CN204435386U - Cavitation district consolidation slip casting loading system - Google Patents
Cavitation district consolidation slip casting loading system Download PDFInfo
- Publication number
- CN204435386U CN204435386U CN201520235535.7U CN201520235535U CN204435386U CN 204435386 U CN204435386 U CN 204435386U CN 201520235535 U CN201520235535 U CN 201520235535U CN 204435386 U CN204435386 U CN 204435386U
- Authority
- CN
- China
- Prior art keywords
- charge
- blender
- way valve
- accelerating admixture
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model discloses a kind of cavitation district consolidation slip casting loading system, comprise: injected hole 1, case material 2, one-way valve tube 3, spray head 4, joint ring 5, return only valve 6, blender 7, accelerating admixture pipeline 8, grouting serous fluid pipeline 9, six are in charge of 10, it is characterized in that, case material 2 is provided with at described injected hole 1 inwall, one-way valve tube 3 is entered under in described case material 2, described one-way valve tube 3 bottom end closure, be provided with six in it and be in charge of 10, described six are in charge of between 10 and one-way valve tube 3 and are provided with joint ring 5, spray head 4 is provided with in described six bottoms being in charge of 10, described six are in charge of 10 upper ends passes through back only valve 6 and is connected with blender 7, described blender 7 is connected with grouting serous fluid pipeline 9, described blender 7 is also connected with accelerating admixture pipeline 8 by one way valve.The utility model accelerating admixture construction method of being annotated in slurry injection technique and aperture combines, effectively prevent and occur with the rear slurry resting period too short situation such as grouting pump, grouting pipeline blocking caused owing to adding accelerating admixture, thus reach the maximum consolidation effect being suitable for formation volumes and the best, ensure success rate and the safety of reinforcing.
Description
Technical field
The utility model relates to a kind of slip casting loading system, especially relate to a kind ofly be applicable to cavitation district, existing foundation consolidation is reinforced, the cavitation district consolidation slip casting loading system of the pile defect of pile foundation or pile bottom force holding layer defect etc.
Background technology
Along with injecting paste material science research deeply and slurry injection technique perfect gradually, slurry injection technique is widely used in the engineering of the every field such as water power, mining, civil engineering, tunnel, bridge, highway.For the various aspects such as reparation of ground base enforcement, the filling of cavitation district, waterproof water-stopping structure, existing structure defect.In filling grouting and reinforcing process, the slurries of conventional slip casting are due to needs admixture accelerating admixture, and slurries are shorter for time of setting, are easy to cause grouting pipeline to block, and affect the quality of grouting and reinforcing engineering.
Summary of the invention
The purpose of this utility model solves the problems of the technologies described above, and provides a kind of cavitation district consolidation slip casting loading system.
For realizing above-mentioned technical purpose, the utility model adopts following technical scheme:
A kind of cavitation district consolidation slip casting loading system, comprise: injected hole, case material, one-way valve tube, spray head, joint ring, return only valve, blender, accelerating admixture pipeline, grouting serous fluid pipeline, six are in charge of, case material is provided with at described injected hole inwall, one-way valve tube is entered under in described case material, described one-way valve tube bottom end closure, be provided with six in it to be in charge of, described six are in charge of are provided with joint ring between one-way valve tubes, spray head is provided with in described six bottoms be in charge of, described six are in charge of upper end passes through back only valve and is connected with blender, described blender is connected with grouting serous fluid pipeline, described blender is also connected with accelerating admixture pipeline by one way valve.
The utility model adopts the construction method of aperture filling accelerating admixture, in the process of conventional grouting and reinforcing, inlet well aperture pipeline installs blender, according to circumstances can add accelerating admixture.Effectively prevent and occur with the rear slurry resting period too short situation such as grouting pump, grouting pipeline blocking caused owing to adding accelerating admixture; By inject in inlet well case material, under enter one-way valve tube and core pipe realizes segmenting slip casting, thus reach maximum and be suitable for formation volumes and best consolidation effect, ensure the success rate of reinforcing and safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: injected hole 1, case material 2, one-way valve tube 3, spray head 4, joint ring 5, return only valve 6, blender 7, accelerating admixture pipeline 8, grouting serous fluid pipeline 9, six and be in charge of 10.
Fig. 2 is the structural representation of blender of the present utility model.
In figure: inlet pipe 2-1, flange 2-2, accelerating admixture supply pipe 2-3, one-way cock 2-4, outer tube 2-5, floral tube 2-6, plug 2-7, outlet pipe 2-8.
Detailed description of the invention
Below in conjunction with accompanying drawing 1-2, the utility model is further described.
As shown in Figure 1, a kind of cavitation district consolidation slip casting loading system, comprise: injected hole 1, case material 2, one-way valve tube 3, spray head 4, joint ring 5, return only valve 6, blender 7, accelerating admixture pipeline 8, grouting serous fluid pipeline 9, six are in charge of 10, it is characterized in that, case material 2 is provided with at described injected hole 1 inwall, one-way valve tube 3 is entered under in described case material 2, described one-way valve tube 3 bottom end closure, be provided with six in it and be in charge of 10, described six are in charge of between 10 and one-way valve tube 3 and are provided with joint ring 5, spray head 4 is provided with in described six bottoms being in charge of 10, described six are in charge of 10 upper ends passes through back only valve 6 and is connected with blender 7, described blender 7 is connected with grouting serous fluid pipeline 9, described blender 7 is also connected with accelerating admixture pipeline 8 by one way valve.
Further, described blender 7 is jetting type blenders.
As shown in Figure 2, described blender 7 comprises inlet pipe 2-1, flange 2-2, accelerating admixture supply pipe 2-3, one-way cock 2-4, outer tube 2-5, floral tube 2-6, plug 2-7, outlet pipe 2-8, in described outer tube 2-5, floral tube 2-6 is set, plug 2-7 is provided with in described floral tube 2-6, described outer tube 2-5, floral tube 2-6 two ends by flange 2-2 respectively with inlet pipe 2-1, outlet pipe 2-8 connects, described outer tube 2-5 is also connected with accelerating admixture supply pipe 2-3 by one-way cock 2-4, described inlet pipe 2-1, accelerating admixture supply pipe 2-3, outlet pipe 2-8 respectively with grouting serous fluid pipeline 9, described accelerating admixture pipeline 8, six are in charge of 10 connections.
The utility model mainly by pore-forming hole flushing, inject case material, bury one-way valve tube underground, lower nozzle and core pipe segmenting slip casting optionally form at a few step work progresss such as aperture filling accelerating admixtures.Comprise following construction sequence:
(1) inlet well pore-forming, clear hole, injection case material: to the slip casting of cavitation district, according to design slip casting depth requirements, adopts geological drilling rig to be bored into projected depth; When reinforcing existing building ground, first adopt geological drilling rig to drill the former basis of existing building or cushion cap, then according to design slip casting depth requirements, adopt geological drilling rig to be bored into projected depth; When the pile defect of pile foundation or pile bottom force holding layer defect are reinforced, geological drilling rig is first adopted in stake, to carry out drilled drawing-core or hole in stake side, need in stake below drilled drawing-core to defective locations about 1 meter when pile defect is reinforced, about 3 meters need to be required from stake or below stake side drilled drawing-core to complete bearing stratum according to design pile bottom force holding layer to during pile bottom force holding layer defect reinforcing; After pore-forming, high pressure clear water is adopted to carry out rinsing reaming: when reinforcing the pile defect of pile foundation or pile bottom force holding layer defect, first adopt high-pressure rotary-spray mode to spray clear water to rinse defective locations, spray by the technological parameter of design code when spraying clear water, by under Grouting Pipe segmentation at the bottom of hand-hole, churning clear water adopts from below to up, single tube jet grouting mode, and clear water sprays 1 ~ 3 time; When existing building ground is reinforced, can omit and spray this step of clear water; After hole flushing, clear hole, enter sleeve shell material to aperture from hole rising pouring, from the bottom of hole to aperture, 1.5 ~ 2.0m cement paste below last aperture adds suitable quantity of water glass sealing of hole.Fill with sleeve shell material cement (white clay powder) mixing slurry (cement weight is 50%, and white clay powder (swell soil) weight is 50%) to make, water/binder ratio is generally 1:1.This measure needs on-the-spot examination to join, and should have pumpability; After extracting sleeve pipe, after-teeming sleeve shell material is to aperture.
(2) bury Grouting Pipe underground and set up aperture grouting device: case material inject after, under enter one-way valve tube and core pipe thereof, two seal; After set up grouting device at drilling orifice, aperture grouting device adopts mixer type, and mixer type is used for the filling of accelerating admixture;
(3) grouting mode adopts aperture from bottom to top to close incremental extrusion slip casting method.In one-way valve tube, insert 6 be in charge of with the slip casting core of two sealing at the bottom of hole, pour into sleeve shell material after 24 ~ 48 hours (depending on sleeve shell material concentration), slip casting by the bottom of hole, before the slip casting of every hole, first time gives pressure, should check, dredge grouting pipeline by first injected clear water, open loop (sends into thin pulp or clear water institute applied pressure, before filler shell does not destroy by grout pump, pump pressure increases in time, and flow is then always zero.After filler shell destroys, pump pressure rapid drawdown or midge amount increase suddenly, when continuing to apply pump pressure, and the midge situation on stratum during the relation of flow and pressure close non-filler).After the open loop of injection clear water completes, then carry out formal slip casting, open accelerating admixture pipe valve filling accelerating admixture according to actual conditions.Slip casting carries out slip casting by the technological parameter of design code; After reaching the grouting amount of regulation or the pressure of restriction, above propose 2 meters of row slip castings again, circulated layered slip casting like this, until stop slip casting apart from 1.5m place, aperture, slurries spread along crack, to reach the object of slip casting, after slip casting completes, during dismounting slip casting core, prevent remaining slurry from flowing in Grouting Pipe
(4) static pressure grouting mode is adopted to carry out supplementary slip casting: after high-pressure slip-casting terminates, utilize aperture grouting device to seal aperture and carry out static pressure grouting, rarer slurries and lower grouting pressure is adopted when static pressure grouting starts, increase concentration of slurry subsequently gradually and strengthen grouting pressure, till design grouting amount and grouting pressure, general static pressure grouting needs to carry out 2 ~ 3 times and supplements perfusion before slurries final set.
When being described in the utility model specific embodiment, those skilled in the art will recognize that the utility model can be revised in the spirit and scope not exceeding claims.
Claims (3)
1. a cavitation district consolidation slip casting loading system, comprise: injected hole (1), case material (2), one-way valve tube (3), spray head (4), joint ring (5), return only valve (6), blender (7), accelerating admixture pipeline (8), grouting serous fluid pipeline (9), six are in charge of (10), it is characterized in that, case material (2) is provided with at described injected hole (1) inwall, one-way valve tube (3) is entered under in described case material (2), described one-way valve tube (3) bottom end closure, be provided with six in it to be in charge of (10), described six are in charge of between (10) and one-way valve tube (3) and are provided with joint ring (5), spray head (4) is provided with in described six bottoms being in charge of (10), described six are in charge of (10) upper end passes through back only valve (6) and is connected with blender (7), described blender (7) is connected with grouting serous fluid pipeline (9), described blender (7) is also connected with accelerating admixture pipeline (8) by one way valve.
2. a kind of cavitation district consolidation slip casting loading system according to claim 1, it is characterized in that, described blender (7) is jetting type blender.
3. a kind of cavitation district consolidation slip casting loading system according to claim 1 and 2, it is characterized in that, described blender (7) comprises inlet pipe (2-1), flange (2-2), accelerating admixture supply pipe (2-3), one-way cock (2-4), outer tube (2-5), floral tube (2-6), plug (2-7), outlet pipe (2-8), arranges floral tube (2-6) in described outer tube (2-5), is provided with plug (2-7) in described floral tube (2-6), described outer tube (2-5), floral tube (2-6) two ends by flange (2-2) respectively with inlet pipe (2-1), outlet pipe (2-8) connects, and described outer tube (2-5) is also connected with accelerating admixture supply pipe (2-3) by one-way cock (2-4), described inlet pipe (2-1), accelerating admixture supply pipe (2-3), outlet pipe (2-8) respectively with grouting serous fluid pipeline (9), described accelerating admixture pipeline (8), six are in charge of (10) connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520235535.7U CN204435386U (en) | 2015-04-17 | 2015-04-17 | Cavitation district consolidation slip casting loading system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520235535.7U CN204435386U (en) | 2015-04-17 | 2015-04-17 | Cavitation district consolidation slip casting loading system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204435386U true CN204435386U (en) | 2015-07-01 |
Family
ID=53603273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520235535.7U Expired - Fee Related CN204435386U (en) | 2015-04-17 | 2015-04-17 | Cavitation district consolidation slip casting loading system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204435386U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115110516A (en) * | 2022-07-15 | 2022-09-27 | 河南省黄河高速公路有限公司 | Ultra-long cast-in-place pile side high polymer sectional type post-grouting construction system and method |
-
2015
- 2015-04-17 CN CN201520235535.7U patent/CN204435386U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115110516A (en) * | 2022-07-15 | 2022-09-27 | 河南省黄河高速公路有限公司 | Ultra-long cast-in-place pile side high polymer sectional type post-grouting construction system and method |
CN115110516B (en) * | 2022-07-15 | 2024-05-28 | 河南省黄河高速公路有限公司 | Super-long cast-in-place pile side high polymer sectional type post grouting construction system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110230309B (en) | Karst area bridge karst cave pile foundation construction method | |
CN109098687B (en) | Single-stop-grouting-plug retreating type segmented grouting device and method applicable to fractured rock mass | |
CN103266614B (en) | Sublevel retreating type two-fluid composite grouting construction method for deep foundation pit of sandy gravel stratum | |
CN100510274C (en) | Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method | |
CN101666234B (en) | Fracture rock no-slurry-blocking wall compound grouting construction method | |
CN105350953A (en) | Measuring method for coal seam gas pressure in complicated geological condition | |
CN105332719A (en) | Cement-polyurethane composite grouting process capable of blocking water fast | |
CN101525881B (en) | Structure of karst strata pile holes protecting wall and method for constructing pile holes | |
CN109519150B (en) | Dewatering well plugging device and method for large water yield | |
CN103806479A (en) | Pile foundation combined grouting reinforcement construction method combining waterproof curtain | |
CN104453946A (en) | Advanced reinforcing construction method for building tunnel in soft surrounding rock | |
CN105386435B (en) | It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution | |
CN103388338B (en) | A kind of method of novel quick sealing and soil improvement | |
CN204753574U (en) | High pressure jet grouting pile stagnant water curtain construction equipment | |
CN105731978B (en) | A kind of grouting serous fluid and grouting method for fine sand layer jacking culvert solidifying of the working face | |
CN107859028B (en) | Double-hole double-liquid grouting method | |
CN107217987A (en) | Colliery flood administers well boring method | |
CN102493403A (en) | Rock-fill dam deformation control technology | |
CN103174135B (en) | Repair method of unqualified post-grouting bored concrete pile | |
CN101979820A (en) | Process for sealing elevation drill hole water-stopping sleeves | |
CN204435386U (en) | Cavitation district consolidation slip casting loading system | |
CN103174428B (en) | A kind of applied chemistry slurries implement the method for grouting for water blocking to vertical shaft | |
CN105507939A (en) | Grouting displacement type borehole curing sealing and pipeless gas extraction method | |
CN203161250U (en) | Deep hole grouting reinforcing system for tunnel | |
CN105544547B (en) | A kind of cover type segmentation strengthening fill and soft soil layer device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 Termination date: 20180417 |