CN102493403A - Rock-fill dam deformation control technology - Google Patents

Rock-fill dam deformation control technology Download PDF

Info

Publication number
CN102493403A
CN102493403A CN2011104019978A CN201110401997A CN102493403A CN 102493403 A CN102493403 A CN 102493403A CN 2011104019978 A CN2011104019978 A CN 2011104019978A CN 201110401997 A CN201110401997 A CN 201110401997A CN 102493403 A CN102493403 A CN 102493403A
Authority
CN
China
Prior art keywords
grouting
perfusion
rock
filling
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104019978A
Other languages
Chinese (zh)
Inventor
谭界雄
卢建华
田波
高大水
余永志
熊威
严晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN2011104019978A priority Critical patent/CN102493403A/en
Priority to PCT/CN2012/073969 priority patent/WO2013082906A1/en
Publication of CN102493403A publication Critical patent/CN102493403A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to the technical field of hydraulic and hydro-power engineering, and discloses a rock-fill dam deformation control technology which can be applied to diseased rock-fill dams or rockfill deformation control in the hydraulic and hydro-power engineering. The rock-fill dam deformation control technology comprises the following steps of: 1, preparing a pasty stable grouting liquid and cement mortar; 2, drilling holes in the dam body of the rock-fill dam, wherein the holes comprise stable grouting liquid grouting holes for sealing, and filling grouting holes; and 3, grouting: injecting the pasty stable grouting liquid into two rows of holes around a filling grouting area to make the pasty stable grouting liquid and a concrete panel on the upstream side of the rock-fill dam form an enclosed area, injecting the cement mortar into holes in the grouting area in an orifice filling mode after the pasty stable grouting liquid has been injected for 14 days, and controlling the rock-fill dam deformation after the grouting area has been grouted for 28 days. By the rock-fill dam deformation control technology, the deformation resistance of the rock-fill dam can be improved, the deformation of the dam body can be controlled, the grouting quality can be guaranteed, and the rock-fill dam deformation control technology has the advantages of short construction period, high work efficiency and the like.

Description

A kind of loose rock dam deformed Control Technology
Technical field
The invention belongs to the Hydraulic and Hydro-Power Engineering technical field; It is a kind of loose rock dam deformed Control Technology; Can be applicable to dangerous loose rock dam of disease or Hydraulic and Hydro-Power Engineering rockfill Deformation control, also can in the ground of some Coarse Aggregates or cofferdam highly permeable foundation deformation control temporarily, use.
Technical background
The loose rock dam that China builds in early days, most employing manual works are filled or the dam body leakiness is filled out in the explosion throwing; Porosity is big, and dam deformation is serious, causes the dam body seepage and jeopardizes dam safety; Because it is poor that loose rock dam fill the material homogeneity, piece footpath difference is big, and dam body materials is complicated; Commonly used is main measure with the anti-seepage reinforcing, and non-deformability is poor, can not fundamentally control the excessive problem of dam deformation.At present, also be not deformed into the purpose grouting technique at home and abroad with the control loose rock dam.
Summary of the invention
The objective of the invention is in order to overcome the deficiency of prior art, a kind of technology that improves loose rock dam compactness, the distortion of control loose rock dam is provided.
For realizing above-mentioned purpose, loose rock dam deformed Control Technology of the present invention may further comprise the steps:
1. prepare paste stable slurry and cement mortar: cement, water, flyash, clay, swell soil are mixed processed the paste body shape slurries, make the plasticity viscosity 0.15~0.25Pa.s of paste slurries, its calculus intensity of 28 days is more than or equal to 5MPa, and is subsequent use to pour into; Cement, water, sand mixed process cement mortar, cement mortar plastic yielding intensity 40~41Pa, plasticity viscosity 0.6~0.65Pa.s, subsequent use with the filling perfusion;
2. boring: in the boring of loose rock dam dam body, boring has comprised the stable slurry grout hole and the filling fill orifice of sealing process;
3. perfusion: to the perfusion of two rounds around filling perfusion area paste stable slurry, make the concrete slab of paste stable slurry and loose rock dam upstream side form the enclosed area earlier; The perfusion of paste stable slurry was accomplished after 14 days, carried out perfusion area drill-pouring cement mortar again, and cement mortar adopts aperture filling perfusion, and perfusion area filling grouting was accomplished after 28 days, the distortion of control loose rock dam.
In technique scheme, step 2. in, the concrete grammar of filling perfusion area boring does, selected small-bore diamond geological drilling rig and Buddha's warrior attendant Shi Po core drill bit are adjusted to the broken core gear wheel of drill bit in the reamer; At drill bit and drilling rod binding site reamer is installed, basket is added grow to 5.0m, drilling rod is every to install guide pipe additional at a distance from 10.0m; Adopt inclinometer to the boring real-time deviation correcting; In holing, annotate clear water and clay slip respectively, on the inlet pipeline of aperture water meter is installed,, guarantee the boring cooling with flushing liquor state in the change monitoring hole of metered pressure with the aperture.
In technique scheme, step 3. in, the perfusion area cement mortar adopts aperture filling perfusion.
Foregoing invention has following advantage:
The paste stable slurry and the cement mortar grouting agent of the present invention's preparation have concrete castability, controllability; The evenly filling in dam body of grouting material; Cementitious matter has good stable property and durability, can effectively reduce the loose rock dam porosity, remedies the mass defect of filling of former dam body; Improve the dam body non-deformability, the control dam deformation.
Among the present invention, the paste stable slurry is used for pouring in advance, around the loose rock dam perfusion area, forms the enclosed area; Run slurry when preventing perfusion area filling grouting; Later stage is used for loose rock dam filling perfusion with cement mortar, effectively reduce the porosity of loose rock dam, and the grouting agent construction costs is low.
Among the present invention, loose rock dam not bit freezing, the not burning of bits of when boring, hole wall is stable, the drilling fluid leakage is few, has the hole quality height; Precision is high, and the drilling tool loss is little, the work efficiency advantages of higher; Can guarantee the hole quality of the dark inclined hole of loose rock dam, fundamentally control dam deformation.In the aperture with drilling rod to rockfill filling cement injection mortar, can guarantee that the sand of perfusion evenly mixes with cement grout, make mortar continue, stable, pour in the dam body expeditiously, filling rockfill cavity guarantees pouring quality, the construction period weak point.
Description of drawings
Fig. 1 is a loose rock dam drilled grout hole sketch map of the present invention;
Among the figure: 1 is paste stable slurry grout hole; 2 is concrete slab; 3 is cement mortar filling grout hole; 4 are the loose rock dam after the grouting.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is made further detailed description:
Loose rock dam Deformation control job practices may further comprise the steps:
1. prepare paste stable slurry and cement mortar.Cement, water, flyash, clay, swell soil etc. are mixed process the paste body shape slurries, subsequent use to pour into; Cement, water, sand etc. are mixed process mortar, subsequent use with the filling perfusion.
2. selected small-bore diamond geological drilling rig and Buddha's warrior attendant Shi Po core drill bit are adjusted to the broken core gear wheel of drill bit in the reamer.
3. at drill bit and drilling rod binding site reamer is installed, basket is added grow to 5.0m, drilling rod is every to install guide pipe additional at a distance from 10.0m.Adopt the correction of KXP-1 type inclinometer, to the boring real-time deviation correcting.
4. in holing, annotate clear water and clay slip respectively, on the inlet pipeline of aperture water meter is installed,, guarantee the boring cooling with flushing liquor state in the change monitoring hole of its pressure with the aperture.
5. perfusion: consulting shown in Figure 1ly, is paste stable slurry fill orifice 1 perfusion paste stable slurry to two rounds around the filling perfusion area earlier, makes paste stability slurries and concrete slab 2 composition closed areas, runs when preventing perfusion area filling grouting and starches; Paste stable slurry perfusion was accomplished after 14 days, and beginning cement mortar filling grout hole 3 cement injection mortars carry out filling to the rockfill perfusion area, and filling grouting was accomplished after 28 days, and filling perfusion material reaches design strength, can control loose rock dam 4 distortion after the grouting.
The present invention has improved the compactness of loose rock dam, has effectively controlled dam deformation.The grouting agent of the loose rock dam of preparation has concrete castability, controllability, the evenly filling in dam body of grouting material, and cementitious matter has good stable property and durability; Effectively reduce the rockfill porosity; Remedied the mass defect of filling of dam body, improved the dam body non-deformability, the control dam deformation.
Boring of the present invention mainly comprises: the diamond pinch roller breaks the core drilling technique, dark inclined hole deviation correcting technology, rockfill boring cooling technology etc.Bit freezing, the not burning of bits, hole wall are unstable during the loose rock dam pore-forming, the drilling fluid leakage is few, have the hole quality height, and precision is high, and the drilling tool loss is little, and the work efficiency advantages of higher can guarantee the hole quality of the dark inclined hole of loose rock dam.It is with the drilling rod stirring rockfill to be carried out the filling perfusion in the aperture that sand grouting filling technique is stirred in the aperture; The sand that can guarantee perfusion can evenly mix with cement grout, makes that mortar continues, stable, high efficiency pouring in the hole, filling rockfill cavity; Can guarantee pouring quality, the construction period is short.
Adopt technology of the present invention, the reservoir loose rock dam are carried out filling grouting, through detecting; The filling of grouting material is even, grouting back loose rock dam porosity 22.8%, adhesive bond compressive strength design load >=7.5MPa (28d); Satisfy the national regulation requirement; 2010 and flood season in 2011 high water level when operation dam deformation 2~3mm, distortion resetted when water level reduced, and had effectively controlled the distortion of dam body.
Those skilled in the art can carry out various changes and modification and not break away from the spirit and scope of the present invention the present invention, and these are revised and modification should belong within the scope of claim of the present invention and equivalent technologies thereof.
The content of not doing in this manual to describe in detail belongs to this area professional and technical personnel's known prior art.

Claims (3)

1. loose rock dam deformed Control Technology is characterized in that may further comprise the steps:
1. prepare paste stable slurry and cement mortar: cement, water, flyash, clay, swell soil are mixed processed the paste body shape slurries, make the plasticity viscosity 0.15~0.25Pa.s of paste slurries, its calculus intensity of 28 days is more than or equal to 5MPa, and is subsequent use to pour into; Cement, water, sand mixed process cement mortar, cement mortar plastic yielding intensity 40~41Pa, plasticity viscosity 0.6~0.65Pa.s, subsequent use with the filling perfusion;
2. boring: in the boring of loose rock dam dam body, boring has comprised the stable slurry grout hole and the filling fill orifice of sealing process;
3. perfusion: to the perfusion of two rounds around filling perfusion area paste stable slurry, make the concrete slab of paste stable slurry and loose rock dam upstream side form the enclosed area earlier; The perfusion of paste stable slurry was accomplished after 14 days, carried out perfusion area drill-pouring cement mortar again, and cement mortar adopts aperture filling perfusion, and perfusion area filling grouting was accomplished after 28 days, the distortion of control loose rock dam.
2. loose rock dam deformed Control Technology according to claim 1; It is characterized in that: step 2. in; The concrete grammar of filling perfusion area boring does, selected small-bore diamond geological drilling rig and Buddha's warrior attendant Shi Po core drill bit are adjusted to the broken core gear wheel of drill bit in the reamer; At drill bit and drilling rod binding site reamer is installed, basket is added grow to 5.0m, drilling rod is every to install guide pipe additional at a distance from 10.0m; Adopt inclinometer to the boring real-time deviation correcting; In holing, annotate clear water and clay slip respectively, on the inlet pipeline of aperture water meter is installed,, guarantee the boring cooling with flushing liquor state in the change monitoring hole of metered pressure with the aperture.
3. loose rock dam deformed Control Technology according to claim 1 is characterized in that: step 3. in, the perfusion area cement mortar adopts aperture filling perfusion.
CN2011104019978A 2011-12-07 2011-12-07 Rock-fill dam deformation control technology Pending CN102493403A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011104019978A CN102493403A (en) 2011-12-07 2011-12-07 Rock-fill dam deformation control technology
PCT/CN2012/073969 WO2013082906A1 (en) 2011-12-07 2012-04-13 Rock-fill dam deformation control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104019978A CN102493403A (en) 2011-12-07 2011-12-07 Rock-fill dam deformation control technology

Publications (1)

Publication Number Publication Date
CN102493403A true CN102493403A (en) 2012-06-13

Family

ID=46185259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104019978A Pending CN102493403A (en) 2011-12-07 2011-12-07 Rock-fill dam deformation control technology

Country Status (2)

Country Link
CN (1) CN102493403A (en)
WO (1) WO2013082906A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741694A (en) * 2013-12-25 2014-04-23 长江勘测规划设计研究有限责任公司 Method for controlling leakage of grouting treatment vertical type asphalt concrete core wall earth-rock dam
CN104711956A (en) * 2013-12-13 2015-06-17 天津市引滦工程尔王庄管理处 Danger removing reinforcement method for plain reservoir dam
CN105350497A (en) * 2015-11-26 2016-02-24 华北水利水电大学 Automatic deformation adjusting device for steel face plate dam
CN111119128A (en) * 2019-11-21 2020-05-08 中电建十一局工程有限公司 Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN111217561A (en) * 2020-02-27 2020-06-02 河海大学 Solidified fly ash for damming and preparation method thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594370B (en) * 2014-11-27 2017-10-10 中国电建集团贵阳勘测设计研究院有限公司 Karst high pressure joint rinses grouting method and its structure
CN109384429A (en) * 2018-09-20 2019-02-26 国家电网有限公司 A kind of freeze proof anti-crack concrete and its preparation method and application

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU819252A1 (en) * 1976-04-05 1981-04-07 Всесоюзный Ордена Трудового Красногознамени Научно-Исследовательскийинститут Гидротехники Им.Б.E.Веденеева Method of retaining monolithic state of core (screen) of clayey-soil dam upon its deformation
CN101654907A (en) * 2009-09-11 2010-02-24 中国水利水电第九工程局有限公司 High-flow high-speed jet plugging grouting technique under high-pressure water head of hydropower station

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001234167A (en) * 2000-02-21 2001-08-28 Mitsubishi Materials Corp Ultra fast-curing injection material and injection process using the same
RU2233938C1 (en) * 2003-03-24 2004-08-10 Российский Университет Дружбы Народов Method for grouting concrete gravity dam built on rock foundation
CN101581088B (en) * 2009-06-18 2010-11-10 沈阳市利千水利技术开发有限责任公司 Construction method for filling mortar combined stone dam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU819252A1 (en) * 1976-04-05 1981-04-07 Всесоюзный Ордена Трудового Красногознамени Научно-Исследовательскийинститут Гидротехники Им.Б.E.Веденеева Method of retaining monolithic state of core (screen) of clayey-soil dam upon its deformation
CN101654907A (en) * 2009-09-11 2010-02-24 中国水利水电第九工程局有限公司 High-flow high-speed jet plugging grouting technique under high-pressure water head of hydropower station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卢建华等: "复合堆石坝加固技术研究与创新", 《人民长江》 *
谭界雄等: "堆石坝加固技术研究与应用", 《人民长江》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104711956A (en) * 2013-12-13 2015-06-17 天津市引滦工程尔王庄管理处 Danger removing reinforcement method for plain reservoir dam
CN103741694A (en) * 2013-12-25 2014-04-23 长江勘测规划设计研究有限责任公司 Method for controlling leakage of grouting treatment vertical type asphalt concrete core wall earth-rock dam
CN103741694B (en) * 2013-12-25 2016-03-30 长江勘测规划设计研究有限责任公司 The method of controlled grouting process vertical-type asphaltic concrete core wall earth and rockfill dam seepage
CN105350497A (en) * 2015-11-26 2016-02-24 华北水利水电大学 Automatic deformation adjusting device for steel face plate dam
CN105350497B (en) * 2015-11-26 2017-04-05 华北水利水电大学 Steel facing dam adjust automatically deformation device
CN111119128A (en) * 2019-11-21 2020-05-08 中电建十一局工程有限公司 Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN111217561A (en) * 2020-02-27 2020-06-02 河海大学 Solidified fly ash for damming and preparation method thereof

Also Published As

Publication number Publication date
WO2013082906A1 (en) 2013-06-13

Similar Documents

Publication Publication Date Title
CN102493403A (en) Rock-fill dam deformation control technology
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN103603689B (en) Curtain grouting construction method for treating mined-out areas
CN100572683C (en) The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN101235632B (en) Grouting leak-stopping technique
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN106592614B (en) The method for blocking of leakage point in foundation pit waterproof of man
CN103388338B (en) A kind of method of novel quick sealing and soil improvement
CN101603427A (en) Shield synchronization slip casting construction technology
CN1609347A (en) Follow-up mud jacking rotary digging drilling hole bored concrete pile technology
CN111455988A (en) Construction method of high-pressure jet grouting pile
CN111170711A (en) Set-time-controllable grouting slurry for wall back grouting, grouting process and grouting device
CN205369234U (en) Freeze high pressure jet grouting pile
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN108978648A (en) A kind of dyke Cement Mixing Pile Construction Technology
CN106192987B (en) It is a kind of to be crushed the construction method that geology is reinforced to stake periphery
CN107035389A (en) A kind of construction method for grouting reinforcement and earth's surface construction method
CN116024963A (en) Low-slurry-returning high-pressure rotary spraying composite grouting method and equipment
CN103114601B (en) The rapid hardening high pressure jet grouting of strong absorbent formation cuts infiltration method and device thereof
CN106837378B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613