dimensional separated type centralized control system | |
| CN205141562U (en) | Complete indoor intelligent substation composite cable support | |
| CN204456427U (en) | High-altitude long-span wire rope pipe arrangement support | |
| CN217713910U (en) | Bracket arm is adjusted to both sides in piping lane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 053200 Spring Street, Jizhou Economic Development Zone, Hengshui, Hebei Patentee after: Hebei LONCIN composite material Co., Ltd. Address before: 053200, Hengshui, Hebei, Jizhou Economic Development Zone, Spring Street Patentee before: HEBEI LONGXIN ELECTRICAL EQUIPMENT CO., LTD. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |