CN204408877U - Saline-alkali soil greening construction every alkali, row's alkali system - Google Patents

Saline-alkali soil greening construction every alkali, row's alkali system Download PDF

Info

Publication number
CN204408877U
CN204408877U CN201420866799.8U CN201420866799U CN204408877U CN 204408877 U CN204408877 U CN 204408877U CN 201420866799 U CN201420866799 U CN 201420866799U CN 204408877 U CN204408877 U CN 204408877U
Authority
CN
China
Prior art keywords
alkali
saline
row
supervisor
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420866799.8U
Other languages
Chinese (zh)
Inventor
王奇勇
阮路峭
董生
赵淑芳
王剑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Landscape Engineering Co Ltd
Original Assignee
Hangzhou Landscape Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Landscape Engineering Co Ltd filed Critical Hangzhou Landscape Engineering Co Ltd
Priority to CN201420866799.8U priority Critical patent/CN204408877U/en
Application granted granted Critical
Publication of CN204408877U publication Critical patent/CN204408877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relate to a kind of saline-alkali soil greening construction every alkali, row's alkali system.Because the greening construction in a lot of saline land, coastal cities is every alkali, row's alkali measure is not in place, causes the salt-alkali contaminated very soon of the planting technique of replacing, causes the bad or large stretch of death of seedling growth.The utility model comprises drainage pipeline system, it is characterized in that described drainage pipeline system comprises many arms, described arm is connected to supervisor, described supervisor is connected to gully, gully external connection row supply mains is connected to city planting ductwork, described supervisor, arm and main sewer are all buried underground in channels, and described arm and supervisor are the blind pipe having through hole on its surface, fill medium coarse sand in described raceway groove.The utility model flow to house steward or draining alkaline discharging well by arm, be disposed to city planting ductwork again, avoid planting soil to pollute by saline-alkali water, the Heat resources Polypropylence Sheet of limit, greenery patches and saline-alkali soil or geomembrane Polypropylence Sheet are laid and can be completely cut off outer peripheral salt-alkali contaminated, thus guarantee nursery stock energy normal growth.

Description

Saline-alkali soil greening construction every alkali, row's alkali system
Technical field
The utility model relate to a kind of saline-alkali soil greening construction every alkali, row's alkali system.
Background technology
Because China coast urban economy increases fast, so construction of city afforestation is also particularly fierce, but the greening construction in a lot of saline land, coastal cities is due to every alkali, the measure of row's alkali is not in place, cause the salt-alkali contaminated very soon of the planting technique of replacing, cause the bad or large stretch of death of seedling growth, therefore the greening construction in saline land science, reasonable, rigorous construction technology measure and construction method must meet greening requirement.
Utility model content
The purpose of this utility model is for prior art Problems existing, provide a kind of saline-alkali soil greening construction every alkali, row's alkali system, guarantee that the planting soil changed is not salt-alkali contaminated, for the survival rate of nursery stock and normal growth escort.
For this reason, the utility model takes following technical scheme, saline-alkali soil greening construction every alkali, row's alkali system, comprise drainage pipeline system, it is characterized in that described drainage pipeline system comprises many arms, described arm is connected to supervisor, described supervisor is connected to gully, gully external connection row supply mains is connected to city planting ductwork, described supervisor, arm and main sewer are all buried underground in channels, described arm and supervisor are the blind pipe having through hole on its surface, fill medium coarse sand in described raceway groove.
The outside of described arm is surrounded by two layers of non-woven fabrics.Two layers of non-woven fabrics can stop that earth blocks pipeline
The outer end of described arm arranges plug.
Described arm at least tilts to supervisor with the centesimal gradient, and described supervisor also tilts to gully with at least centesimal gradient.
The top of described tubes rows water system arranges metalling.
Described metalling top arranges the plantation soil layer in order to replace saline-alkali soil, arranges barrier film between described plantation soil layer and the saline and alkaline soil layer of external boundary.
Described barrier film is Polypropylence Sheet or geomembrane cloth, and described barrier film is higher than the saline-alkali soil at least 200mm of external boundary.
Described arm diameter is 110mm, and the diameter of supervisor is 160mm, and described supervisor is pvc pipe or Double-wall PVC screwed pipe, and described supervisor and arm be spacing 30mm perforate on tube wall, and opening diameter is 8mm and is quincunx.The drain structure of this structure is beneficial to draining
The bottom of described plantation soil layer is 1000mm ~ 1500mm far from ground.
After the utility model delimit greening construction scope, excavation falls saline-alkali soil and re-lays drainage pipeline system, metalling and plantation soil layer.The saline-alkali water that saline-alkali soil below metalling is oozed out and planting soil down ooze out the moisture come and are reasonably diverted to drainage alkali raceway groove, then draining Pipe for draining alkali is infiltrated, house steward or draining alkaline discharging well is flow to by arm, be disposed to city planting ductwork again, avoid planting soil to pollute by saline-alkali water, the Heat resources Polypropylence Sheet of limit, greenery patches and saline-alkali soil or geomembrane Polypropylence Sheet are laid and can be completely cut off outer peripheral salt-alkali contaminated, thus guarantee nursery stock energy normal growth.
Accompanying drawing explanation
Fig. 1 is partial structurtes schematic plan view of the present utility model.
Fig. 2 is the A-A profile of Fig. 1.
Embodiment
Below in conjunction with specific embodiment, set forth the utility model further.
As shown in Figure 1, saline-alkali soil has been dug by planting soil desired depth in region, greenery patches, draining, row's alkali ditch and arm 1 are set, must by gradient slope aspect supervisor 2 erection of 1% when digging draining, row's alkali ditch and lay arm 1, supervisor 2 and supervisor row alkali ditch also set up by the gradient slope aspect gully 3 of 1%, be disposed to municipal Storm Sewer Network by main sewer 4 again, city planting ductwork also should be led to by the gradient of 1% in main sewer 4 and house steward drain ditch 5.Arm and supervisor are blind pipe, should install plug in blind pipe termination, and all blind pipes all need bag two layers of non-woven fabrics 6 outward, and draining is clapped in alkali raceway groove and filled the thick medium coarse sand of 150mm.
As shown in Figure 2, complete draining, after row's alkali ditch, pipe, spread medium coarse sand 7, then return the mat formation wide Polypropylence Sheet of 1500mm ~ 1800mm or geomembrane cloth 8 of side and saline land intersection in greenery patches and do every alkaline treatment, and the 200mm that should turn over suitable for reading is high, in case the inflow of outside buck.Again the thick metalling 9 (Φ 5 ~ Φ 10mm) of substrate paving 200mm, finally fill out planting soil 10 kinds and plant nursery stock.
Should be understood that these embodiments are only not used in restriction scope of the present utility model for illustration of the utility model.In addition should be understood that those skilled in the art can make various changes or modifications the utility model, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the utility model instruction.

Claims (9)

1. saline-alkali soil greening construction every alkali, row's alkali system, comprise drainage pipeline system, it is characterized in that described drainage pipeline system comprises many arms, described arm is connected to supervisor, described supervisor is connected to gully, and gully external connection row supply mains is connected to city planting ductwork, and described supervisor, arm and main sewer are all buried underground in channels, described arm and supervisor are the blind pipe having through hole on its surface, fill medium coarse sand in described raceway groove.
2. saline-alkali soil greening construction according to claim 1 every alkali, row's alkali system, it is characterized in that the outside of described arm is surrounded by two layers of non-woven fabrics.
3. saline-alkali soil greening construction according to claim 2 every alkali, row's alkali system, it is characterized in that the outer end of described arm arranges plug.
4. saline-alkali soil greening construction according to claim 3 every alkali, row's alkali system, it is characterized in that described arm at least tilts to supervisor with the centesimal gradient, described supervisor also tilts to gully with at least centesimal gradient.
5. saline-alkali soil greening construction according to claim 4 every alkali, row's alkali system, it is characterized in that the top of described tubes rows water system arranges metalling.
6. saline-alkali soil greening construction according to claim 5 every alkali, row's alkali system, it is characterized in that metalling top arranges the plantation soil layer in order to replace saline-alkali soil, between described plantation soil layer and the saline and alkaline soil layer of external boundary, barrier film be set.
7. saline-alkali soil greening construction according to claim 6 every alkali, row's alkali system, it is characterized in that described barrier film is Polypropylence Sheet or geomembrane cloth, described barrier film is higher than the saline-alkali soil at least 200mm of external boundary.
8. saline-alkali soil greening construction according to claim 7 every alkali, row's alkali system, it is characterized in that described arm diameter is 110mm, the diameter of supervisor is 160mm, described supervisor is pvc pipe or Double-wall PVC screwed pipe, described supervisor and arm be spacing 30mm perforate on tube wall, and opening diameter is 8mm and is quincunx.
9. saline-alkali soil greening construction according to claim 8 every alkali, row's alkali system, it is characterized in that the bottom of described plantation soil layer is 1000mm ~ 1500mm far from ground.
CN201420866799.8U 2014-12-31 2014-12-31 Saline-alkali soil greening construction every alkali, row's alkali system Active CN204408877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420866799.8U CN204408877U (en) 2014-12-31 2014-12-31 Saline-alkali soil greening construction every alkali, row's alkali system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420866799.8U CN204408877U (en) 2014-12-31 2014-12-31 Saline-alkali soil greening construction every alkali, row's alkali system

Publications (1)

Publication Number Publication Date
CN204408877U true CN204408877U (en) 2015-06-24

Family

ID=53459313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420866799.8U Active CN204408877U (en) 2014-12-31 2014-12-31 Saline-alkali soil greening construction every alkali, row's alkali system

Country Status (1)

Country Link
CN (1) CN204408877U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105830573A (en) * 2016-03-30 2016-08-10 浙江省亚热带作物研究所 Muddy coast saline-alkali soil ecotype comprehensive improving method
CN106245604A (en) * 2016-08-30 2016-12-21 山东胜伟园林科技有限公司 A kind of water-retention is hided salt irrigation canals and ditches device
CN110495277A (en) * 2019-09-20 2019-11-26 上海应用技术大学 A kind of construction method and its system of alkaline land soil Drainage of salt

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105830573A (en) * 2016-03-30 2016-08-10 浙江省亚热带作物研究所 Muddy coast saline-alkali soil ecotype comprehensive improving method
CN106245604A (en) * 2016-08-30 2016-12-21 山东胜伟园林科技有限公司 A kind of water-retention is hided salt irrigation canals and ditches device
CN106245604B (en) * 2016-08-30 2019-03-15 山东胜伟盐碱地科技有限公司 A kind of water storage is hided salt irrigation canals and ditches device
CN110495277A (en) * 2019-09-20 2019-11-26 上海应用技术大学 A kind of construction method and its system of alkaline land soil Drainage of salt

Similar Documents

Publication Publication Date Title
Sharp The impacts of urbanization on groundwater systems and recharge
CN102160480B (en) Saline-alkali soil irrigation and drainage ecological improvement method
CN205030218U (en) Salt prevention waterlogging system is arranged to saline and alkaline land blind pipe
CN105544343A (en) Source rainwater purification and storage system based on low impact development and installation method
CN201943173U (en) Sinking groove type permeable gutter inlet facility system
CN204697604U (en) Modularization planting pot
CN105696646A (en) Underground reservoir technique
CN204408877U (en) Saline-alkali soil greening construction every alkali, row's alkali system
CN104412751A (en) Improvement method for viscous seashore saline soil of saline-alkali wasteland
CN102612883B (en) Saline discharge and alkali reduction concealed conduit device for saline-alkali soil
CN202524735U (en) Composite concealed conduit for salt elimination and alkalinity reduction in saline-alkali land
CN104695451A (en) Slope greening system having internal impounding and draining structure
CN201957533U (en) Infiltrating irrigation device for diversifolious poplar root system
CN203866858U (en) Riverway revetment plant-growing retaining wall
CN103548440B (en) Hair row formula pipe drainage method under a kind of shallow embedding condition
CN202455773U (en) Concealed conduit device for discharging salt and reducing alkali on saline-alkali land
CN110226379A (en) The saline and alkaline region water resource of the automatic dripping irrigation of the structure containing terraced fields, which is regulated and stored, utilizes system
CN102726141A (en) Saline-alkali soil improvement facility and method
CN106638629B (en) A kind of device for loess slope slope greening
CN102870651B (en) Underground water storage infiltrating irrigation system
CN108781577B (en) Nano capillary-concealed pipe combined soil salt elimination method
CN104067898B (en) The husky Desert Regions of the dry wind water saving method of forestation of retaining and conserveing soil moisture
CN202679934U (en) Saline-alkali soil improvement facility
CN111058461A (en) Micro-lubrication circulating system for slope greening and construction method
CN109618884A (en) A kind of phreatic water seepage flow catchments hidden pipe structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant